REKAPITULASI RENCANA ANGGARAN BIAYA PEKERJAAN PEMBUATAN RUMAH DINAS MEDIS Tahun Anggaran 2012
JUMLAH HARGA
URAIAN
(Rp.)
I. II III. IV. V VI VII. VIII
I. II.
I. II. III.
ARSITEKTURAL PEKERJAAN PERSIAPAN PEK. DINDING BATA PEKERJAAN LANTAI PEKERJAAN PLAFOND PEKERJAAN PINTU DAN JENDELA PEKERJAAN SANITAIR PEKERJAAN ATAP PEKERJAAN LAIN LAIN SUB TOTAL
Rp.
5,097,312 54,697,323 12,669,109 8,128,665 17,891,088 1,948,640 16,466,833 11,588,256 128,487,225
SUB TOTAL
Rp. Rp. Rp.
2,517,919 32,439,198 34,957,117
SUB TOTAL
Rp. Rp. Rp. Rp.
7,283,300 15,336,757 11,420,600 34,040,656
JUMLAH KONSTRUKSI PPN 10% TOTAL
Rp. Rp. Rp.
197,484,999 19,748,500 217,233,498
DI BULATKAN
Rp.
218,741,000
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
STRUKTURAL PEKERJAAN GALIAN dan URUGAN PEK. PONDASI DAN BETON MEKANIKAL ELEKTRIKAL PEKERJAAN AIR BERSIH PEKERJAAN AIR KOTOR PEKERJAAN ELEKTRIKAL
TERBILANG : # DUA RATUS DELAPAN BELAS JUTA TUJUH RATUS EMPAT PULUH SATU RIBU RUPIAH#
Cimahi, 21 Mei 2012 Mitra Consultant Engineering
H.Hari Pradoko,ST. MT. Direktur
KOTA CIMAHI 2012
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBUATAN RUMAH DINAS MEDIS Tahun Anggaran 2012
NO. KODE
DESKRIPSI PEKERJAAN
KETERANGAN
VOLUME JML
I.
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
PEKERJAAN PERSIAPAN
Listrik kerja dan jaringannya (biaya pemakaian)
1
*******
1.00 ls
750,000
750,000
900,000
900,000
2
Air kerja dan jaringannya
*******
1.00 ls
3
Pengukuran dan staking out
*******
70.00 m²
15,000
1,050,000
4
Pasang bowplank
*******
34.00 m¹
70,509
2,397,312
Subtotal I II.
5,097,312
PEK. DINDING BATA
1
DINDING BATA
a
Pas. Bata merah 1:5
BATA MERAH GARUT/PASIR PASANG CIMLAKA
201.70 m²
92,260
18,608,842
b
Plesteran + acian 1:4
SEMEN TIGA RODA /PASIR PASANG CIMALAKA
403.40 m²
47,610
19,205,874
c
Pengecatan dinding luar
/SETARA VINILEX SANLEX
201.70 m²
15,420
3,110,214
d
Pengecatan dinding dalam
/SETARA VINILEX SANLEX
201.70 m²
15,420
3,110,214
2
KERAMIK DINDING
a
Toilet
KW 01, 20X20
11.55 m²
153,900
1,777,545
b
Dapur bersih
KW 0, 20X20 CM
2.31 m²
153,900
355,509
c
Cor nad
SEMEN WARNA
13.86 m²
8,000
110,880
3
MEJA BETON
a
Meja beton dapur bersih
PLAT BETON
0.23 m³
5,217,380
1,205,215
4
DINDING PAGAR
a
Pondasi batu kali
BATU BELAH /PASIRPASANG CIMALAKA
4.80 m³
610,850
2,932,080
b
Sloof 15/20
BETON BERTULANG /BESI TULANGAN BESI SNI
0.38 m³
3,594,800
1,348,050
4.00 m'
66,850
267,400
10.00 m'
66,850
668,500
10.00 m²
199,700
1,997,000
PASIR BETON CIMALAKA/SPLIT/PC TIGA RODA
c
Kolom 15/15
BETON BERTULANG /BESI TULANGAN BESI SNI PASIR BETON CIMALAKA/SPLIT/PC TIGA RODA
d
Ringbalk 15/20
BETON BERTULANG /BESI TULANGAN BESI SNI PASIR BETON CIMALAKA/SPLIT/PC TIGA RODA
e
Pas. Dinding conblok
CISANGKAN
Subtotal II III.
