RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015 NO
URAIAN
I
MATERIAL
1 2 3 4 5 6
Tiang besi 11 meter 200 daN Isolator tumpu 20 kV Isolator tarik 20 kV Cut Out 20 kV + Fuse Lighting Arester 20 kV Konduktor AAAC 70 mm2 JUMLAH I
II
ANGKUTAN
1 2 3 4 5 6
Tiang besi 11 meter 200 daN Isolator tumpu 20 kV Isolator tarik 20 kV Cut Out 20 kV + Fuse Lighting Arester 20 kV Konduktor AAAC 70 mm2 JUMLAH II TOTAL I + II PPN 10 % JUMLAH DIBULATKAN
Terbilang ;
STN
VOL
Btg Bh Bh Bh Bh km
213 577 174 3 3 28,397
btg m3 m3 m3 m3 m3
213 8,251 4,019 0,025 0,025 5,679
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015 NO I
URAIAN
STN
HARGA SATUAN (Rp)
VOL
JUMLAH HARGA (Rp)
MATERIAL
1. Trafo 3 P 50 KVA 20 KV - B2 2. Cut Out 20 KV 100 A + Fuse Link 3. L Arrester 20 KV 10 kA
Buah Bh Bh
3 9 9
JUMLAH I II ANGKUTAN 1. Trafo 3 P 50 KVA 20 KV - B2 2. Cut Out 20 KV 100 A + Fuse Link 3. L Arrester 20 KV 10 kA JUMLAH II TOTAL I + II PPN 10 % JUMLAH DIBULATKAN Terbilang ;
m3 m3 m3
2,078 0,208 0,075
-
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC) KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015 NO I 1 2
JENIS MATERIAL MATERIAL Tiang Besi 9 meter 100 daN LVTC 3 X 50+1X35 mm2
STN
VOL
btg km
71 9,833
btg m3
71 11,799
JUMLAH I II
ANGKUTAN
1 2
Tiang Besi 9 meter 100 daN LVTC 3 X 50+1X35 mm2 JUMLAH II TOTAL I + II PPN 10 % JUMLAH DIBULATKAN
Terbilang ;
HARGA SATUAN (Rp)
JUMLAH HARGA (Rp)
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015 A3C 70 mm2 = 9,280 kms HARGA SATUAN HARGA BAGIAN JUMLAH
PAKET 014
NO. I
JENIS MATERIAL
SATUAN
VOLUME BAHAN RP
UPAH RP
BAHAN RP
UPAH RP
MATERIAL UTAMA
1 2 3 4 5 6
Tiang besi 11 meter 200 daN Isolator tumpu 20 kV Isolator tarik 20 kV Cut Out 20 kV + Fuse Lighting Arester 20 kV Konduktor AAAC 70 mm2
Btg Bh Bh Bh Bh kms
210 568 174 3 3 9,28
II 1 2 3 4
5 6 7 8 9 10 11
MATERIAL NON UTAMA Perlengkapan druck schoor Perlengkapan kontramast Treck schoor Cross Arm UNP 100 (Balance) : a. Type A1 b. Type A2 c. Type A3 d. Type B3 H. Type Conector 70 mm2 Alluminium Bending wire Joint sleeve 70 mm2 Penghalang panjat Tanda kilat Arde TM u/ Arrester Beton kaki tiang
set set set
29 6 60
set set set set Bh Mtr Bh Bh Bh Set Btg
112 32 42 90 852,00 30 49 175 1 210
III 1 2 3
PEKERJAAN PERSIAPAN Angkutan Material Angkutan Tiang Besi Pembersihan Trase
m3 Btg Kms
43,39 210 9,28
IV 1 2 3 4
PEKERJAAN FINISHING Foto dokumentasi Gambar Pengecatan tiang Komisioning
Lbr Lbr Btg Kms
30 8 210 9,28
SUB. JUMLAH PPN 10 % JUMLAH DIBULATKAN
Rp Rp Rp Rp
HARGA RP
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015 TRAFO 3 PHS 50 KVA = 3 HARGA SATUAN HARGA BAGIAN
PAKET 014
SANO.
