TERMS AND CONDITIONS CBM BIDDING ROUND YEAR 2010
MINISTRY OF ENERGY AND MINERAL RESOURCES REPUBLIC OF INDONESIA DIREKTORAT GENERAL OF OIL AND GAS
1,496
1,699
1,102
1,108
977.7
GMB Kutai Timur
GMB Kutai Barat
GMB Kapuas I
GMB Kapuas II
GMB Kapuas III
2.
3.
4.
5.
6.
PSC
PSC
PSC
PSC
PSC
PSC
Contract Model
10
10
10
20
15
15
First 3 Year (%)
80
80
80
60
70
Remaining Area 6 Year* (%) 70
Relinquishment
25
25
25
25
25
25
DMO** * (%)
10
10
10
10
10
10
FTP** (%)
55
55
55
60
60
55
After Tax Gas
45
45
40
40
40
45
After Tax Gas
TERMS AND CONDITIONS Government Take Contractor take (%) (%)
100%
100%
100%
100%
100%
100%
Cost Recovery****
-
-
-
-
-
-
Investment Credit (%)
1,000,000
1,000,000
1,000,000
2,000,000
2,000,000
1,000,000
Minimum Signature Bonuss (US$)
Direct Proposal Tender
Direct Proposal Tender
Direct Proposal Tender
Direct Proposal Tender
Direct Proposal Tender
Direct Proposal Tender
Offering Mechanism
Information : * If the area of CBM found more than 80% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 90% If the area of CBM found more than 70% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 85% If the area of CBM found more than 60% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 80% ** FTP 10% for Government and undivided with Contractor *** DMO since commercial production with domestic market prices ****Cost Recovery 100% from Annual Gross Revenue Generally applicable provisions in the Production Sharing Contract which will be applied to the Work Area : •Contract Period of 30 Years •Contractor are required to pay a signature bonus, production bonus and the bonus support equipment / services to the Government and the payment can not be charged as operating costs in the PSC. •Contractor are required to offer the 10% Participating Interest since POD I is approved by the Government to the Local Government Owned Company (LGOC) or private companies if LGOC are not interested.
1,305
GMB 1 Sijunjung
Blocks
Size (Km2)
1.
No
WORKING AREA
TERMS AND CONDITIONS OF CBM DIRECT PROPOSAL TENDER YEAR 2010
851.6
869.1
894.6
981.9
992.6
995.7
GMB Kampar II
GMB Pelalawan I
GMB Pelalawan II
GMB Melak Mendung I
GMB Melak Mendung II
GMB Melak Mendung III
2.
3.
4.
5.
6.
7.
PSC
PSC
PSC
PSC
PSC
PSC
PSC
Contract Model
10
10
10
10
10
10
10
First 3 Year (%)
80
80
80
80
80
80
Remaining Area 6 Year* (%) 80
Relinquishment
25
25
25
25
25
25
25
10
10
10
10
10
10
10
DMO*** FTP** (%) (%)
55
55
55
55
55
55
55
After Tax Gas
45
45
45
45
45
45
45
After Tax Gas
TERMS AND CONDITIONS Contractor Government Take (%) take (%)
100%
100%
100%
100%
100%
100%
100%
Cost Recovery****
-
-
-
-
-
-
-
Investment Credit (%)
1,500,000
1,500,000
1,500,000
1,500,000
1,000,000
1,500,000
1.000.000
Minimum Signature Bonuss (US$)
Regular Tender
Regular Tender
Regular Tender
Regular Tender
Regular Tender
Regular Tender
Regular Tender
Offering Mechanism
Information : * If the area of CBM found more than 80% from the total of the Original Working Area, then size of the remaining Working Area can be maintained up to 90% ** FTP 10% for Government and undivided with Contractor *** DMO since commercial production with domestic market prices ****Cost Recovery 100% from Annual Gross Revenue Generally applicable provisions in the Production Sharing Contract which will be applied to the Work Area : •Contract Period of 30 Years •Contractor are required to pay a signature bonus, production bonus and the bonus support equipment / services to the Government and the payment can not be charged as operating costs in the PSC. •Contractor are required to offer the 10% Participating Interest since POD I is approved by the Government to the Local Government Owned Company (LGOC) or private companies if LGOC are not interested.
