171
DAFTAR ACUAN
1
Harold Kerzner (2001). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (7th edition).
2
Clough & Sears. (1994). Construction Contracting, 6th Edition.
3
Clough & Sears (1994). Construction Contracting, 6th Edition.
4
Clough & Sears (1994). Construction Contracting, 6th Edition.
5
Clough & Sears (1994). Construction Contracting, 6th Edition.
6
Soeharto (1995). Manajemen Proyek dari konseptual sampai operasional, Jakarta : Erlangga.
7
Brandon dan Gray (1970).
8
Clough & Sears (1994). Construction Contracting, 6th Edition
9
Smith (2000)
10
Brandon dan Gray (1970).
11
Clough & Sears (1994). Construction Contracting, 6th Edition.
12
Soeharto (1995). Manajemen Proyek dari konseptual sampai operasional, Jakarta : Erlangga
13
Clough & Sears (1994). Construction Contracting, 6th Edition.
14
Clough & Sears (1994). Construction Contracting, 6th Edition.
15
A Guide to the Project Management Body Of Knowledge 3rd Edition, 2004.
16
A Guide to the Project Management Body Of Knowledge 3rd Edition, 2004.
17
An Integrated Approach for Risk Response Development in Project Planning, The Journal of the Operational Research Society, Vol. 52, No. 1, (Jan., 2001).
18
Risk Management Program Standard, The Joint Risk Management Program Standard Team, (1996).
19
Risk Management Standards Australia, AS/NZS 4360:1999.
20
Risk Management Standards Australia, AS/NZS 4360:1999.
21
Pearce II and Robinson Jr., (2000), Rabin et al., (2000), Macmillan and Tampoe, (2000).
22
R.G. Dyson / European Journal of Operational Research 152, 2004.
23
Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.
24
Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.
25
Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.
26
Freddy Rangkuti (2008). Analisis SWOT Teknik Membedah Kasus Bisnis.
27
J.A. Joyce, P.A. Hobson (2006). Monte Carlo Simulation As a Tool For Technical Modelling And Project Analysis.
28
Lawrence I. Goldman (2002), Crystal Ball Professional Introdutory Tutorial, Proceedings of the 2002 Winter Simulation Conference.
29
James R. Evans dan David L. Olson (1998). Introduction to Simulation and Risk Analysis. New Jersey: Prentice Hall, Inc. Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009
172
30
Dale E. Clark. Monte Carlo Analysis: Ten Years of Experience. Technical Article – Roll of Risk Series. P. 40.
31
Dale E. Clark. Monte Carlo Analysis: Ten Years of Experience. Technical Article – Roll of Risk Series. P. 40.
32
Fente Javier dkk. (May/June 2000), Defining a Probability Distribution Function For Construction Simulation. Journal of Construction and Management.
33
Christiano Maio dkk. (July/August 2000), Probability Function For Construction Simulation. Journal of Construction and Management.
34
Fente Javier dkk. (May/June 2000), Defining a Probability Distribution Function For Construction Simulation. Journal of Construction and Management.
35
W. Edward Back. Defining Triangular Probability Distribution From Historical Cost Data. Journal of Construction Engineering and Management.
36
W. Edward Back. Defining Triangular Probability Distribution From Historical Cost Data. Journal of Construction Engineering and Management.
37
Yusuf Latief, (2001), Perencanaan dan Penjadwalan Konstruksi. Jakarta: Jurusan Sipil FTUI.
38
David S. Christensen, Ph.D, Using The Earned Value Cost Management Report To Evaluate The Contractor's Estimate At Completion.
39
E.L. Whtiney, Ibid, (1960), P. 160.
40
Moh. Nasir, Ph.D, (Agustus 2003), Metode Penelitian, Jakarta : Ghalia Indonesia, P.54.
41
Yin, R. K., (1994 ), Case Study Research : Design and Method , Sage Publication.
42
Brown, (1998), P.7.
43
Davis, (1998), P.23.
44
Nasir, Ph.D, (Agustus 2003), Metode Penelitian, Jakarta : Ghalia Indonesia, P. 124.
45
Aryati Indah Kusumastuti, (2004 ), Pengaruh Kualitas Komunikasi Padapengelolaan Proyek Konstruksi Bangunan Gedung Terhadap Kinerja Waktu, Universitas Indonesia, Teknik Sipil Kekhususan Manajemen Konstruksi.
46
Gay & Diehl, (1996).
