EKOL, spol. s r.o. Brno Křenová 65 602 00 Brno
Tel.: 00420 543 531 710 Fax: 00420 543 242 912 E-mail:
[email protected] http:// www.ekolbrmo.cz
Page 1
REFERENCE LIST STEAM TURBINES
Qty
Year of implementation
Kojetín Czech republic
1
1994
Tlaková plynárna Ústí n/L
Ústí n/L Czech republic
1
1994
Adjustment of R1,5 - 3,5/0,45 steam turbine control system.
TONUS a.s.
Jaroměř Czech republic
1
1994
4
Technical assistance during R1,5/3,7/0,6 steam turbine overhaul.
OLŠANSKÉ PAPÍRNY a.s.
Olšany Czech republic
1
1995
5
General overhaul of K5 - 0,5 turbine.
ČEZ,a.s. Elektrárny Poříčí
Teplárna Náchod Czech republic
1
1995
6
Overhaul of nozzle segments and trial run of R16 - 12,75/1,67 steam turbine.
SANBORN a.s.
Velké Meziříčí Czech republic
1
1995
7
Adjustment of 12,75/1,67 steam turbine control system.
TEPLÁRNA TRMICE a.,s.
Ústí n/L Czech republic
1
1995
8
PR 2,8/2,8 - 3,5/0,6/0,18 steam turbine overhaul.
JITKA a.s.
Jindřichův Hradec Czech republic
1
1995
9
EPR 2/2 - 3,6/1,1/0,4 steam turbine overhaul
HARMANECKÉ PAPIERNE, a.s.
Harmanec Slovakia
1
1996
10
EPR 4/4-3,9/1,1/0,4 steam turbine supply
LOVOCHEMIE a.s.
Lovosice Czech republic
1
1996
11
General overhaul R1,5 -3,7/0,6 steam turbine.
OLŠANSKÉ PAPÍRNY, a.s.
Olšany Czech republic
1
1995
12
General overhaul R1,5 - 3,5/0,35 steam turbine.
SELIKO, a.s.
Kojetín Czech republic
1
1995
13
Modification of ER/6 - 3,5/0,68 back-pressure steam turbine
OSTROVSKÁ TEPLÁRENSKÁ, a.s.
Ostrov Czech republic
1
1996
14
General overhaul of MV 550 steam turbine.
KARLOVARSKÁ TEPLÁRENSKÁ, a.s.
Karlovy Vary Czech republic
1
1996
15
Modification of PR 25 steam turbine - HP part reblanding, replacement of control systém for WOODWARD systém, replacement of monitoring system for BENTLY NEVADA system. Conversion of heating plant into power and heating plant. Supply and installation of steam turbine, step-down station and heat exchangers. Modification and instrallation of BergmannBorsig turbine including piping, replacement of control system for WOODWARD systém. Modification of D 7,5 turbines for feed water pump driving.
TEPLÁRNA OTROKOVICE, a.s.
Otrokovice
1
1997
VYTOPNA FRÝDEK-MÍSTEK
Frýdek Místek
1
1997
VYTOPNA FRÝDEK-MÍSTEK
Frýdek Místek
1
1997
ELEKTRÁRNA POČERADY
Počerady
5
1998
Czech republic
Planning, design, manufacture, supply and comiisioning of P 12 - 4,1/1,1 condensing steam turbine with one controlled extraction, 12 MW output. . General overhaul of PP 9 - 3,7/1,1/0,4 steam turbine.
KUTNOHORSKÁ a.s.
Kolín Czech republic
1
1998
LOVOCHEMIE, a .s.
Lovosice Czech republic
1
1999
21
PR 6,4 - 1,6/0,7 steam turbine repair..
Tp Bratislava
Bratislava Slovakia
1
1999
22
Overhaul and repair of 6 MW backpressure turbine, type specification R 6 - 3,5/0,5.
Vihorlat, a.s.
Snina Slovakia
1
1999
Item
Activity
1
Repair of R1,5 - 3,5/0,35 steam turbine control system
Seliko Kojetín
2
R12 - 3,2/0,4 steam turbine repair.
3
16
17
18 19
20
For company
Site
Czech republic
Czech republic
Czech republic
EKOL, spol. s r.o. Brno Křenová 65 602 00 Brno
Tel.: 00420 543 531 710 Fax: 00420 543 242 912 E-mail:
[email protected] http:// www.ekolbrmo.cz
Qty
Year of implementation
Povážská Bystrica Slovakia
1
2000
Slovenské elektrárne, a.s.
Nováky
1
2000
SSE š.p. Žilina, závod Tepláreň Martin
Martin
1
2000
Cukrovar NOVA, a.s.