972.4
GMB Kampar I
Blocks
Size (Km2)
1.
No
WORKING AREA
TERMS AND CONDITIONS OF CBM REGULAR TENDER YEAR 2010
ACCESS BID DOCUMENT : JANUARY 10, 2011 - FEBRUARY 23, 2011 CLARIFICATION FORUM : FEBRUARY 14, 2011 – FEBRUARY 22, 2011 SUBMIT PARTICIPATING DOCUMENT : FEBRUARY 24, 2011, TIME 09.30 AM – 02.30 PM
• • •
ACCESS BID DOCUMENT : JANUARY 10, 2011 - MAY 09, 2011 CLARIFICATION FORUM : APRIL 25, 2011 –MAY 06, 2011 SUBMIT PARTICIPATING DOCUMENT : MAY 10, 2011, TIME 09.30 AM – 02.30 PM
REGULAR TENDER
• • •
DIRECT PROPOSAL TENDER
BIDDING ROUND SCHEDULE
PRODUCT_NAME
5.
3. 4.
1. 2.
2 1 1 1 2 1 1 1 3 2 3 1 3 1 2 2 1 1 1 1 3 4 4
520.68 893.73 896.08 802.53 731.3 762.88 1,525.19 2,114.35 1,730.32 2,452.37 1,650.19 2,029.08 2,262.34 1,072.63 1,142.61 805.6 1,156.85 1,104.79 1,565.41 1,302.98 1,676.47
WELL (ea)
802.61 785.18 1,329.70 1,195.05 837.53 442.63 653.19
SEISMIC (km)
9 9 9 9 9 9 9 5 5 5 5 9 9 9 9
10 21 7 9 9 9
9 9 9 9 5 5 5
GGR (tit)
DATA MANDATORY
10 10 10 10 10 10 10 8 8 8 8 10 10 10 10
16 26 8 10 10 10
10 10 10 10 8 8 8
GGM (sheet)
CBM BIDDING ROUND 2010 DATA PACKAGE VOLUME AND PRICE
2 2 2 3
1 1 1
PE (ea)
71,138.89 96,990.18 77,432.51 110,669.85 74,189.65 91,531.32 100,971.35 108,322.98 111,155.07 95,508.28 141,731.36 52,984.55 75,641.82 67,029.27 82,144.41
31,766.44 51,353.39 43,211.64 38,744.10 37,869.41 43,163.43
41,896.08 37,174.70 61,219.42 55,770.13 68,808.48 50,818.89 59,340.25
PRICE (USD)
DATA MANDATORY
-
-
-
PRICE (USD)
DATA OPTIONAL
© DJ MIGAS 2010
Data Package Prices listed do not include VAT (VAT) 10% For the consortium charged a special price following the formula {(nx 100 %)-(( n-1) X 50%)}, for example: - The Consortium is composed of 2 (two) members, the price to 150% of the price Data Package for 2 (two) sets of Data Package. - The Consortium is composed of 3 (three) members, the price to 150% of the price Data Package, for 3 (three) sets of Packet Data - The consortium consists of 4 (four) members, the price to 200% of the price Data Package, for 4 (four) sets of Packet Data - The consortium consists of 5 (five) members, the price to 250% of the price Data Package, for 5 (five) sets Packet Data For clients who have access to advance some or all existing data in the data package and the license is still valid, do Data Package price reduction in accordance with the data that have been accessed. Payment can be made by transfer to: PT. PATRA NUSA DATA, Bank Mandiri, Graha Elnusa , Jl. TB Simatupang Kav 1B, Jakarta - Indonesia 12 560 No Rek: 127-00-0484264-5 (U.S. $), No Rek: 127-00-9701636-2 (Rp) Swift Code: BMRIIDJA Data will be sent by PT. PATRA NUSA DATA after the payment is completed
