1
2
3
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
DAFTAR PERALATAN No.
Jenis Peralatan
Merk
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
Excavator PC-200 Excavator SK-07 Excavator Hitachi EX 200 Excavator SK-200-8 Excavator SK-200-8 Excavator SK-200-8 Excavator SK-200-8 Bulldozer D4C Bulldozer D5C Bulldozer D5C Bulldozer D6 Wheel Loader WA 350 Drilling / CRD Vibro Compactor CS 533 C Vibro Compactor Sheep Foot Vibro Compactor Vibro Compactor Vibro Compactor Crane 8 Ton Trailer Mobil Storing Colt Diesel storing Dump Truck Tronton Dump Truck Tronton Dump Truck Tronton Dump Truck Tronton Dump Truck Tronton Dump Truck Tronton Dump Truck Tronton Dump Truck GD Dump Truck Colt Diesel Dump Truck Colt Diesel Dump Truck Colt Diesel Pesawat Waterpas Pesawat Teodolith Total Station Genset Mesin Las Stamper Jumping Vibrator Cor Motor Greader Vibrator SV 10 / Baby Roller Forklift 4 ton Forklift 3 ton
Komatsu Kobelco Hitachi Kobelco Kobelco Kobelco Kobelco CAT CAT CAT Komatsu Komatsu Furukawa CAT CAT Dynapac Cakai Bomag Isuzu Mitsubishi Fuso Panther Hino Mitsubishi Fuso Mitsubishi Fuso Mitsubishi Hino Mitsubishi Fuso Mitsubishi Fuso Mitsubishi Fuso Hino Hino Mitsubishi Mitsubishi Mitsubishi Yukiza Top Con Sokia Yanmar Yanmar Honda M 6 330 Sumitomo Mitsubishi
Tahun
Jumlah
Kondisi
Pembuatan
(Unit)
Saat Ini
1997 1997 2002 2010 2011 2012 2013 1996 2003 2003 2000 2002 2000 2003 2003 1997 2000 1997 1998 2001 2004 1997 2011 2012 2013 2001 2000 1996 1998 1997 2004 2002 1997 1994 1994
10 2 2 6 5 5 2 2 5 5 4 2 1 2 1 1 2 1 1 2 5 5 9 5 2 26 14 18 12 12 6 6 11 3 3 2 1 1 1 4 1 2 2 3
Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik Baik
1994 1994 2000 2004 1994 2000 2008 2009
24
25
26
DAFTAR PROYEK YANG SEDANG & SUDAH DIKERJAKAN Tahun
Nama Proyek
Pemberi Tugas
No. SPK
Nilai Kontrak
Ket.
2015
Pek. Jalan dan Saluran Test Cpurse 2nd Stage ADM Assembly Plant Karawang
PT. KADI INTERNATIONAL
001/KADIIADM/SPA/04/2015/870AO
Rp
26,297,705,500.00
2015
Pek. Urugan, Perkerasan Limestone & Base Course di Jalan Lingkar Luar Karawang
PT. SELAMAT ANUGRAH JAYA
027/SPK/SAJ/III/2015
Rp
902,848,890.00
2015
Pek. Urugan Tanah di Karawang Sentra Bizhub
PT. INNOVINDO KREASI BERSAMA
012/SPKB/KSB/II/2015
Rp
6,741,350,000.00
2015
Pek. Pondasi Jembatan Timbang
PT. EMBLEM ASIA
F - 150102
Rp
139,669,495.00
Proyek Selesai
2015
Pek. Dudukan Mesin Project Wire Over Turn
PT. CHUNPAO STEEL INDONESIA
017/PO/CPS/I/15
Rp
165,000,000.00
Proyek Selesai
2015
Pek. Pemasangan Pagar Panel di Karawang Sentra Bizhub
PT. INNOVINDO KREASI BERSAMA
008/SPKB/KSB/I/2015
Rp
200,700,000.00
Proyek Selesai
2014
Pek. Pembuatan Saluran, Turap dan Perbaikan Jalan Akses Jalan Desa Kamp. Lio
PT. INNOVINDO KREASI BERSAMA
06/SPKB/KSB/XII/2014
Rp
947,278,200.00
Proyek Selesai
2014
Pek. Perluasan Gudang Sludge B3 WWTP
PT. SURYACIPTA SWADAYA
057/SCS-EDM/SPP/XII/14
Rp
330,495,000.00
Proyek Selesai
2014
Pek. Pengurugan Tanah Merah Semu Pangkalan - Loji
PT. USAHA MULTI GUNA
001/SPK-UMG/11/2014
Rp
1,134,187,500.00
Proyek Selesai
2014
Pek. Maintenance Access Road & Cut Fill Land Dev. Indotaisei Indah Phase 2
PT. KADI INTERNATIONAL
02/11/14/MAINTENANCE ACCESS ROAD & CUT FILL-IIDPPT/KDI/Sub.SPA/776A0
Rp
758,455,500.00
Proyek Selesai
2014
Pek. Earth Work to Nippon Konpo Ind. Warehouse Ext.
