BUSWAY TRACK
TOL ROAD BECAKAYU
MONORAIL TRACK
FAST TRAIN
Site Entry
INTERCONECTION
ELEVATED JAKARTA-CIKAMPEK
TOL BECAKAYU ARAH KE JAKARTA
HIGH SPEED RAILWAY INDO-CHINA
JEMBATAN GKL
TOL JAKARTA-CIKAMPEK
TOL BECAKAYU ARAH KE BEKASI
LIGHT RAIL TRANSIT
OPRIT PERMANEN GKL
Phase 3
Phase 4
Phase 1 ( Project on Preogress )
Phase 2 Phase 5
Phase 7 Phase 6
EMERALD FLOOR PLAN
EMERALD NORTH TOWER UNITS
EMERALD SOUTH TOWER UNITS
TECHNICAL SPECIFICATION : EMERALD NORTH 1 2
3 4 5 6 7 8 9
10 11 12 13
FLOOR
: Homogeneous tile 40X40 cm Ceramic tile for bath room WALL : Interiror : brickwall ,plastered, smooth painted Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M Finishing : gypsum ,smooth painted DOOR : Timber engineering solid door apply to main door Timber engineering door apply to internal door WINDOWS : Glass with powder coating aluminium frame BATHROOM AND SANITARY FITTING : TOTO brand or equal HOT WATER AC ELECTRICITY Provided by PLN
Generating Set Metering WATER SUPPLY GAS KITCHEN FEATURES Entertainment Fire fighting system
14
LIFT
15
SECURITY SYSTEM
16
PARKING
: The installation for Electric Water Heater in bathroom : The installation for Wall mounted AC in each room : One bedroom : 1,300 Two bedrooms : 2,200 Three bedrooms : 3,500 : Full Power backup : Prepaid Individual KWH meter for each unit : Treated water from PDAM : Treated from PGN : Inlet and Outlet are installed : : Cable TV installation , Telephone installation and internet outlet, audio video intercomm, public sound system : Water sprinklers, Fire alarm, smoke detector and hydrant system Evacuation sound system : 6 Units Passenger Lift 1 unit Service Lift ,serving at all floor ( from loading dock) : CCTV 24 hours installed at main public entrance all floors, and every access point : 1 lot per unit for 2BR and 3 BR (unreserved) 1 lot for 3 units for 1BR .
VA VA VA
TECHNICAL SPECIFICATION : EMERALD SOUTH 1 2
3 4 5 6 7 8 9
10 11 12 13
FLOOR
: Homogeneous tile 60x60 cm High Quality Ceramic tile for bath room WALL : Interiror : brickwall ,plastered, smooth painted Exterior : panel finish Watershield, Glass Curtain Wall, Allumunium Cladding CEILING : Height ( floor to concrete ceiling) : 2.40 to 2.80 M Finishing : gypsum ,smooth painted DOOR : Timber engineering solid door apply to main door Timber engineering door apply to internal door WINDOWS : Glass with powder coating aluminium frame BATHROOM AND SANITARY FITTING : TOTO brand or equal HOT WATER AC ELECTRICITY Provided by PLN
Generating Set Metering WATER SUPPLY GAS KITCHEN FEATURES Entertainment Fire fighting system
14
LIFT
15
SECURITY SYSTEM
16
PARKING
: The installation for Electric Water Heater in bathroom : The installation for Wall mounted AC in each room : One bedroom : 1,300 Two bedrooms : 2,200 Three bedrooms : 3,500 : Full Power backup : Prepaid Individual KWH meter for each unit : Treated water from PDAM : Treated from PGN : Inlet and Outlet are installed : : Cable TV installation , Telephone installation and internet outlet, audio video intercomm, public sound system : Water sprinklers, Fire alarm, smoke detector and hydrant system Evacuation sound system : 6 Units Passenger Lift 1 unit Service Lift ,serving at all floor ( from loading dock) : CCTV 24 hours installed at main public entrance all floors, and every access point : 1 lot per unit for 2BR and 3 BR (unreserved) 1 lot for 3 units for 1BR .
