KOP PERUSAHAAN
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB) PROGRAM
: PENDIDIKAN ISLAM
KEGIATAN PEKERJAAN LOKASI THN. ANGGARAN
: : : :
PENINGKATAN AKSES, MUTU KESEJAHTERAAN DAN SUBSIDI RA/RB DAN MADRASAH PEMBANGUNAN 4 RUANG KELAS MTS NEGERI KALABAHI KALABAHI, KABUPATEN ALOR - PROVINSI NTT 2014
NO
JENIS PEKERJAAN
1
2 PEKERJAAN PERSIAPAN
B
PEKERJAAN STRUKTUR I STRUKTUR BAWAH 1 PEKERJAAN TANAH 2 PEKERJAAN PONDASI II. STRUKTUR ATAS 1 PEKERJAAN LANTAI 1 2 PEKERJAAN LANTAI 2 III. STRUKTUR ATAP 1 PEKERJAAN ATAP
D.
TOTAL
( Rp. )
( Rp. ) 3
4 -
A
C.
JUMLAH
-
PEKERJAAN ARSITEKTUR I. LANTAI 1 II. LANTAI 2
-
-
PEKERJAAN MEKANIKAL ELEKTRIKAL I. LANTAI 1 II. LANTAI 2
-
-
JUMLAH
-
PPN ( 10 % )
-
TOTAL NILAI FISIK
-
PEMBULATAN
-
TERBILANG : .....................................................................................................................
Kalabahi, ........................................ Penawar PT/CV/Fa,,..................................
............................................... Direktur/Direktris
KOP PERUSAHAAN
RENCANA ANGGARAN BIAYA (RAB) PROGRAM KEGIATAN PEKERJAAN LOKASI THN. ANGGARAN
: : : : :
PENDIDIKAN ISLAM PENINGKATAN AKSES, MUTU KESEJAHTERAAN DAN SUBSIDI RA/RB DAN MADRASAH PEMBANGUNAN 4 RUANG KELAS MTS NEGERI KALABAHI KALABAHI, KABUPATEN ALOR - PROVINSI NTT 2014
NO.
JENIS PEKERJAAN
1
2
A
VOLUME
SATUA N
HARGA SATUAN
JUMLAH HARGA
3
4
5
6
PEKERJAAN PERSIAPAN 1
Pekerjaan Pembersihan Lokasi
2
Pemasangan Bowplank
1,000
ls
-
-
38,000
-
-
1,000
m ls
3
Pemasangan Papan Nama Proyek
-
4
-
Penyediaan Air Kerja
1,000
ls
-
5
-
Pelaporan, Dokumentasi
1,000
ls
-
1
JUMLAH A ……………………………………………………………………………………… B
PEKERJAAN STRUKTUR
I
STRUKTUR BAWAH
-
1 PEKERJAAN TANAH 38,199
m3
-
-
- Urugan pasir di bawah pondasi menerus
3,820
m3
-
-
- Urugan tanah kembali
9,550
m3
-
-
45,000
m3
-
-
- Galian Tanah untuk pondasi menerus dan Foot Plate
- Urugan tanah peninggian peil lantai
m3 JUMLAH B.I.1 ………………………………………………………………………………………
- Urugan pasir dibawah lantai 1 t=5 cm
9,000
-
-
2 PEKERJAAN PONDASI - Lantai Kerja Pondasi Telapak 1PC : 3Psr : 5 Krl (t=5 cm)
1,080
m3
-
-
- Beton Bertulang Footplate [K-225]
7,890
m3
-
-
- Beton Bertulang Tangga [K-225]
3,020
m3
-
-
15,280
m3
-
-
- Pas. Batu untuk pondasi menerus dalam gedung (1Pc : 5Psr) 41,255
m3
-
-
- Pasangan Batu Kosong/ Aanstamping
m3 JUMLAH B.I.2 ………………………………………………………………………………………
- Beton Bertulang Sloof Struktur 25/30 [K-225]
6,110
-
-
TOTAL STRUKTUR BAWAH …………………………………………………………………......
-
II. STRUKTUR ATAS 1 PEKERJAAN LANTAI 1 - Beton Bertulang Kolom [30/30] K-225 - Beton Kolom Praktis [12/15] K-225
4,860
m
3
-
-
-
m
3
-
-
m3 JUMLAH B.II.1 ………………………………………………………………………………………
- Beton Balok Latei [12/15] K-225
1,080
-
-
2 PEKERJAAN LANTAI 2 13,560
m3
-
-
- Beton Bertulang Balok Anak [20/25] K-225
0,300
m3
-
-
- Beton Balok Latei [12/15] K-225
1,080
m3
-
-
21,600
m3
-
-
4,860
m3
-
-
- Beton Bertulang Balok Induk [30/40] K-225 bentang 4,0 m
- Beton Bertulang Pelat Lantai 2 (t=10 cm) K-225 - Beton Bertulang Kolom lantai 2 [30/30] K-225
m3 JUMLAH B.II.2 …………………………………………………………………….............
- Beton Bertulang Listplank Beton
7,560
TOTAL STRUKTUR ATAS …………………………………………………………………......
-
-
NO.
JENIS PEKERJAAN
1 III.
VOLUME
SATUA N
HARGA SATUAN
JUMLAH HARGA
3
4
5
6
2 STRUKTUR ATAP 1 PEKERJAAN ATAP - Beton Bertulang Ring Balok [15/20] K-225 -
Penutup Atap Seng BJLS 0,20
-
Kuda - Kuda Kayu Klas II 6/12
m3 m2
-
-
3,370
m2
-
-
2,290
m'
-
-
36,800
m'
-
- Gording Kayu Klas II 6/12 -
C.
-
2,67 240,400
Pek. Bubungan Seng Plat BJLS 0,20 dan Jurai
-
-
TOTAL STRUKTUR ATAP…………………………………………………………………......
-
TOTAL PEKERJAAN STRUKTUR …………………………………………………………………......
-
PEKERJAAN ARSITEKTUR I. LANTAI 1 1 PEKERJAAN LANTAI : - Lantai Ubin Keramik 40x40 cm
162
- Plint Keramik 10x40 cm
-
- Lantai Ubin Keramik 40x40 cm (Pada tangga)
16,68
m2
-
-
m'
-
-
m2
-
JUMLAH C.I.1…………………………………………………………………......
-
2 PEKERJAAN DINDING : -
Pasangan Tembok 1PC : 5 Psr
- Plesteran Dinding (1Pc : 4Psr) tebal 15 mm
134,958
m2
-
-
269,916
m2
-
-
53,760
m2
-
-
323,676
m2
-
-
m'
-
-
m3
-
-
- Plesteran Kolom - Acian Dinding dan kolom
- Tali Air, Benangan sudut pada kolom canopy dan listplank - Beton Bertulang Kolom praktis 12 x 15 Cm
0,446
JUMLAH C.I.2…………………………………………………………………......
-
3 PEKERJAAN PINTU DAN JENDELA - Kusen Pintu, Jendela dan Bouven - Pasangan Pintu Panil Jati - Pasangan Jendela Panil Kaca - Pasangan Bouven Panil Kaca - Pasang Kaca Mati Tebal 5 mm - Pasang Kunci Tanam Kualitas Baik - Engsel Pintu - Engsel Jendela dan Bouven - Grendel Pintu - Grendel Jendela dan Bouven - Kait Angin
1,5220 4,2000 17,7072 5,6576 8,8536 2,0000 16,0000 56,0000 4,0000 72,0000 30,0000
3
m m2 m2 m2 m2 Buah Buah Buah Buah Buah Buah
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH C.I.3…………………………………………………………………......
-
4 PEKERJAAN PLAFON - Pekerjaan Plafond Tripleks 2,8 mm+Rangka
-
- Listplafond Profil lebar = 7cm
2
-
m'
-
m
JUMLAH C.I.4…………………………………………………………………......
-
5 PEKERJAAN PENGECATAN - Pengecatan Interior ( Dinding & Beton ) di dlm. Ruangan 323,676
m2
-
-
- Pengecatan Eksterior
m2
-
-
- Menie Listplank
48,840
m2
-
-
- Pengecatan Lisplank
24,420
m2
-
-
- Menie Kusen
38,230
m2
-
-
- Cat Kusen
32,256
m2
-
-
-
m2
-
- Cat Plafond
-
JUMLAH C.I.5…………………………………………………………………......
-
TOTAL PEKERJAAN LANTAI 1.................................................................................
-
II. LANTAI 2 1 PEKERJAAN LANTAI : - Lantai Ubin Keramik 40x40 cm
0
m2
-
- Plint Keramik 10x40 cm
0
m'
-
JUMLAH C.II.1…………………………………………………………………......
-
VOLUME
SATUA N
HARGA SATUAN
JUMLAH HARGA
3
4
5
6
134,958
m2
-
-
17,230
m2
-
-
- Plesteran Dinding (1Pc : 4Psr) tebal 25 mm
-
m2
-
-
- Plesteran Kolom
-
m2
-
-
- Acian Dinding dan kolom
-
m'
-
-
-
m2
-
-
- Beton Bertulang Kolom praktis 12 x 15 Cm
0,446
m3
-
-
- Beton Bertulang Kolom praktis Pagar 12 x 15 Cm
0,324
m3
-
-
- Beton Bertulang Ringbalk Pagar [12/15] Cm
0,341
m3
-
-
- Profil Tembok Pagar
0,568
m3
-
NO.
JENIS PEKERJAAN
1
2 2 PEKERJAAN DINDING : -
Pasangan Tembok 1PC : 5 Psr
-
Pasangan Tembok Pagar 1PC : 5 Psr
Tali Air, Benangan sudut pada kolom canopy dan listplank
JUMLAH C.II.2…………………………………………………………………......
-
3 PEKERJAAN PINTU DAN JENDELA - Kusen Pintu, Jendela dan Bouven - Pasangan Pintu Panil Jati - Pasangan Jendela Panil Kaca
3
1,5220 -
m m2 2 m m2 2 m Buah Buah Buah Buah Buah Buah
-
- Pasangan Bouven Panil Kaca - Pasang Kaca Mati Tebal 5 mm - Pasang Kunci Tanam Kualitas Baik - Engsel Pintu - Engsel Jendela - Grendel Pintu - Grendel Jendela dan Bouven - Kait Angin
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH C.II.3…………………………………………………………………......
-
4 PEKERJAAN PLAFON - Pekerjaan Plafond Tripleks 2,8 mm+Rangka
-
m2
-
- Listplafond Profil lebar = 7cm
-
m'
-
JUMLAH C.II.4…………………………………………………………………......
-
5 PEKERJAAN PENGECATAN - Pengecatan Interior ( Dinding & Beton ) di dlm. Ruangan
-
m2
- Pengecatan Eksterior
-
m2
- Menie Listplank
48,840
m2
- Pengecatan Lisplank
24,420
m2
- Menie Kusen
38,230
m2
- Cat Kusen
32,256
m2
-
m2
- Cat Plafond
-
JUMLAH C.II.5…………………………………………………………………......
-
6 PEKERJAAN LAIN-LAIN - Pasangan Pagar Stainles Steel
D.
m'
-
-
JUMLAH C.II.5…………………………………………………………………......
-
TOTAL PEKERJAAN LANTAI II..................................................................................
-
TOTAL ARSITEKTUR..................................................................................
-
PEKERJAAN MEKANIKAL ELEKTRIKAL I. LANTAI 1 1 PEKERJAAN INSTALASI LISTRIK - Pasang Jaringan Kabel Transmisi
30
m1
- Pasang Jaringan Kabel Saklar + Stop Kontak
20
m1
- @ Pasang T Dos
bh
- @ Pasang Elbow
bh
- Pasang Titik Mata Lampu
4
- Pasang Lampu Lilin ex. Philips 18 Watt - Pasang Lampu Lilin ex. Philips 23 Watt
bh 16
- Pasang Fitting Merk Setara Broco / Philips - Pasang Saklar Merk Setara Broko / Philips (Tunggal)
ttk bh bh
4
- Pasang Saklar Merk Setara Broco / Philips (Ganda)
bh bh
- Pasang Stop Kontak Merk Setara Broco / Philips (Tunggal)
4
bh
- Pasang MCB + Komplit
1
bh
-
JUMLAH D.I.1…………………………………………………………………......
-
2 PEKERJAAN INSTALASI AIR KOTOR 1 Pasang Pipa AW Ø 3 " ( Jaringan Air Kotor )
m1
-
-
JUMLAH D.I.2…………………………………………………………………......
-
TOTAL PEKERJAAN LANTAI I..................................................................................
-
NO.
JENIS PEKERJAAN
1
2
VOLUME
SATUA N
HARGA SATUAN
JUMLAH HARGA
3
4
5
6
II. LANTAI 2 1 PEKERJAAN INSTALASI LISTRIK - Pasang Jaringan Kabel Transmisi
30
m1
- Pasang Jaringan Kabel Saklar + Stop Kontak
20
m1
- @ Pasang T Dos
bh
- @ Pasang Elbow
bh
- Pasang Titik Mata Lampu
4
- Pasang Lampu Lilin Merk Philips 18 Watt - Pasang Lampu Lilin Merk Philips 23 Watt
bh 16
- Pasang Fitting Merk Setara Broco / Philips - Pasang Saklar Merk Setara Broko / Philips (Tunggal)
ttk bh bh
4
- Pasang Saklar Merk Setara Broco / Philips (Ganda)
bh bh
- Pasang Stop Kontak Merk Setara Broco / Philips (Tunggal)
4
bh
- Pasang MCB + Komplit
1
bh
-
JUMLAH D.II.1…………………………………………………………………......
