DAFTAR ACUAN
[1] Asiyanto, Ir. MBA. IPM. Construction Project Cost Management. ed: 2. Jakarta : PT. Pradnya Paramita. 2005. [2] Asiyanto, Ir. MBA. IPM. “Hasil penelitian : wawancara” [3] Batara. “Analisa Persaingan Dalam Proses Pelelangan Proyek Konstruksi Dengan Simulasi Monte Carlo. Depok: Departemen Teknik Sipil FTUI. 2004 [4] D. K. H. Chua, (Member ASCE) dan D. Li. “Key Factors In Bid Reasoning Model”. [5] Daryanto, Tri. “Peran Kualitas Pengendalian Penyusunan Dokumen Penawaran Terhadap Perolehan Peringkat Pada Tender Proyek Konstruksi di PT Waskita Karya” (Depok : Departemen Teknik Sipil FTUI. 1998) [6] Derek S Drew, W. K. FU1 dan H. P. LO. “The effect of experience on contractors
competitiveness in recurrent bidding”. Referensi Dr. Ir. Yusuf
Latief, MT. 2006. [7] Donald S. Barrie, Boyd C. Paulson, JR
dan
Sudinarto. “Manajemen
Konstruksi Proyek”. (Jakarta : Erlangga. 1987) [8] Ebab, MT, Ir. Asril. “Tata Cara Pelaksanaan dan Pelatihan Tender”. Forum Komunikasi Mahasiswa Teknik Sipil Indonesia, PT. Guci Nusantara. [9] Febriano, Reza. “Penentuan bobot penilaian kriteria pada evaluasi penawaran pekerjaan jasa pemborongan di PT. JASA MARGA (persero) dengan menggunakan analytical hierarchy process”. Depok: Departemen Teknik Sipil FTUI. 2006/2007. [10] “How Tenders Or Bids Are Awarded” http://www.capegateway.gov.za/eng/tenders/open/ diakses 9/10/2007 10: 21 am
89
Identifikasi faktor dominan..., Iwan Darliansyah, FT UI, 2008
[11] “How to complete a tender or bid” http://www.capegateway.gov.za/eng/tenders/open/ diakses 9/26/2007, 4:34 PM [12] Keputusan Presiden Republik Indonesia Nomor 18 Tahun 2000 Tentang “Pedoman Pelaksanaan Pengadaan Barang/Jasa Instansi Pemerintah” [13] Keputusan Presiden Republik Indonesia Nomor 80 Tahun 2003 Tentang “Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah”. [14] Latief MT, Dr. Ir. Yusuf . “Estimasi Biaya Dalam Proses Pelelangan Proyek”. Materi kuliah : Padang, 7 Juni 2007. [15] Palaneeswaran, Ekambaram dan Kumaraswamy, Mohan M.. “Contractor Selection For Design/Build Projects”. 2 Member, ASCE. jurnal. Referensi Dr. Ir. Yusuf Latief, MT. 2006. [16] Pembangunan Perumahan, PT. “Buku Referensi untuk Kontraktor Bangunan Gedung dan Sipil.” (Jakarta : PT. Gramedia Pustaka Utama, 2003). [17] Peraturan Pemerintah Republik Indonesia Nomor 29 Tahun 2000 Tentang “Penyelenggaraan Jasa Konstruksi”. Bab I Ketentuan Umum [18] PT. Underdogs. “Rencana Kerja dan Syarat : instruction to bidder”, Proyek Pembangunan Perkantoran Sewa, Mampang – Jakarta Selatan [19] Suprijanto. Hasil penelitian : wawancara.
