6.82
Existing Road
Original Ground
Prepared by : UHACAE,LDA
MARITO BAPTISTA SITE ENGINEER
Submitted by :
Checked by :
Recomended for approved by:
UHACAE,LDA
MANUEL H.E.SOARES DIRECTOR
PROJECT AND LOCATION
REHABILITATION OF ASAILATULA TO OSSU ROADS CARLOS F.A. FREITAS SUPERVISOR
ENG.MARIO DO REGO CHEFE DEP. EPCC DISTRITO VIQUEQUE
ENG.JOSE AGUSTO FREITAS DEMOCRATIC REPUBLIC OF TIMOR LESTE MINISTRY OF PUBLIC WORK EPCC
STA 0 + 000 - 14 + 000
SHEET CONTENTS
CROSS SECTION 6+900
9.50
935.372 9.50
934.742 5.00
1.00
933.962 3.97
Approved by :
0.00
930.712
OFFSET
8.85
EXISTING GROUND
13.85 929.352
17.85 928.352
FINISHED GRADE
934.542 936.325
KM 6+900
ELV:927.000
SCALE
1 : 100
SHEET NO
04