-
2 PEKERJAAN INSTALASI AIR KOTOR - Pasang Pipa AW Ø 3 " ( Jaringan Air Kotor )
m1
-
-
JUMLAH D.II.2…………………………………………………………………......
-
TOTAL PEKERJAAN LANTAI II..................................................................................
-
TOTAL PEKERJAAN MEKANIKAL ELKTRIKAL..................................................................................
-
KOP PERUSAHAAN
DAFTAR ANALISA HARGA SATUAN SEKOLAH PEKERJAAN LOKASI KABUPATEN PROPINSI THN. ANGGARAN
NO 1
: MADRASAH TSANAWYAH NEGERI KALABAHI : PEMBANGUNAN 4 (EMPAT ) RUANG KELAS BELAJAR : KALABAHI : ALOR : NTT : 2014
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M2
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PARATAAN
SNI.2002 Hal. 8-11 UPAH :
0,1000 oh 0,0500 oh
2
1 M1 SNI.2002 Hal. 6-11
PEKERJAAN PENGUKURAN DAN PEMASANGAN BOUWPLANK BAHAN : 3 0,0070 m Kayu papan klas III 3 0,0120 m 0,0200 kg
UPAH : 0,1000 0,0100 0,1000 0,0050
3
1 M3
Pekerja Mandor
oh oh oh oh
Rp. Rp.
-
Rp. Rp. Rp.
-
Rp.
-
Rp.
-
Kayu usuk 5/7 Paku Biasa 2 ''
Rp. Rp.
-
Rp. Rp.
-
Tukang Kayu Kepala tukang Kayu Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp. Rp.
-
PEKERJAAN GALIAN TANAH BIASA SEDALAM 1 M
SNI DT-91-006-2007 Ongkos galian Hal. 3-7
4
1 M3
UPAH : 0,8000 oh 0,0400 oh
Pekerja Mandor
PEKERJAAN GALIAN TANAH PONDASI TAPAK
SNI DT-91-006-2007 Ongkos galian Hal. 3-7
1 M3
UPAH : 1,2000 oh 0,0600 oh
Pekerja Mandor
PEKERJAAN GALIAN TANAH BIASA SEDALAM 2 M
SNI DT-91-006-2007 Ongkos galian Hal. 3-7
1 M3
UPAH : 0,5260 oh 0,0520 oh
Pekerja Mandor
PEKERJAAN GALIAN TANAH BIASA SEDALAM 3 M
SNI DT-91-006-2007 Ongkos galian Hal. 3-7
UPAH : 0,7350 oh 0,0730 oh
Pekerja Mandor
NO 5
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M3
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN URUGAN KEMBALI
SNI DT-91-006-2007 Ongkos galian Hal. 4-7 UPAH :
0,1920 oh 0,0190 oh
6
1 M3
Pekerja Mandor
Rp. Rp.
-
Rp. Rp. Rp.
-
Pasir urug
Rp.
-
Rp.
-
Pekerja Mandor
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tanah urug
Rp.
-
Rp.
-
Pekerja Mandor
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Kerikil bulat
Rp.
-
Rp.
-
Pekerja Mandor
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Batu kali
Rp.
-
Rp.
-
Pasir urug
Rp.
-
Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN URUGAN PASIR
SNI DT-91-006-2007 BAHAN : Hal. 4-7
3 1,2000 m
UPAH : 0,3000 oh 0,0100 oh
7
1 M3
PEKERJAAN URUGAN TANAH
SNI DT-91-006-2007 BAHAN : Hal. 4-7
3 1,2000 m
UPAH : 0,3000 oh 0,0100 oh
8
1 M3
PEKERJAAN URUGAN KERIKIL
SNI DT-91-006-2007 BAHAN : Hal. 4-7
3 1,2000 m
UPAH : 0,3000 oh 0,0100 oh
9
1 M3
PEKERJAAN PASANGAN BATU KOSONG / BATU KALI
SNI DT-91-007-2007 BAHAN : Hal. 5-8
3 1,1500 m 3 0,3000 m
UPAH : 0,3900 0,0390 0,7800 0,0390
10
1 M3
oh oh oh oh
PEKERJAAN PASANGAN PONDASI BATU GUNUNG BERTEKSTUR / BATU BELAH ( 1PC : 4 PSR )
SNI DT-91-007-2007 BAHAN : Hal. 3-8
3 1,1000 m 4,0750 zak 3 0,5200 m
Batu gunung bertekstur / batu belah Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang
Rp.
-
Rp.
-
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,6000 0,0600 1,5000 0,0750
11
1 M2
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
HARGA SATUAN
JUMLAH HARGA
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Bata Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Bata Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANGAN TEMBOK BATA TANPA SPESIE ( Dinding dari pasangan 1/2 bata ) BAHAN : 75,0000 bh Bata
Rp.
-
Rp. Rp.
-
UPAH : 0,1000 0,0100 0,3000 0,0150
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Portland Cement
Rp.
-
Rp.
-
Pasir pasang
Rp.
-
Rp. Rp.
-
PEKERJAAN PASANGAN TEMBOK BATA ( 1PC : 3 PSR )
SNI DT-91-009-2007 ( Dinding dari pasangan 1/2 bata ) Hal. 5-11
BAHAN : 70,0000 bh 0,3593 zak 3 0,0400 m UPAH : 0,1000 0,0100 0,3000 0,0150
1 M2
oh oh oh oh
PEKERJAAN PASANGAN TEMBOK BATA ( 1PC : 5 PSR )
SNI DT-91-009-2007 ( Dinding dari pasangan 1/2 bata ) Hal. 5-11
BAHAN : 70,0000 bh 0,2420 zak 3 0,0450 m UPAH : 0,1000 0,0100 0,3000 0,0150
12
13
1 M2
1 M2
oh oh oh oh
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
PEKERJAAN PLESTERAN ( 1 PC : 3 PSR ) SETEBAL 25 MM
SNI. 2002 Hal. 12-18 BAHAN :
0,2938 zak 3 0,0350 m
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,2000 0,0200 0,3000 0,0130
1 M2 SNI.2002 Hal. 12-18
1 M2
oh oh oh oh
JUMLAH HARGA
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PLESTERAN ( 1 PC : 4 PSR ) SETEBAL 25 MM BAHAN : 0,2350 zak Portland Cement 3 0,0380 m Pasir pasang
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,1500 0,0200 0,3000 0,0130
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Portland Cement
Rp.
-
Rp.
-
Pasir beton
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Portland Cement
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp.
-
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp.
-
Rp.
-
Rp.
-
Rp.
-
Kerikil Bulat
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang
Rp. Rp.
-
Rp. Rp.
-
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
HARGA SATUAN
Tukang batu Kepala tukang Pekerja Mandor
PEKERJAAN PLESTERAN ( 1 PC : 3 PSR ) SETEBAL 15 MM
SNI DT-91-010-2007 BAHAN : Hal. 3-11
0,1944 zak 3 0,0230 m UPAH : 0,2000 0,0150 0,2000 0,0100
14
1 M2
oh oh oh oh
PEKERJAAN ACIAN PLESTERAN DAN BETON
SNI DT-91-010-2007 BAHAN : Hal. 9-11
0,0813 zak UPAH : 0,1000 0,0100 0,1500 0,0080
15
16
1 M'
1 M3 SNI. 2002 Hal. 4-28
oh oh oh oh
PEKERJAAN TALI AIR DAN BENANGAN SUDUT BAHAN : 0,1963 zak Semen PC 40 kg UPAH : 0,1500 oh Tukang 0,0120 oh Kepala Tukang 1,0000 Ls Alat Bantu
PEKERJAAN BETON TUMBUK CAMPURAN 1 PC : 3 PSR : 5 KRL BAHAN : 5,4500 zak Portland Cement 3 0,5200 m Pasir beton 3 0,8700 m
UPAH : 0,2500 oh 0,0250 oh
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA 1,6500 oh 0,0800 oh
1 M3
Pekerja Mandor
HARGA SATUAN
JUMLAH HARGA
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Portland Cement Pasir beton Batu Pecah 2/3
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Portland Cement Pasir beton Batu Pecah 2/3
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
kg
Portland Cement Pasir beton Batu Pecah 2/3 (stone crusher ) Strorox - 100
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp.
-
PEKERJAAN BETON CAMPURAN 1 PC : 2 PSR : 3 BPC
SNI. 2002 Hal.10-18 BAHAN :
8,4000 zak 3 0,5400 m 3 0,8100 m UPAH : 0,3500 0,0350 2,0000 1,0000
1 M3
oh oh oh oh
PEKERJAAN BETON CAMPURAN 1 PC : 1.5 PSR : 2.5 BPC
SNI. 2002 Hal. 12-28 BAHAN :
10,0000 zak 3 0,4800 m 3 0,8000 m UPAH : 0,3500 0,0350 2,0000 1,0000
1 M3
oh oh oh oh
PEKERJAAN BETON KEDAP AIR STROROX - 100
SNI DT-91-008-2007 BAHAN : Hal. 7-17
10,0000 0,4800 0,8000 1,2000 UPAH : 0,3500 0,0350 2,0000 1,0000
17
1 KG SNI. 2002 Hal. 15-28
zak m3 m3
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ 8 & 10 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp. UPAH : 0,0070 oh 0,0007 oh
Tukang besi Kepala tukang
Rp. Rp.
-
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA 0,0070 oh 0,0003 oh
1 KG
-
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ10 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0070 0,0007 0,0070 0,0003
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ 12 & 16 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0030 kg Kawat Beton Rp. -
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ10 & 12 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp. UPAH : 0,0070 0,0007 0,0070 0,0003
1 KG
oh oh oh oh
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ 10 & 16 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp. -
UPAH : 0,0070 0,0007 0,0070 0,0003
1 KG
-
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ 8 & 12 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp. -
UPAH : 0,0070 0,0007 0,0070 0,0003
1 KG
Rp. Rp.
JUMLAH HARGA Rp. Rp. Rp. Rp.
UPAH : 0,0070 0,0007 0,0070 0,0003
1 KG
Pekerja Mandor
HARGA SATUAN
oh oh oh oh
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
Rp. Rp. Rp. Rp.
1 KG
1 KG
NO 18
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ8 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0070 0,0007 0,0070 0,0003
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PEMBESIAN DENGAN BESI POLOS ATAU BESI BERULIR ( Φ12 mm ) BAHAN : 1,0500 kg Besi beton ( polos/ulir ) Rp. 0,0150 kg Kawat Beton Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0070 0,0007 0,0070 0,0003
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
Rp. Rp. Rp. Rp.
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M2
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN PASANG BEKISTING UNTUK SLOOF
SNI DT-91-008-2007 BAHAN : Hal. 9-17
3 0,0450 m 0,3000 kg 0,1000 ltr
UPAH : 0,2600 0,0260 0,5200 0,0260
1 M2
oh oh oh oh
Kayu papan bekisting Paku 5 - 10 cm Minyak bekisting
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Kayu papan bekisting Paku 5 - 12 cm Minyak bekisting
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Balok kayu bekisting Triplex 2.8 mm Kayu bulat Φ 8-10/4m
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG BEKISTING UNTUK KOLOM
SNI DT-91-008-2007 BAHAN : Hal. 9-17
3 0,0400 m 0,4000 kg 0,2000 ltr 3 0,0150 m
0,3500 lbr 2,0000 btg UPAH : 0,3300 0,0330 0,6600 0,0330
oh oh oh oh
1 M2
PEKERJAAN PASANG BEKISTING UNTUK BALOK
SNI DT-91-008-2007 BAHAN : Hal. 10-17
3 0,0400 m 0,4000 kg 0,2000 ltr 3 0,0180 m
0,3500 lbr 2,0000 btg UPAH : 0,3300 0,0330 0,6600 0,0330
1 M2
oh oh oh oh
Kayu papan bekisting Paku 5 - 12 cm Minyak bekisting
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Balok kayu bekisting Triplex 2.8 mm Kayu bulat Φ 8-10/4m
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Kayu papan bekisting Paku 5 - 12 cm Minyak bekisting
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Balok kayu bekisting Triplex 2.8 mm Kayu bulat Φ 8-10/4m
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG BEKISTING PLAT LANTAI
SNI DT-91-008-2007 BAHAN : Hal. 10-17
3 0,0400 m 0,4000 kg 0,2000 ltr 3 0,0150 m
0,3500 lbr 6,0000 btg
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,3300 0,0330 0,6600 0,0330
19
1 M3
oh oh oh oh
1 M3
21
1 M3
1 M3
1 M3
1 M3
1 M3
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
PEKERJAAN KOLOM BETON BERTULANG DIMENSI 25/25 Tulangan Pokok : 4 Φ12 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 95,1936 kg 2 16,0000 m
23
Besi beton
PEKERJAAN KOLOM BULAT BETON BERTULANG DIMENSI 30/30 Tulangan Pokok : 8 Φ16 mm Sngkang Spiral : Φ 10 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 243,7885 kg 2 13,3333 m
1
-
PEKERJAAN KOLOM BETON BERTULANG DIMENSI 30/30 Tulangan Pokok : 8 Φ16 mm Sengkang : Φ 10 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 191,8793 kg 2 6,6667 m
22
Rp. Rp. Rp. Rp. Rp. Rp.