47
Moh. Nasir, Ph.D, (Agustus 2003), Metode Penelitian, Jakarta : Ghalia Indonesia, P. 12.
48
Thomas L. Saaty, (1983).
49
Standards Australia, Standards New Zealand. Risk Management Risk Management, (1999), AS/NZS 4360.
50
Nunnaly dan Bernstein. (1994).
51
Santoso dan Tjiptono. (2001). P. 134.
52
Bhina Patria. http://www.inparametric.com.
53
Lukman Nurzaman (2006). Simulasi Waktu dan Biaya Pada Proyek Menara Base Transceiver Station di Wilayah Propinsi Banten Dengan Software Pertmaster . Program Sarjana, Dep. Teknik Sipil Universitas Indonesia.
Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009
173
54
James R. Evans dan David L. Olson, (1998). Introduction to Simulation and Risk Analysis. New Jersey : Prentice Hall, Inc. P.67.
55
Pertmaster Manual and Help. Interpreting The Result.
56
Pertmaster Manual and Help. Interpreting The Result.
57
Phillip Rawlings. Pertmaster Sensitivity. Euro Log Ltd.
58
Pertmaster Manual and Help. Interpreting The Result.
59
Pertmaster Manual and Help. Interpreting The Result.
Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009
174
DAFTAR PUSTAKA
1. An Integrated Approach for Risk Response Development in Project Planning. The Journal of the Operational Research Society, Vol. 52, No. 1, (Jan., 2001). 2. A Guide to the Project Management Body Of Knowledge 3rd Edition, 2004. 3. AGC of America, (1994). Construction, Planning and Schedulling. AGC Of America. 4. Ahuja H. N (1976). Construction Performance Control By Networks Newyork. John Wiley and Sons. 5. Ahuja, H. N. (1980). Succesful Construction Cost Control. New York, John Wiley and Sons. 6. Alin Veronica (2002). Rekomendasi Tindakan Koreksi Pada Manajemen Material Dalam Pengendalian Biaya Proyek dengan Menggunakan Expert System. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia. 7. Anna Klemetti (2006). Risk Management in Construction Project Networks. Helsinki University of Technology. 8. Aryati
Indah
Kusumastuti
(2004).
Pengaruh
Kualitas
Komunikasi
Padapengelolaan Proyek Konstruksi Bangunan Gedung Terhadap Kinerja Waktu. Teknik Sipil Kekhususan Manajemen Konstruksi, Universitas Indonesia. 9. Badiru, A. B. (1995). Comprehensive Project Management Singapore. Prentice Hall. 10. Barrie, S. D. (1993). Manajemen Konstruksi Profesional. Jakarta, Erlangga, Edisi Kedua: 269. 11. Benjamin S. Blanchard, Walter J. Fabrycky. Systems Engineering and Analysis 3rd Edition. Pentice Hall International Series In Industrial and Systems Engineering. 12. Budiono (2006). Simulasi Waktu dan Biaya Pada Konstruksi Pier Pada Jalan Layang Suprapto Jakarta. Program Pasca Sarjana Manajemen Konstruksi, Universitas Indonesia. 13. Burton E Lipman (1978). Successful cost reduction and control, Prentice Hall. 14. Clough & Sears (1994). Construction Contracting, 6th Edition. Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009
175
15. Cohen, M.W., Palmer, G.R. (2004). Project Risk Identification and Management. AACE International Transactions, 2004. 16. Connolly, Joseph P. Risk (1997). Management perceptions and trends of U.S. construction. Journal of Construction Engineering and Management, American Society of Civil Engineers. 17. Dr Patrick. X.W. Zou, Dr Guomin Zhang and Professor Jia-Yuan Wang. Identifying Key Risks in Construction Projects: Life Cycle and Stakeholder Perspectives. 18. E.L. Whitney, Ibid (1960). 19. Eko Susanto (2008). Evaluasi Kinerja Manajemen Proyek Dengan Menggunakan Konsep Nilai Hasil. Program Sarjana, Dep. Teknik Industri Universitas Indonesia. 20. Gary R. Smith & Caryn M. Bohn (1999). Small to Medium Contractor Contingency and Assumption of Risk. Journal of Construction Engineering and Management. March/April, 1999. 21. Gustaf hamilton (1997). This is Risk Management. 22. Halpin, D. W. (1998). Construction Management USA. John Wiley and Sons, Inc. 23. Harold Kerzner (2001). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (7th edition). 