Sereď
1
2000
Vihorlat, a.s.
Snina
1
2000
Item
Activity
23
Overhaul of 6 MW backpressure steam turbine, reblanding, type specificaton R 6 - 3,5/0,6.
Povážské strojárne, a.s. Energetika
24
32 MW condensing steam turbine overhaul, oil system and control system modification - type specification T 32 - 6,95/0,25. 32 MW backpressure steam turbine repair, turbine base plate modification. Type specification PR 32 - 9,0/0,8/0,17. 10 MW backpressure steam turbine inspection and repair, type specification R 10 - 5,9/0,7. 6 MW condensing steam turbine inspection and repair, type specification P 6 - 3,5/0,6 (ŠKODA). Planning, design, manufacture and delivery of 25 MW h.-p. stage for 30 MW condensing steam turbine, reblading of m.-p. and I.-p. stages. Power increase from 30 MW to 33 MW, type specification PT 33-9,0/1,0/0,12. 12 MW backpressure steam turbine modification and reblading, type specification R 12 - 3,6/0,25. Planning, design and manufacture of condensing steam turbine with 14500/1500 gearbox, type specification K 1,6 - 2,0. Turbine modernization, replacement of parts in turbine steam inlet section, reblading of some rows of 55MW turbine. Type specification PP 55 - 13,0/3,5/0,5. Overhaul and connection to the 25MW backpressure parent kontrol systém, type specification PR 25 - 9,0/1,5/0,7. Turbine modification, modernization, power increase from 6 MW to 8,6 MW, turbine base plate modification, generátor replacement (biger output), type specification PR 8,6 - 6,0/1,5/0,7. Planning, design and manufacture, delivery, commisioning of 4,5 MW backpressure steam turbine, type specification R 4,5 - 2,2/0,3. Inspection and repair of 60 MW condensing steam turbine, type specification PP 57 - 6,6/3,5/0,55. Inspection and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5. Project, design, manufacture, delivery, putting into operation of 560 kW, backpressure steam turbine, type specification R 0,56 - 1,1/0,2. Project, design, manufacture, delivery, putting into operation of 5,6 MW, backpressure steam turbine, type specification R 5,6 - 3,8/0,32 Rekonstruction and reblading of 10 MW condensing steam turbine, type specification T 9,8 -1,8/0,12. Revision and repair of 6 MW condensing steam turbine ŠKODA, type specification
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Page 2
REFERENCE LIST STEAM TURBINES
For company
Site
Slovakia
Slovakia
Slovakia
Slovakia Kaučuk, a.s.
Kralupy n/Vltavou Czech republic
1
2000
Moravskoslezské teplárny, a.s.
Karviná
1
2000
LOBBE, Switzerland
Dąbrowa Górnicza Poland
1
2000
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2000
Teplárna Otrokovice, a.s.
Otrokovice Czech republic
1
2000
Cinergetika Ú/L
Ústí nad Labem Czech republic
1
2000
S.I.I.C. Cairo
Kous Egypt
1
2000
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2001
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2001
Elektrárna Kolín, a.s.
Kolín Czech republic
1
2001
MVA
Bielefeld Germany
1
2001
Energetika Třinec, a.s.
Třinec Czech republic
1
2001
Žďas, a.s.
Žďár n/Sázavou
1
2001
Czech republic
EKOL, spol. s r.o. Brno Křenová 65 602 00 Brno
Item
41
Tel.: 00420 543 531 710 Fax: 00420 543 242 912 E-mail:
[email protected] http:// www.ekolbrmo.cz
Activity P 6 - 3,5/0,4. Revision and repair of 25 MW backpressure steam turbine, type specification R 25 - 13,0/1,3. Revision and repair of 12 MW backpressure steam turbine, type specification R 12 - 9,0/1,3. Revision and repair of 9 MW condensing steam turbine, type specification PP 9 - 3,7/1,1/0,4. Revision and repair of 10 MW backpressure steam turbine, type specification R 10 - 5,9/0,7. Overhaul of 15 MW steam turbine.
Page 3
REFERENCE LIST STEAM TURBINES
For company
Site
Qty
Year of implementation
Czech republic Zvolenská teplárenská, a. s.
Zvolen Slovakia
1
2001
Žilinská teplárenská, a. s.
Žilina Slovakia
1
2001
Lovochemie, a.s.
Lovosice Czech republic
1
2001
Slovenské cukrovary, a. s.