PEKERJAAN BALOK INDUK BETON BERTULANG DIMENSI 30/45 Tulangan Pokok : 8 Φ16 mm Tul. Pinggang : 2 Φ 12 mm Sengkang : Φ 10 mm, Tul. Tumpuan x=20 cm dan Tul. Lap. X=10 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc Rp. 103,9609 kg 2 11,1111 m
21
-
PEKERJAAN BALOK INDUK BETON BERTULANG DIMENSI 25/40 Tulangan Pokok : 8 Φ16 mm Sengkang : Φ 10 mm, Tul. Tumpuan x=20 cm dan Tul. Lap. X=10 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc Rp. 150,9394 kg 2 9,1667 m
PEKERJAAN BALOK ANAK DIMENSI 20/25 Tulangan Pokok : 4 Φ12 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 137,6400 kg 2 14,0000 m
JUMLAH HARGA
Rp. Rp. Rp. Rp.
PEKERJAAN SLOOF BETON BERTULANG DIMENSI 20/30 Tulangan Pokok : 4 Φ16 mm Sengkang : Φ 10 mm, x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 145,3820 kg 2 8,3333 m
20
Tukang kayu Kepala tukang Pekerja Mandor
HARGA SATUAN
24
1 M3
PEKERJAAN KOLOM BETON BERTULANG DIMENSI 20/40 Tulangan Pokok : 8 Φ12 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 103,2448 kg 2 6,5000 m
25
1 M3
26
1 M3
1 M3
1 M3
1 M3
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
1 M3
1 M3
JUMLAH HARGA
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
PEKERJAAN BALOK BETON BERTULANG DIMENSI 12/25 Tulangan Pokok : 4 Φ10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
PEKERJAAN BALOK BETON BERTULANG DIMENSI 12/35 Tulangan Pokok : 6 Φ10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 141,1384 kg 2 11,1905 m
HARGA SATUAN
Besi beton
PEKERJAAN RING BALK BETON BERTULANG DIMENSI 12/50 Tulangan Pokok : 8 Φ10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
138,8016 kg 2 12,3333 m
31
Begesting
PEKERJAAN RING BALK BETON BERTULANG DIMENSI 12/30 Tulangan Pokok : 6 Φ10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
133,0632 kg 2 10,3333 m
30
-
PEKERJAAN RING BALK BETON BERTULANG DIMENSI 12/25 Tulangan Pokok : 4 Φ12 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
157,3918 kg 2 11,6667 m
29
Rp. Rp.
PEKERJAAN RING BALK BETON BERTULANG DIMENSI 20/25 Tulangan Pokok : 4 Φ12 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
138,8016 kg 2 12,3333 m
28
-
URAIAN - KOOFISIEN - SATUAN - TENAGA
113,6640 kg 2 9,0000 m
27
Rp. Rp.
PEKERJAAN KOLOM BETON BERTULANG DIMENSI 12/15 Tulangan Pokok : 4 Φ12 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 132,4475 kg 2 9,9462 m
NO
Besi beton
32
1 M3
PEKERJAAN BALOK BETON BERTULANG DIMENSI 30/45 Tulangan Pokok : 8 Φ16 mm Sengkang : Φ 10 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc 176,6133 kg 2 6,5000 m
NO 33
1 M3
1 M3
1 M3
1 M3
1 M3
Rp.
-
Rp. Rp.
-
1 M3
1 M3
JUMLAH HARGA
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
PEKERJAAN PLAT BETON BERTULANG ( tebal = 10 cm ) Tulangan Pokok : Φ10 mm Sengkang : Φ10 mm x = 10 cm 3 1,0000 m Beton Campuran 1 Pc : 1.5 Psr : 2.5 Bpc
PEKERJAAN PLAT BETON BERTULANG ( tebal = 12 cm ) Tulangan Pokok : Φ12 mm Sengkang : Φ10 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 1.5 Psr : 2.5 Bpc 178,1994 kg 2 9,2773 m
HARGA SATUAN
Besi beton
PEKERJAAN PLAT BETON BERTULANG ( tebal = 8 cm ) Tulangan Pokok : Φ10 mm Sengkang : Φ10 mm x = 20 cm 3 1,0000 m Beton Campuran 1 Pc : 1.5 Psr : 2.5 Bpc
158,6207 kg 2 10,2034 m
39
Begesting
PEKERJAAN PLAT BETON BERTULANG ( tebal = 6 cm ) Tulangan Pokok : Φ 8 mm Sengkang : Φ 8 mm x = 10 cm 3 1,0000 m Beton Campuran 1 Pc : 1.5 Psr : 2.5 Bpc
65,6669 kg 2 13,4460 m
38
-
PEKERJAAN BALOK LATEI BETON BERTULANG DIMENSI 10/50 Tulangan Pokok : 8 Φ10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
148,0000 kg 2 19,1437 m
37
Rp. Rp.
PEKERJAAN BALOK LATEI BETON BERTULANG DIMENSI 12/30 Tulangan Pokok : 4 Φ10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
157,2747 kg 2 12,0000 m
36
-
PEKERJAAN BALOK LATEI BETON BERTULANG DIMENSI 12/15 Tulangan Pokok : 4 Φ 10 mm Sengkang : Φ 8 mm x = 15 cm 3 1,0000 m Beton Campuran 1 Pc : 2 Psr : 3 Bpc
261,9324 kg 2 15,0000 m
35
Rp. Rp.
URAIAN - KOOFISIEN - SATUAN - TENAGA
261,9324 kg 2 15,0000 m
34
Besi beton
NO 40
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M3
PEKERJAAN PLAT BETON BERTULANG ( tebal = 15 cm ) Tulangan Pokok : Φ10 mm Sengkang : Φ10 mm x = 10 cm 3 1,0000 m Beton Campuran 1 Pc : 1.5 Psr : 2.5 Bpc 213,8304 kg 2 9,2773 m
41
1 M3
42
1 M2
JUMLAH HARGA
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Besi beton
Rp. Rp.
-
Rp. Rp.
-
Begesting
Rp.
-
Rp. Rp.
-
Keramik 40 x 40 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang Pc warna
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN FOOT PLAT BETON BERTULANG ( tebal = 30 cm ) Tulangan Pokok : Φ 16 mm Sengkang : Φ 12 mm x = 12 cm 3 1,0000 m Beton camp. 1 Pc : 1.5 Psr : 2.5 Bpc 136,9460 kg 2 4,2683 m
HARGA SATUAN
PEKERJAAN LANTAI KERAMIK DALAM RUANGAN ( 40 x 40 cm )
SNI.2002 Hal. 8-41 BAHAN :
6,2500 bh 0,2450 zak 3 0,0215 m 1,3000 kg UPAH : 0,1200 0,0120 0,2500 0,0125
43
1 M2
oh oh oh oh
PEKERJAAN LANTAI KERAMIK PERMUKAAN BERBINTIK (20 x 20 cm)
SNI.2002 Hal. 24-41 BAHAN :
25,0000 bh 0,2845 zak 3 0,0420 m 1,5000 kg UPAH : 0,3500 0,0350 0,6200 0,0300
44
1 M2
oh oh oh oh
Keramik 20 x 20 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang Pc warna
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN LANTAI KERAMIK PERMUKAAN KASAR BERMOTIF (20 x 20 cm)
SNI.2002 Hal. 24-41 BAHAN :
25,0000 bh 0,2845 zak 3 0,0420 m 1,5000 kg UPAH : 0,3500 oh 0,0350 oh
Keramik 20 x 20 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang Pc warna
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang
Rp. Rp.
-
Rp. Rp.
-
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA 0,6200 oh 0,0300 oh
45
1 M2
Pekerja Mandor
HARGA SATUAN
JUMLAH HARGA
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Keramik 20 x 25 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang Semen Warna
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Plint Keramik 10 x 40 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang Pc warna
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang batu Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Batu Granit 40 x 40 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang Pc warna
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Batu Candi 20 x 20 cm Portland Cement
Rp. Rp.
-
Rp. Rp.
-
Pasir pasang
Rp.
-
Rp. Rp.
-
PEKERJAAN DINDING KERAMIK KM/WC (20 x 25 cm)
SNI.2002 Hal. 35-41 BAHAN :
20,0000 bh 0,2325 zak 3 0,0180 m 1,5000 kg UPAH : 0,1000 0,0450 0,6000 0,0300
46
1 M1
oh oh oh oh
PEKERJAAN PLINT KERAMIK (10 x 40 cm)
SNI.2002 Hal. 13-41 BAHAN :
2,6500 bh 0,0300 zak 3 0,0030 m 0,1000 kg UPAH : 0,0400 0,0040 0,0800 0,0040
47
1 M2
oh oh oh oh
PEKERJAAN PASANG DINDING GRANIT (40 X 40 cm)
SNI.2002 Hal. 36-41 BAHAN :
6,2500 bh 0,3110 zak 3 0,0250 m 0,1500 kg UPAH : 0,6500 0,0650 0,7200 0,0350
48
1 M2
oh oh oh oh
PEKERJAAN PASANG BATU CANDI (20 X 20 cm)
SNI.2002 Hal. 37-41 BAHAN :
25,0000 bh 0,2938 zak 3 0,0350 m
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,3500 0,0350 0,6200 0,0300
49
1 M3
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
HARGA SATUAN
JUMLAH HARGA
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Profil alluminium Skrup fixer Sealant tube
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang Besi Kepala Tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Papan klas I Lem kayu
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang kayu Kepala Tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG KUSEN PINTU DAN JENDELA
SNI DT-91-011-2007 BAHAN : Hal. 3-12
3 1,1000 m 1,2500 kg 1,0000 kg
UPAH : 18,0000 2,0000 6,0000 0,3000
50
1 M1
oh oh oh oh
Kayu Klas I Paku 5-10 cm Lem kayu
Tukang kayu Kepala tukang Pekerja Mandor
PEKERJAAN PASANG KUSEN PINTU DAN JENDELA ALLUMINIUM
SNI DT-91-014-2007 BAHAN : Hal. 5-9
1 1,1000 m 2,0000 bh 0,0600 tube
UPAH 0,0430 0,0043 0,0430 0,0021
51
1 M2
oh oh oh oh
PEKERJAAN PASANG DAUN PINTU PANEEL
SNI DT-91-011-2007 BAHAN : Hal. 4-12
3 0,0400 m 0,5000 kg
UPAH 2,0000 0,2000 0,8000 0,0400
52
1 M2
oh oh oh oh
PEKERJAAN PASANG DAUN PINTU PANEEL + ALUMUNIUM FOIL
SNI.2002 Hal. 14-29 BAHAN : (Modifikasi)
0,0400 0,1500 0,1500 0,5000
m3 kg ltr lbr
Papan klas I Paku 0.5 - 2 cm Lem tripleks Alumunium Foil
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH 2,0000 0,2000 0,8000 0,0400
53
1 M2
oh oh oh oh
Tukang kayu Kepala tukang Pekerja Mandor
HARGA SATUAN
JUMLAH HARGA
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Papan kayu klas I Kaca bening 5 mm Lem kayu
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG PINTU + JENDELA + BUVEN KACA
SNI DT-91-011-2007 BAHAN : Hal. 4-12
3 0,0240 m 0,5957 lbr 0,3000 kg
UPAH : 2,0000 0,2000 0,8000 0,0400
54
1 M2
oh oh oh oh
PEKERJAAN PASANG PINTU + JENDELA + BUVEN KACA ALLUMINIUM
SNI DT-91-014-2007 BAHAN : Hal. 6-9
1 4,4000 m 0,5957 lbr 0,2700 tube
UPAH : 0,0850 0,0080 0,0850 0,0040
55
1 M2
oh oh oh oh
Rangka alluminium Kaca bening 5 mm Sealant
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rangka alluminium
Rp.
-
Rp.
-
Alluminium strip
Rp.
-
Rp.
-
Tukang besi Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Kaca Bening 5 mm
Rp.
-
Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG PINTU ALLUMINIUM STRIP LEBAR 8 cm
SNI DT-91-014-2007 BAHAN : Hal. 5-9
1 4,4000 m 1 14,6000 m
UPAH : 0,0850 0,0085 0,0850 0,0042
56
1 M2
oh oh oh oh
PEKERJAAN PASANG KACA TEBAL 5 MM
SNI.2002 Hal. 10-13 BAHAN :
0,5964 lbr UPAH : 0,1500 0,0150 0,0150 0,0008
oh oh oh oh
NO 57
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M2 SNI.2002 Hal. 11-13
58
1 M3 SNI.2002 Hal.16-29
Rp.
-
Rp.