54,697,323
PEKERJAAN LANTAI
1
KERAMIK LANTAI :
a
R.dalam
KW 1, 40X40 CM POLIS
b
teras
c
54.00 m²
144,110
7,781,940
KW 1, 40X40 CM UNPOLISH
4.80 m²
145,840
700,032
km/wc
ROMAN 25X25 CM UN POLIS
3.00 m²
142,900
428,700
d
Cor nad
SEMEN WARNA
61.80 m²
8,000
494,400
KRAMIK 10X40 CM UN POLIS
77.50 m¹
30,670
2,376,925
0.22 m³
3,594,800
798,046
2.22 m²
40,120
89,066
Subtotal III
12,669,109
54.50 m²
96,270
5,246,715
e
Plint lantai keramik
2
RABAT BETON :
a
Cor beton 1:2:3 t=10cm
PASIR BETON 1 CIMALAKA / SPLIT SETARA SEMEN TIGA RODA
b
Kamprot halus
IV.
PEKERJAAN PLAFOND
1
Plafond Gypsum Datar
RANGKA HOLOW 20X40 & 40X40 MM GALVANIS GYPSUM EX.KNAUF
2
Plafond GRC
6.00 m²
96,270
577,620
3
List Plafond
LIST GYPSUM
85.50 m² m
16,040
1,371,420
4
Pengecatan Plafond
SETARA VINILEX/SANLEX
60.50 m²
15,420
932,910
V.
PEKERJAAN PINTU DAN JENDELA
RANGKA HOLOW 20X40 & 40X40 MM GALVANIS GRC /GERSIK PRTLAND CEMENT
Subtotal IV
1
P1&P2 Kusen Pintu 5 UNIT (uk. 85cmx275 cm) Daun pintu Fin Vernis Pas kaca boven Pas engsel Pas kunci Pas pegangan pintu
KOTA CIMAH 2012
8,128,665
RANGKA KUSEN : ALUMUNIUM EX. ALEXINDO
36.00
m'
93,230
3,356,280
RANGKA KAYU BORNEO, DOBEL TRIPLEX
11.69 0.34 5.00 5.00 5.00
m² m² bh bh bh
403,840 119,850 54,950 207,960 124,530
4,719,880 40,449 274,750 1,039,800 622,650
KACA CLER 5mm ENGSEL 2 BUAH SETARA ROYAL
2
3
4
5
P3
P4
J1
Kusen Pintu KM WC 1 UNIT (uk. 75cmx275 cm) Daun pintu Pas kaca boven Pas engsel Pas kunci Pas pegangan pintu
RANGKA KUSEN : ALUMUNIUM EX. ALEXINDO
7.00
m'
93,230
652,610
RANGKA ALUMUNIUM
3.60 0.29 1.00 1.00 1.00
m² m² bh bh bh
147,510 119,850 54,950 207,960 124,530
531,036 35,056 54,950 207,960 124,530
Kusen Pintu Keluarga Daun pintu Fin Vernis Pas kaca boven& jendela Pas engsel Pas kunci Daun Jendela Pas Slot hak angin Pas pegangan pintu Kusen jendela Daun jendela Pas kaca Pas engsel Pas slot Pas hak angin
RANGKA KUSEN : ALUMUNIUM EX. ALEXINDO
14.70 1.68 1.71 3.00 1.00 1.64 2.00 4.00 1.00 30.50 4.03 4.85 5.00 5.00 10.00
m' m² m² bh bh m² bh bh bh m' m² m² bh bh bh
403,840 119,850 54,950 207,960 69,690 31,110 38,450 124,530 93,230 69,690 119,850 54,950 31,110 38,450
678,451 204,944 164,850 207,960 114,292 62,220 153,800 124,530 2,843,515 280,502 581,273 274,750 155,550 384,500
2.70 0.46
m' m²
BV1 Kusen jendela bouven lich Pas kaca
VI.
