DEFINISI – RUMUS - APLIKASI
NISBAH KUPAS COG – BECOG - ICOG
CUTOFF GRADE , CUT-OFF GRADE (KADAR BATAS)
STRIPPING RATIO (NISBAH KUPAS) KADAR EKIVALEN BREAK EVEN CUTOFF GRADE (BECOG) INTERNAL CUTOFF GRADE (ICOG)
CUTOFF GRADE 1. KADAR RATA-RATA TERENDAH
YANG MASIH BISA DITAMBANG BERDSRK KONDISI EKONOMI DAN TEKNOLOGI SAAT ITU 2. KADAR TERENDAH
YANG MASIH BISA DITAMBANG BERDSRK KONDISI EKONOMI DAN TEKNOLOGI SAAT ITU
STRIPPING RATIO - SR (NISBAH KUPAS) SR = NISBAH ANTARA JUMLAH MATERIAL PENUTUP DAN JUMLAH MATERIAL BIJIH SR FUNGSI KADAR BATAS (COG) TAMBANG BIJIH: SR = TON WASTE PER TON ORE
SR = BCM WASTE PER TON ORE SR = (TON TOTAL/TON ORE)-1 TAMBANG BATUBARA: BCM OVERBURDEN PER TON COAL MISAL SR 8:1 tidak 1:8!!!
STRIP RATIO
NORTH-SOUTH SECTION Original Topography NORTH-SOUTH SECTION
2005 Surface -90mLR
-180mLR
Phase 4 -300mLR
Phase 5 -390mLR
Phase 6 -540mLR
Ultimate Pit Surface
-540mLR
Ultimate Pit
APAKAH HUBUNGAN ANTARA KADAR BATAS (COG) – HARGA KOMODITI – SR - CADANGAN
BENTUK PIT – STRI P RATIO
2005 TONGOLOKA
KATALA
RL245 RL-90
NEWTS EAST DUMP
BREAK EVEN STRIPPING RATIO NISBAH KUPAS PULANG POKOK
APABILA KADAR BIJIH DIKETAHUI
SEMUA KEUNTUNGAN BERSIH DIPAKAI UNTUK MENGUPAS MATERIAL PENUTUP BERAPAKAH JUMLAH MATERIAL PENUTUP DAPAT DIKUPAS?
BESR BESR = (PENDAPATAN-ONGKOS TAMBANG&OLAH) PER TON BIJIH DIBAGI (ONGKOS KUPAS) PER TON WASTE
NILAI BESR = 0 PADA TITIK BECOG REVENUE TIDAK DAPAT MENDUKUNG STRIPPING
BESR VS SR
NORTH-SOUTH SECTION
-180mLR
Phase 4 -300mLR
Phase 5 -390mLR
Phase 6 -540mLR
Ultimate Pit
BREAK EVEN CUTOFF GRADE BERAPA “KADAR BIJIH” YANG MENGHASILKAN ANGKA YANG SAMA ANTARA PENDAPATAN
DAN BIAYA UNTUK MENAMBANG DAN MEMPROSES PENDAPATAN = BIAYA
(TITIK PULANG POKOK) DISEBUT KADAR BATAS PULANG POKOK (BECOG)
BECOG = ONGKOS (MINE+MILL+G&A) / (HARGA
JUAL-SRF)(MILL REC)(SMELREC)(FAC)
INTERNAL CUTOFF GRADE (ICOG) RUMUS SAMA DENGAN BECOG TETAPI
ONGKOS PENAMBANGAN (MINE) = 0 FAKTOR KOREKSI
% ke POUND (LB) = 20 UNTUK SATUAN METRIK, FAKTOR = 22.046 LOGAM MULIA (Au) TIDAK DIPERLUKAN FAKTOR: oz/ton, g/t
PERHITUNGAN KADAR BATAS Cu PENGHASILAN = BIAYA (TITIK PULANG POKOK UNTUK 1 TON BIJIH) HARGA x KADAR x MILL REC x SMELT REC x 20 = ONGKOS (MINE+MILL+G&A)+SRF x KADAR x MILL REC x SMELT REC x 20 (HARGA-SRF) x KADAR x MILL REC x SMELT REC x 20 = ONGKOS (MINE+MILL+G&A)
BECOG = ONGKOS (MINE+MILL+G&A) (HARGA-SRF) x MILL REC x SMELT REC X 20
PERHITUNGAN KADAR BATAS Cu ONGKOS PENAMBANGAN PER TON MATERIAL ONGKOS PENGOLAHAN PER TON BIJIH ONGKOS G&A PER TON BIJIH PEROLEHAN PABRIK SMELTING REFINING FREIGHT PER lb PRODUK PEROLEHAN SMELTER HARGA TEMBAGA PER lb (POUND)
$0.750 $3.250 $0.250 94% $0.275 96.15% $0.950
BECOG = ONGKOS (MINE+MILL+G&A) (HARGA-SRF) x MILL REC x SMELT REC x 20
BECOG = $0.750 + $3.250 + $0.250 ($0.95-$0.275) x 0.94 x 0.9615 x 20 BECOG= 0.35%
TUGAS HITUNGLAH ICOG!
