Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Energy Renovation 2020 Luk Vandaele Belgian Building Research Institute
Sustainable Energy Saving in Existing Housing Now Antwerp
14-10-2009
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
The Energy Renovation Programme 2020 “By 2020 there will be no more energy wasting dwellings in the Flemish Region” (2007)
Operational objectives: 1. Every dwelling has roof or attic insulation 2. All single glazing in dwellings is replaced by HE glazing 3. Every central heating boiler has an efficiency of at least 90 % 4. Every gas heater has an efficiency of at least 90 %
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Energy behaviour of Flemish households Investments: Insulation
Q12-Q13-Q14-Q15-Q16-Q17: Q12-Q13-Q14-Q15-Q16-Q17:Isolatievormen Isolatievormen(% (%geheel geheelofofgedeeltelijk) gedeeltelijk)
100%
85 78 78
80 69
69 66 66 67 60
89
56 48
49 51
49 49
44
41
45
48
40 20
25 24 26
30
20
12 14
16 15
0 Dak
Zolder
Vloer 1998
2001
Kelder 2003
2005
Vloerisolatie Vloerisolatieen endubbelglas dubbelglasvertonen vertoneneen eensignificante significantestijging stijgingten tenopzichte opzichtevan van2005. 2005.
Muur 2008
Dubbelglas
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Financial incentives: subsidies
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Household subsidies 2008 148.035 = 30.7 M€ (+ 80% to 2007) 64% of household subsidies = 95.000 to priority measures of the ER2020 programme z z
z
HE Glazing to replace single glazing (40.671) Condensing gasboiler to replace old boiler (34.533) Roof insulation in existing dwelling (19.523)
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Easy to communicate Easy to understand
No measures subject to easy critics Support of all stakeholders
Measurable effects 7
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Mix of measures…
Public support essential
8
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
How to implement? Step by step development of coherent approach supported by stakeholders with specific attention to structural measures Investigate which situations may lead to problems when imposing measures and find solutions
November 2008 9
Sep 2009
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Preparation phase Teams + experts proposal for approach
November 2008
22 june
30 april
18 march
Conference
Meetings with Stakeholders
Discussion phase Stakeholders wisselen van gedachten over zinvolle pistes om structurele stappen te zetten voor het bereiken van de doelstellingen
June 2009
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Concertation with stakeholders To develop a broad support basis for structural measures To identify potential problems and to develop alternative approaches z z z z z z z z
Contractors Industry: glazing, insulation, heating, ventilaton, Architects Tenants, owners Consumers Authorities Energy sector … 11
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Result: 10 Recommendations 3 types of recommendations in 3 groups : z Technical procedures : 3 z Public support : 5 z Quality : 2
12
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Technical procedures 1. Use the EPC-concept to check the conformity of the requirements to fulfill in 2020 This means a generalised application of the EPC-certificate
Æ proposed timing : political decision in
2010 – phased introduction until 2020
13
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Technical procedures 2. The 3 mandatory measures are not always evident to apply and/or economically not optimal. Æ exchangeable with alternative measures with at least the same result (expressed as EPC number). But: roof insulation and glazing should meet minimal reqs (e.g. Umax)
Æ Proposed timing : political decision in 2010
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Technical procedures 3. Present calculation tool for EPC to be optimised to perform recs 1 & 2 to make it an effective tool for evaluation for the proposed measures.
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Public support 4. To create a sufficient basis in the private rental market, it is proposed to foster (non-)voluntary agreements between tenant and landlord. This would be eased by: * a simple tool to calculate a fair increase of rent for the energy saving investments and the mutual profit for both parties * providing appropriate model contracts * specific provisions for co-owned buildings *… Minimal quality reqs may be used For social housing: specific measures
Æ Proposed timing: results of additional studies available in 2011
16
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Public support 5. To timely realise the voluntary measures before 2020, the government communicates a clear plan on the evolution of the incentive measures (type of measures, level of support, time table, …), an efficient communication strategy, sensibilising and follow-up are essential. Communication and fine tuning with federal measures is desirable.
Æ proposed timing: communication plan in 2010
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Public support 6. Special attention for sensibilisation ans financial support of owners and renters with too poor incomes or without access to financing of the necessary measures.
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Public support 7. For each of the mandatory measures (roof insulation, glazing, heating) clear preformance criteria and requirement levels are necessary. For the alternative measures (wall insulation, …) minimal requirements should be ensured.
Æ Proposed timing: concrete requirements in 2010
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations – Public support 8. To maintain and enhance the necessary societal basis for the Energy Renovation Programme 2020, it is proposed to continue the consultation of the stakeholders at a rate of 2 meetings/year for follow-up, feed-back and correction.
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations– Quality 9. The application of energy saving measures should be done in a qualitative way. Thereto a concept of quality assurance is proposed adapted to each type of measure and its risk of failure. Suggestions: * Training and education (esp. professional schooling) * minimal requirements on systems and on execution *…
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Recommendations– Quality 10. The application of energy saving measures should lead to improvement of the indoor comfort and should not lead to physical problems. It is proposed to ask sufficient attention to flanking measures such as summer comfort, ventilation, etc.
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Proposed further studies 1. Renter – Land lord Æ See rec 4
2. Coherent long term plan for measures Æ See rec 5
3. Concrete requirement levels for 2020 Æ See rec 7
4. Quality assurance Æsee recs 9 & 10
5. Continuation of the concertation with stakeholders Æ See rec 8
Wetenschappelijk en Technisch Centrum voor het Bouwbedrijf – http://www.wtcb.be
Conclusions