KONDISI KELISTRIKAN TAHUN 2013 KONDISI KELISTRIKAN DI SULAWESI TENGGARA TAHUN 2008 – 2013 : JUMLAH KEPALA KELUARGA BERLISTRIK NAIK DARI 183.421 KK TAHUN 2008 MENJADI 379.629 KK (116,7%). RASIO ELEKTRIFIKASI NAIK DARI 37,16% PADA TAHUN 2008 MENJADI 69,53% TAHUN 2013 TAHUN
2008
2009
2010
JUMLAH KK
493.598
529.977
547.924 547,890
JUMLAH KK BERLISTRIK
183.421
198.280
255.813
307.351
324.630
379.629
37,16
41,00
46.69
56.13
61.95
69.53
RASIO ELEKTRIFIKASI
2011
2012
2013
527.017
546.024
91
KUNJUNGAN KERJA WAKIL PRESIDEN R.I. KE SULAWESI TENGGARA DALAM RANGKA PENGEMBANGAN KELISTRIKAN DAN PEMANFATAN ASPAL BUTON
SIMPOSIUM NASIONAL PERTAMBANGAN DI SULAWESI TENGGARA PEMBICARA UTAMA PROF. DR. AMIEN RAIS
NIKEL (ORE) DEPOSIT = 97,4 MILYAR TON (ASUMSI HARGA $,25/TON); NILAI RP. 23,1 RIBU TRILYUN.
ASPAL CURAH, DEPOSIT = 3,8 MILYAR TON (ASUMSI HARGA RP. 480.000/TON), NILAI RP. 1.841 TRILYUN.
EMAS, ESTIMASI DEPOSIT = 1,125 JUTA TON
(ASUMSI HARGA RP. 270.000/ GRAM). NILAI RP. 303,75 RIBU TRILYUN. TOTAL NILAI = RP. 328,65 RIBU TRILIUN
TAHUN
2008 2009 2010 2011 2012 2013
ROYALTI (RP)
6,661,181,653 3,732,276,372 7,995,390,700 13,987,024,609 43.440.730.378 53.883.523.510
LANDRENT (RP)
462,357,295 234,613,114 707,407,000 798,618,957 1.845.444.163 2.031.864.226
DANA BAGI HASIL (RP)
JUMLAH
Dokumentasi Dinas ESDM Provinsi Sulawesi Tenggara, 2010 103,000,000,000 110.123.538.948 35,692,820,000 39.659.709.486 38,000,000,000 46.702.797.700 85,108,562,734 99.894.206.297 62.788.631.852 108.074.806.393 39.320.000.000 95.235.387.736
DANA BAGI HASIL, LANDRENT DAN SUMBANGAN PIHAK KETIGA SEKTOR PERTAMBANGAN, PADA TAHUN 2008 – 2013, BERFLUKTUASI SESUAI KONDISI USAHA PERTAMBANGAN. 97
MEMANTAPKAN PEMBANGUNAN KEBUDAYAAN DAERAH
98
PELATIHAN PENGEMBANGAN KUALITAS DAN DESAIN TENUN DAERAH SULAWESI TENGGARA KERJASAMA CITA TENUN INDONESIA FASILITASI PENGEMBANGAN KERAJINAN DAERAH SULTRA KUNJUNGAN KETUA DEWAN KERAJINAN NASIONAL DAERAH PROVINSI KE KABPUATEN/KOTA PARTISIPASI KERAJINAN DAERAH DALAM MENGIKUTI AJANG PAMERAN TINGKAT NASIONAL FASHION SHOW TENUNAN KHAS DAERAH SULTRA
ACARA RITUAL MOSEHE DI KABUPATEN BOMBANA
KONTES KECANTIKAN DAN KECERDASAN DI SULAWESI TENGGARA
MENDORONG DAN MENGEMBANGKAN SENI BUDAYA DAERAH
DAYA TARIK BUDAYA SULTRA 1. 2. 3. 4.