PT. PP-TAISEI INDONESIA CONTRUCTION
06/PPT/NKI-EXT/SubCont/XI/2014
Rp
2,483,800,000.00
Proyek Selesai
2014
Pek. Cor Beton & Saluran PT. Izumi
PT. MAXFOS PRIMA
33/EPS/X/2014
Rp
475,000,870.00
Proyek Selesai
2014
Pek. Perkerasan Central Motor Wheel, Phase II Kawasan Suryacipta
PT. MURINDA IRON STEEL
000464/HO/2279/2014
Rp
580,569,863.50
Proyek Selesai
2014
Pek. Pembangunan Metalize, Coal Boiler, Cooling Tower Line 7 & Sparepart Line 6
PT. ARGHA KARYA PRIMA INDUSTRY, Tbk
07/Proj-Line 7/Argha/2014
Rp
6,228,200,000.00
Proyek Berjalan
2014
Pek. Nutrifood New Plant
PT. MURINDA IRON STEEL
000464/HO/2279/2014
Rp
2,178,445,161.20
Proyek Berjalan
2014
Pek. Perbaikan Lantai Area FP, Oven Unit 1-5 & Lantai 3-Reaktor (4501930639)
PT. DIC GRAPHIC KARAWANG
4501930639
Rp
247,422,452.20
Proyek Selesai
2014
Pek. Add Hazardous Waste Building-An
PT. DIC GRAPHIC KARAWANG
4501930699
Rp
273,699,360.00
Proyek Selesai
2014
Pek. Pagar Panel
PT. AKASHI WAHANA INDONESIA
1732/PO/AWI/VIII/14
Rp
1,003,200,000.00
Proyek Selesai
2014
Pek. Pagar Panel Precast Suryacipta Square
PT. SURYACIPTA SWADAYA
025/SCS-EDM/SPP/VI/14
Rp
694,331,000.00
Proyek Selesai
2014
Pek. Cut & Disposal Land Development - Indotaisei Phase 2
PT. KADI INTERNATIONAL
01/06/14/CUT & DISPOSAL-IIDPPT/KDI/Sub.SPA/776A0
Rp
2,651,000,000.00
Proyek Selesai
2014
Pek. Pagar Talud Batu Kali
PT. ARGHA KARYA PRIMA INDUSTRY, Tbk
YB98149
Rp
503,349,000.00
Proyek Selesai
2014
Pek. Lantai Beton & Lt. CPC KW-5
PT. DIC GRAPHIC Karawang
4501689602
Rp
385,000,000.00
Proyek Selesai
2014
Asphalt and Curbstone Work
PT. SMCC UTAMA INDONESIA
131/IHI-TIGAR/SMCC/V/WO/2014
Rp
662,851,750.00
Proyek Selesai
2014
Perbaikan Sal. DV 2-4
PT. SURYACIPTA SWADAYA
011/SCS-EDM/SPP/IV/2014
Rp
247,280,000.00
Proyek Selesai
2014
Schlumberger Integration Base at KITIC
PT. MURINDA IRON STEEL
000369/HO/2267/2014
Rp
6,820,000,000.00
Proyek Selesai
2014
Pek. Galian & Urugan (Cut & Fill & Bobok Beton)
PT. ARGHA KARYA PRIMA INDUSTRY, Tbk
04/Proj-Line 7/ARGHA/2014
Rp
2,255,000,000.00
Proyek Selesai
2014
Pek. Pemasangan Pagar Pembatas Panel Beton Suryacipta Teknopark
PT. SURYACIPTA SWADAYA
006/SCS-EDM/SPP/II/14
Rp
699,999,999.60
Proyek Selesai
2014
Pek. Pembangunan Masjid Karess
PT. SURYACIPTA SWADAYA
005/SCS-EDM/SPP/II/14
Rp
367,427,500.00
Proyek Selesai
2014
Pek. Pembangunan Masjid Pasir Huni 2
PT. SURYACIPTA SWADAYA
009/SPP/SCS/II/2014
Rp
360,621,800.00
Proyek Selesai
Proyek Berjalan
Proyek Selesai
Proyek Berjalan
27
DAFTAR PROYEK YANG SEDANG & SUDAH DIKERJAKAN Tahun
Nama Proyek
Pemberi Tugas
No. SPK
Nilai Kontrak
Ket.