24. Harrison (1991). Synergies and Post-Acquisition Performance: Differences versus Similarities in Resource Allocations. Journal of Management, Vol. 17, No. 1, 173-190. 25. Hendrickson, C (1989). Project Management For Construction . Fundamental Concepts for Owners, Engineers, Architect and Builders. Singapore. Prentice Hall. 26. Hernandez (1993). Applications of descriptive measures in risk management. 27. Hira N Ahuja & V Nandakumar (1985). Simulation model to forecast project completion time. Journal of Construction Engineering and Management, ASCE. 28. J.A. Joyce, P.A. Hobson (2006). Monte Carlo Simulation As a Tool For Technical Modelling And Project Analysis. Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009
176
29. John P. Kindinger, John L.Darby (2000). Risk Factor Analysis - A New Qualitative Risk Management Tool. Proceedings of the Project Management Institute Annual Seminars & Symposium, September 7-16, 2000. Houston , Texas, USA. 30. Laufer, A. and J. D. Borcherding (1981). Financial Incentives to Raise Productivity. ASCE journal of the Construction Division Vol. 107, No. CO4: 745-752. 31. Lawrence I. Goldman (2002). Crystal Ball Professional Introdutory Tutorial. Proceedings of the 2002 Winter Simulation Conference. 32. Lenny Sagita (2002). Rekomendasi Tindakan Koreksi Pada Manajemen Tenaga Kerja Dalam Pengendalian Biaya Proyek dengan Menggunakan Expert System. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia. 33. Lukman Nurzaman (2004). Simulasi Waktu dan Biaya Pada Proyek Menara Base Transceiver Station di Wilayah Propinsi Banten Dengan Software Pertmaster . Program Sarjana, Dep. Teknik Sipil Universitas Indonesia. 34. Mills, A. (2001). A systematic approach to risk management for construction. Structural Survey, 2001, Vol. 19, No. 5. 35. Moh. Nazir, Metode Penelitian, (2003). 36. Odeh, A.M., Battaineh, H.T (2002). Causes of construction delay: traditional contracts. International Journal of Project Management, 2002, Vol. 20, No. 1. 37. Oguri, T. (1990). Project Planning and Control. Japan, JGC Corporation of Japan. 38. OptQuest For Crystal Ball - User Manual, Decisioneering Inc (1988-2001) 39. Pearce II and Robinson Jr. (2000), Rabin et al., (2000), Macmillan and Tampoe (2000). 40. R.G. Dyson / European Journal of Operational Research 152, 2004 41. Risk Management Standards Australia, AS/NZS 4360:1999. 42. Ritz (1994). Total construction project management. McGraw-Hill. 43. Roger
Flanagan,
George
Norman
(1993).
Risk
Management
And
Construction. Blackwell Scientific Publications, Oxford.
Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009
177
44. Rowe,
K.
(1975).
Management
Techniques
for
Civil
Engineering
Construction. London, Applied Science Publisher Ltd. 45. Schuette & Liska (1994). Construction Estimating. McGraw-Hill Education (ISE Editions). 46. Soeharto (1995). Manajemen Proyek dari konseptual sampai operasional, Jakarta, Erlangga. 47. Suriaty Paraminta Putri (2008). Pengelolaan Risiko Pembuatan Kapal Kayu Tradisional Type Phinisi. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia 48. Ward, S., Chapman (2003). Transforming project risk management into project uncertainty management. international Journal of Project Management, 2003, Vol.21. 49. Warszawski, A. (1982). Cost Control Under Inflation in Construction Company. Journal of the Construction Divisions 107 (No. CO4 December) 50. Wysocki, Beck, dan Crane (2000). Effective Project Management, 2nd Edition. 51. Yacovy, Haimes (1998). Risk Modelling, Assesment and Management. John Wiley & Sons, Inc. 52. Yin, R. K (1994). Case Study Research : Design and Method. Sage Publication. 53. Yudiansyah (2002). Rekomendasi Tindakan Koreksi Pada Manajemen Peralatan Dalam Pengendalian Biaya Proyek dengan Menggunakan Expert System. Program Pasca Sarjana Manajemen Proyek, Universitas Indonesia. 54. Yuono Dolly (2006). Optimasi Biaya Tenaga Kerja Proyek Jalan pada Kontraktor Jalan Kelas Besar. Tesis Dep. Teknik Sipil Universitas Indonesia.
Universitas Indonesia
Simulasi rencana..., Beta Patrianto, FT UI, 2009