JENIS MATERIAL
TU-
VOLUME BAHAN
AN
RP
I 1 2 3 4 5
MATERIAL UTAMA Tiang besi 11 meter 200 daN Isolator tumpu 20 kV Cut Out 20 kV + Fuse Lighting Arester 20 kV Trafo 3 phs 50 kVA - 20 kV
Btg Bh Bh Bh Bh
3 9 9 9 3
II 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
MATERIAL NON UTAMA Penghalang panjat Tanda kilat Rangka Dudukan u/.trafo 3 phs Cross Arm type A1 Cross Arm u/ dudukan CO Cross Arm u/ dudukan Arester LV Board 3 phs 1 tiang 2 Jurusan 2 Pintu Pipa Inlet-Outlet Medium B + Invoring Alluminium Bending wire Arde Gardu Arde TM u/ Arrester Pondasi Lantai Kerja Paralel Grove 35 - 70 mm Kabel NYY 50 mm2 Sepatu Kabel AL-CU 35-50 mm2 Sepatu Kabel CU 50 mm2 Beton kaki tiang
Bh Bh Set Set Set Set Set Set Mtr Set Set Bh Bh mtr Bh Bh Btg
3 3 3 3 3 3 3 3 13,50 3 3 3 18 288,00 12 48 3
III PEKERJAAN PERSIAPAN 1 Pengedropan Material 2 Pengedropan Tiang Besi
m3 btg
4,68 3
IV PEKERJAAN FINISHING 1 Foto dokumentasi 2 Penomoran Tiang 3 Penomoran Tiang 4 Komisioning
Lbr Btg Btg Bh
6 3 3 3
BH JUMLAH
UPAH
BAHAN
UPAH
HARGA
RP
RP
RP
RP
SUB. JUMLAH PPN 10 % JUMLAH DIBULATKAN
Rp Rp Rp Rp
RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC) KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015 PAKET 014 NO.
JENIS MATERIAL
SATUAN
LVTC 3X50+1X35 MM2 = 9,640 HARGA SATUAN HARGA BAGIAN VOLUME BAHAN UPAH BAHAN UPAH RP RP RP RP
I 1 3
MATERIAL UTAMA Tiang besi 9 mtr 100 daN LVTC 3 x 50- + 1 x 35 mm2
Btg km
71 9,64
II 1 2 3 4
MATERIAL NON UTAMA Perlengkapan druck schoor Perlengkapan kontramast Treck schoor Beton kaki tiang
Set Set Set btg
6 28 71
5 6 7 8 9 10 11 12 13 III 1 2 3
ACCESSORIES LVTC : Suspension Assembly Large Angle Assembly Fixed Dead End Assembly Adjustable Dead End Assembly Bundle End Protection Bimetalic Joint 50 mm2 Joint Sleves 50 mm2 Arde TR ( 5 ohm ) Tap Conector PEKERJAAN PERSIAPAN Pengedropan Material Pengedropan Tiang Besi Pembersihan Trase
Set Set Set Set Set Bh Bh Set Bh
129 38 14 14 14 16 40 20 32
m3 Btg kms
15,47 71 9,64
IV 1 2 3 4 5
PEKERJAAN FINISHING Foto dokumentasi Gambar revisi Penomoran tiang Pengecatan tiang Komisioning
Lbr Lbr Btg Btg kms
16 8 181 71 9,64 SUB. JUMLAH PPN 10 % JUMLAH DIBULATKAN
Rp Rp Rp Rp
KMS JUMLAH HARGA RP
PT. PLN (PERSERO) SATUAN KERJA LISTRIK PERDESAAN PROVINSI NUSA TENGGARA TIMUR
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN JARINGAN DISTRIBUSI DAN GARDU KABUPATEN TIMOR TENGAH UTARA DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR 030.DL/611/LISDES.NTT/2015
NO
URAIAN
I
JARINGAN TEGANGAN MENENGAH - PENGADAAN - PEMASANGAN
II
GARDU DISTRIBUSI - PENGADAAN - PEMASANGAN
III
JARINGAN TEGANGAN RENDAH - PENGADAAN - PEMASANGAN
Terbilang :
SATUAN
9,280
KMS
BH/KVA
KMS
JUMLAH HARGA RP
VOLUME
3
150
9,640
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
ANALISA HARGA SATUAN MATERIAL AKSSESORIS TAHUN 2015 NO.