2014
Pek. Pengaman DV-6 (Tahap I), Phase II
PT. SURYACIPTA SWADAYA
002/SCS-EDM/SPP/I/2014
Rp
278,520,000.00
Proyek Selesai
2014
Pek. Urugan Tanah Merah Bengkel Body Repaire Jl. Soleh Iskandar
PT. BHINEKACIPTA BAHANA PURA
052/SPK/Body Repaire/II/14
Rp
507,410,035.00
Proyek Selesai
2014
Pek. Urugan Tanah Merah New Warehouse Murinda
PT. MURINDA IRON STEEL
000343/HO/MURINDA/2014
Rp
3,616,250,000.00
Proyek Selesai
2014
Pek. Pembongkaran Gedung Ex. PVC
PT. ARGHA KARYA PRIMA INDUSTRY, Tbk
YU93521
Rp
302,500,000.00
Proyek Selesai
2014
Pek. Pengaman DV-6 (Tahap I), Phase II
PT. SURYACIPTA SWADAYA
002/SCS-EDM/SPP/I/2014
Rp
278,520,000.00
Proyek Selesai
2014
Pek. Kupas Lumpur - HC MAIN BUILDING - CIVIL & UNDERGROUND PT. P&G
PT. CITRA KARSA DINAMIKA
003/CKD PO/SPA/P&G/I/2014
Rp
500,607,668.00
Proyek Selesai
2014
Pek. Cut & Fill dan Badan Jalan - HC MAIN BUILDING CIVIL & UNDERGROUND PT. P&G
PT. CITRA KARSA DINAMIKA
001/CKD PO/SPA/P&G/XII/2014
Rp
1,435,748,600.00
Proyek Selesai
2013
Pek. Waste B3 Building
PT. DIC GRAPHIC Karawang
4500931183
Rp
1,980,000,000.00
Proyek Selesai
2013
Pek. Jalan di Proyek Astra Honda Motor - Die Casting Kaw. Industri Indotaisei
PT. BHINEKA CIPTABAHANA PURA
051/SPK/AHM Plant 4/XI/2013
Rp
7,502,000,000.00
Proyek Selesai
2013
Pek. Cut & Fill Belakang Kav. Art Piston, Phase I
PT. SURYACIPTA SWADAYA
037/SCS-EDM/SPP/XI/13
Rp
3,477,386,000.00
Proyek selesai
2013
Pek. Tank Foundation
PT. DIC GRAPHIC Karawang
4500590841
Rp
630,630,000.00
Proyek selesai
2013
Pek. Cut & Disposal Land Development Indotaisei Indah Phase - 2
PT. KADI INTERNATIONAL
01/09/13/Cut & Disposal-IIDPPT/KDI/Sub.SPA/718A0
Rp
2,321,000,000.00
Proyek selesai
2013
Pek. Earth & Outdoor Work of PT. AICA Indonesia New Factory Project
PT. PP-TAISEI INDONESIA CONTRUCTION
004/SC/PPT/AICA/VIII/2013
Rp
1,180,000,000.00
Proyek selesai
2013
Pekerjaan Infrastruktur Kavling I-68 ABCEFG, Phase III Suryacipta
PT. KADI INTERNATIONAL
004/07/KI-Kav I-68 SC/2013
Rp
4,526,130,272.00
Proyek selesai
2013
Pek. Pagar Kawasan (Emergency Pond) Phase I
PT. SURYACIPTA SWADAYA
033/SCS-EDM/SPP/VIII/13
Rp
386,272,700.00
Proyek selesai
2013
Pek. Perbaikan Saluran Diversion Canal Jl. Surya Utama & Jl. Surya Madya, Phase-I
PT. SURYACIPTA SWADAYA
026/SCS-EDM/SPP/VI/13
Rp
4,024,526,000.00
Proyek selesai
2013
Pekerjaan Civil di Pindo Deli 2
PT. PINDO DELI PULP & PAPER MILLS
PD/O/015/VI/2013
Rp
1,135,000,000.00
Proyek selesai
2013
Pekerjaan Outlet Saluran Hujan Jl. Surya Kencana