90
Identifikasi faktor dominan..., Iwan Darliansyah, FT UI, 2008
DAFTAR PUSTAKA Alhazmi. T, Mccaffer. R. “Project Procurement System Se;ection Model. construction engineering and management. China. 2000. Asiyanto, Ir. MBA. IPM. Construction Project Cost Management. ed: 2. Jakarta : PT. Pradnya Paramita. 2005 Batara. Analisa Persaingan Dalam Proses Pelelangan Proyek Konstruksi Dengan Simulasi Monte Carlo,(Depok: Departemen Teknik Sipil FTUI. 2004) Burce T, Barkley. “Project Risk Management”. United State of America: McGrawHill. 2004. Burchet. Jhon E and Tumala. V.M.Rao.”The application of risk management process in capital investment decision for EHV transmision line project” Construction Management and Economics. Hong Kong. 1997 Chan. Albert P. C, Ho. Danny C. K and Tam. C. M.”Effect of interorganizational teamwork on project outcome”. Journal of management. Hong Kong. 2001 Cheung. Sai On, Lam. Tsun Ip, Wan. Yue Wang and Lam Ka Chi. “Improving Objectivity in procurement selection”.Journal of management. Hong Kong. 2001 Crowley. Larry G. “Robust Statistical Estimators for Use within Competitive Bid Data”. Construction Engineering and Management.1997 D. K. H. Chua, (Member ASCE) dan D. Li. “Key Factors In Bid Reasoning Model”. Journal
of
construction engineering and management. Hong Kong. 1999 Daryanto, Tri, Peran Kualitas Pengendalian Penyusunan Dokumen Penawaran Terhadap Perolehan Peringkat Pada Tender Proyek Konstruksi di PT Waskita Karya. (Depok: Departemen Teknik Sipil FTUI. 1998) Department of Building and Real Estate, The Hong Kong Polytechnic University, Hong Kong Department of Management Sciences, City University of Hong Kong, Hong Kong Received 26 September 2001; accepted 12 July 2002 Derek S Drew, W. K. FU1 dan H. P. LO. “The effect of experience on contractors competitiveness in recurrent bidding”. Construction Management and Economics.. 2006 http://www.tandf.co.uk/journals. 26 September 2001. 91
Identifikasi faktor dominan..., Iwan Darliansyah, FT UI, 2008
Donald S. Barrie, Boyd C. Paulson, JR dan Sudinarto. Manajemen Konstruksi Proyek. (Jakarta : Erlangga. 1987) Ebab, MT, Ir. Asril. Tata Cara Pelaksanaan dan Pelatihan Tender, Forum Komunikasi Mahasiswa Teknik Sipil Indonesia, PT. Guci Nusantara. Febriano, Reza. “Penentuan bobot penilaian kriteria pada evaluasi penawaran pekerjaan jasa pemborongan di PT. JASA MARGA (persero) dengan menggunakan analytical hierarchy process”. Depok: Departemen Teknik Sipil FTUI. 2006/2007. Griffith and Headley. J.D. “Using a weighted score model as an aid to selecting procurement methods for small building works.” Construction management and economics. 1997 How Tenders Or Bids Are Awarded” http://www.capegateway.gov.za/eng/tenders/open/ diakses 9/10/2007 10: 21 am How to complete a tender or bid. http://www.capegateway.gov.za/eng/tenders/open/ diakses 9/26/2007, 4:34 PM Kale. Serder, Arditi. David. “General contractor’ relationships with subcontractors : a strategic asset.” Construction Management. 2001. Keputusan Presiden Republik Indonesia Nomor 18 Tahun 2000 Tentang ”Pedoman Pelaksanaan Pengadaan Barang/Jasa Instansi Pemerintah” Keputusan Presiden Republik Indonesia Nomor 80 Tahun 2003 Tentang ”Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah”. Kini. Damodara U.”The key to successful project management” Journal of management in engineering. 1999 Lam. K. C, Hu. Tiesong, Thomas. S. NG, Skitmore. Martin, Cheung. S.O.”A fuzzy neural network approach for contractor prequalification”. University of Hong Kong.1999. Miller. Jhon B, Garvin. Michael J, Ibbs. William and Mahoney. Stephen E. “Toward a new paradigm : simultanous use of multiple project delivery methodes’. Journal of management in engineering. 2000. Palaneeswaran, Ekambaram dan Kumaraswamy, Mohan M.. “Contractor Selection For Design/Build Projects”. 2 Member, ASCE. jurnal. Architectural Services Department, Hong Kong. 2000. Pembangunan Perumahan, PT.Buku Referensi untuk Kontraktor Bangunan Gedung dan Sipil. (Jakarta : PT. Gramedia Pustaka Utama, 2003).
92
Identifikasi faktor dominan..., Iwan Darliansyah, FT UI, 2008
Peraturan Pemerintah Republik Indonesia Nomor 29 Tahun 2000 Tentang ”Penyelenggaraan Jasa Konstruksi”. Bab I Ketentuan Umum PT. Underdogs, Rencana Kerja dan Syarat, Proyek Pembangunan Perkantoran Sewa, Mampang – Jakarta Selatan Qing Wang. Shou, Thiong. R. L. K, Kiong Thing. Seng, Chew. David, Ashley. Davic. “Evaluation and competitive tendering of BOT power plant project in china”. Journal of construction engineering and management. China. 1998. Robinson, Pearce, Management Strategik, terj. jilid 1. (Jakarta: Binarupa Aksara, 1991) Shen. Liyin, Drew Derek and Zhang. Zhihui.”Optimal bid model for price-time biparameter construction contracts”. Journal of construction engineering and management. 1999 Shen, liyin dan Song, Wieguo. “Competitive tendering practice in chinese construction” Journal of construction engineering and management. 1998. Tender for a contract http://www.businesslink.gov.uk
.
93
Identifikasi faktor dominan..., Iwan Darliansyah, FT UI, 2008