LAMPIRAN A GAMBAR-GAMBAR PELAKSANAAN PROYEK
LAMPIRAN B STRUKTUR ORGANISASI PROYEK
LAMPIRAN C TIME SCHEDULE PELAKSANAAN PROYEK
LAMPIRAN F METODE PEKERJAAN KOLOM, BALOK, DAN PELAT LANTAI
FLOW CHART PEMERIKSAAN BESI BALOK
MULAI CHECK BESI BALOK
JUMLAH BESI OK
TIDAK SESUAI
GANTI SESUAI SHOP DRAWING
OK
OK
DI PERBAIKI
TAMBAH BESI
CHECK DIAMETER BESI
CHECK JARAK JARAK ANTAR BESI
TIDAK SESUAI
TIDAK SESUAI
CHECK POSISI TULANGAN
OK
SELESAI
TIDAK SESUAI
DI PERBAIKI
FLOW CHART PENGECHECKAN BESI KOLOM
MULAI
CHECK BESI KOLOM
CHECK JUMLAH
SESUAI
TIDAK SESUAI
DITAMBAH
TIDAK SESUAI CHECK DIAMETER
DIGANTI
SESUAI
CHECK TERHADAP POSISI
SESUAI
SELESAI
TIDAK SESUAI
DI PERBAIKI
FLOW CHART CHECK PEMBESIAN BESI PLAT
MULAI
CHECK BESI PLAT
CHECK JARAK
TIDAK SESUAI
DI PERBAIKI
SESUAI TIDAK SESUAI CHECK DIAMETER
DIGANTI
SESUAI
CHECK TERHADAP OVERLAP
TIDAK SESUAI
DI PERBAIKI
SELESAI
FLOW CHART PENGENDALIAN MUTU BESI
MULAI BESI SAMPAI DI SITE
CHECK MILL SHEET
TIDAK MASUK
MASUK
GUDANG
TIDAK MASUK
TEST BESI MASUK
TOLAK DIKEMBALIKAN KE PABRIK
DIPRODUKSI SELESAI
TOLAK
FLOW CHART PEMELIHARAAN BETON
MULAI
MULAI
BETON KOLOM HASIL COR
BETON PLAT HASIL COR
BUNGKUS KOLOM DENGAN KARUNG
BUAT TANGGUL KELILING TEPI PLAT
SIRAM KOLOM DENGAN AIR MIN 3X SEHARI
RENDAM DENGAN AIR PBI. 14 HARI
SELESAI
SELESAI
PEKERJAAN KOLOM
PEKERJAAN BALOK DAN PLAT LANTAI
LANGKAH 1 - MELETAKKAN BASE JACK
LANGKAH 3 - PASANG JOIN PIN - PASANG LADDER FRAME - PERKUAT DENGAN CROSS BRACE
LANGKAH 2 - PASANG MAIN FRAME - PERKUAT DENGAN CROSS BRACE
LANGKAH 4 - PASANG CROSS HEAD JACK - PASANG PERI GIRDER GT. 24
LANGKAH 7 - PASANG SIDE FORM
LANGKAH 6 - PASANG BOTTOM FORM
RESUME PEKERJAAN STRUKTUR
KEGIATAN PLAT LANTAI - BEKISTING PEMBESIAN - COR KOLOM PEMBESIAN - BEKISTING - COR
1
2
HARI KE3 4 5
6
7
LAMPIRAN D ” INSPECTION PROSEDURE AND MATERIAL TEST”
INSPECTION PROSEDURE AND MATERIAL TEST No. 1.
2.
3.
Material Wood For Form Work
Concrete Iron
Ready mix Concrete
Criteria / Standard
Cement
There is a factory sheet
Quality BJTP 24 and BJTD 40
Length 12 m
Rustless
Make
sample for strength test
Slump 12 ± 2 cm Not yet ossified
5.
Multiplex
Acceptance Tolerance
Material according to example : Type Dampness Straight Not mushroom Not break Not rotten Measure and length is according to : Length 4 m ( Approx ) Size 4/6,5/7,5/10,5/12
Duration
4.
Inspection Method
Visual
Measure according to request
Visual Measure Read from factory sheet Visual
Measured Look at slump test result Look at delivery letter
± 1 cm If rusting do not lessen the diameter
±
2 cm
Visual Visual Visual Measured
width =122 cm
Its corner is sharp
Not deformity (abraded / moldy)
Flatten
Gauge Gauge
Gauge
Gauge Slump test
± 5 cm ± 2-3 mm
thick =12 mm, 18 mm length = 242 cm
Every Arrival
Every Arrival (minimal 30 ton)
Every 5 m3 Every 4 mixer truck Every arrival
Used appliance
of delivery & unload ± 2 hr.