1 1 2 3 4 5 6 7
URAIAN
Type A1 Balance UNP 100x50x5x2000 UNP 100x50x5x2000 mm Pole band 1/2, 4" (6x50) Pole band 2/2, 4" (6x50) Arm Tie ( Besi L. 50x4x1270 mm) Steel plat type 2 Bollt & nut 5/8 x 70 + ring (galvanis) Bollt & nut 5/8 x 140 + ring (galvanis)
STN VOLUME
Btg Bh set btng bh Bh bh
HARGA SATUAN ( Rp.)
1 1 1 1 2 5 2 Jumlah Pembulatan
2 1 2 3 4 5 6 7
Type A2 Balance UNP 100x50x5x2000 UNP 100x50x5x2000 mm Pole band 2/2, 4" (6x50) Steel Plate typre I (6x100x37,5) Steel Plate typre II (6x100x12) Arm Tie ( Besi L. 50x4xx 1270 mm) Bollt & nut 5/8 x 70 + ring (galvanis) Bollt & nut 5/8 x 140 + ring (galvanis)
Btg bh bh bh btng Bh bh
2 2 4 4 1 3 14 Jumlah Pembulatan
3 1 2 3 4 5 6 7
Type A3 Balance UNP 100x50x5x2000 UNP 100x50x5x2000 mm Pole band 2/2, 4" (6x50) Steel Plate typre I (6x100x37,5) Steel Plate typre II (6x100x12) Arm Tie ( Besi L. 50x4xx 1270 mm) Bollt & nut 5/8 x 70 + ring (galvanis) Bollt & nut 5/8 x 140 + ring (galvanis)
btng bh bh bh btng Bh bh
2 2 4 4 1 3 14 Jumlah Pembulatan
4 1 2 3 4 5
Type B3 Balance UNP 100x50x5x2200 UNP 10x50x5x2200 mm Pole band 2/2, 4" (6x50) Steel Plate typre I (6x100x37,5) Bollt & nut 5/8 x 140 + ring (galvanis) Bollt & nut 5/8 x200 + 4 mur (galv)
btng set bh bh bh
2 2 6 12 4 Jumlah Pembulatan
5 1 2 3 4 5 6 7 8 9 10
Treck scoor - Guy Wire TM Stall drad 64 mm2 Pole band 2/2, 4" (6x50) Bolt nut + Plat & spring plat 5/8" x 50 mm galv Spanschroef 3/4" / Turn Bucle 50 KN Guy isolator/tui isolator Wire clip/cros by 35 mm2 Stay road 16 mm2 panjang = 2500 mm (anker) Cousen gegalv 64 mm2/guy wire thimble 70 mm2
Beton Block 40x40x10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok
mtr set bh bh bh bh btng Set bh set
15 1 2 1 1 4 1 2 1 1 Jumlah Pembulatan
6 1 2 3 4 5 6 7 8 9 10
Kontramast - Horizontal Guy Wire Stall drad 64 mm2 Pole band 2/2, 4" (6x50) Bolt nut + Plat & spring plat 5/8" x 50 mm galv Spanschroef 3/4" / Turn Bucle 50 KN Guy isolator/tui isolator Wire clip/cros by 12 mm2 Stay road 16 mm2 panjang = 2500 mm (anker) Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Beton Block 40 cmx40 cmx10 cm U-Bolt 19mm with nut+plat 120x50x5 u/beton blok
mtr set bh bh bh bh bh Set bh set
26 2 4 2 2 6 1 4 1 1 Jumlah Pembulatan
HARGA BAGIAN ( Rp.)