PAWAI BUDAYA PESTA ADAT WOBULA FESTIVAL KERATON NUSANTARA PENOBATAN RAJA MORONENE
DAYA TARIK PARIWISATA SULAWESI TENGGARA 1. SAIL WAKATOBI BELITONG 2. PARADE KAPAL HIAS 3. PAMERAN PRODUK UNGGULAN, PELUANG INVESTASI, PARIWISATA & EKONOMI KREATIF
REALISASI KUNJUNGAN WISATAWAN KUNJUNGAN WISATAWAN MANCA NEGARA DAN WISATAWAN NUSANTARA DI SULAWESI TENGGARA TAHUN
WISMAN
PERJALANAN WISNUS
%
%
2008
3.661
-
1.288.189
-
2009
2.169
- 40,75
1.495.491
16,09
2010
9.949
358,69
1.547.144
3,45
2011
4.966
- 50,09
2.119.721
37,01
2012
14.725
196,52
2.061.536
- 2,74
KUNJUNGAN WISATAWAN MANCA NEGARA MENINGKAT HAMPIR 200% YAITU DARI 4.966 ORANG PADA TAHUN 2008 MENJADI 14.725 ORANG PADA TAHUN 2013.
PERKEMBANGAN HOTEL DI SULAWESI TENGGARA TAHUN 2010 - 2013 KAB/ KOTA Kendari Bau-Bau Buton Muna Konawe Konsel Konut Kolaka Kolut Wakatobi Buton Utara Bombana TOTAL
2010
2011
2012
2013
90 39 10 18 12 6 4 34 15 16 7 14 265
114 52 15 21 12 11 8 35 20 32 8 19 347
121 52 12 21 12 11 8 35 20 40 10 19 361
131 52 12 21 12 11 7 35 20 42 10 20 386
PERKEMBANGAN HOTEL DI SULAWESI TENGGARA MENINGKAT PESAT DALAM 4 TAHUN TERAKHIR YAITU DARI 265 UNIT PADA TAHUN 2010 MENJADI 386 UNIT PADA TAHUN 2013 ATAU 68,65%
106
Milyar
1,800 1,600 1,400 1,200 1,000 800
TAHUN 2008 TOTAL ASET BPD 1,144 TRILIUN BERKEMBANG MENJADI RP. 3,162 TRILIUN PADA TAHUN 2013
600 400 200 0 2005 JUMLAH ASET
2006
2007
2008
LABA TAHUN BERJALAN
2009
2010
JUMLAH PENDAPATAN
LABA TAHUN 2008 SEBESAR RP. 61, 841 MILYAR NAIK MENJADI 159,222 MILYAR PADA TAHUN 2013 PENDAPATAN TAHUN 2008 RP. 186,464 MILYAR NAIK MENJADI RP 549,005 PADA TAHUN 2013.
