ANALISIS INVESTASI TAMBANG 17 SEPTEMBER 2014
Hendra Harisman
REVIEW • INTI
DARI PERTAMBANGAN DALAM HAL MENG-EXTRACT/MENGAMBIL MINERAL DALAM JUMLAH BESAR DARI BUMI ADALAH BAGAIMANA PENGGALIAN DILAKUKAN DARI PERMUKAAN SAMPAI KEPADA MINERAL YANG DITUJU.
• JIKA
PENGGALIANNYA TERBUKA, ATAU DI OPERASIKAN DARI/DI PERMUKAAN, NAMANYA : SURFACE MINE
• JIKA
PENGGALIANNYA MENGHARUSKAN ADANYA AKSES BAGI MANUSIA
UNTUK MASUK KE BAWAH PERMUKAAN TANAH, NAMANYA: MINE
• PROSEDUR,
UNDERGROUND
RANCANGAN, DAN PERALATAN YANG DIGUNAKAN TERGANTUNG
PADA KONDISI GEOLOGI, LINGKUNGAN, EKONOMI DAERAH TAMBANG
TAHAP-TAHAP PENAMBANGAN DALAM 5:
PERTAMBANGAN MODERN, TAHAPAN PENAMBANGAN DIBAGI MENJADI
• PROSPECTING • EKSPLORASI
• DEVELOPMENT • EKSPLOITASI • REKLAMASI
Sometimes Combined. Geologist & Mining Engineers share responsibilities
Closely related Tuntutan masyarakat demi kepentingan lingkungan Regulasi Hukum
PROSPECTING • PENCARIAN ORE ATAU MINERAL-MINERAL
BERHARGA LAIN
(BATU BARA)
• METODE: • LANGSUNG: GEOLOGI FISIK • TIDAK LANGSUNG: GEOFISIKA, GEOKIMIA, FOTO UDARA, SATELIT • MENCARI ANOMALY, UNTUK
DIANALISIS DAN DIEVALUASI
• STUDY LITERATURE, PETA GEOLOGI, TAMBANG LAMA • JANGKA WAKTU : 1 – 3 TAHUN • BIAYA : $0.2 – $10 M
EKSPLORASI • MENENTUKAN LUAS SEBARAN DAN NILAI ORE • METODE: • SAMPEL (DRILLING OR EXCAVATION) • MEMPERKIRAKAN TONNAGE DAN GRADE DARI ORE • EVALUASI DEPOSIT: PRESENT VALUE = INCOME - COST • FEASIBILITY STUDY: • DEVELOP?, OR • ABANDON
• JANGKA WAKTU : 2 – 5 TAHUN • BIAYA : $1 – $15 M
DEVELOPMENT • MULAI MEMBUKA AKSES MENUJU ORE DEPOSIT AGAR BISA DIPRODUKSI • MENGURUS PERIZINAN • MEMPERKIRAKAN PENGARUH TERHADAP LINGKUNGAN
• MENENTUKAN PERALATAN YANG AKAN DIGUNAKAN • MEMBANGUN JALAN UNTUK AKSES/SISTEM TRANSPORTASI • MEMBANGUN FASILITAS-FASILITAS YANG DIBUTUHKAN
• BUAT AKSES MENUJU ORE DEPOSIT
• JANGKA WAKTU : 2 – 5 TAHUN • BIAYA : $10 – $500M
EKSPLOITASI • PRODUKSI DALAM SKALA BESAR • MENERAPKAN MINING METHOD • SURFACE MINE: OPEN PIT,OPEN CAST,ETC. • UNDERGROUND: ROOM AND PILLAR, BLOCK CAVING, ETC • MENGAWASI BIAYA OPERASI DAN JANGKA WAKTU BALIK MODAL (3-10 TAHUN)
• JANGKA WAKTU : 10 – 30 TAHUN • BIAYA : $5 – $75 M
REKLAMASI • RESTORATION OF SITE • PEMINDAHAN PABRIK/MESIN-MESIN INDUSTRI • REKLAMASI WASTE DAN TAILING DAMS.
• JANGKA WAKTU : 1 – 10 TAHUN • BIAYA : $1 – $20 M
THE PLANNING PHASE FASE PERENCANAAN SECARA UMUM TERDIRI DARI TIGA TAHAP: • CONCEPTUAL STUDY (PRELIMINARY VALUATION) • PRE-FEASIBILITY STUDY (PRELIMINARY)
• FEASIBILITY STUDY
CONCEPTUAL STUDY • CONCEPTUAL STUDY • TRANSFORMASI IDE PROYEK MENJADI PROPOSAL INVESTASI • MENGGUNAKAN METODE PERBANDINGAN LINGKUP DEFINISI, DAN PERKIRAAN BIAYA UNTUK MENGIDENTIFIKASI POTENSI INVESTASI
• CAPITAL & OPERATING COST BIASANYA MERUPAKAN PERKIRAAN DALAM BENTUK RATIO BERDASARKAN HISTORICAL DATA.