-
UPAH : 0,1500 0,0150 0,0150 0,0008
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Paku 5 - 12 cm
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang kayu Kepala Tukang kayu Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Papan klas II Paku 5 - 7 cm
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
RANGKA ATAP BAJA RINGAN BAHAN : 1,0000 m2 Bahan Rangka Atap (HDG)
Rp.
-
Rp. Rp.
-
UPAH : 0,0600 0,0050 0,1500 0,0060
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PEMASANGAN GENTENG METAL BAHAN : 0,9000 lbr Seng Gelombang BJLS 0,20 0,0200 kg Paku Seng
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0600 0,0060 0,1200 0,0060
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
Tukang kayu Kepala tukang Pekerja Mandor
PEKERJAAN PASANG KUDA - KUDA KAYU KLAS I BAHAN : 3 1,1000 m Kayu klas II
UPAH : 12,0000 1,2000 4,0000 0,2000
1 M1
JUMLAH HARGA
PEKERJAAN PASANG KACA CERMIN TEBAL 5 MM BAHAN : 0,5964 lbr Kaca Bening 5 mm
0,8000 kg
59
HARGA SATUAN
oh oh oh oh
PEKERJAAN PASANG LISPLANG ( 3 x 20 ) cm
SNI DT-91-011-2007 BAHAN : Hal. 8-12
3 0,0108 m 0,1000 kg
UPAH : 0,2000 0,0250 0,1000 0,0500
60
61
1 M2
1 M2 SNI. 2002 Hal.19-21
oh oh oh oh
oh oh oh oh
oh oh oh oh
Tukang Kepala tukang Pekerja Mandor
Tukang Kepala tukang Pekerja Mandor
NO 62
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M'
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN PASANG NOK GENTENG METAL
SNI. 2002 Hal.13-21 BAHAN :
1,0000 m' 0,0500 kg UPAH : 0,1500 0,0150 0,2500 0,0130
63
1 M1
1 M2
-
Rp. Rp. Rp.
-
Tukang seng Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp.
-
Rp.
-
Rp. Rp.
-
oh oh oh oh
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Tukang seng Kepala tukang Pekerja Mandor
PEKERJAAN PLAFOND TRIPLEK / DINDING KAYU RANGKA KAYU KLAS II
SNI DT-91-011-2007 BAHAN : Hal. 8-12 SNI DT-91-013-2007 Hal. 4-7
0,0163 0,3750 0,0250 0,0300 UPAH : 0,3000 0,0300 0,2000 0,0100
65
Rp. Rp.
PEKERJAAN PASANG TALANG MIRING BAHAN : 0,5000 lbr Seng plat 0,0150 kg Paku 3 - 5 cm 3 0,0190 m Papan klas II UPAH : 0,4000 0,0250 0,0400 0,0013
64
oh oh oh oh
Nok Genteng Metal Paku pentul
1 M2
m3 lbr kg kg
Kayu Usuk klas II Tripleks 2.8 mm Paku 3-5 cm Paku 1/2-2 cm
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PLAFOND GYPSUM BOARD + RANGKA HOLLOW GALVANISE ( 60 X 120 ) cm
SNI DT-91-013-2007 BAHAN : Hal.4-7
3,6000 0,1500 24,0000 0,3819 UPAH : 0,5000 0,0500 0,1500 0,0080
m1 kg pcs lbr
Hollow galvanise 40 x 40 mm Kawat plafon Φ 4 mm Skrup gipsum uk. 2.5 cm Gypsum board
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
NO 66
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M1
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN PASANG LIST PLAFOND PROFIL LEBAR 7 CM
SNI DT-91-013-2007 BAHAN : Hal.5-7
1 1,0500 m 0,0100 kg
Kayu profil Paku 1/2-2 cm
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang kayu Kepala Tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Profil gypsum Skrup gipsum uk. 2.5 cm
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang kayu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PENGELASAN DENGAN LISTRIK BAHAN : 0,0400 kg Kawat las listrik 0,0300 Liter Solar 0,0040 Liter Minyak pelumas
Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
UPAH : 0,0020 0,0002 0,0040 0,0002 0,0170
Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
-
PEMBUATAN RAILING STAINLESS STEEL SESUAI GAMBAR RENCANA BAHAN : 1 4,4400 m Pipa Stainless steel Dia. 2" Rp.
UPAH : 0,0500 0,0050 0,0500 0,0030
67
1 M1
oh oh oh oh
PEKERJAAN PASANG LIST PLAFOND GYPSUM LEBAR 10 CM
SNI DT-91-013-2007 BAHAN : Hal.5-7
1 1,0500 m 6,0000 kg
UPAH : 0,0500 0,0050 0,0500 0,0030
68
69
1 cm
1 M1
oh oh oh oh
oh oh oh oh jam
-
Rp.
-
Pipa Stainless steel Dia. 1"
Rp.
-
Rp. Rp.
-
Biaya Pengelasan Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PENGECATAN BIDANG KAYU BARU ( 1 lapis plamir, 2 lapis cat penutup ) BAHAN : 0,1500 kg Plamir kayu 0,2600 kg Cat penutup 2 kali
Rp. Rp.
-
Rp. Rp. Rp.
UPAH : 0,0090 0,0060 0,0700 0,0025
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
1 2,4800 m
UPAH : 63,863 0,0050 0,0500 0,0030
70
1 M2 SNI.2002 Hal.7-14
Tukang Las Kepala tukang Pekerja Mandor Biaya Sewa Alat
cm oh oh oh
oh oh oh oh
Tukang cat Kepala tukang Pekerja Mandor
-
71
1 M2 SNI.2002 Hal.9-14
NO 72
1 M2 Hal.9-14
1 M2 SNI.2002 Hal.9-14
74
1 M2 SNI.2002 Hal.7-14
75
Rp. Rp.
-
Rp. Rp. Rp.
UPAH : 0,0630 0,0063 0,0200 0,0025
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
oh oh oh oh
Tukang cat Kepala tukang Pekerja Mandor
URAIAN - KOOFISIEN - SATUAN - TENAGA
SNI.2002
73
PEKERJAAN PENGECATAN TEMBOK BARU ( INTERIOR ) ( 1 lapis plamir , 2 cat penutup ) BAHAN : 0,1000 kg Plamir 0,2600 kg Cat penutup 2 kali
1 M2 SNI.2002 Hal.7-14
HARGA SATUAN
-
JUMLAH HARGA
PEKERJAAN PENGECATAN TEMBOK BARU ( EKSTERIOR ) ( 1 lapis plamir , 2 cat penutup ) BAHAN : 0,1000 kg Plamir 0,1300 kg Cat penutup 1 kali
Rp. Rp.
-
Rp. Rp. Rp.
UPAH : 0,0630 0,0063 0,0200 0,0025
Tukang cat Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PENGECATAN / PELAPISAN PLAT BETON ( 3 lapis cat penutup ) BAHAN : 0,3900 kg Cat penutup 2 kali
Rp.
-
Rp. Rp.
-
UPAH : 0,0630 0,0063 0,0200 0,0025
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PENGECATAN PLAFOND ( 1 lapis plamir, 2 lapis cat penutup ) BAHAN : 0,1000 kg Plamir Kayu 0,2600 kg Cat penutup 2 kali
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0630 0,0060 0,0400 0,0025
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PENGECATAN SENK / BESI ( 1 lapis cat dengan penutup 200 um ) BAHAN : 0,3000 kg Cat senk
Rp.
-
Rp. Rp.
-
UPAH : 0,0600 0,0120 0,0060 0,0060
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
oh oh oh oh
oh oh oh oh
oh oh oh oh
Tukang cat Kepala tukang Pekerja Mandor
Tukang cat Kepala tukang Pekerja Mandor
Tukang cat Kepala tukang Pekerja Mandor
-
76
1 BH SNI.2002 Hal.4-13
NO
PEKERJAAN PASANG KUNCI TANAM BIASA BAHAN : 1,0000 bh Kunci tanam biasa
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,5000 0,0100 0,0100 0,0050
77
1 BH SNI.2002 Hal.4-13
78
1 BH SNI.2002 Hal.5-13
79
1 BH SNI.2002 Hal.5-13
80
Rp.
1 BH SNI.2002 Hal.7-13
oh oh oh oh
Rp. Rp.
HARGA SATUAN
-
JUMLAH HARGA
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG KUNCI TANAM ALLUMINIUM BAHAN : 1,0000 bh Kunci tanam alluminium
Rp.
-
Rp. Rp.
-
UPAH : 0,5000 0,0100 0,0100 0,0050
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG ENGSEL PINTU BAHAN : 1,0000 bh Engsel pintu
Rp.
-
Rp. Rp.
-
UPAH : 0,0150 0,0150 0,0150 0,0008
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG ENGSEL JENDELA & BUVEN BAHAN : 1,0000 bh Engsel jendela / buven
Rp.
-
Rp. Rp.
-
UPAH : 0,0150 0,0150 0,0150 0,0008
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG KAIT ANGIN JENDELA DAN BUVEN BAHAN : 1,0000 bh Kait angin
Rp.
-
Rp. Rp.
-
UPAH : 0,1500 0,0150 0,0150 0,0008
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
oh oh oh oh
oh oh oh oh
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
-
Tukang kayu Kepala tukang Pekerja Mandor
Tukang kayu Kepala tukang Pekerja Mandor
Tukang kayu Kepala tukang Pekerja Mandor
Tukang kayu Kepala tukang Pekerja Mandor
NO 81
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 BH SNI.2002 Hal.7-13
82
1 BH SNI.2002 Hal.7-13
83
1 BH SNI.2002 Hal.7-13
1 BH SNI.2002 Hal.4-20
Rp.
-
Rp. Rp.
-
UPAH : 0,1500 0,0150 0,0150 0,0008
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG GRENDEL PINTU TANAM BAHAN : 1,0000 bh Grendel pintu tanam
Rp.
-
Rp. Rp.
-
UPAH : 0,1500 0,0150 0,0150 0,0008
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp.
-
Rp.
-
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
1 BH SNI.2002
PEKERJAAN PASANG KLOSET DUDUK BAHAN : 1,0000 bh Kloset duduk Perlengkapan 6 %
Hal.4-20
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 1,1000 oh 0,0010 oh
Rp. Rp.
-
Rp. Rp.
-
oh oh oh oh
oh oh oh oh
Tukang kayu Kepala tukang Pekerja Mandor
Tukang kayu Kepala tukang Pekerja Mandor
PEKERJAAN PASANG DOOR CLOSE PINTU BAHAN : 1,0000 bh Sok pintu alluminium oh oh oh oh
Tukang kayu Kepala tukang Pekerja Mandor
PEKERJAAN PASANG KLOSET JONGKOK BAHAN : 1,0000 bh Kloset jongkok 0,1500 zak Portland Cement 3 0,0100 m Pasir pasang UPAH : 1,1000 0,0010 3,3000 0,1600
85
JUMLAH HARGA
PEKERJAAN PASANG GRENDEL JENDELA & BUVEN BAHAN : 1,0000 bh Grendel pintu dan jendela
0,1500 0,0150 0,0150 0,0008
84
HARGA SATUAN
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
Tukang batu Kepala tukang
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA 3,3000 oh 0,1600 oh
86
1 BH SNI.2002 Hal.4-20
87
1 M1 SNI.2002 Hal.13-20
88
1 M1 SNI.2002 Hal.14-20
89
1 M1 SNI.2002 Hal.14-20
JUMLAH HARGA
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG FIBERGLASS BAHAN : 1,0000 bh Bak fiberglass Perlengkapan 12 %
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 2,7000 0,5400 1,8000 0,1100
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG PIPA GALVANIS ɸ 1/2" BAHAN : 1,2000 bh Pipa galvanis Perlengkapan 35 %
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0900 0,0090 0,0540 0,0270
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG PIPA STAINLESS ɸ 2" BAHAN : 1,2000 bh Pipa stainless Perlengkapan 35 %
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0900 0,0090 0,0540 0,0270
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG PIPA PVC TYPE "AW" ɸ 2" BAHAN : 1,2000 bh Pipa pvc Perlengkapan 35 %
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,0900 0,0090 0,0540 0,0270
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
oh oh oh oh
oh oh oh oh
oh oh oh oh
oh oh oh oh
Pekerja Mandor
HARGA SATUAN
Tukang batu Kepala tukang Pekerja Mandor
Tukang besi Kepala tukang Pekerja Mandor
Tukang besi Kepala tukang besi Pekerja Mandor
Tukang besi Kepala tukang Pekerja Mandor
NO 90
URAIAN - KOOFISIEN - SATUAN - TENAGA 1 M1 SNI.2002 Hal.18-20
91
1 M1 SNI.2002 Hal.18-20
92
1 BH
HARGA SATUAN
JUMLAH HARGA
PEKERJAAN PASANG PIPA PVC TYPE "AW" ɸ 3" BAHAN : 1,2000 bh Pipa pvc Perlengkapan 35 %
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,1350 0,0135 0,0810 0,0041
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG PIPA PVC TYPE "AW" ɸ 4" BAHAN : 1,2000 bh Pipa pvc Perlengkapan 35 %
Rp. Rp.
-
Rp. Rp. Rp.
-
UPAH : 0,1350 0,0135 0,0810 0,0041
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Kran air stainless Seal tape
Rp. Rp.