Sereď Slovakia
1
2001
MEGATEM EC. Lublin
Lublin Poland
1
2002
Overhaul of 12 MW condensing steam turbine with automatic double extraction, type specification PT 12 - 3,5/1,3/0,12. Planning, design, manufacture, delivery, comissioning of condensing steam turbine, -1 type specification K 5,5 - 3,1. 9000min Planning, design, manufacture, delivery, comissioning of condensing steam turbine, -1 type specification K 5 - 4. 9000min . Revision and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5. Revision and repair of 60 MW condensing steam turbine, type specification PP 57 - 6,6/3,5/0,55. Revision and repair of 6 MW backpressure steam turbine, type specification PR 8,6 - 6,00/1,5/0,7. Planning, design, manufacture, supply, commissioning of backpressure steam turbine with starting condenser, with controlled extraction, type specification PR 10,3 - 7,3/0,5-0,23E Overhaul of 55 MW backpressure steam turbine, type specification PR 55 - 13,0/3,5/0,5. Overhaul of 16 MW condensing steam turbine, type specification K 16,5 - 4,5.
Actherm Chomutov a.s.
Chomutov Czech republic
1
2002
Kronospan
Lampertswalde Germany
1
2002
BKH
Grossaitingen Germany
1
2002
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2002
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2002
Cinergetika Ú/L
Ústí n/L Czech republic
1
2002
Schering AG
Berlin Germany
1
2003
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2003
Chemopetrol Litvínov, a.s.
Litvínov Czech republic
1
2003
55
Overhaul of 6 MW backpressure steam turbine, type specification R6 - 3,5.
ACTHERM Chomutov s.r.o.
Chomutov Czech republic
1
2003
56
Repair of 44 MW condensing steam turbine.
Ško-Energo, a. s.
Mladá Boleslav Czech republic
1
2003
57
Planning, design, manufacture and commissioning of backpressure steam turbine, type specification ER 5,5 - 13/1,4 for turbofeed pump drive, 200 MW unit powerplant Starobeshevo. Overhaul of 12 MW steam turbine, type specification PR 12/7 - 5,4/0,8/0,12.
SES, a. s. Tlmače
Powerplant Starobreshevo Ukraine
1
2003/04
Martinská teplárenská, a.s.
Martin Slovakia
1
2003
59
Inspection and repair of 6 MW condensing steam turbine, type specification P 6 - 4,0.
Vihorlat s.r.o.
Snina Slovakia
1
2003
60
Inspection of 5 MW condensing steam turbine.
ZRE Katovice S.A.
Katovice Poland
1
2003
42
43
44
45
46
47
48
49
50
51
52
53
54
58
EKOL, spol. s r.o. Brno Křenová 65 602 00 Brno
Tel.: 00420 543 531 710 Fax: 00420 543 242 912 E-mail:
[email protected] http:// www.ekolbrmo.cz
Item
Activity
61
Overhaul and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5. Repair of 44 MW condensing steam turbine.
62
Page 4
REFERENCE LIST STEAM TURBINES
For company
Site
Qty
Year of implementation
Sokolovská uhelná, a. s.
Vřesová Czech republic
1
2004
Ško-Energo, a. s.
Mladá Boleslav Czech republic
1
2004
63
Complete overhaul of R 25 - 9,0/1,0 steam turbine including new blading.
Teplárna České Budějovice
České Budějovice Czech republic
1
2004
64
Complete overhaul of 13 MW turbine.
DALKIA ČR, a. s.
Ostrava Czech republic
1
2004
65
Update of hydraulic governing system in ŠKODA 110 MW steam turbine.
ACETO Industries
KAFR EL DAWAR Egypt
1
2004
66
Overhaul and repair of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5.
Sokolovská uhelná, a. s.
Vřesová Czech republic
1
2005
67
Overhaul and repair of 55 MW backpressure steam turbine, type specification PR 55 - 13,0/3,5/0,5.
Sokolovská uhelná, a. s.
Vřesová Czech republic
1
2005
68
Modernization, modification, and repair of 11 MW condensing steam turbine, type specification T 11/9,5 - 15,0/2,0 for blastfurnace compressor drive.
ČKD Nové Energo, a.s.
Energetika Třinec Czech republic
1
2005
69
Supply of spare parts, modification, erection and commissioning of 33 MW steam turbine type specification PT 33 - 9,0/1,2/0,5.
Škoda Power, s.r.o.
Dalkia Ostrava Czech republic
1
2005
70
Planning, design, manufacture and commissioning of backpressure steam turbine, type specification ER 19,7 - 1,4/0,3 for generátor drive.
COLTERM Dinuinstal
Timisoara Romania
1
2005
71
Planning, design, manufacture and commissioning of backpressure steam turbine type specification R 6 - 2,3/0,3.