JUMLAH HARGA (Rp.)
7 1 2 3 4 5 6
Druck Schoor TM Pole band galvanise 1/2 4" Pole band galvanise 2/2 4" (atas) Pole band galvanise 2/2 8' (bawah) u/sekang Pipa galvanise Diameter 2"- panajang 2000 mm Besi UNP 100x50x5x200 mm u/stop druck Bolt nut + plat & spring plat 5/8' x 50 mm galv
bh bh bh btng btng bh
1 2 2 1 1 9 Jumlah Pembulatan
1 M2 CAT TIANG BESI Cat dasar Minyak cat Cat besi kuas Pekerja Mandor Tukang
Kg Ltr Kg Lbr HO HO HO
0,1 0,05 0,15 0,1 0,3 0,125 0,25 Jumlah Pembulatan
8 Pengecatan T. besi 9 mtr (1 batang) - Material Upah
m2/btg
2,814
m2/btg
2,814 Jumlah Pembulatan
9 Pengecatan T. besi 11 mtr (1 batang) - Material Upah
m2/btg m2/btg
4,691 4,691 Jumlah Pembulatan
8 1 2 3 4 5 6 7
ARDE ARESTER Grounding Rod 16 mm2 L = 1750 mm BC 50 mm2 Pipa Galvanis 1/2" L= 6000 mm Klem Steinless Steel 4 titik Connector CU 35 - 50 mm2 Stoping Bukle Link 25 x 25
bh Mtr Btg mtr Buah bh bh
2,00 15,00 1,00 4,00 3,00 4,00 4,00 Jumlah Pembulatan
9 1 2 3 4 5 6 7 8
ARDE GARDU Grounding Rod 16 mm2 L = 1750 mm BC 50 mm2 Pipa Galvanis 1/2" L = 2000 mm Klem Steinless Steel 4 titik Connector Cu 35 - 50 mm mm2 Sepatu Kabel CU 50 mm2 Stoping Bukle Link
bh Mtr bh mtr bh bh bh bh
1,00 11,00 1,00 4,00 2,00 1,00 4,00 4,00 Jumlah Pembulatan
10 1 2 3 4 5 6 7 8
RANGKA DUDUKAN TRAFO 25-50 KVA (CANTOL) : UNP 100 x 45x4x1500 mm galv UNP 100 x 45x4x750 mm galv UNP 100 x 45x4x 600mm galv Arm tie galvanise 50x50x5 1000 mm Arm tie galvanise 50x50x5 1200 mm Bolt nut + plat & spring plat 5/8" 300 mm Bolt nut + plat & spring plat 5/8" 50 mm Pole band 1/2 6" u penahan dudukan trafo
Btg Btg btg btg btg bh bh bh
2,00 2,00 2,00 2,00 2,00 2,00 18,00 4,00 Jumlah Pembulatan
11
TRAVERS UNTUK CUT OUT DAN ARRESTER : 1 UNP 100x50x5x2000 mm u/dudukan CO dan Arester 2 Pole band 1/2, 4" (6 X 70) 3 Bolt nut + plat & spring plat 5/8" 50 mm
btg bh bh
-
1,00 1,00 2,00 Jumlah Pembulatan
12
BETON BLOCK UNTUK SCHOOR TARIK 1 Beton Cor : 1 ; 2 ; 3 (40cmx40 cm x10 cm) 2 Besi Beton 16 mm2 Galvanis L=2500 mm 3 U. Bolt 3/4"
M3 btg Buah
0,0160 1,0000 1,00 Jumlah Pembulatan
-
13 1 2 3 4
LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu UNP 100 x 50x100 mm L 1000 mm galv Pole band 1/2, 7" Bolt nut + plat & spring plat 5/8" 50 mm
set btg bh bh