(Disajikan dalam milyar rupiah) 2008 2009 2010 2011 2012 2013 JUMLAH ASET 1.144,964 1.558,991 1.669,787 2.348,090 3.066,769 3.162,791 LABA TAHUN BERJALAN 61,841 55,467 81,500 111,284 110,727 159,222 107 JUMLAH PENDAPATAN 186,464 194,574 227,568 330,959 362,471 549,005
PERESMIAN KANTOR KAS BNI LEPO-LEPO OLEH GUBERNUR SULAWESI TENGGARA DAN KOMISARIS PT. BANK NEGARA INDONESIA
KESEJAHTERAAN PEGAWAI
PEMBANGUNAN PERUMAHAN PNS JUMLAH PNS YANG TELAH TERLAYANI DANA PENUNJANG PERUMAHAN (BAPERTARUM) 3.400 ORANG TARGET PEMBANGUNAN PERUMAHAN PNS PROVINSI SULAWESI TENGGARA SEBANYAK 1.000 UNIT. SAAT INI TELAH TERBANGUN 101 UNIT, 953 PNS TELAH MENDAFTAR DAN 632 PNS TELAH MEMBAYAR
LUAS KAPLING 300 M2 DAN LUAS BANGUNAN 36 M2, HARGA PER UNIT Rp. 60 JUTA LAHAN PERUMAHAN TELAH TERSERTIFIKAT
110
PEMBANGUNAN INFRASTRUKTUR WILAYAH
PERHUBUNGAN JALAN, JEMBATAN DAN IRIGASI KESEHATAN (RUMAH SAKIT PROVINSI) KAWASAN EX- MTQ FASILITAS EKONOMI DAN PEMBINAAN GENERASI MUDA 111
PEMASANGAN GARBARATA
RUANG KEBERANGKATAN LANTAI II
PENINGKATAN FASILITAS BANDARA HALUOLEO TERUS DITINGKATKAN PENAMBAHAN GARBARATA SEBANYAK 2 UNIT SEHINGGA MENJADI 4 UNIT PERLUASAN APROM DAN PERLUASAN APPRON DAN TAXIWAY PENAMBAHAN CONVEYOR BELT PENINGKATAN KUALITAS LANDASAN PACU
112
TAHUN 2009, PERPANJANGAN DAN PELEBARAN LANDASAN PACU DARI 30 M MENJADI 45 M, ALOKASI ANGGARAN SEBESAR RP.24.400.000.000, TAHUN 2010, DILAKUKAN PERPANJANGAN LANDASAN PACU DARI 2.250 M MENJADI 2.500 M (SELESAI 60 %) ALOKASI ANGGARAN SEBESAR RP.8.000.000.000,- AKAN DITUNTASKAN PADA TAHUN 2012, TAHUN 2013 DILAKUKAN PERPANJANGAN LANDASAN MENJADI 22.500 M2 (SELESAI 100 %) ALOKASI ANGGARAN SEBESAR RP. 23.153.810.000,-
113
KONDISI JALAN RAYA PROVINSI SULAWESI TENGGARA KONDISI JALAN 2012
KONDISI JALAN TAHUN 2013
STATUS JALAN
PANJANG RUAS JALAN (KM)
PROVINSI
906,09
448,29
457,80
588,61
64,96
317,48
NASIONAL
1.397,50
272,61
1.124,37
570,29
40,80
1.088,97
JUMLAH
2.303,09
721,90
1.582,17
1.158,90
50,31
1.144.19
BAIK
RUSAK SEDANG BERAT
BAIK
%
RUSAK SEDANGBERAT
TOTAL PANJANG JALAN PROVINSI DALAM KONDISI BAIK 64,96% TOTAL PANJANG JALAN NASIONAL DALAM KONDISI BAIK 22,07% SECARA KOMULATIF TOTAL JALAN DALAM KONDISI BAIK 50,31% ATAU 1.158,90 KM
KOTA KENDARI
KETERANGAN : JALAN NASIONAL JALAN PROVINSI
PANJANG JEMBATAN YANG DIBANGUN TAHUN 2012-2013 PANJANG JEMBATAN YANG DI BANGUN TAHUN 2012 1. JEMBATAN KALI KATINDA DAN KALI LANOBAKE PANJANG JEMBATAN 5 M 2. JEMBATAN S.MATANDAHI PANJANG JEMBATAN 6M PANJANG JEMBATAN YANG DI BANGUN TAHUN 2013 1. PEMBANGUNAN/PENINGKATAN JEMBATAN LEPOLEPO BOX CULVERT. 2. PEMBANGUNAN BOX CULVERT POLI-POLI 3. PEMBANGUNAN JEMBATAN S.KONAWEHA HULU (PIP) 4. PEMBANGUNAN JEMBATAN POROS DESA SOMBANO-HOROU KEC.KALEDUPA (BOX CULVERT) TOTAL PANJANG JEMBATAN YANG DIBANGUN DALAM TAHUN 2012 DAN 2013, ADALAH 304 METER.
BOX CULVERT
JEMBATAN SUNGAI KONAWEHA HULU