Agenda Training AVR 1. Keterangan sistem 2. Instalasi unit 3. Pengoprasian unit 4. Metering unit 5. Trouble shooting 6. Maintenace
Limawira Wisesa Training Operator AVR
Serving is Our Culture
2
Bag: 1
agenda
Keterangan Sistem
Limawira Wisesa Training Operator AVR
Serving is Our Culture
3
Fungsi Fungsi Automatic Voltage Regulator (AVR) Untuk melindungi perangkat / peralatan listrik Anda dari semua fluktuasi tegangan listrik dan mengaturnya agar tetap pada tegangan nominal yang disarankan.
Limawira Wisesa Training Operator AVR
Serving is Our Culture
4
Fitur Servo Motor Controlled Technology Short circuit protection Manual Bypass Switch Electro-mechanic (breaker module) highlow voltage protection ( optional ) Output Isolation Transformer ( optional ) Digital Display (Optional)
Limawira Wisesa Training Operator AVR
Serving is Our Culture
5
Wiring Diagram AVR AVR With Breaker (Optional)
Limawira Wisesa Training Operator UPS SHDMP
Serving is Our Culture
6 3/23/2012 08/11/09
Wiring Diagram AVR AVR Without Breaker
Limawira Wisesa Training Operator UPS SHDMP
Serving is Our Culture
7 3/23/2012 08/11/09
Spesifikasi Input: • Tegangan nominal Input 1 ph: 220 VAC • Range teg. nom. input 1 ph: 160~245 VAC • Range teg. “wide” input 1 ph: 135~245 VAC
• Tegangan nominal Input 3 ph: 380-400 VAC • Range teg. nom. input 3 ph: 277~424 VAC • Range teg. “wide” input 3 ph: 233~424 VAC • Frekwensi input: 50/60 Hz
Output: • Regulasi teg. output • Efisiensi
: 1% : 96~97%
Limawira Wisesa Training Operator AVR
Serving is Our Culture
8
Spesifikasi Kelebihan : Range tegangan Input lebar Toleransi tegangan Output rendah Regulasi menggunakan servo motor, lebih awet Respon cepat untuk Fluktuasi Efisiensi tinggi pada tiap model Kemampuan untuk bekerja dengan beban non-linear Limawira Wisesa Training Operator AVR
Serving is Our Culture
9
1 Phase AVR
Limawira Wisesa Training Operator AVR
Serving is Our Culture
10
3 Phase AVR
Limawira Wisesa Training Operator AVR
Serving is Our Culture
11
agenda
Bag: 2
Instalasi Unit
Limawira Wisesa Training Operator AVR
Serving is Our Culture
12
Instalasi AVR
Limawira Wisesa Training Operator AVR
Serving is Our Culture
13
agenda
Bag: 3
Pengoprasian AVR
Limawira Wisesa Training Operator AVR
Serving is Our Culture
14
PROSEDUR START UP Pastikan Pemasangan installasi AVR sudah benar. Naikan “Breaker Input AVR“ yang ada di Panel I/O AVR (Gb. 4) dan MCB Variac Fuse yang ada AVR (Gb. 2).
Pastikan juga posisi COS yang ada AVR (Gb. 2) pada posisi 2 (regulator) . Led indicator merah di AVR nyala dan meter display AVR bergerak. Naikan “Breaker Output AVR“ yang ada di Panel I/O AVR (Gb. 4). Perlu di ingat : “Pada posisi sekarang BREAKER BYPASS AVR HARUS TETAP OFF / tersegel “ (Seperti pada Gb.4). Beban AVR siap di operasikan.
Gb.1 (AVR)
Gb.2 (Display AVR)
Gb.3 (Panel I/O AVR)
Gb.4 (Dalam Panel I/O AVR)
Limawira Wisesa Training Operator AVR
Serving is Our Culture
15
PROSEDUR SHUT DOWN Pastikan beban AVR sudah mati. Turunkan berturut- turut “ Breaker Output dan Input AVR “ (Gb. 4) yang ada di panel I/O AVR. AVR mati total.
Gb.1 (AVR)
Gb.2 (Display AVR)
Gb.3 (Panel I/O AVR)
Gb.4 (Dalam Panel I/O AVR)
Limawira Wisesa Training Operator AVR
Serving is Our Culture
16
PROSEDUR BYPASS Pastikan beban AVR sudah mati. Turunkan berturut- turut “ Breaker Output dan Input AVR “ (Gb.4) yang ada di panel I/O AVR .