S.I.I.C. Cairo
Armant Egypt
1
2005
72
Planning, design, manufacture and commissioning of 1 MW backpressure steam turbine with gearbox for sugar mill, type specification TR 700 hsf.
SI.I.C Cairo
Abou-Kourkas Egypt
1
2005
73
Overhaul und reblading of 17 MW steam turbine type specification T17/17- 1,8/0,12. Moderniztion of turbine, replacement of inlet extensions, reblading of some rows of 55 MW condensing steam turbine, type specification PP 55 - 13,0/3,5/0,5 Revision and repair of 60 MW condensing steam turbine, type specification PP 57 - 6,6/3,5/0,55.
Energetika Třinec
Třinec Czech republic
1
2006
Sokolovská uhelná, a.s.
Vřesová Czech republic
1
2006
Sokolovská uhelná, a. s.
Vřesová Czech republic
1
2006
76
Planning, design, manufacture and commissioning of 1,64 MW backpressure steam turbine, type specification R1,546,3/2,3.
ADATO
Banská Bystrica Slovakia
1
2006
77
Planning, design, manufacture and commissioning of 5,4 MW condensing steam turbine, type specification K 5,4 - 2,1.
ADATO
Banská Bystrica Slovakia
1
2006
78
Delivery of 20,4 MW backpressure steam turbine including generátor, type specification R 20,4 - 9,0/0,6-E
HSFC Co. Ltd. Bangkok
Bangkok Thailand
1
2006
74
75
EKOL, spol. s r.o. Brno Křenová 65 602 00 Brno
Tel.: 00420 543 531 710 Fax: 00420 543 242 912 E-mail:
[email protected] http:// www.ekolbrmo.cz
Page 5
REFERENCE LIST STEAM TURBINES
Qty
Year of implementation
Borken Germany
1
2006
Nobaria Sugar and Rafining company
Nobaria Egypt
2
20062007
Planning, design, manufacture and commissioning of 10 MW condensing steam turbine, type specification T 10,5 1,0/0,25.
Tp Tábor
Tábor Czech republic
1
20062007
82
Planning, design, manufacture and commissioning of 5,6 MW condensing steam turbine with one controlled extraction, type specification T 5,6 - 3,8/0,3.
Jitka Otín
Jindřichův Hradec Czech republic
1
2007
83
Retrofit of backpressure steam turbine with one controlled extraction, type specification R 36 - 11,5/0,6-E.
Thajsko II
Bangkok Thailand
1
2007
84
Planning, design, manufacture and commissioning of 1,6 MW backpressure steam turbine, type specification R 1,6 - 3,0/0,8.
Anwil
Wloclawek Poland
1
2007
85
Modification of 12 MW condensing steam turbine generátor aimed at power increase by 1 MW, type specification P 12-4,1/1,1
Dalkia
Elektrárna Kolín Czech republic
1
2007
86
Planning, design, manufacture and commissioning of 7,35 MW backpressure steam turbine with heat exchanger type specification R7,35 - 4,0/0,0439.
PEC
Suwalki Poland
1
2008
87
Planning, design, manufacture and commissioning of 10 MW condensing steam turbine with generátor, heat exchanger and other accesories, type specification R 10,8 - 5,3/0,04-0,12.
EC Kielce
Kielce Poland
1
2008
88
Supply of two 8 MW backpressure steam turbines, type specification R8-4,5/0,3
Nile Sugar Copany Cairo
Alexandria Egypt
2
2007
89
Planning, design, manufacture and commissioning of 20 MW condensing steam turbine with two controlled extractions, type specification PT 20 - 3,7/0,6/0,15.
ACTHERM, s.r.o.
Chomutov Czech republic
1
2007
90
Planning, design, manufacture, erection and commissioning of rotating reduction for boiler 0,7 MW
Teplárna Dalkia Kolín, a.s.
Kolín Czech republic
1
2009
91
Planning, design, manufacture erection and commissioning of 6 MW backpressure steam turbine with generátor, type specification R6 – 2,3/0,3.
E.S.I.I.C. cukrovar
EDFU Egypt
1
2010
92
Planning, design, manufacture erection and commissioning of 6 MW backpressure steam turbine with generátor, type specification R6 – 2,3/0,3.
E.S.I.I.C cukrovar
Qous Egypt
1
2010
Item
Activity
For company
79
Planning, design, manufacture and commissioning of 6,5 MW condensing steam turbine, type specification K 6,5 - 5,2.
Borken
80
Planning, design, manufacture and commissioning of 8 MW backpressure steam turbine, type specification R 8 - 4,5/0,3E.
81
Site