PT. SURYACIPTA SWADAYA
020/SCS-EDM/SPP/IV/2013
Rp
326,040,000.00
Proyek selesai
2013
Pek. Perbaikan Slope Belakang Kavling Art Piston
PT. SURYACIPTA SWADAYA
015/SCS-EDM/SPP/III/2013
Rp
1,131,920,900.00
Proyek selesai
2013
Pek. Pengurugan Tanah Merah di Perumahan Resinda
PT. BUKIT MURIA JAYA ESTATE
014/SPK-PURC/III/13
Rp
1,901,300,000.00
Proyek selesai
2013
Pek. Pembuatan dan Improve Jalan U-Turn
PT. KIA SERPIH MAS
KSM-SPA/4205004/2013
Rp
864,000.00
Proyek selesai
2012
Pek. Tanah Paket Land Grading Cut & Fill Kavling Pasir Huni
PT. KADI INTERNATIONAL
002/XII/2012/CUT & FILL-PASIR HUNI/KADII/711AO
Rp
1,530,388,000.00
Proyek selesai
2012
Pek. Fill Soil - Build Test Course - Astra Daihatsu Motor
PT. KADI INTERNATIONAL
052/12/KI-ADM/2012
Rp
2,890,429,300.00
Proyek selesai
2012
Pek. Tanah Paket Land Grading Cut & Fill Kavling I68ABCEFG Phase III
PT. KADI INTERNATIONAL
001/XI/2012/LANDGRADING/KADII/711 AO
Rp
1,853,084,400.00
Proyek selesai
2012
Pek. Tanah Paket Land Formation Sango New Factory Project Kav. M1-M2 KIM
PT. KADI INTERNATIONAL
01/08/12/LGSANGO/KDI/Sub.SPA/704AO
Rp
7,734,966,800.00
Proyek selesai
2012
Earth Work (Additional) to New Factory Project for PT. Sumi Indo Wiring Systems
PT. PP-TAISEI INDONESIA CONTRUCTION
06/PPT/SIWS/SC/VIII/2012
Rp
469,000,000.00
Proyek selesai
2012
Pek. Cut & Fill Kavling Techno Park Kawasan Industri Suryacipta
PT. SURYACIPTA SWADAYA
020/SCS-EDM/SPP/VIII/12
Rp
4,590,168,000.00
Proyek selesai
2012
Pengurugan Tanah Hitam Padat - Section I - III
PT. SAMUDRA TEKNINDO HYDRAUMATIC
011/STH/SOK/VIII/2012
Rp
2,091,723,750.00
Proyek selesai
2012
Earth Work to New Factory Project for PT. Sumi Indo Wiring Systems
PT. PP-TAISEI INDONESIA CONTRUCTION
02/PPT/SIWS/SC/VII/2012
Rp
1,363,600,000.00
Proyek selesai
2012
Pek. Infrastruktur Kavling Main Road To Phase III Jl. Surya Utama
PT. KADI INTERNATIONAL
003/06/KI-MR/2012
Rp
4,294,666,010.00
Proyek selesai
2012
Pek. Land Grading Kavling I 41-44 (Tahap 2) Phase II Addm
PT. SURYACIPTA SWADAYA
008/SCS-EDM/Add.1-Grading Kav. I 4144 (Tahap-2)/VI/12
Rp
5,560,995,000.00
Proyek selesai
2012
Pek. Pengurugan Tanah Merah
PT. SAMUDRA TEKNINDO HYDRAUMATIC
002/SPK-SPA/IV/2012
Rp
1,026,950,000.00
Proyek selesai
2012
Pek. Pengurugan Tanah Merah
PT. SAMUDRA TEKNINDO HYDRAUMATIC
001/SPK-SPA/IV/2012
Rp
1,374,750,000.00
Proyek selesai
28
DAFTAR PROYEK YANG SEDANG & SUDAH DIKERJAKAN Tahun
Nama Proyek
Pemberi Tugas
No. SPK
Nilai Kontrak
Ket.