• CONCEPTUAL ENGINEER
STUDY INI BIASANYA DIKERJAKAN OLEH
1
ATAU
2
ORANG
PRE-FEASIBILITY STUDY • TAHAP
PERTENGAHAN ANTARA CONCEPTUAL STUDY YANG MURAH DENGAN FEASIBILITY STUDY YG RELATIF MAHAL
• BIASANYA
BELUM COCOK UNTUK DIJADIKAN ACUAN UNTUK PERTIMBANGAN
INVESTASI
• BIASANYA DIKERJAKAN OLEH 1 TEAM YANG TERDIRI DARI 2 OR 3 ORANG ENGINEER
• MEMPUNYAI AKSES DENGAN KONSULTAN-KONSULTAN
DARI BERBAGAI BIDANG
PRE-FEASIBILITY STUDY • ISI LAPORANNYA: • AIM • TECHNICAL CONCEPT • FINDINGS • ORE TONNAGE AND GRADE • MINING AND PRODUCTION SCHEDULE • CAPITAL COST ESTIMATE • OPERATING COST ESTIMATE • REVENUE
ESTIMATE
• TAXES AND FINANCING • CASH FLOW TABLES
FEASIBILITY STUDY • MEMBERIKAN DASAR-DASAR PERTIMBANGAN TEKNIKAL, ENVIRONMENTAL, DAN COMMERCIAL UNTUK KEPUTUSAN INVESTASI
• MENGGUNAKAN
PROSES ITERATIVE UNTUK MENGOPTIMASI ELEMENT-ELEMENT PROYEK YANG PENTING
• MENGIDETIFIKASI: • KAPASITAS PRODUKSI • TEKNOLOGY YANG AKAN DIGUNAKAN
• CAPITAL & PRODUCTION COST • SALES REVENUES • RETURN OF INVESTMENT
FEASIBILITY STUDY • KARENA
LAPORAN FEASIBILITY STUDY SANGAT PENTING, SEMUA INFORMASI YANG MENDUKUNG PERSETUJUAN INVESTASI HARUS DI BERIKAN SECARA MENDETIL
• ALASAN PEMILIHAN METODE ATAU PROSES TERTENTU
• PEMILIHAN EQUIPMENT, DLL
• IMPORTANT REQUIREMENTS: • MUST BE EASY TO READ, • REGARDING INFORMATION MUST BE EASILY ACCESSIBLE
• PARTS OF THE REPORTS NEED TO BE READ AND UNDERSTOOD BY NON-TECHNICAL PEOPLE
FEASIBILITY STUDY • FUNGSI PENTING FEASIBILITY STUDY: • MEMBERIKAN (MINERAL)
INFORMASI
DAN FAKTA-FAKTA
YANG
MENDETIL MENGENAI
PROYEK
• MEMBERIKAN SKEMA EKSPLOITASI, LENGKAP DENGAN DESAIN, DAFTAR PERALATAN, YANG MENDETIL, YANG DAPAT MEMBERIKAN INFORMASI YANG CUKUP UNTUK MEMPREDIKSI BIAYA DAN HASIL SECARA AKURAT
• MENERANGKAN
KEPADA PEMILIK PROYEK ATAU INVESTOR, POTENSI KEUNTUNGAN DARI
PROYEK TSB JIKA DILAKSANAKAN SEPERTI YANG DIJELASKAN DALAM LAPORAN
• MEMBERIKAN
INFORMASI YANG DAPAT DIMENGERTI OLEH PEMILIK PROYEK, ATAU DAPAT
DIJADIKAN PRESENTASI KEPADA PROSPECTIVE PARTNERS OR SOURCES OF FINANCE.