-
Rp. Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
PEKERJAAN PASANG FLOOR DRAIN BAHAN : 1,0000 bh Floor drain stainless
Rp.
-
Rp. Rp.
-
UPAH : 0,1000 0,0100 0,0100 0,0050
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp.
-
Rp. Rp.
-
Rp.
-
Rp. Rp.
-
oh oh oh oh
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
Tukang besi Kepala tukang Pekerja Mandor
PEKERJAAN PASANG 1 BUAH KRAN ɸ 1/2
SNI.2002 Hal.19-20 BAHAN :
1,0000 bh 0,0250 bh UPAH : 0,1000 0,0100 0,0100 0,0050
93
1 BH SNI.2002 Hal.20-20
94
1 BH
oh oh oh oh
oh oh oh oh
Tukang besi Kepala tukang Pekerja Mandor
PEKERJAAN PASANG TEMPAT SABUN BAHAN : 1,0000 bh Tempat sabun 0,0125 zak Portland Cement 3 0,0008 m Pasir pasang
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,1000 0,0100 0,0100 0,0050
95
1 BH SNI.2002 Hal.6-20
oh oh oh oh
Tukang batu Kepala tukang Pekerja Mandor
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Portland Cement
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Pasir pasang
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Portland Cement
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Pasir pasang
Rp.
-
Rp. Rp.
-
Tukang batu Kepala tukang Pekerja Mandor
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Ijuk
Rp.
-
Rp. Rp.
-
Pekerja Mandor
Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp.
-
Rp.
-
Rp.
-
Perlengkapan 12 % harga wastafel
UPAH : 1,4500 0,1500 1,2000 0,1000
96
1 BH SNI.2002 Hal.6-20
oh oh oh oh
PEKERJAAN PASANG WASTAFEL ALLUMINIUM BAHAN : 1,0000 bh Wasstafel Perlengkapan 12 % harga wastafel
0,1500 zak 3 0,0100 m UPAH : 0,1000 0,0100 0,0100 0,0050
97
1 M3 SNI.2002 Hal.8-9
oh oh oh oh
PEKERJAAN PASANG LAPISAN IJUK BAHAN : 3 1,2000 m
UPAH : 0,1500 oh 0,0150 oh
98
1 M1
JUMLAH HARGA
Rp. Rp. Rp. Rp.
PEKERJAAN PASANG WASSTAFEL BAHAN : 1,0000 bh Wastafel 0,1500 zak 3 0,0100 m
HARGA SATUAN
PEKERJAAN JARINGAN KABEL TRANSMISI BAHAN : 0,2500 bh T Dos 0,2500 bh Elbow 0,2500 btg Pipa Instalasi 1,0000 bh Klem pipa 0,2500 bh Isolator 1 1,0500 m Kabel NYM 3 x 2.5 mm
NO
URAIAN - KOOFISIEN - SATUAN - TENAGA UPAH : 0,0533 0,0053 0,0400 0,0020
99
1 M1
1 TITIK
Tukang listrik Kepala tukang Pekerja Mandor
PEKERJAAN JARINGAN KABEL SAKLAR + STOP KONTAK BAHAN : 0,2500 btg Pipa Instalasi 1,0000 bh Klem pipa 0,2500 bh Isolator 1 1,0500 m Kabel NYM 3 x 2 mm UPAH : 0,0533 0,0053 0,0400 0,0020
100
oh oh oh oh
oh oh oh oh
Tukang listrik Kepala tukang Pekerja Mandor
PEKERJAAN MATA LAMPU BAHAN : 1,0000 bh Elbow 0,5000 btg Pipa Instalasi 4,0000 bh Klem pipa 2,0000 bh Isolator 1 5,0000 m Kabel NYM 3 x 2 mm UPAH : 0,0533 0,0053 0,0400 0,0020
oh oh oh oh
Tukang listrik Kepala tukang Pekerja Mandor
HARGA SATUAN
JUMLAH HARGA
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Rp. Rp. Rp.
-
Rp.
-
Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp.
-
Rp.
-
Rp.
-
Rp. Rp. Rp. Rp.
-
Rp. Rp. Rp. Rp. Rp. Rp.
-
KOP PERUSAHAAN
DAFTAR HARGA UPAH DAN BAHAN SEKOLAH PEKERJAAN LOKASI KABUPATEN PROPINSI THN. ANGGARAN
I.
: : : : : :
MADRASAH TSANAWYAH NEGERI KALABAHI PEMBANGUNAN 4 (EMPAT ) RUANG KELAS BELAJAR KALABAHI ALOR NTT 2014
UPAH PEKERJA 1 2 3 4 5 6 7 7 8 9
II. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Pekerja Mandor Tukang Besi Tukang Batu Tukang Kayu Tukang Cat Tukang Listrik Kepala tukang Operator / Sopir Pembantu Operator / Sopir
Rp.
HARGA UPAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
/ / / / / / / / / /
DAFTAR BAHAN AC Dinding Kapasitas 1 PK Merk Setara LG / SAMSUNG / PANASONIC / SHARP AC Merk 2 PK Setara LG / SAMSUNG / PANASONIC / SHARP Merk Setara LG / SAMSUNG / PANASONIC / SHARP Alluminium Foil Alluminium Strip Lebar 8 cm ALLUCOPAN Standarisasi Pabrik, tebal 4 mm Termasuk Rangka + Selant + Fastener + Jasa Pemasangan Anti Bocor Waterproofing / Masterproof / No Drop Batu Pecah 2/3 cm ( Non Selektif pecahan stone crusher ) Batu Pecah 2/3 cm ( Selektif pecahan stone crusher ) Batu Candi Batu Kali Batu Gunung Bertekstur / Batu Belah Batu Granit Merk Setara Granito / Inesa / Essensa Bata Berkualitas Bak Mandi Fiberglass Berkualitas Buven Beton ( 25 x 35 ) cm Besi Beton SNI Ø 8 mm Besi Beton SNI Ø10 mm Besi Beton SNI Ø 12 mm Besi Beton SNI Ø 16 mm Harga Rata-Rata Besi Beton SNI Ø 8 mm dan 10 mm Harga Rata-Rata Besi Beton SNI Ø 8 mm dan 12 mm Harga Rata-Rata Besi Beton SNI Ø 10 mm dan 12 mm Harga Rata-Rata Besi Beton SNI Ø 10 mm dan 16 mm Harga Rata-Rata Besi Beton SNI Ø 12 mm dan 16 mm Besi Angker Kusen / Plat
hr hr hr hr hr hr hr hr hr hr
HARGA DASAR Rp.
/ bh
Rp.
/ bh
Rp. Rp. Rp.
/ lbr / strip 2 / m
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
/ / / / / / / / / / / / / / / / / / / /
kg m3 m3 bh m3 m3 bh bh bh unit kg kg kg kg kg kg kg kg kg bh
KOP PERUSAHAAN
II.
DAFTAR BAHAN
HARGA DASAR
26 27 28 29 30 31 32 33 34 35 36 37
Cat Kayu Cat Tembok @ Interior @ Eksterior Setara JOTUN / DULUX / MOWILEX / CATILAC Cat Senk Merk Setara JOTUN / DULUX / MOWILEX / CATILAC Dumpul Kayu Engsel Pintu Setara Stainless Engsel Jendela / Buven Setara Stainless Floor Drain Setara Stainless Gerendel Pintu, Jendela dan Buven Setara Stainless Gerendel Pintu Tanam Setara Stainless Gipsum / Calsyboard Uk. ( 120 X 240 ) cm ; Tebal = 4.5 mm Merk Setara JAYA BOARD/ELEPHANT/KNAUF/GIPROC/APLUS
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
/ kg
38 38 38 39 40 41
Gipsum Profil Lebar 10 Cm Hollow Galvanise (4 x 4 x 0.3) Isolasi Merk Unibel Ijuk Kerikil Bertekstur / Koral Pecahan Alam Keramik Berkualitas Merk Setara ARWANA / MULIA / ROMAN PLATINUM / ESSENSA @ Keramik Lantai Dalam Ruangan Uk. 40 x 40 cm Mengkilap bercahaya dan Warna Cram Keputihan @ Keramik Luar Ruangan (Teras) Uk. 40 x 40 cm Mengkilap, Permukaan Berbintik dan Warna Cram Keputihan @ Keramik Lantai Ruang Pencucian Uk. 20 x 20 cm Mengkilap, Permukaan Berbintik dan Warna Cram Keputihan @ Keramik Lantai KM /WC Uk. 20 x 20 cm Permukaan Kasar Bermotif dan Warna Campur Biru + Putih @ Keramik Dinding KM /WC & Wasstafel Uk. 20 x 25 cm Mengkilap Komposisi 2 ( Dua ) Cram Keputihan dan Biru @ Keramik Plint 10 x 40 cm (Licin dan Kilap ) Mengkilap dan Warna Cram Keputihan Kawat Beton Kawat Plafon 4 mm Kayu Balok Jati / Klas I Kayu Papan Jati / Klas I Kayu Balok Klas II Kayu Balok Bekisting Kayu Usuk Klas II Kayu Papan Klas II Kayu Papan Begesting Klas III Kayu Bulat / Steger Kaca Bening Tebal 5 mm Kaca Bening Tebal 10 mm Kaca Cermin Tebal 5 mm Kait Angin, Jendela dan Buven (Stainless) Kawat Las Listrik Kertas Pasir / Amplas
Rp. Rp. Rp. Rp. Rp.
m1 m1 bh m3 m3
42 43 44 45 46 47 48 49 50 51 52 53 53 54 55 55
/ / / / / / / / / / / / / / / /
kg kg kg kg bh bh bh bh bh lbr
Rp.
/ / / / / / / / / / /
bh bh bh bh bh bh bh bh bh bh bh
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
/ / / / / / / / / / / / / / / /
kg kg m3 m3 m3 m3 m3 m3 m3 btg lbr lbr lbr bh kg lbr
Rp. Rp. Rp. Rp. Rp.
KOP PERUSAHAAN
II. 54 55 56 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102
DAFTAR BAHAN Kuda-Kuda Baja Ringan Standarisasi Pabrik (Reng Profil U, Sekrup + Jasa Pemasangan) Kunci Pintu Tanam Paneel Kunci Pintu Tanam Alluminium + Pegangan Kusen Alluminium Coklat 4 inc Kusen Rangka Alluminium Daun Pintu+Jendela+Buven Kloset Jongkok Merk INA Kloset Duduk Merk INA ( Komplit ) Kran Air Ø 1/2 Stainless Kayu List Plafon Profil Lebar : 5 - 7 cm Lem Tripleks Aico Aibon Lem Kayu Weber / Rajawali Minyak Bekisting Seng Gelombang BJLS 0,20 Nok Genteng Metal Mortar Utama (MU-200) Acian Plesteran dan Beton 40 Kg Magnet Pintu Pasir Urug Pasir Pasang Pasir Beton Paku 3-5 cm Paku 7-12 cm Paku List 1/2 - 2 cm Paku pentul Pelumas Paku Ramset Pelat Strep Tebal 4 mm Pelat Strep "U" Tebal 4 mm Pipa Galvanis AW Ø 1/2" Pipa Hawa Ø 1" Pipa Stainless Ø 1" Pipa Stainless Ø 2" Pipa PVC Type AW Ø 1" Pipa PVC Type AW Ø 2" Pipa PVC Type AW Ø 3" Pipa PVC Type AW Ø 4" Plamir Kayu Merk Setara JOTUN / DULUX / MOWILEX / CATILAC Plamir Tembok Merk Setara JOTUN/DULUX/MOWILEX/CATILAC Solar (Industri) Semen Putih ( Pc ) Semen Type I 40 Kg ( Pc ) Seng Plat 0.30 cm Seal Tape Sealant Tube Skrup Gypsum Uk. 2.5 cm Shok / Door Close Alluminium Strorox-100 Tanah urug Tripleks 2.8 mm Tempat Sabun Wasstafel Merk INA Wasstafel Stainless
HARGA DASAR Rp.