KACA ES 5mm ENGSEL 2 BUAH SETARA ROYAL
RANGKA KAYU BORNEO, DOBEL TRIPLEX KACA CLER 5mm ENGSEL 2 BUAH SETARA ROYAL SETARA ALEXINDO 3.5 CM
RANGKA KUSEN : ALUMUNIUM EX. ALEXINDO SETARA ALEXINDO 3.5 CM KACA CLER 5mm ENGSEL 2 BUAH
RANGKA KUSEN : ALUMUNIUM EX. ALEXINDO KACA CLER 5mm
93,230 119,850 Subtotal V
251,721 17,891,088
PEKERJAAN SANITAIR
1
Zink
1.00
bh
272,160
272,160
2
Kran zink
STAILESS STEEL
1.00
bh
37,030
37,030
3
Kran KM + T. Cuci
KRAN STENLES STEEL
2.00
bh
37,030
74,060
4
Closet jongkok
EX.INA
1.00
set
401,830
401,830
5
T. sabun
BAHAN KRAMIK 1 SNI
1.00
bh
118,750
118,750
6
Bak mandi atu bata
FINISING KRAMIK
1.00
Set
1,004,180
1,004,180
7
Floor Drain
STENLES STEEL
1.00
bh
40,630
40,630
Subtotal VI VII. 1
ATAP GENTENG
a
Rangka baja ringan
EX.SMARTTRUSS ROOF APLIKATOR
b
Penutup atap genteng palentong
EX. JATIWANGI
c
Pek. Nok palentong
EX. SEGITIGA JATI WANGI
d
Listplank
e
Talang depan dan belakang
f
Talang Vertikal 3" PVC
VIII 1
PEKERJAAN LAIN LAIN TOWER BESI TOREN KETINGGIAN 6M BESI 60.60.6 BESI 50.50.5 BESI 40.40.3 PLAT 3MM PONDASI BETON TORN KAPASITAS 1000 L PAPAN DUDUKAN 3CM
70.00 m²
135,000
9,450,000
111.00 m²
20,180
2,239,980
11.65 m¹
73,850
860,353
WOOD PLANK/GRC
30.00 m¹
42,050
1,261,500
plat Besi tekuk
17.00 m¹
125,000
2,125,000
8.00 m¹
66,250
530,000
Subtotal VII
16,466,833
21,450 21,450 21,450 21,450 5,049,020 1,080,000 4,520,000
3,132,017 5,067,563 745,817 205,920 1,009,804 1,080,000 347,136
KAPASITAS KEKUATAN 1000 LITER
87.61 141.75 20.86 9.60 0.20 1.00 0.08
kg kg kg kg m3 bh m3
Subtotal XI
KOTA CIMAH 2012
1,948,640
PEKERJAAN ATAP
11,588,256
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBUATAN RUMAH DINAS MEDIS Tahun Anggaran 2012
NO. KODE
DESKRIPSI PEKERJAAN
VOLUME JML
I.
PEKERJAAN GALIAN dan URUGAN
1
Galian pondasi batu kali
2 3
SAT
HARGA SATUAN
JUMLAH HARGA
(Rp.)
(Rp.)
48.38 m³
40,680
1,967,895
Urugan pasir bawah pondasi batu kali
4.84 m³
88,870
429,909
Lantai kerja bawah pondasi telapak
2.42 m³
49,660
120,115
Subtotal I II.
1
Sloof 15/20
2
Pondasi batu kali
3
Kolom KP 15/15
4
RB 1 15/20
2.42 m³
3,594,800
8,694,923
23.22 m³
588,050
13,654,521
0.99 m³
5,067,970
5,035,535
64.50 m'
78,360
5,054,220
Subtotal II
KOTA CIMAHI 2012
2,517,919
PEK. PONDASI DAN BETON
32,439,198
RENCANA ANGGARAN BIAYA PEKERJAAN PEMBUATAN RUMAH DINAS MEDIS Tahun Anggaran 2012
LINGKUP PEKERJAAN : PLUMBING NO.