2012
Supply Material AMP Cirebon 2012
PT. KADI INTERNATIONAL
001/01/KI-CBR/2012 Add
Rp
1,239,250,540.00
Proyek selesai
2012
Pek. Infrastruktur Jl. Surya Madya III - Extention
PT. KADI INTERNATIONAL
001/11/KI-SM III/2011 Add 1
Rp
896,038,207.00
Proyek selesai
2012
Pek. Infrastruktur Kavling Phase - I Extension
PT. KADI INTERNATIONAL
003/02/KI-SCS.KENCANA/2012
Rp
2,906,751,843.00
Proyek selesai
2012
Pek. Badan Jalan Section A - B
PT. SAMUDRA TEKNINDO HYDRAUMATIC
007/STH/SPK/V/2012
Rp
641,854,850.00
Proyek selesai
2012
Pek. Jalan, Saluran, dan Pagar Pemisah (Pry. Nissan Motor Indonesia)
PT. KADI INTERNATIONAL
001/02/KI-NMI/2012
Rp
1,997,371,211.00
Proyek selesai
2012
Pek. Cut & Fill Relokasi Kampung
PT. SURYACIPTA SWADAYA
003/SCS-EDM/SPP/I/2012
Rp
388,850,000.00
Proyek selesai
2011
Pek. Land Grading - Surya Cipta City Of Industry Phase I, Extension Location Plan
PT. KADI INTERNATIONAL
001/06/KI-LGSC/2011 Add-1
Rp
10,088,896,708.00
Proyek selesai
2011
Pek. Infrastruktur Jalan Surya Pratama
PT. NUSA RAYA CIPTA
181/ADD.1/SPK/SPA-CnF/VIII-11
Rp
2,208,962,250.00
Proyek selesai
2011
Land Development (Cut & Fill) SCS, Jl. Surya Pratama Kawasan Suryacipta
PT. NUSA RAYA CIPTA
185/SPK/SPA-SCS.CnF/VIII-11
Rp
1,378,803,305.00
Proyek selesai
2011
Pek. Land Grading Kav. I 41 -44 (Tahap II) Surya Cipta City of Industry Phase II
PT. SURYACIPTA SWADAYA
035/SCS-EDM/SPP/XI/11
Rp
6,710,682,000.00
Proyek selesai
2011
Cut & Fill Work for Ware House at New Land Purwakarta
PT. INDO-BHARAT RAYON
IBR/CV-B/382
Rp
9,786,150,000.00
Proyek selesai
2011
Pek. Land Grading - Surya Cipta City Of Industry Phase I, Extension Location Plan
PT. KADI INTERNATIONAL
001/06/2011/Landgrading/KADII/612AO
Rp
13,931,907,000.00
Proyek selesai
2011
Pembangunan Jalan Antar Kawasan Industri Terpadu Karawang Barat
PT. WASKITA KARYA
11A/SPK/WK/DIV.III/WIT1/2011
Rp
5,969,456,900.00
Proyek selesai
2011
Pekerjaan Cut & Fill area III & IV Paket 3
PT. NUSA RAYA CIPTA
084/SPK/SPA-SCS.CnF/IV-11
Rp
19,152,940,950.00
Proyek Selesai
2011
Pekerjaan Struktur Jalan Surya Pratama
PT. NUSA RAYA CIPTA
057/SPK/SPA-SCS.CnF/III-11
Rp
879,449,670.00
Proyek Selesai
2011
Pekerjaan Cut & Fill Area 7C dan 8A
PT. NUSA RAYA CIPTA
058/SPK/SPA-SCS.CnF/III-11
Rp
5,859,530,600.00
Proyek Selesai
2011
Pek. Infrastruktur Kawasan Industry Teluk Jambe Timur
PT. SAMUDRA TEKNINDO HYDRAUMATIC
003/STH/SPK/III/2011
Rp
305,410,724.00