2 / m
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
bh bh m1 m1 bh bh bh m1 ltr kg ltr lbr m' zak bh m3 m3 m3 kg kg kg kg Ltr pcs bh bh m1 unit m1 m1 m1 m1 m1 m1 kg kg Ltr kg zak lbr roll tube pcs bh pcs m3 lbr bh unit unit
KOP PERUSAHAAN
III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
KOMPONEN LISTRIK Elbow Fiting merk setara Broko / Philips Handle 220 Volt Isolator Kabel NYM 3 x 2 mm Kabel NYM 3 x 2.5 mm Kawat Klem Kabel Klem Pipa Klem Baja Canal C Lampu TL Merk Philips 2x40 Watt Komplit Lampu XL Merk Philips 18 Watt + Tabung Komplit Lampu Bulat Tempel Merek Philips 20 Watt Lampu Lilin Merk Philips 18 Watt Lampu Lilin Merk Philips 23 Watt Lampu Sorot + Perlengkapannya MCB Komplit Pipa Instalasi Listrik Kualitas Baik Pipa Arde Pipa Galvanis Ø 1/2 Penangkal Petir Saklar Tombol Merk Setara Broco / Philips Saklar Ganda Tombol Merk Setara Broco / Philips Saklar Tryple Merk Setara Broco / Philips Stop Kontak Merk Setara Broco / Philips Shock Galvanis Ø 1/2 Sekring 1 Group Splits 1" T Dos Timah
HARGA DASAR Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / /
bh bh bh bh m1 m1 m1 bh bh bh bh bh bh bh bh Unit bh btg m1 m1 unit bh bh bh bh bh bh bh bh kg
B
S-05
S-02
A
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI
C
D
PROGRAM
E
PENDIDIKAN AGAMA ISLAM
4,500
4,500
KEGIATAN
18,000
4,500
PENINGKATAN AKSES MTS. N KALABAHI
4,500
4,000
1
RUANG KELAS
4,000 10,000
S-04
RUANG KELAS
2,000
S-01
SELASAR 1
18
2
PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU DIPERIKSA
2
PPK. MTS N KALABAHI
ISKANDAR BAY NIP:19600615 198303 1 804 S-01
MENGETAHUI KEPALA MTS N KALABAHI
3 ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
4
16
4
2,400
S-04
17
3
15
5
14
6
13
7
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN
12
8
3,500
PEKERJAAN
11
5 6
9
1,100
10
FRIT D. MALAIKOSA, BE DRAFTER
TANDA TANGAN
CHARLES Y. KALLA, A Md
3,000
F
NAMA GAMBAR
G
-
DENAH LANTAI I 1:100
SKALA GAMBAR
S-05
S-02
DENAH LANTAI I
1:100 Layout ID
A.01
NO. LBR
01
JLH.LBR
B
S-05
S-02
A
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI
C
D
E
PROGRAM PENDIDIKAN AGAMA ISLAM
4,500
4,500
KEGIATAN
18,000
4,500
4,500
PENINGKATAN AKSES MTS. N KALABAHI
1 4,000
PEKERJAAN
RUANG KELAS
4,000 10,000
S-04
RUANG KELAS
S-01
S-04
PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU DIPERIKSA
2
PPK. MTS N KALABAHI
ISKANDAR BAY NIP:19600615 198303 1 804
S-01
MENGETAHUI
2,000
KEPALA MTS N KALABAHI
SELASAR 1
18
2
4
KONSULTAN PERENCANA
16
4
2,400
ZUFRI, S. Pd NIP: 19710708 199703 1 005
17
3
15
5
14
6
13
7
12
8
3,500
3
11
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN
5 6
9
1,100
10
FRIT D. MALAIKOSA, BE DRAFTER
3,000
TANDA TANGAN
CHARLES Y. KALLA, A Md
F
G
NAMA GAMBAR
0. -
DENAH LANTAI II 1:100
S-05
S-02
DENAH LANTAI II SKALA GAMBAR
1:100 Layout ID
A.02
NO. LBR
JLH.LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI PROGRAM PENDIDIKAN AGAMA ISLAM KEGIATAN PENINGKATAN AKSES MTS. N KALABAHI PEKERJAAN PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU
3D-01 -
PERPEKTIF 01 1:250
-
TAMPAK DEPAN 1:150
DIPERIKSA PPK. MTS N KALABAHI
ISKANDAR BAY NIP:19600615 198303 1 804
MENGETAHUI KEPALA MTS N KALABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN FRIT D. MALAIKOSA, BE DRAFTER
TANDA TANGAN
CHARLES Y. KALLA, A Md NAMA GAMBAR PERPEKTIF 01, PERPEKTIF 02, TAMPAK DEPAN, TAMPAK SAMPING SKALA GAMBAR
3D-02 -
PERPEKTIF 02 1:250
-
TAMPAK SAMPING 1:150
1:250, 1:150 Layout ID
A.02
NO. LBR
03
JLH.LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI 3,250
PROGRAM
3,500
0,250 0,150 0,500
PENDIDIKAN AGAMA ISLAM KEGIATAN
PEKERJAAN
1,619
0,231
3,500
4,150
PENINGKATAN AKSES MTS. N KALABAHI
2,000
1,000
PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU
1,000
2,500
2,000
4,000
DIPERIKSA
4,000
PPK. MTS N KALABAHI
POTONGAN B-B 1:150
-
ISKANDAR BAY NIP:19600615 198303 1 804
MENGETAHUI
3,250
KEPALA MTS N KALABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005
3,500
KONSULTAN PERENCANA
0,200
0,050
0,500
1,000
2,000 1,000
3,500
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN
0,800 1,000
FRIT D. MALAIKOSA, BE DRAFTER
TANDA TANGAN
CHARLES Y. KALLA, A Md NAMA GAMBAR
4,500
9,000
4,500
4,500
9,000
4,500
POTONGAN B-B, POTONGAN A-A SKALA GAMBAR
-
POTONGAN A-A 1:150
1:150 Layout ID
A.03
NO. LBR
04
JLH.LBR
PASANGAN TEMBOK BATU BATA 1 PC : 5 PS
PASANGAN PONDASI BATU KARANG/KALI 1 PC : 5 PS
PLESTERAN TEMBOK 1 PC : 5 PS KOLOM STRUKTUR 30/30 SLOFF 25/30 CM PASANGAN PONDASI BATU KARANG/KALI 1 PC : 5 PS
50,00
100,00
URUGAN SIRTU PENINGGI LANTAI URUGAN TANAH KEMBALI PADA BEKAS GALIAN
PROGRAM PENDIDIKAN AGAMA ISLAM KEGIATAN PENINGKATAN AKSES MTS. N KALABAHI PEKERJAAN PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU DIPERIKSA
AANSTAMPIN
PPK. MTS N KALABAHI
URUGAN PASIR DIBAWAH PONDASI
ISKANDAR BAY NIP:19600615 198303 1 804
5,00
20,00
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI
MENGETAHUI KEPALA MTS N KALABAHI
80,00 100,00
DETAIL PONDASI 1:20
-
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
Kaki Kuda2 Gording Balok Pengikat Angin
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN
Balok nok Balok Pegapit Kuda2 Siku Kuda2
FRIT D. MALAIKOSA, BE
Penopang Kuda2 penyokong Kuda2 Balok Induk
DRAFTER
Plafond Triplek 3 mm
TANDA TANGAN
CHARLES Y. KALLA, A Md
Ranka Plafond
NAMA GAMBAR PERPEKTIF KUDA2, DETAIL PONDASI SKALA GAMBAR
1:200, 1:20
-
PERPEKTIF KUDA2 1:200
Layout ID
A.04
NO. LBR
05
JLH.LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI PROGRAM PENDIDIKAN AGAMA ISLAM KEGIATAN PENINGKATAN AKSES MTS. N KALABAHI PEKERJAAN PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU DIPERIKSA PPK. MTS N KALABAHI
ISKANDAR BAY NIP:19600615 198303 1 804
MENGETAHUI KEPALA MTS N KALABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN FRIT D. MALAIKOSA, BE DRAFTER
TANDA TANGAN
CHARLES Y. KALLA, A Md
-
RENCANA ATAP 1:100
NAMA GAMBAR RENCANA ATAP SKALA GAMBAR
1:100 Layout ID
A.05
NO. LBR
JLH.LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI PROGRAM PENDIDIKAN AGAMA ISLAM Kolom Struktur
Pasangan Tembok Batu Bara 1 PC : 5 PS
KEGIATAN PENINGKATAN AKSES MTS. N KALABAHI PEKERJAAN PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU DIPERIKSA PPK. MTS N KALABAHI
ISKANDAR BAY NIP:19600615 198303 1 804
MENGETAHUI KEPALA MTS N KALABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN FRIT D. MALAIKOSA, BE DRAFTER
TANDA TANGAN
CHARLES Y. KALLA, A Md NAMA GAMBAR
-
RENCANA PONDASI 1:100
RENCANA PONDASI SKALA GAMBAR
1:100 Layout ID
A.06
NO. LBR
JLH.LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI Rangka Plafond 5/7 cm Rangka Plafond 5/7 cm Plafond Tripleks 3 mm
PROGRAM PENDIDIKAN AGAMA ISLAM KEGIATAN PENINGKATAN AKSES MTS. N KALABAHI PEKERJAAN PEMBANGUNA 4 (EMPAT) RUANG KELAS BARU DIPERIKSA PPK. MTS N KALABAHI
ISKANDAR BAY NIP:19600615 198303 1 804
MENGETAHUI KEPALA MTS N KALABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLANT UTAMA KONSULTAN TAEM LEADER TANDA TANGAN FRIT D. MALAIKOSA, BE
-
RENCANA PLAFON LANTAI 2 120 x 60 cm 1:100
DRAFTER
TANDA TANGAN
CHARLES Y. KALLA, A Md NAMA GAMBAR RENCANA PLAFON LANTAI 2 120 x 60 cm SKALA GAMBAR
1:100 Layout ID
A.07
NO. LBR
JLH.LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABAHI
PROGRAM: PENDIDIKAN AGAMA ISLAM KEGIATAN: PENINGKATAN AKSES MTS N. KALABAHI PEKERJAAN: PEMBANGUNAN 4 (EMPAT) RUANGKELAS BARU
KONSULTAN PERENCANA PT. SIARPLAN UTAMA KONSULTAN
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI PROGRAM PENDIDIKAN AGAMA ISLAM
122
3 3
3
KEGIATAN
100
3
10
3
9
12
PENINGKATAN AKSES MTS N. KLABAHI
3
PEKERJAAN PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
3
1
DIPERIKSA
132
6 0
10
6
100
6
10
6
10
PPK. MTS N. KALABAHI 12
10
ISKANDAR BAY NIP: 19600615 198303 1 804
132
MENGETAHUI
5
100
210
KEPALA MTS N. KLABAHI
5
50
1
ZUFRI, S. Pd NIP: 19710708 199703 1 005
KONSULTAN PERENCANA
2 PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE 3
TAEM LEADER
9
TANDA TANGAN
CHARLES Y. KALLA, A Md
NAMA GANBAR
2
DETAIL KUSEN BV 1 4 (EMPAT) UNIT SKALA : 1: 20 SKALA GAMBAR
DETAIL KUSEN P 1 4 (EMPAT) UNIT SKALA : 1: 20
KODE GBR
NO. LBR
JLH. LBR
10
6
60
6
60
6
59
6
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
10
12
PROGRAM PENDIDIKAN AGAMA ISLAM
KEGIATAN 12
12 9 12 9
3
PENINGKATAN AKSES MTS N. KLABAHI 3
3
3
3
3
12 9
3
3
9
PEKERJAAN PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
DIPERIKSA
106
100
106
100
100
106
100
106
1
PPK. MTS N. KALABAHI
3
3
MENGETAHUI
6
3
3
ISKANDAR BAY NIP: 19600615 198303 1 804 3
9 12
3
9 12
3
3
2
9
9
12
12
KEPALA MTS N. KLABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005
DETAIL KUSEN J 1 38 (TIGA PULUH DELAPAN) UNIT SKALA : 1: 20
KONSULTAN PERENCANA
12
12
9 12 9 3
12 9 3 3
5
3
3
3
PT. SIARPLAN UTAMA KONSULTAN
3
9 3
56
50
56
50
60
50
50
56
50
1 3
9 3 12
9
3
3
5
3 3
TANDA TANGAN
FRIT D. MALAI KOSA, BE TAEM LEADER
3
56
TEAM LEADER
TANDA TANGAN
CHARLES Y. KALLA, A Md
9 3 12
NAMA GANBAR
9 12 12
10
6
2
60
6
60
6
54
6
10
SKALA GAMBAR
DETAIL KUSEN BV 2 38 (TIGA PULUH DELAPAN) UNIT SKALA : 1: 20
KODE GBR
NO. LBR
JLH. LBR
30
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
30 6 30 18
30
18
30
18 18
PENDIDIKAN AGAMA ISLAM 30
KEGIATAN 30
PENINGKATAN AKSES MTS N. KLABAHI
18
18
18
PROGRAM
30 30
18
PEKERJAAN
18
30
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU 20
30 30
20
DIPERIKSA
20
30
20
30
PPK. MTS N. KALABAHI
20
ISKANDAR BAY NIP: 19600615 198303 1 804
MENGETAHUI KEPALA MTS N. KLABAHI
60
20
30
20
30
20
20
30
ZUFRI, S. Pd NIP: 19710708 199703 1 005
KONSULTAN PERENCANA
DETAIL TANGGA AKALA 1 : 20
DETAIL PENULANGAN TANGGA AKALA 1 : 20
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TAEM LEADER
TANDA TANGAN
CHARLES Y. KALLA, A Md
NAMA GANBAR
DETAIL TANGGA SKALA GAMBAR
1 : 20 KODE GBR
NO. LBR
06
JLH. LBR
15
125
20
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
210
PROGRAM
PENDIDIKAN AGAMA ISLAM
40 41,77
100,46
41,77
93
30
93
41,77
100,46
41,77
93
15
85
93
30
210
KEGIATAN
370
15
185
PENINGKATAN AKSES MTS N. KLABAHI
200
400
PEKERJAAN
10
400
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