TUGAS CUTOFF CALCULATION COSTS:
mining : $1.00/ton materl processing : $4.00/ton ore G$A : $0.75/ton ore Refining & Freight : $5.00/oz REVENUE: commodity price : $ 425/oz recovery : 75% HITUNGLAH: 1. BECOG 2. ICOG! Untuk apa diperlukan ICOG
KADAR EKIVALEN DALAM CEBAKAN BIJIH TERDAPAT LEBIH DARI SATU MINERAL
ADA MINERAL UTAMA DAN IKUTAN DALAM KADAR EKIVALEN :
ADA ISTILAH NSR DAN SRF NSR = NET SMELTER RETURN ADALAH NILAI KOTOR DARI SATU TON BIJIH SETELAH DIKURANGI ONGKOS-ONGKOS SRF SRF =SMELTING – REFIN ING - FREIGHT
TAHAPAN PERHITUNGAN KADAR EKIVALEN MISAL Cu EKIVALEN (CuEq) 1. 2.
3. 4. 5.
HITUNG NSR 1 TON mineral utama (TEMBAGA) DG KADAR BIJIH 1% HITUNG NSR 1 TON MINERAL IKUTAN MISAL: MOLY DG KADAR 1% atau EMAS DG KADAR 1 oz/ton ATAU 1 g/t HITUNG FAKTOR EKIVALENSI = NISBAH NSR MINERAL IKUTAN DAN MINERAL UTAMA KADAR EKIVALEN = TOTAL Cu + FAKTOR x MOLY BILA DALAM BLOK DIKETAHUI KADAR TOTAL Cu DAN KADAR MOLY (EMAS, PERAK) MAKA KADAR CuEq DARI BLOK TERSEBUT DAPAT DIHITUNG KADAR EKIVALEN = KADAR YG MENGHASILKAN GABUNGAN NILAI NSR DARI SEMUA MINERAL YANG ADA
PERHITUNGAN KADAR EKIVALEN APABILA DIKETAHUI: HARGA KOMODITAS PEROLEHAN PABRIK PEROLEHAN SMELTER (KONVERTER) BIAYA SMELTING KONVERSI KE POUND (LB)
TEMBAGA
MOLY
$ 0.900 88%
$ 3.000 70%
96.1%
99%
$ 0.324
$ 0.810
PROSEDUR PERHITUNGAN 1.
2. 3. 4.
HITUNG NSR 1 TON BIJIH DGN KADAR 1%Cu: ($0.90/lb-$0.324/lb)(1%)(0.88)(0.961)(20lb/%) = $ 9.74 HITUNG NSR 1 TON BIJIH DGN KADAR 1% MOLY ($3.0/lb-$0.81/lb)(1%)(0.70)(0.99)(20lb/%) = $30.35 FAKTOR EKIVALEN = NSR MOLY/NSR TEMBAGA $30.35 / $9.74 = 3.1160 TEMBAGA EKIVALEN = KADAR Cu + (3.1160 x KADAR MOLY) DALAM MODEL BLOK SERING MEMAKAI NILAI NSR drpd KADAR EKIVALEN PEROLEHAN MILL DAN SMELTER, ONGKOS: SRF, HARGA KOMODITAS SUDAH DIPERHITUNGKAN DALAM NSR