1,00 2,00 2,00 4,00 Jumlah Pembulatan
14 1 2 3 4 5 6
Pipa Inlet / Oulet Gardu Pipa 2" Galvanise L - bow pipa PVC 2" u/ bagian atas UNP 100 x 50 x 5 x 500 mm u/ dudukan pipa galv Pole band 1/2 4" Pole band 1/2 2" Bolt nut + plat & spring plat 5/8" 50 mm
btg bh btng bh bh bh
3,00 3,00 2,00 2,00 6,00 16,00 Jumlah Pembulatan
15 1 2 3 4 5 6 7
PONDASI COR BETON MANSET : 1 M3 COR BETON 1:2:3 : Semen (PC) Kerikil Beton Pasir Pasangan Pekerja Tukang Batu Kepala Tukang Mandor
Zak M3 M3 Org Org Org Org
8,30 0,83 0,54 6,00 1,00 0,10 0,30 Jumlah Pembulatan
8 Cor Kaki Tiang Besi 11 mtr 200 daN 9 Cor Kaki Tiang Besi 9 mtr 100 daN 10 Cor Lantai Kerja Gardu 120cm x 100 cm x 10 cm
m3 m3 m3
0,118 0,093 0,269 Jumlah Pembulatan
16 1 2 3 4
1 M3 GALIAN TANAH BIASA SEDALAM 2 M : Pekerja Tukang Batu Tukang Listrik Mandor
OH OH OH OH
0,667 0,333 0,333 Jumlah Pembulatan
17 1 2 3 4
1 M3 GALIAN BATU CADAS SEDALAM 2 M : Pekerja Tukang Batu Tukang Listrik Mandor
OH OH OH OH
2,500 1,250 1,250 Jumlah Pembulatan
18 1 2 3 4
1 M3 URUGAN KEMBALI : Pekerja Tukang Batu Kepala Tukang Mandor
OH OH OH OH
0,400 0,200 Jumlah Pembulatan
19 1 2 3 4
1 M3 PEMADATAN TANAH : Pekerja Tukang Batu Kepala Tukang Mandor
OH OH OH OH
0,250
0,125 Jumlah Pembulatan
RATA2 GALIAN PER M3 NTT(1/2 CADAS+1/2 TANAH) m3 Volumer galian satu lubang tiang 11m 200 daN m3 Volumer galian satu lubang tiang 9m 100 daN m3 Mendirikan tiang 11 m 200 daN Pekerja HO Tukang Listrik HO Mandor HO
1,00 0,45 0,38 0,50 0,13 0,13 Jumlah Pembulatan
Mendirikan tiang 9 m 100 daN Pekerja Tukang Listrik Mandor
HO HO HO
0,33 0,08 0,08 Jumlah Pembulatan
-
20 21 22 23 24 25 26 27 28 29
MENDIRIKAN TIANG 11 M 200 daN PERMANENT MENDIRIKAN TIANG 9 M 100 daN PERMANENT Alluminium Bending wire Joint sleeve 70 mm2 Penghalang panjat Tanda kilat Kecil Tanda kilat Besar u. Gardu Parel Grove 35-70 mm Sepatu Kabel Cu 50 mm Sepatu Kabel AL-CU 35-50 mm
btg btg mtr bh bh bh bh bh bh bh
1 1 1 1 1 1 1 1 1 1
(Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
ANALISA HARGA SATUAN MATERIAL SUTR TAHUN 2015 NO. 1 1 2 3 4 5
URAIAN Suspension Assembly Suspension Clamp Pole Bracket Stainless Steel Strip 20 x 0,7 mm Stopping bukle Plastic strip
STN
bh bh mtr bh bh
VOL
HARGA SATUAN ( Rp.)