Proyek Selesai
2011
Pek. Infrastruktur Kawasan Surya Cipta
PT. KADI INTERNATIONAL
002/01/KI-SC/2011
Rp
1,240,594,752.00
Proyek Selesai
2011
Pek. Pengurugan Tanah Merah di Kawasan Industri Teluk Jambe Timur
PT. IDEA MANDIRI
01,001/SPA-IDEA/I/2011
Rp
1,890,000,000.00
Proyek Selesai
2010
Pek. Cut & Fill Kawasan Industri Suryacipta
PT. KADI INTERNATIONAL
001/10/KI-SC/2010
Rp
5,871,297,896.00
Proyek Selesai
2010
Pek. Tanah Proyek Pembangunan Tarum Barat Fly Over Cikarang
YASA PAESA KSO
001/SP3/YP-KSO/PM-TBFO/IX/2010
Rp
3,233,655,392.00
Proyek Selesai
2010
Pek. Tanah Proyek Demo Plant Pindo Deli Pulp & Paper Mills Karawang
PT. JGC Indonesia
JIND-SC/JCF DEMO/CONST/001
Rp
1,804,500,000.00
Proyek Selesai
2010
Pek. Pembuatan Saluran dan Jalan Hotmix Perum Kota Permata Purwakarta
PT. TUBS Development
004/SPK/KP-TUBS/VII/2010
Rp
943,758,500.00
Proyek Selesai
2010
Pek. Perkerasan Badan Jalan dan Saluran Cluster Valleria Perum Metland Menteng
PT. BAKOMIDO UTAMA
003/SPK/BU-BNR/VI/10
Rp
5,465,000,000.00
Proyek Selesai
2010
Pek. Pengaspalan Hot mix
PT. TUBS Development
003/SPK/KP-TUBS/III/2010
Rp
352,282,200.00
Proyek Selesai
2010
Pek. Infrastruktur - PT. AKPI Citeureup Bogor
PT. CIPTA DIMENSI BAJA NUSANTARA
001/AKICB/CDBN-SPA/II/2010
Rp
2,145,656,000.00
Proyek Selesai
2010
Supply Material Batu Bronjol untuk AMP Karawang
PT. KADI INTERNATIONAL
041/03/KI-KCP2/2010
Rp
973,839,020.00
Proyek Selesai
2010
Supply Material Batu Bronjol untuk AMP Karawang
PT. KADI INTERNATIONAL
063/03/KI-KRW/2010
Rp
350,000,000.00
Proyek Selesai
2010
Supply Material untuk AMP Cirebon (Batu Pecah)
PT. KADI INTERNATIONAL
001/01/KI-CRB/2010
Rp
800,800,000.00
Proyek Selesai
2009
Pek. Pengadaan dan Pemasangan Batu Kapur untuk Jalan PM 11
PT. PINDO DELI PULP & PAPER MILLS
PD/NP/096/XI/2009
Rp
582,326,052.00
Proyek Selesai
2009
Supply Material untuk AMP Cirebon (Batu Pecah)
PT. KADI INTERNATIONAL
012/11/KI-CRB/2009
Rp
1,222,650,000.00
Proyek Selesai
2009
Pek. Pengurugan dan Saluran Proyek Pembangunan Production Line OPP No. 6
PT. ARGHA KARYA PRIMA INDUSTRI, Tbk
AKPI/2009/11/06
Rp
2,200,000,000.00
Proyek Selesai
21/SUB/KSO ADHI-KADII/XI/2009
Rp
1,697,201,331.00
Proyek Selesai
JO PT ADHI KARYA (PERSERO) TBK. & PT 2009
Pek. Galian dan Timbunan Agregate Class B KADI INTERNATIONAL
29
DAFTAR PROYEK YANG SEDANG & SUDAH DIKERJAKAN Tahun
Nama Proyek
Pemberi Tugas
No. SPK
Nilai Kontrak
Ket.