4A
3A
2A
DETAIL PORTAL SKALA : 1: 20
1A
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
CHARLES Y. KALLA, A Md
4 16
3 16
NAMA GANBAR
4 16 25
2 10
2 16
15
4 12
2 16
3 16
15
4 12
15
20
30
40
10-10
12-10 8-20
8-20
4 16
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
15
125
20
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
40
210
PROGRAM
15
85
PENDIDIKAN AGAMA ISLAM
185
30
210
KEGIATAN
15
PENINGKATAN AKSES MTS N. KLABAHI
10
PEKERJAAN 200
400
400
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
4B
3B
2B
DETAIL PORTAL SKALA : 1: 20
1B
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
3 16
CHARLES Y. KALLA, A Md
4 16
NAMA GANBAR
25
2 10
2 16
15
4 12
2 16
3 16
15
4 12
15
20
30
40
10-10
12-10 8-20
8-20
4 16
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
15
125
20
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
40
210
PROGRAM
210
15
85
PENDIDIKAN AGAMA ISLAM
185
30
KEGIATAN
15
PENINGKATAN AKSES MTS N. KLABAHI
10
PEKERJAAN 200
400
400
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
4C
3C
2C
DETAIL PORTAL SKALA : 1: 20
1C
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
4 16
NAMA GANBAR
25
2 10
2 16
15
4 12
2 16
3 16
15
4 12
15
20
30
40
10-10
12-10 8-20
8-20
4 16
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
PROGRAM
PENDIDIKAN AGAMA ISLAM
KEGIATAN
PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
4D
3D
2D
DETAIL PORTAL SKALA : 1: 20
1D
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
CHARLES Y. KALLA, A Md
4 16
3 16
NAMA GANBAR
4 16 25
2 10
2 16
15
4 12
2 16
3 16
15
4 12
15
20
30
40
10-10
12-10 8-20
8-20
4 16
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
PROGRAM
PENDIDIKAN AGAMA ISLAM
KEGIATAN
PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
4E
3E
2E
DETAIL PORTAL SKALA : 1: 20
1E
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
RING BALK 15X20
SLOFF 25X30
BALOK LATEI 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
4 16
NAMA GANBAR
25
2 10
2 16
15
4 12
2 16
3 16
15
4 12
15
20
30
40
10-10
12-10 8-20
8-20
4 16
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
PROGRAM
PENDIDIKAN AGAMA ISLAM
KEGIATAN
PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
4E
3E
2E
DETAIL PORTAL SKALA : 1: 20
1E
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
RING BALK 15X20
SLOFF 25X30
BALOK LATEI 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
4 16
NAMA GANBAR
25
2 10
2 16
15
4 12
2 16
3 16
15
4 12
15
20
30
40
10-10
12-10 8-20
8-20
4 16
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
110 25
50
105
20
35
210
350
15
PROGRAM
350
15
85
40
PENDIDIKAN AGAMA ISLAM
30
210
KEGIATAN
225
225
225
225
225
225
225
225
185
235
PENINGKATAN AKSES MTS N. KLABAHI
5 15
PEKERJAAN
5
100 10
10
450
450
450
450
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
1800
DIPERIKSA PPK. MTS N. KALABAHI
B1
A1
D1
C1
E1
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
KOLOMPRAKTIS 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
NAMA GANBAR
4 16 25
2 10
2 16
15
3 16
15
4 12
4 12
12-10
15
15
20
30
40
10-10
15
4 12
2 16
8-20 8-20
4 16
8-20
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
15
105
20
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
40
210
350
PROGRAM
350
15
85
PENDIDIKAN AGAMA ISLAM
30
210
KEGIATAN
225
225
225
225
225
225
235
225
185
225
PENINGKATAN AKSES MTS N. KLABAHI
15
5 5
PEKERJAAN 900
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
1800
A2
E2
C2
DETAIL PORTAL SKALA : 1: 20
DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
KOLOMPRAKTIS 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
NAMA GANBAR
4 16 25
2 10
2 16
15
3 16
15
4 12
4 12
12-10
15
15
20
30
40
10-10
15
4 12
2 16
8-20 8-20
4 16
2 16
8-20
SKALA GAMBAR
KODE GBR
NO. LBR
JLH. LBR
15
105
20
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
40
210
350
PROGRAM
126,46
41,77
146,77
105
41,77
126,46
41,77
105
105
41,77
126,46
41,77
105
105
41,77
126,46
41,77
105
PENDIDIKAN AGAMA ISLAM
85
41,77
350
15
105
30
210
KEGIATAN
225
225
225
225
225
225
235
225
185
225
PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN 450
450
450
450
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
1800
DIPERIKSA PPK. MTS N. KALABAHI
B3
A3
D3
C3
E3 ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
KOLOMPRAKTIS 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
NAMA GANBAR
4 16 25
2 10
2 16
15
3 16
15
4 12
4 12
12-10
15
15
20
30
40
10-10
15
4 12
2 16
8-20 8-20
4 16
8-20
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
15
105
20
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
40
210
350
PROGRAM
126,46
41,77
146,77
105
41,77
126,46
41,77
105
105
41,77
126,46
41,77
105
105
41,77
126,46
41,77
105
PENDIDIKAN AGAMA ISLAM
85
41,77
350
15
105
235
185
30
210
KEGIATAN
PENINGKATAN AKSES MTS N. KLABAHI
15
5 5
PEKERJAAN 450
450
450
450
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU
1800
DIPERIKSA PPK. MTS N. KALABAHI
B4
A4
D4
C4
E4 ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
KOLOM STRUKTUR 30X30
BALOK INDUK 30X40
SLOFF 25X30
RING BALK 15X20
BALOK LATEI 15X15
KOLOMPRAKTIS 15X15
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER 30
4 16
CHARLES Y. KALLA, A Md
3 16
NAMA GANBAR
4 16 25
2 10
2 16
15
3 16
15
4 12
4 12
12-10
15
15
20
30
40
10-10
15
4 12
2 16
8-20 8-20
4 16
8-20
SKALA GAMBAR
2 16
KODE GBR
NO. LBR
JLH. LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
PROGRAM
PENDIDIKAN AGAMA ISLAM
KEGIATAN
PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN
DETAIL PENULANGAN PLAT PLAT LEFEL DAN PLAT KANOPPI SKALA 1 : 20
TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER CHARLES Y. KALLA, A Md
NAMA GANBAR
SKALA GAMBAR
KODE GBR
NO. LBR
JLH. LBR
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
10-20 10-20
PROGRAM
PENDIDIKAN AGAMA ISLAM
10-20
KEGIATAN
10-20 PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN
PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI KEPALA MTS N. KLABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN TEAM LEADER
10-20 10-20
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
DRAFTER CHARLES Y. KALLA, A Md
NAMA GANBAR
DETAIL PENULANGAN PLAT LANTAI DAN PLAT LEFEL SKALA 1 : 20
SKALA GAMBAR
KODE GBR
NO. LBR
JLH. LBR
30
KEMENTRIAN AGAMA MADRASAH TSANAWIYAH NEGERI KALABHI
DENAH FOOTPLAT SKALA 1 : 20
PROGRAM
225
50
PENDIDIKAN AGAMA ISLAM
KEGIATAN
8 16
12-20 100
PENINGKATAN AKSES MTS N. KLABAHI
PEKERJAAN
10-10 PEMBANGUNAN 4 (EMPAT) RUANG KELAS BARU DIPERIKSA PPK. MTS N. KALABAHI
ISKANDAR BAY NIP: 19600615 198303 1 804 MENGETAHUI
100
150
8 16
KEPALA MTS N. KLABAHI
ZUFRI, S. Pd NIP: 19710708 199703 1 005 KONSULTAN PERENCANA
PT. SIARPLAN UTAMA KONSULTAN
12-10
TEAM LEADER
TANDA TANGAN
FRIT D. MALAI KOSA, BE TANDA TANGAN
15
DRAFTER
100 10
12-20
10
CHARLES Y. KALLA, A Md
NAMA GANBAR
SKALA GAMBAR
DETAIL PENULANGAN FOOTPLAT SKALA 1 : 20
KODE GBR
NO. LBR
JLH. LBR
SPESIFIKASI TEKNIS
PROGRAM
:
PENDIDIKAN ISLAM
KEGIATAN
:
PENINGKATAN AKSES, MUTU KESEJAHTERAAN DAN SUBSIDI RA/RB DAN MADRASAH
PEKERJAAN
:
PEMBANGUNAN 4 ( EMPAT ) RUANG KELAS MTs Negeri Kalabahi
LOKASI
:
KALABAHI, KABUPATEN ALOR - PROVINSI NTT
TAHUN ANGGARAN
:
2014
1. SPESIFIKASI UMUM PEKERJAAN ARSITEKTUR DAN STRUKTUR A. UMUM Pasal 1 Peraturan-Peraturan Apabila tidak ditentukan lain, dalam pelaksanaan pekerjaan ini berlaku dan mengikat ketentuan-ketentuan yang disebut di bawah ini, dan Kontraktor dianggap mengerti dan memahaminya termasuk (apabila ada) segala perubahan-perubahan dan tambahantambahan lainnya : a. Algemene Voorwarden voor de aaneming bij openbare Warken In Indonesia 28 Mei 1941 disingkat A.V.41 ditamabah dengan UNdang-undang RI Nomor 28 Tahun 2002 tentang bangunan Gedung b. Peraturan Umum Pemeriksanaan Bahan-bahan Bangunan (PUBBI 1960). c. Keputusan Presiden RI Nomor 80 tahun 2003 d. Keputusan Menteri Permukiman dan Prasarana Wilayah Nomor : 339/Kpts/M/2003, tanggal 31 Desember 2003 e. Peraturan Beton Indonesia (PBI 1971). f.
Peraturan Konstruksi Kayu Indonesia (PPKI 1961).
g. Peraturan Perencanaan Bangunan Baja Indonesia 1983 (PPBBI 1983) h. Peraturan Pembebanan Indonesia untuk Gedung 1981 (PPI 1981). i.
Peraturan-peraturan Pembangunan Daerah setempat.
j.
Peraturan lain yang berhubungan dengan pembangunan yang berlaku di Indonesia.
k. Petunjuk serta perintah tertulis dari Direksi pada saat pelaksanaan pekerjaan.
Pasal 2 Bestek dan Gambar 1. Kontraktor diwajibkan meneliti gambar-gambar dan bestek mengenai pekerjaan ini. 2. Bila ternyata ada perbedaan antara kontrak, gambar dan bestek, juga antara gambargambar dengan gambar lain, maka yang berlaku adalah urutan di bawah ini
Kontrak
Bestek
Gambar-gambar yang lebih besar dengan skala yang lebih kecil.
3. Bila
perbedaan
itu
menimbulkan
keragu-raguan
yang
dikemudian
hari
yang
menimbulkan kekeliruan atau bahaya, Kontraktor wajib menanyakan terlebih dahulu kepada Direksi untuk mendapatkan ketegasannya. Pasal 3 Rencana Kerja 1. Sebelum mulai pelaksanaan pekerjaan, Kontraktor harus menyusun Rencana Kerja (Time Schedulle) yang diajukan selambat-lambatnya dalam waktu 1 (satu) minggu sesudah tanggal penerimaan Surat Perintah Kerja, dengan disetujui oleh Direksi 2. Setelah Rencana Kerja disetujui oleh Direksi, satu salinan akan ditahan oleh Direksi dan satu salinan lainnya harus ditempel di Bangsal Kontraktor di tempat pekerjaan. Pasal 4 Kuasa Kontraktor 1. Kontraktor wajib menempatkan seorang wakil yang cukup cakap dan berpengalaman untuk memimpin pelaksanaan pekerjaan ini di lapangan (selanjutnya disebut “Kepala Proyek”). 2. Kepala Proyek yang ditunjuk oleh Kontraktor harus mendapat kuasa penuh yang bertindak untuk dan atas nama Kontraktor. 3. Dengan adanya Pelaksana ini tidak berarti bahwa Kontraktor lepas dari tanggung jawab sebagian atau sepenuhnya dari seluruh pekerjaan. 4. Kontraktor harus memberikan laporan secara tertulis kepada Direksi tentang segala keterangan mengenai Pelaksana ini. Pelaksana baru bisa bertindak setelah ada persetujuan dari Direksi. Dalam satu minggu kalau tidak ada keberatan dari Direksi, berarti Direksi menyetujuinya.