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • GENERAL: • TOPOGRAPHY, CLIMATE, POPULATION, ACCESS, SERVICES • SUITABLE
SITES FOR PLANT, DUMPS, TOWNS, ETC
• GEOLOGICAL (FIELD): • GEOLOGICAL STUDY
OF STRUCTURE
& MINERALIZATION
• SAMPLING BY DRILLING OR TUNNELING (OR BOTH) • BULK SAMPLING FOR CHECKING AND FOR METALLURGICAL TESTING • ASSAYING STABILITY
AND RECORDING OF DATA INCLUDING: ROCK PROPERTIES, STRENGTH AND
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: (LANJUTAN) • GEOLOGICAL (FIELD): • CLOSER DRILLING OF AREAS SCHEDULED
FOR THE START OF MINING
• GEOPHYSISCS AND INDICATION OF THE LIKELY ULTIMATE • SOURCES OF WATER
LIMITS OF MINERALIZATION
AND OF CONSTRUCTION MATERIALS
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • GEOLOGICAL AND MINING (OFFICE): • CHECKING, CORRECTING
AND CODING OF DATA FOR COMPUTER INPUT
• MANUAL CALCULATIONS OF ORE TONNAGES
AND GRADES
• ASSAY COMPOSITING AND STATISTICAL ANALYSIS • COMPUTATION OF MINERAL INVENTORY (GEOLOGICAL RESERVES) RESERVES, SEGREGATED AS NEEDED BY OREBODY, BY ORE TYPE, BY BENCH, AND BY GRADE CATEGORIES • COMPUTATION OF ASSOCIATED WASTE • DERIVATION RESERVES
AND MINABLE ELEVATION OR
ROCK
OF THE ECONOMIC FACTORS USED IN THE DETERMINATION OF MINABLE
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • MINING: • OPEN PIT LAYOUTS
AND PLANS
• DETERMINATION OF PREPRODUCTION MINING OR DEVELOPMENT • ESTIMATION OF WASTE
REQUIREMENTS
ROCK DILUTION AND ORE LOSSES
• PRODUCTION SCHEDULES, IN DETAILS FOR THE FIRST FEW YEARS, AVERAGED THEREAFTER • WASTE
MINING AND WASTE DISPOSAL
• LABOR AND EQUIPMENT REQUIREMENTS AND COST, AND AN APPROPRIATE REPLACEMENT SCHEDULE FOR THE MAJOR EQUIPMENT
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • ANCILLARY SERVICES AND REQUIREMENTS: • ACCESS, TRANSPORT, POWER, WATER, FUEL
AND COMMUNICATION
• WORKSHOPS, OFFICES, CHANGEHOUSE, LABORATORIES, DLL • LABOUR STRUCTURE
AND STRENGTH
• HOUSING AND TRANSPORT OF EMPLOYEES • OTHER SOCIAL REQUIREMENTS
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • CAPITAL COST ESTIMATION: • DEVELOP
THE MINE AND PLANT CONCEPTS AND MAKE ALL NECESSARY DRAWINGS
• CALCULATES
OR ESTIMATE THE EQUIPMENT LIST AND ALL IMPORTANT QUANTITIES
EXCAVATION, CONCRETE, BUILDING AREA, PIPEWORKS, DLL)
• DETERMINE • OBTAIN
(OF
A PROVISIONAL CONSTRUCTION SCHEDULE
QUOTES OF THE DIRECT COST OF ITEMS OF MACHINERY, ESTABLISH THE COSTS OF
MATERIALS AND SERVICES, AND INSTALLATION
• DETERMINE
THE VARIOUS AND VERY SUBSTANTIAL INDIRECT COSTS, WHICH INCLUDE
FREIGHT AND TAXES ON EQUIPMENT (MAY INCLUDE IN DIRECT), CONTRACTORS’CAMPS AND EQUIPMENT RETAL, DLL
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • OPERATING COST ESTIMATION: • DEFINE THE LABOR STRENGTH, BASIC PAY RATES • ESTABLISH THE QUANTITIES OF IMPORTANT MEASURABLE SUPPLIES POWER, FUEL, GRINDING STEEL, REAGENTS, DLL + THEIR UNIT COSTS • DETERMINE • ESTIMATE
TO BE CONSUMED:
THE HOURLY OPERATING AND MAINTENANCE COSTS FOR MOBILE EQUIPMENT THE
FIXED
ADMINISTRATION
COST
AND
OTHER
IRRECOVERABLE ELEMENTS OF TOWNSITE AND SOCIAL COST
OVERHEADS
PLUS
THE
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • MARKETING • RIGHT, OWNERSHIP • FINANCIAL
AND TAX MATTERS
• ENVIRONMENTAL • REVENUE
AND LEGAL MATTERS
EFFECTS
AND PROFIT ANALYSIS
FEASIBILITY STUDY ISI LAPORAN FEASIBILITY STUDY: • REVENUE • THE
AND PROFIT ANALYSIS:
MINE AND MILL PRODUCTION SCHEDULES THE THE YEAR-BY-YEAR OUTPUT OF
PRODUCTS
• NET
REVENUE AT THE MINE AFTER DEDUCTION OF TRANSPORT, TREATMENT, AND OTHER
REALIZATION CHARGES
• CALCULATION
OF ANNUAL COSTS FROM THE PRODUCTION SCHEDULES AND FROM UNIT
OPERATING COST DERIVED PREVIOUSLY
• CALCULATION
OF COMPLETE CASH FLOW SCHEDULES WITH DEPRECIATION, TAXES, ETC,
FOR SOME APPROPRIATE NUMBER OF YEARS
• DERIVED FIGURES (RATE
OF RETURN, PAYBACK, PROFIT SPILT ETC
THE END