VA VA VA
BARCLAY FLOOR PLAN
Phase 3
Phase 4
Phase 1 ( Project on Preogress )
Phase 2 Phase 5
Phase 7 Phase 6
BARCLAY NORTH TOWER UNITS
2 Bedroom
SGA : 52 m2
1 Bedroom
1 Bedroom Executive
SGA : 24 m2
SGA : 30 m2
2 Bedroom
2 Bedroom Corner Suite
SGA : 50 m2
3 Bedroom
BARCLAY SOUTH TOWER UNITS
BUILDING SPECIFICATION
BUILDING SPECIFICATION
BUILDING SPECIFICATION
BARCLAY SOUTH TOWER FULLY FURNISHED
All Loose and Fixed Furniture Bedroom & Living Room • Sofa • Beds by King Koil (sheets included) • Wallpaper • Dining table & chairs • Cabinets • Air Conditioning • 42” LED TV Kitchenette • 2-pit stove • 2-door refrigerator • Cookerhood • Tableware • Kitchen Set
Bathroom • 60x60cm ceramic for floor • 120x60cm ceramic for wall • Towels • Sanitary by Toto • Accesories : • Top Table* • 12mm Tempered glass* • Wall mounted mirror* • Wall mounted shelf* • Towel hanger* • Tissue holder* • Soap basket*
*unavailable in non-fully furnished units
AVAILABLE FURNITURE EMERALD & BARCLAY NORTH TOWER
KITCHEN
KAMAR TIDUR UTAMA
KAMAR TIDUR ANAK
AVAILABLE FURNITURE EMERALD & BARCLAY
RUANG DUDUK
KITCHENETTE
• • • • • • •
• • • • • • • • • •
Sofa 2 Seater Gordyn Meja TV Panel Dinding TV TV 32” AC LG / Setara Rug Carpet
Cabinet Bawah Cabinet Atas Cookerhood Modena / Setara Kompor Gas Modena / Setara Kulkas LG 2 pintu / Setara Meja Makan Kursi Makan Top Table, Granit Star White Keramik Dinding 60 X 60 Cm Lampu Gantung
AVAILABLE FURNITURE EMERALD & BARCLAY
KAMAR TIDUR UTAMA • Kamar Tidur Utama • Tempat Tidur • Headboard • Meja Rias dan Cermin • Pouff Meja Rias • Lemari Pakaian • Wallpaper di Headboard / Bravo (Setara)
AVAILABLE FURNITURE EMERALD & BARCLAY
KAMAR TIDUR ANAK • Tempat tidur • Headboard • Meja belajar dan cermin • Kursi belajar • Lemari pakaian • Rug carpet
TOWER PROGRESS
BRIDGE PROGRESS
BRIDGE PROGRESS
BARCLAY TOWER PROMO
POTENSI CASH BACK 100% PADA TAHUN KE-15
*syarat dan ketentuan berlaku,
HARDCASH Booking Fee
Rp. 10.000.000
H.15
10% - BF
H.45
10%
H.75
10%
H.105
70%
INSTALLMENT24X Booking Fee Mulai H.15
Rp. 10.000.000
(10% - BF) / 24bln
INSTALLMENT36X Booking Fee Mulai H.15 Mulai bulan ke-7
INSTALLMENT48X Booking Fee
Mulai H.15 Mulai bulan ke-7
Rp. 10.000.000
30% / 6bln 70% / 42bln
Rp. 10.000.000 30% / 6bln
70% / 30bln
EMERALD
KPA Booking Fee DP KPA
Rp. 10.000.000 20% / 12bln
80%
BARCLAY KPA Booking Fee DP KPA
Rp. 10.000.000 20% / 24bln
80%
APARTEMEN
Rp.300 Juta-an
DIKAWASAN CBD PRESTIGIOUS
Phase 3
Phase 4
Phase 1 ( Project on Preogress )
Phase 2 Phase 5
Phase 7 Phase 6
Typical Floor Pocket Garden
Podium 3 Floors Parking Lobby & Commercial
LG
TOTAL UNITS : 1.137 Units
• Semi Basement / Lower Ground • Drop Off Area / Lobby • 3 Floors Parking Area
• • • • • •
Swimming Pool & Kids Pool Yoga Zone Gym Children Playground Daily Needs Commercial Area Parking Lot 1 : 7
Floor plan podium
Floor plan low zone
Floor plan pocket garden
Floor plan high zone
Jumlah unit 600 unit Harga Rp 8,4 jt/m2 Dp (tanpa booking fee) 1% Masa konstruksi 2018 - 2020 Tipe unit Studio (21,25 m2) Studio corner (23,5 m2) Studio deluxe (33,5 m2) • • •
Apartemen bersubsidi non ppn Bunga kpa btn fixed 5% selama 15 tahun DIGUNAKAN SENDIRI SEBAGAI RUMAH TINGGAL DAN TIDAK DIPINDAHTANGANKAN DALAM JANGKA WAKTU SESUAI UU RUMAH SUSUN KECUALI PINDAH ALAMAT/PEWARISAN
Non-MBR / Non-Subsidi
• • • •
Harga termasuk ppn Pengalihan hak setelah lunas 50% Biaya pengalihan 5% harga unit KPA sesuai btn, non subsidi
Kitchen sink *stop kontak dan jalur Floor drain
PERSYARATAN KPA BERSUBSIDI • Rumah / Unit Hunian Pertama • Penghasilan Kurang dari Rp. 7 Juta / Bulan • PADA SAAT PEMILIHAN UNIT MEMBAWA BERKAS LOLOS MBR
Floor plan low zone (lt 1-10)
26
25
27
28
23
21
29
30
32
33
35
36
12 20
15
19
16
18
17
37
38
39
41
11
10
09
08
07
42
43
06
05
45
03
01
02
JUMLAH UNIT 36
Floor plan high zone (lt 11-18)
18
17
19
20
16
15
21
23
25
26
27
28
12
29
30
32
33
11
10
09
08
07
35
36
06
05
37
03
01
02
JUMLAH UNIT 30
Studio sga 21,25 m2
Studio corner sga 23,5 m2
Studio deluxe sga 33,5 m2