A. REGULAR TENDER 1 GMB KAMPAR I 2 GMB KAMPAR II 3 GMB PELALAWAN I 4 GMB PELALAWAN II 5 GMB MELAK-MENDUNG I 6 GMB MELAK-MENDUNG II 7 GMB MELAK-MENDUNG III B. DIRECT PROPOSAL 8 GMB SIJUNJUNG 9 GMB KUTAI BARAT 10 GMB KUTAI TIMUR 11 GMB KAPUAS I 12 GMB KAPUAS II 13 GMB KAPUAS III C. OVERLAP DATA 1 GMB KAMPAR I_II 2 GMB KAMPAR I_PELALAWAN I 3 GMB KAMPAR II_PELALAWAN I 4 GMB KAMPAR I_II_PELALAWAN I 5 GMB KAMPAR II_PELALAWAN II 6 GMB PELALAWAN I_PELALAWAN II 7 GMB KAMPAR II_PELALAWAN I_II 8 GMB MELAK MENDUNG I_II 9 GMB MELAK-MENDUNG I_III 10 GMB MELAK-MENDUNG II_III 11 GMB MELAK-MENDUNG I_II_III 12 GMB KAPUAS I_II 12 GMB KAPUAS I_III 12 GMB KAPUAS II_III 13 GMB KAPUAS I_II_III
NO
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010
1.Each company participating in Tender (hereinafter called “Tender Participant”), whether participating as an individual company or as a group of companies, is required to register as a participant by obtaining individually official Bid Document (which is correspond to 1 (one) block) issued by MIGAS. 2.The Bid Document which correspond to 1 (one) block shall be purchased in the amount of Five Thousand US Dollar (US$ 5,000). Payment shall be made to the account of “Kegiatan Pelaksanaan Pengelolaan (KPP) Wilayah Kerja Minyak dan Gas Bumi number 122.00.0110899-5, Bank Mandiri Cabang Jakarta Kebon Melati” (Swift Code BMRIIDJA). Proof of payment should be delivered to: Sekretariat Tim Penawaran Wilayah Kerja Gas Metana Batubara Lantai 1 Plaza Centris Jl. HR. Rasuna Said Kav. B.5 Kuningan – Jakarta Selatan (Ph. 62-21-5268910 ext. 139, 145, 169, Facs. 62-21-5269151) www.migas.esdm.go.id www.wkmigas.com The fee is non-refundable. 3. It is mandatory that any Tender Participants will have to purchase official Government a Data Package for the particular block being offered for Tender through Pusat Data dan Informasi (PUSDATIN) KESDM, Executing Agency MIGAS Data Management PT. Patra Nusa Data (hereinafter called “MDM) prior to submitting the Participating Document, in support for their technical evaluation of the Block and preparation of their proposed exploration program. The data package consists of geological data for the specific block being tendered; it is also includes relevant data for that area outside the block directly linked to the area within the block. The fee for data package for a particular block shall be stated at the time at the block is put up for the tender. Companies which have formed a consortium as Tender Participant shall have data package license for each consortium member.
CONDITONS FOR PARTICIPATING IN TENDERS
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
REGULAR TENDER
© DJ MIGAS 2010
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
DIRECT PROPOSAL TENDER
© DJ MIGAS 2010
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010
THANK YOU
http : www.migas.esdm.go.id or http: www.wkmigas.com
PLAZA CENTRIS BUILDING, 7TH FLOOR JL. HR. RASUNA SAID KAV. B-5, JAKARTA 12929, INDONESIA PHONE: 62-21- 5268910 PESAWAT : 139, 145, 169 FACSIMILE : 62-21-5269151
DIREKTORAT PEMBINAAN USAHA HULU MINYAK DAN GAS BUMI
DIREKTORAT JENDERAL MINYAK DAN GAS BUMI
FURTHER INFORMATION, PLEASE CONTACT :
KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL
© DJ MIGAS 2010