2009
Supply Material Batu Bronjol untuk AMP Karawang
PT. KADI INTERNATIONAL
0118/08/KI-KRW/2009
Rp
756,000,000.00
Proyek Selesai
2009
Supply Material Proyek DKI Jakarta Zona - 1 (Sirtu, Limestone)
PT. KADI INTERNATIONAL
010/07/KI-DKI/2009
Rp
1,463,100,058.00
Proyek Selesai
2009
Supply Material untuk AMP Cirebon (Batu Pecah)
PT. KADI INTERNATIONAL
003/07/KI-CRB/2009
Rp
698,500,000.00
Proyek Selesai
2009
Pek. Penambahan Ruas Lajur Tol Karawang Timur Cikampek KM 65+400 - 68+400
PT. PEMBANGUNAN PERUMAHAN
04/SPB/PP/TOL KRW TIMUR/VII/2009
Rp
1,702,238,670.00
Proyek Selesai
2009
Supply Material Batu Bronjol untuk AMP Karawang
PT. KADI INTERNATIONAL
036/04/KI-KRW/2009
Rp
539,000,000.00
Proyek Selesai
2009
Pek. Infrastruktur Jalan CBD Sta. 0+246.081 s/d Inner Ringroad Sta. 0+724 di BNR
PT. CIPTA JAYA UTAMI
31/CJU-SGT/INFRA3/VI/09
Rp
930,000,000.00
Proyek Selesai
2009
Pekerjaan Jalan - Unilever Kecap Bangau Subang
PT. CITRA KARSA DINAMIKA
001/CKD PO/SPA/II/2009
Rp
418,000,000.00
Proyek Selesai
2009
Pek. Cut, Fill & Perkerasan Badan Jalan - Cluster Cendana Bogor Nirwana Residance
PT. BAKOMIDO UTAMA
001/SPK/BU-BNR/II/09
Rp
2,083,209,507.50
Proyek Selesai
2008
Supply Material untuk AMP Tangerang (Fine, Medium, Course Aggregate)
PT. KADI INTERNATIONAL
012/Add IV/PO/12/12/KI-2008
Rp
1,332,670,130.00
Proyek Selesai
2008
Pek. Gal. Tanah, Borrow Material, Pembongkaran Guard Rail, Bongkar Pas. MCB
PT. SUMBER MITRA JAYA
015/SUBKON/2008
Rp
588,460,000.00
Proyek Selesai
2008
Pek. Stabilisasi Tanah dg Limestone & Manhole Proyek Pelebaran Jalan Tol Jakarta - Cikampek
PT. SUMBER MITRA JAYA
008/SUBKON/2008
Rp
1,622,600,000.00
Proyek Selesai
2008
Supply Red Soil for Landfill Site for ash Dumping
PT. INDO-BHARAT RAYON
IBR/CV-B/302
Rp
1,050,000,000.00
Proyek Selesai
2008
Pek. Galian Badan Jalan & Saluran
PT. TUBS Development
24/SPK/TUBS/IX/2008
Rp
851,747,957.00
Proyek Selesai
2008
Supply Material Batu Bronjol untuk AMP Karawang
PT. KADI INTERNATIONAL
014/PO/8/KI-2008
Rp
1,074,036,950.00
Proyek Selesai
2008
Pekerjaan Urugan Padat Proyek Resinda Auto Center
PT. BUKIT MURIA JAYA ESTATE
008/SPK-PURC/V/08
Rp
1,097,545,788.00
Proyek Selesai
2008
Pematangan Lahan Ruko Resinda auto Center
PT. BUKIT MURIA JAYA ESTATE
005/SPK-PURC/V/08
Rp
1,139,387,077.00
Proyek Selesai
2008
Pek. Galian Badan Jalan, Pemadatan Subgrade & Sirtu
PT. TUBS Development
14/SPK/TUBS/V/2008
Rp
907,109,224.00
Proyek Selesai
2008
Pek. Galian Badan Jalan, Pemadatan Subgrade & Sirtu
PT. TUBS Development
13/SPK/TUBS/V/2008
Rp
701,898,900.00
Proyek Selesai
2008
Pekerjaan Pengurugan Tanah Lahan Perum Kota Permata Purwakarta
PT. TUBS Development
SPK. Tgl. 18 Januari 2008
Rp
380,000,000.00
Proyek Selesai
2007
Pek. Pengurugan Tanah & Pembuatan Pagar SPBE Batangsari
PT. PURWASUKA JAYA GAS
01.01/SPK/IX/2007
Rp
984,900,000.00
Proyek Selesai
2007
Pek. Pembuatan Tanggul, Gebalan Rumput & Gal. Pond PT. United Tractor
PT. ALKONUSA INTI DAYA
001/SPK/AID-UT/IX/2007
Rp
475,000,000.00
Proyek Selesai
2007
Supply Material Cobble Stone, Aggregate (00-20 mm) for Hot Mix AMP Karawang
PT. KADI INTERNATIONAL
027/PO/04/KI-2007
Rp
1,438,840,000.00
Proyek selesai
2006
Pekerjaan Lagoon Expantion Raw Water Treadment
PT. INDAH KIAT PULP & PAPER Tbk.
IKS C 37000501 C
Rp
2,310,000,000.00
Proyek selesai
2006
Pekerjaan Land Fill
PT. INDAH KIAT PULP & PAPER Tbk.