Amount according to request Sack not ripped or dry Not yet ossified Portland Cement type according to request
Frequency
Measured Visual Visual Visual
± 1 cm ± 1 cm ± 1 cm
Every
arrival
Every
arrival
Gauge
INSPECTION PROSEDURE AND MATERIAL TEST No 6.
Material Sand
Criteria / Standard Have
to clean
When Have
Inspection Method Test
of mud degree
Acceptance Tolerance Mud
degree maximum 5%
Frequency Every
30 m3
Every
installed
crumpled up do not Lump
to sharply, ossify and cannot be
broken with the finger Not
sea sand
Adhesion
7.
Water Proofing ( Coating Type )
to porous and non porous surfaces Non Toxid Flexible Water proof
Visual See Brocure Visual Fabric
guaranty
Used appliance Measure
glass
.
LAMPIRAN E ” PROSEDUR QUALITY CONTROL”
F L OW C HA R T QC T E S T K O MP E T E NS I MANDO R (B UAT MO C K UP DAN B .A. QUAL IT AS
INS P E K S I & T E S T MAT E R IAL P R A K O NS T R UK S I(T R IAL MIX , B E S I B E T O N)
INS P E K S I K E WO R K S HO P S UP P L IE R / S UB K O NT
T E S T DI L AB O R AT O R IUM INDE P E NDE NT
AP P R O VAL MAT E R IAL
F O R M AP P R O VAL MAT E R IAL
K E MK / O WNE R
INS P E K S I MAT E R IAL Y ANG O N S IT E
F O R M P E ME R IK S AAN B AHAN
MAT E R IAL O N S IT E Y ANG T IDAK S E S UAI DE NG AN S T ANDAR / S P E K / P O DI R E J E C T
IP L (IZ IN P E L AK S ANAAN P E K E R J AAN)
F O R M IP L K E MK
P R OS E S … .
QUAL IT Y P AT R O L
ME MO QC DAN S T O P C AR D
OK E ?
C E K L IS T INT E R NAL S P V-QC -K 3L
T E R J ADI F R IK S I DI P R O Y E K AK IB AT ME MO / S T O P C AR D Y ANG DI R IL IS ?
ADA C AC AT / DE F E C T ? B UAT F O R M K E T IDAK S E S UAIAN
C AC AT B E R UL ANG ? DIB UAT K AN T INDAK AN K O R E K S I (T K )/ C O R R E C T IVE A C T IO N (C A ) : AG AR T IDAK T E R UL ANG K E MB AL I
S E T IAP AK HIR B UL AN DAF T AR P T S , T K , T P DAN K E L UHAN P E L ANG G AN DIL AP O R K AN K E DG
O P NAME
T E MB US K AN ME MO / S T O P C AR D K E B AG IAN MK 3L DIVIS I G E DUNG DIL E NG K AP I DE NG AN E VAL UAS I
LAMPIRAN G ” FOTO – FOTO PELAKSANAAN PEKERJAAN”
PROYEK GREEN BAY
PEKERJAAN TABLE FORM LANTAI
PEKERJAAN PEMBESIAN PELAT LANTAI
PEKERJAAN PEMBESIAN SHEAR WALL
PEKERJAAN BEKISTING CORE WALL
PEKERJAAN BEKISTING KOLOM
PEKERJAAN PEMBONGKARAN TABLE FORM
PEKERJAAN TABLE FORM LANTAI
PEKERJAAN PERKUATAN BESKISTING BALOK
PEKERJAAN BEKISTING DAN PEMBESIAN KOLOM
PEKERJAAN COR KOLOM
PEKERJAAN PEMBESIAN KOLOM CORE WALL
PEKERJAAN PLAT DAN KOLOM
PEKERJAAN PEMASANGAN SAFETY NET VERTIKAL
PEKERJAAN BEKISTING PLAT LANTAI
PEKERJAAN PEMBESIAN KOLOM
PEKERJAAN COR KOLOM
PEKERJAAN PEMBESIAN SHEAR WALL
PELAKSANAAN PEKERJAAN STRUKTUR ATAS
PENULANGAN LANTAI
PEKERJAAN BEKISTING CORE WALL
EXPOSED BALOK DAN PELAT LANTAI
PEKERJAAN PENGECORAN LANTAI
LAMPIRAN H ” SURAT PERMOHONAN KERJA PRAKTEK”
LAMPIRAN I ” SURAT PERSETUJUAN KERJA PRAKTEK”
LAMPIRAN J ” LEMBAR ASISTENSI LAPORAN KERJA PRAKTEK”
LAMPIRAN K ” DAFTAR PESERTA PRESENTASI LAPORAN KERJA PRAKTEK”