Buka segel “ Breaker Bypass AVR “ (Gb. 4) yang ada di panel I/O AVR lalu “ On-kan “. AVR sekarang sudah posisi Bypass . Untuk Panel I/O AVR (Gb. 4) perlu di ingat : “JIKA BREAKER BYPASS ON MAKA BREAKER INPUT & OUTPUT AVR HARUS OFF“ begitu juga sebaliknya “JIKA BREAKER INPUT & OUTPUT AVR ON MAKA BREAKER BYPASS HARUS OFF“ Beban AVR siap di operasikan lagi pada posisi Bypass.
Gb.1 (AVR)
Gb.2 (Display AVR)
Gb.3 (Panel I/O AVR)
Gb.4 (Dalam Panel I/O AVR)
Limawira Wisesa Training Operator AVR
Serving is Our Culture
17
Bag: 4
agenda
Metering
Limawira Wisesa Training Operator AVR
Serving is Our Culture
18
Front AVR LED Indicator
METERING (Volt) FUSE LED & METERING SELECTOR SWITCH 0 → OFF Position 1 → Line Position 2 → Regulator Position
MCB / FUSE Input AVR
Limawira Wisesa Training Operator AVR
Serving is Our Culture
19
Front & Inside Panel AVR
LED Indicator
MCB/MCCB Input
MCB/MCCB Bypass
MCB/MCCB Output
Limawira Wisesa Training Operator UPS SHDMP
Serving is Our Culture
20 3/23/2012 08/11/09
Bag: 5
agenda
Trouble Shooting AVR
Limawira Wisesa Training Operator AVR
Serving is Our Culture
21
? AVR bersuara dengung ☼ Tegangan Hilang 1 Phase
☼ Cek Tegangan Input AVR (PLN) ☼ Nyalakan Genset ? Tegangan Input AVR (PLN) ada, tapi Output AVR / Beban mati ☼ Cek MCB/FUSE AVR ☼ Cek MCB Output pada Panel AVR ☼ Lakukan Prosedur BYPASS ☼ Hubungi Kami ! ? Tegangan Output AVR Unbalance, Tinggi/Kurang dari tegangan nominal ☼ Lakukan Prosedur BYPASS
☼ Hubungi Kami ! ? AVR normal, tetapi LED Indicator / METERING mati ☼ LED Indicator mati, FUSE LED & METERING putus ☼ Hubungi Kami !
Limawira Wisesa Training Operator AVR
Serving is Our Culture
22
Bag: 6
agenda
Maintenance
Limawira Wisesa Training Operator AVR
Serving is Our Culture
23
Maintenance-1 • AVR dapat diprediksikan bisa tahan lama dan bebas masalah dengan hanya maintenance yang simple • Masalah kebersihan dan temperature ruangan akan berpengaruh terhadap ketahanan unit.
Limawira Wisesa Training Operator AVR
Serving is Our Culture
24
Maintenance-2 • Jaga suhu operasional ruangan AVR agar tetap stabil, yang ideal adalah 15°C – 25°C • Usahakan ruangan selalu tertutup ini untuk menjaga kesetabilan suhu dan lingkungan agar tetap sejuk dan bersih
Limawira Wisesa Training Operator AVR
Serving is Our Culture
25
Maintenance-3 • Berikan jarak bebas minimal 30cm antara belakang AVR dengan dinding, ini untuk memelihara kebebasan keluaran aliran udara • Begitupun dinding sebelah kiri dan dinding sebelah kanan, ini adalah aliran udara masuk untuk pendinginan komponen di dalam AVR Limawira Wisesa Training Operator AVR
Serving is Our Culture
26
Jika menemui kendala silahkan menghubungi kami dengan menyiapkan data data sebagai berikut :
1. MODEL AVR dan Serial No 2. Penyebab kerusakan ? 3. Sampaikan Kendala yang anda hadapi kepada kami.
Limawira Wisesa Training Operator UPS SHDMP
Serving is Our Culture
27 3/23/2012 08/11/09
Terima Kasih atas Perhatiannya
PT. LIMAWIRA WISESA Serving is our culture
Graha Mas pemuda AA15 JL. Pemuda – Jakarta 13220 Tel. 021 4788 2000 (Hunting) Fax. 021 4788 1771 e-mail :
[email protected] http: www.limawira.co.id HP Online: 0811 190 750
Limawira Wisesa Training Operator AVR
Serving is Our Culture
28