1 1 1,75 2 3 Jumlah Pembulatan
2 1 2 3 4 5
Large Angle Assembly Strain Clamp 25 - 70 Pole Bracket Stainless Steel Strip 20 x 0,7 mm Stopping bukle Plastic strip
bh bh mtr bh bh
2 1 1,75 2 3 Jumlah Pembulatan
3 1 2 3 4 5
Fixed Dead And Assembly Strain Clamp 25 - 70 Pole Bracket Stainless Steel Strip 20 x 0,7 mm Stopping bukle Plastic strip
bh bh mtr bh bh
1 1 1,75 2 2 Jumlah Pembulatan
4 1 2 3 4 5 6
Adjustable Dead And Assembly Strain Clamp 25 - 70 Pole Bracket Stainless Steel Strip 20 x 0,7 mm Stopping bukle Plastic strip Turn Buckle/Span Scroef
bh bh mtr bh bh bh
1 1 1,75 2 2 1 Jumlah Pembulatan
5 1 2 3 4 5
Bundle Protection Pipa PVC 2" 50 cm Stainless Steel Strip 20 x 0,7 mm Stopping bukle Link End cap
bh mtr Bh Set Set
1 1,75 2 2 4 Jumlah Pembulatan
HARGA BAGIAN ( Rp.)
JUMLAH HARGA (Rp.)
(Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT
ANALISA HARGA SATUAN MATERIAL SUTR TAHUN 2015 NO. 6 1 2 3 4 5 6 7 8 9 10
7 1 2 3 4 5 6 7 8 9 10
8 1 2 3 4 5 6
9 1 2 3 4 5 6 7 8
URAIAN Treck scoor - Guy Wire TR Stall drad 35 mm2 Pole band 2/2" dia 4" (45 x 4 mm) Mur Baut 5/8"-50 mm +Plat+Ring Plat Spanschroef/ Turn Bucle 17 KN Guy isolator/tui isolator dia 8 mm Cousen gegalv 8 mm2 Stay road 16 mm2 panjang = 1800 mm Cros by 8 mm2
Beton Block 40x40x10 dengan besi penguat 8 mm U bolt 16 mm + nut plat u. Beton block
Kontramast - Horizontal Guy Wire Stall drad 35 mm2 Pole band 2/2, 4" (6x50) Bolt nut + Plat & spring plat 5/8" x 50 mm galv Spanschroef 3/4" / Turn Bucle 17 KN Guy isolator/tui isolator Wire clip/cros by 12 mm2 Stay road 16 mm2 panjang = 2500 mm (anker) Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Beton Block 40 cmx40 cmx10 cm U bolt 16 mm + nut plat u. Beton block
Druck Schoor TR Pole band galvanise 1/2 3" Pole band galvanise 2/2 3" (atas) Pole band galvanise 2/2 5' (bawah) u/sekang Pipa galvanise Diameter 2"- panjang 1200 mm Besi UNP 8 L=160 mm Bolt nut + plat & spring plat 5/8' x 50 mm galv
GROUNDING TR Grounding Rod 16 mm2 L = 1750 mm BC 50 mm2 Pipa Galvanis 1/2" L= 6000 mm Klem Steinless Steel 4 titik 3 titik AL/CU 35 - 50 mm2 Electroda clam cu Stoping bukle Link 25 x 25
STN
mtr bh bh bh bh bh bh bh bh bh
mtr bh bh bh bh bh bh Set bh bh
bh bh bh btng btng bh
bh Mtr Btg mtr bh bh bh bh
HARGA SATUAN ( Rp.)
VOL
Tap Connector 25 - 50 mm2 Compression Joint 50 mm2+ heat shrink
bh set
JUMLAH HARGA (Rp.)
11 1 2 1 1 2 1 4 1 1 Jumlah Pembulatan
-
Jumlah Pembulatan
-
Jumlah Pembulatan
-
26 2 4 2 2 8 1 4 1 1
1 2 2 1 1 9
1 10 1 4 1 1 4 4 Jumlah Pembulatan
10 11
HARGA BAGIAN ( Rp.)
1 1
-
i
:
I I
i 3
t
31
t9
F= 9ts
i:9i i
I'a .'.
ea
B
;E
tq 9;
+t
iE
t6
i
qE
i
9B
: ;
,5" B
Y
\
\."
\
\3 F
6. : t
.i
I I
-JI
l
, : !
F
!;
ti A
il
j
i I
{
x
?
I E
?
z
c
:
I
I I t
e
3 q ..'
\
EE
t9 9;
!ii€ !!
EC
5i