A
URAIAN PEKERJAAN
SAT
VOL
HARGA SAT. ( Rp )
TOTAL HARGA ( Rp )
PEKERJAAN AIR BERSIH INSTALASI PEMIPAAN AIR BERSIH
a PEKERJAAN PLUMBING AIR BERSIH AS 3-6 KOLOM I-J Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2, etc. ~ PVC AW dia 20mm
m
15.00
22,500.00
337,500.00
~ PVC AW dia 15mm
m ls
20.00
16,000.00
320,000.00
1.00
250,000.00
250,000.00
unit
1.00
750,000.00
750,000.00
2.00 2.00 2.00 2.00
500,000.00 450,000.00 350,000.00 450,000.00
1,000,000.00 900,000.00 700,000.00 900,000.00
~ Aplikasi air bersih bertekanan & alat bantu b PEKERJAAN PLUMBING AIR BERSIH DARI TOREN Pipa PVC, Class AW Standard JIS K 6741/2, 10 Kg/cm2, etc. Peralatan utama BOOSTER PUMP (Jet Pump) Pengadaan, Pemasangan & pondasi pompa Lokasi : Toren Type : Jet Pump Kelengkapan : dudukan diatas pondasi batu kali seukuran mesin Total head : Daya : 100 w Valve - Valve : - Gate Valve - Gate Valve - Flexible Joint - Check Valve
Dia. 50 mm Dia. 40 mm Dia. 50 mm Dia. 50 mm
Pemipaan Air Bersih dengan pipa PVC AW" Wavin Standard - PVC AW dia 20mm - PVC AW dia 15mm
m' m'
60.00 40.00
22,828.58 18,902.13
1,369,714.50 756,085.00
c Testing Commssioning
ls
1.00
1,500,000.00
1,500,000.00
TOTAL PEKERJAAN AIR BERSIH B
7,283,299.50
PEKERJAAN AIR KOTOR INSTALASI PEMIPAAN AIR KOTOR
a PEKERJAAN PLUMBING AIR KOTOR AS 3-6 KOLOM I-J Pemipaan Air Kotor, Air bekas & Vent dengan pipa PVC AW" Standard , 5kg/cm2 ~ PVC dia 50mm ~ PVC dia 65mm ~ Aplikasi air bersih bertekanan & alat bantu
m m
15.00 15.00
ls
1.00
110,000.00 180,000.00 600.00
1,650,000.00 2,700,000.00 600.00
841,669.20 3,345,347.60 1,800,671.60 4,643,468.20 320,000.00
PEKERJAAN SEPTICTANK ~ Septictank kap 20m3 uk 40X20X25 Pekerjaan galian
m³
20.69
Pasangan Bata
m²
36.26
Pekerjaan Plesteran
m²
36.26
Pekerjaan Beton
m³
0.89
Plat besi
m²
1.28
40,680.00 92,260.00 49,660.00 5,217,380.00 250,000.00
ls
1.00
35,000.00
35,000.00
TOTAL PEKERJAAN AIR KOTOR
15,336,756.60
TOTAL PEKERJAAN PLUMBING
22,620,056.10
b Testing Commssioning
LINGKUP PEKERJAAN : ELECTRIKAL NO. C I
URAIAN PEKERJAAN
SAT
TOTAL HARGA ( Rp )
PEKERJAAN ELEKTRIKAL INSTALASI PENERANGAN & STOP KONTAK ~ MCB ~ Lampu Downlight Essential 25W
~ ~ ~ ~ ~
II
VOL
HARGA SAT. ( Rp )
1.00 10.00
6.00
bh bh bh bh bh ttk ttk
160,000.00 67,000.00 21,250.00 17,000.00 11,000.00 75,000.00 75,000.00
160,000.00 670,000.00 127,500.00 34,000.00 44,000.00 450,000.00 450,000.00
15.00
m'
21,000.00
315,000.00
15.00
m'
21,000.00
315,000.00
15.00
m'
21,000.00
315,000.00
1.00
unit unit
1,750,000.00 250,000.00
1,750,000.00 250,000.00
Stop Kontak 1P,10A
6.00
Saklar ganda
2.00
Saklar tunggal
4.00
Instalasi Penerangan dgn kabel NYA 3X(1X2.5 mm2) dlm PVC conduit 20 mm Instalasi Stop kontak dgn kabel NYA 3X(1X2.5 mm2) dlm PVC conduit 20 mm
6.00
PEKERJAAN KABEL FEEDER ~ Dari Panel Utama ke Panel lighting LP-A NYY3X2.5mm2
~ Dari Panel Utama ke Panel lighting PP-A NYY3X2.5mm2
~ Dari Panel Utama ke Panel lighting PP-POMPA NYY3X2.5mm2
III
V
VI
PEKERJAAN PANEL LISTRIK ~ Panel Utama Dari PLN Grounding Panel lengkap Bak kontrol 50x50x50
1.00
BIAYA PERIZINAN Penyambungan daya 75kVA terdiri dari: Biaya penyambungan Uang jaminan langganan
220 220
VA VA
1,400.00 450.00
308,000.00 99,000.00
TEST COMMISSIONING
220.00
VA
605.00
133,100.00
TOTAL PEKERJAAN ELEKTRIKAL
11,420,600.00