IKS C 21400601 C PO 46009733
Rp
2,365,000,000.00
Proyek selesai
2006
Pekerjaan Penanganan Tanah longsor di Area Gedung STO Telkom
PT. PURADELTA LESTARI
016/SPKK/PDL-SPA/III/06
Rp
240,460,000.00
Proyek selesai
2006
Pek. Cut & Fill Cluster vintage De Latinos - Sektor X (Proyek SBU Housing 2)
PT. BUMI SERPONG DAMAI
SPKB-HS2/CT-247/Sek-10/V/06
Rp
481,140,000.00
Proyek selesai
2006
Pembangunan Jalan & Saluran Cluster Fresno
PT. PEMBANGUNAN DELTAMAS
112/SPKB/PDM-SPA/IX/05
Rp
2,645,793,700.00
Proyek selesai
2006
Supply Material Cobble Stone for Hot Mix AMP Karawang
PT. KADI INTERNATIONAL
033/PO/03/KI-2006
Rp
1,259,000,000.00
Proyek selesai
2005
Rougn Grading DeltaMas Circle Sub Sector 7.4 - Kota DeltaMas Cikarang
PT. PURADELTA LESTARI
077/SPKK/PDL-SPA/VIII/05
Rp
1,584,000,000.00
Proyek selesai
2005
Pek. Jalan Akses Ke Cluster Langkawi dan Jalan & Saluran Cluster Langkawi
PT. PURADELTA LESTARI
046/SPKK/PDL-SPA/V/05
Rp
2,695,000,000.00
Proyek selesai
2005
Infrastruktur SSK - Sinar Syno Kimia Cikarang
PT. MITRABANGUN ADIGRAHA
015-SPK/MA/CKR-IFS/III/2005
Rp
740,000,000.00
Proyek selesai
2005
Rough Grading Area Rumah Sakit (Extention) 1 Ha. Deltamas, Cikarang
PT. PURADELTA LESTARI
045/SPKK/PDL-SPA/V/05
Rp
1,320,000,000.00
Proyek selesai
2005
Drainage Work - YAMAHA Indonesia New Factory Project
SHIMIZU CORPORATION
Order No. 088/YNF
Rp
664,400,000.00
Proyek selesai
30
PEKERJAAN PEMBANGUNAN METALIZE, COAL BOILER, COOLING TOWER LINE 7 & SPAREPART LINE 6
31
PEKERJAAN PAGAR PANEL BETON PT. AKASHI WAHANA INDONESIA
PEKERJAAN WASTE B3 BUILDING PT. DIC GRAPHIC KARAWANG
32
PEK. PERBAIKAN SALURAN DIV. CANAL JL. SURYA UTAMA & JL. SURYA MADYA, PHASE - I PT. SURYACIPTA SWADAYA
PEKERJAAN FILL SOIL – BUILD TEST COURSE ASTRA DAIHATSU MOTOR PT. KADI INTERNATIONAL
33
PEK. INFRASTRUKTUR KAVLING PHASE – I EXTENTION KAWASAN INDUSTRI SURYACIPTA KARAWANG PT. KADI INTERNATIONAL
PEK. INFRASTRUKTUR KAV. MAIN ROAD TO PHASE III JALAN SURYA UTAMA KAWASAN INDUSTRI SURYACIPTA PT. KADI INTERNATIONAL
34
PEKERJAAN CUT & FILL KAWASAN INDUSTRI SURYACIPTA KARAWANG PT. KADI INTERNATIONAL
PEK. TANAH PROYEK DEMO PLANT PINDO DELI PULP & PAPER MILLS KARAWANG PT. JGC INDONESIA
35
PEK. PENGURUGAN & SALURAN PRY. PEMBANGUNAN PRODUCTION LINE OPP No. 6 PT. ARGHA KARYA PRIMA INDUSTRI, Tbk
PEKERJAAN PENAMBAHAN RUAS LAJUR TOL KARAWANG TIMUR – CIKAMPEK KM 65+400 – 68+400 PT. PEMBANGUNAN PERUMAHAN
36
PEK. CUT, FILL & PERKERASAN BADAN JALAN – CLUSTER CENDANA BOGOR NIRWANA RESIDANCE
STABILISASI TANAH DENGAN LIMESTONE PROYEK PELEBARAN JALAN TOL JAKARTA - CIKAMPEK
PROYEK PENANGANAN TANAH LONGSOR (GEOTEXTILE) & BOX CULVERT (INCLUDE EARTH WORK) KOTA DELTAMAS
37