5. Bilamana kemudian menurut pendapat Direksi, Pelaksana kurang mampu/tidak bisa menunjukkan kecakapannya dalam memimpin pekerjaan dengan sebaik-baiknya, maka Direksi berhak memerintahkan kepada Kontraktor untuk menggantikannya, dalam waktu 6 (enam) hari setelah dikeluarkannya surat perintah itu Kontraktor harus sudah menunjuk seorang kuasa yang baru. Pasal 5 Tempat Tinggal Kontraktor dan Kepala Proyek Untuk menjaga kemungkinan akan diperlukan hubungan diluar jam kerja, Kontraktor wajib memberitahukan alamat rumah dan nomor telpon Kontraktor dan Kepala Proyek kepada Direksi. Diharapkan alamat ini tidak berubah-ubah selama pelaksanaan pekerjaan tersebut. Pasal 6 Pengamanan 1. Kontraktor wajib mengadakan penjagaan keamanan untuk barang-barang di seluruh lokasi pekerjaan. 2. Barang-barang bahan bangunan yang hilang, baik yang sudah maupun yang belum dipasang tetap menjadi tanggungan Kontraktor dan tidak diperkenankan untuk diperhitungkan di dalam borongan biaya tambahan. 3. Pekerjaan utama dalam paket pekerjaan ini adalah rehabilitasi gedung, oleh karenya kontraktor harus bekerja hati-hati sehingga bagian bangunan yang tidak menjadi obyek yang direhab tidak mengalami kerusakan. 4. Kerusakan bagian bangunan yang tidak menjadi obyek yang direhab yang diakibat oleh aktifitas pelaksanaan rehab harus diperbaiki dengan biaya ditanggung oleh kontraktor pelaksana. Pasal 7 Laporan Harian dan Mingguan 1. Kontraktor diwajibkan membuat Laporan Harian dimana tercantum tentang kemajuan pekerjaan setiap harinya, bahan-bahan dan alat-alat yang didatangkan, jumlah pekerja dan petugas lapangan yang ada serta keadaan cuaca pada hari yang bersangkutan, adalah merupakan kewajiban Kontraktor untuk membuatnya dalam rangkap 3 (tiga), satu untuk Konsultan Pengawas, satu lainnya untuk Kepala Satuan Kerja. 2. Laporan Harian harus mendapat pesetujuan dari Konsultan pengawas dan Pengelola Teknis Proyek (PTP) atas substansi laporan yang disampaikan, jika ada koreksi dari konsultan pengawas atau PTP maka Laporan harian harus segera diperbaiki dan hasil perbaikan disampaikan paling lambat 1 x 24 Jam dari saat dikembalikannnya laporan tersebut. 3. Laporan Mingguan-nya disusun oleh konsultan pengawas berdasarkan hasil laporan harian yang disampaikan oleh Kontraktor. Laporan Mingguan ini dibuat dalam rangkap 3
(tiga), satu asli sebagai arsip konsultan pengawas dan dua salinan untuk kontraktor dan Kepala Satuan Kerja setelah diteliti dan disetujui oleh Kepala Satuan Kerja. 4. Tugas-tugas dan perintah-perintah dari Konsultan pengawas, PTP dan Direksi berlaku dan mengikat bagi Kontraktor, apabila tugas-tugas dan perintah-perintah itu dimuat dalam laporan/buku harian dan telah dibubuhi tanda tangan dan nama jelas petugas/Direksi yang menugaskan/memerintahkan. 5. Pekerjaan-pekerjaan tambah kurang harus pula dicatat dalam Laporan Harian. 6. Kelalaian membuat Laporan Harian dapat dikenakan sanksi menurut ketentuanketentuan A.V. 7. Kontraktor wajib membuat foto proses pekerjaan (berwarna) yang dilampirkan pada setiap permohonan termyn, minimal 4 (empat) pose rangkap 3 (tiga), dimulai dari 0% sampai dengan 100% dan Kontraktor menyediakan dalam album. Pasal 8 Jaminan Sosial, Kesehatan dan Keselamatan 1. Kontraktor diwajibkan menyediakan peti obat-obatan sesuai syarat-syarat P3K yang selalu harus tersedia secara lengkap di lapangan. Obat-obatan tersebut disediakan baik untuk Direksi, staf Kontraktor, termasuk pekerja-pekerja dari pihak ketiga. 2. Kontraktor wajib menyediakan air minum yang memenuhi standar kesehatan untuk para pekerja. 3. Segala yang menyangkut kesehatan dan jaminan lainnya yang belum disebutkan disini, Kontraktor wajib melakukan sesuai dengan peraturan perburuhan yang berlaku bagi para pekerja. Pasal 9 Pemeriksaan Pekerjaan
1. Sebelum dimulai satu pekerjaan, yang bila pekerjaan ini dilaksanakan mengakibatkan tidak dapat dilanjutkan pekerjaan yang telah dikerjakan, Kontraktor diwajibkan meminta kepada Direksi (PTP dan Konsultan Pengawas) memeriksa bagian pekerjaan yang telah dikerjakan itu. Baru setelah Direksi menyatakan bagian ini baik, Kontraktor dapat memulai pekerjaan selanjutnya.
2. Bila permintaan pemeriksaan tersebut selama 24 jam tidak dipenuhi oleh Direksi, maka Kontraktor bisa meneruskan bagian-bagian pekerjaan, yang seharusnya diperiksa itu dianggap seolah-olah telah diperiksa dan disetujui. Hal ini dikecualikan apabila Direksi minta perpanjangan waktu pemeriksaan dan Kontraktor menyetujuinya.
3. Bila ayat 1 di atas dilanggar oleh Kontraktor, Direksi berhak menyuruh membongkarnya bagian pekerjaan tersebut, dan ongkos pembongkaran serta pemasangan kembali karena kelalaian Kontraktor ini dibebankan kepada Kontraktor.
Pasal 10 Pemeriksaan Bahan-Bahan 1. Semua bahan-bahan yang diperlukan untuk bangunan tersebut, Kontraktor/Pelaksana terlebih dulu harus memberikan contoh kepada Pengawas Lapangan untuk mendapatkan persetujuan sebelum bahan-bahan tersebut didatangkan atau dipakai. 2. Bahan-bahan yang tidak memenuhi persyaratan atau kualitas jelek yang dinyatakan afkir/ditolak oleh Pengawas Lapangan/Pengelola Teknis Kegiatan , harus segera dikeluarkan dari lapangan bangunan selambat-lambatnya dalam waktu 3 x 24 jam dan tidak boleh dipergunakan. 3. Apabila
sesudah
bahan-bahan
tersebut
Lapangan/Pengelola Teknis Kegiatan
dinyatakan
ditolak
oleh
Pengawas
dan ternyata masih dipergunakan oleh
Pelaksana, maka Pengawas Lapangan/Pengelola Teknis Kegiatan
berhak untuk
memerintahkan pembongkaran kembali kepada Pelaksana (Kontraktor), dan biaya ditanggung oleh Kontraktor.
B. URAIAN
TEKNIS
DAN
SYARAT-SYARAT
PEKERJAAN STRUKTUR DAN
ARSITEKTUR Pasal 11 Pekerjaan Persiapan 1. Lingkup Pekerjaan : 1
Pembersihan Lokasi
2
Pemasangan Bowplank
3 4
Pemasangan Papan Nama Proyek Penyediaan Air Kerja
5
Pelaporan, Dokumentasi & Gambar As Built Drawing
2. Persyaratan Bahan Persyaratan Bahan dari kayu kelas II, untuk patok 5/7 cm dan untuk papan 3/18 cm Air kerja yang dipakai adalah air tawar yang bersih dan harus bebas dari bahan-bahan yang berbahaya bagi konstruksi. 3 Pedoman Pelaksanaan Ukuran-ukuran patok dan ukuran tinggi telah di tetapkan dalam gambar dan dijelaskan dalam gambar detail. Ukuran-ukuran dalam gambar tersebut adalah ukuran setelah pekerjaan selesai dikerjakan. Peil ketinggian lantai ( 0,00) diambil sesuai dengan ketetapan dalam gambar rencana. Penentuan peil ini akan dilakukan oleh Pemilik Pekerjaan, Konsultan Pengawas dan Pengelola Teknis Pekerjaan bersama-sama dengan kontraktor. Penentuan titik-titik ketinggian dilakukan dengan selang air ukuran 1/4" atau dengan alat ukur Theodolit, sedangkan untuk sudut siku-siku dilakukan dengan benang secara azas segitiga Pythagoras.
Papan diketam halus dan lurus pada sisi atasnya Harus benar-benar waterpass (timbang air) dan sudut-sudutnya harus siku. Bouwplank harus terpasang kuat Air kerja yang dipakai adalah air tawar yang bersih dan harus bebas dari bahanbahan yang berbahaya bagi konstuksi. Administrasi harus dibuat teratur menyangkut aktifitas harian dilapangan, pencatan material yang masuk maun yang keluar dari gudang logistik, tenaga kerja dan kondisi cuaca serta selalu membuat fofo-foto setiap terjadi kemajuan pekerjaan dilapangan. Pelaporan yang harus dibuat oleh kontraktor adalah laporan harian yang isinya harus mendapat persetujuan dari pengawas lapangan. Pasal 12 Pekerjaan Tanah dan Urugan
1. Lingkup pekerjaan 1.
Galian tanah pondasi menerus
2.
Urugan pasir bawah pondasi menerus
3.
Urugan tanah kembali
4.
Urugan sirtu peninggian peil lantai
5.
Urugan Pasir bawah lantai
2. Persyaratan bahan Timbunan peninggian peil lantai digunakan tanah urug kualitas baik. Tanah timbunan dan pasir urugan harus bersih dari kotoran-kotoran dan akar-akar kayu, serta sampah lainnya. 3
Pedoman Pelaksanaan : Galian boleh dilaksanakan setelah bouwplank dengan penandaan sumbu ke sumbu selesai diperiksa dan disetujui, Konsultan Pengawas, dan Pemilik Pekerjaan bersama Kontraktor. Apabila di tempat galian ditemukan pipa-pipa pembuangan, kabel listrik, telepon atau lainnya yang masih berfungsi, maka Kontraktor secepatnya memberitahukan kepada instansi yang berwenang untuk mendapat petunjuk seperlunya. Kontraktor bertanggung jawab sepenuhnya atas segala kerusakan yang diakibatkan pekerjaan galian tersebut. Pasal 13 Pekerjaan Pasangan dan Pelesteran 1. Lingkup Pekerjaan 1
Pasangan batu kosong
2
Pasangan pondasi batu karang
3
Pasangan Bata 1 PC : 5 Ps
4
Plesteran dinding Trassram 1 PC : 2 Ps
5
Plesteran dinding 1 PC : 5 Ps
6
Plesteran pondasi
7
Plesteran list plank beton
8
Acian
2. Persyaratan Bahan a. Batu karang untuk pasangan pondasi adalah batu karang dengan ukuran 15-20 cm, dengan tiga muka pecahan. b. Batu karang yang dipergunakan sebagai pondasi, harus dipilih batu yang keras dan tidak keropos dan dikerjakan sesuai bentuk dan ukuran yang tertera dalam gambar dan mendapat persetujuan Direksi. c. Bahan pasir, semen dan air untuk pekerjaan pasangan dan plesteran mengikuti persyaratan yang telah ditentukan dalam pasal beton bertulang. d. Batu bata yang digunakan ádalah batu bata kualitas baik, merupakan batu bata hasil campuran pasir dengan semen. 3. Pedoman Pelaksanaan Sebelum pondasi dipasang terlebih dahulu diadakan pengukuran-pengukuran untuk as-as pondasi sesuai dengan gambar konstruksi dan dimintakan persetujuan Konsultan pengawas tentang kesempurnaan galian. Setelah selesai galian itu, baru pelaksanaan pondasi pada bagian dasar pondasi dilapisi pasir pasang setebal 5 cm dan dipadatkan, sebagai lantai kerja. Di atas pasir, dipasang aanstamping, terdiri dari batu kali dan pasir pasang (pasangan batu kosong). Lapisan ini juga harus dipadatkan, dengan menyiram air di atasnya, sehingga pasir akan mengisi rongga-rongga batu kali tersebut. Tebal lapisan dibuat sesuai dengan gambar detail pondasi. Pondasi dibuat dari pasangan batu karang dengan adukan 1 PC : 5 PS, dan plesteran pondasi 1PC : 5Ps diaci PC sampai merata halus Pasangan batu bata dilakukan dengan teliti sehingga, pasangan batu bata rata dan tegak. Spesi perekat menggunakan adukan dengan komposisi campuran 1 PC : 5 PS untuk pasangan dinding biasa dan 1 PC : 2 PS untuk pasangan batu bata trassram yaitu 20 cm diatas sloof dan 1,5 pada dinding-dinding KM/WC. Saluran keliling bangunan yang baru dibuat dengan pasangan batu karang dan campuran perekar 1PC : 3 Ps. Ukuran panjang dan dimensi saluran dikerjakan sesuai gambar rencana. Bidang-bidang sisi saluran harus rata dan dibuat dengan kemiringan sesuai gambar rencana. Kemringan dasar saluran harus dibuat sedemikian rupa sehingga dapat mengalirkan air dengan lancar ke saluran pembuang. Plesteran dibuat dengan campuran 1PC : 5 Ps untuk Plesteran pada pondasi, dinding batu bata, sedangkan plesteran dinding saluran dengan 1PC : 3 Ps. Ketebalan plesteran pada semua bidang permukaan harus sama tebalnya dan tidak diperbolehkan plesteran yang terlalu tipis dan terlalu tebal. Ketebalan yang diperbolehkan berkisar antara 1,00 cm sampai 1,50 cm. Untuk mencapai tebal plesteran yang rata sebaiknya diadakan pemeriksaan secara silang dengan menggunakan mistar kayu panjang yang digerakkan secara horizontal dan vertikal. Bilamana terdapat bidang plesteran memperbaikinya secara keseluruhan.
yang
berombak
harus
diusahakan
Semua bidang plesteran harus dipelihara kelembabannya selama seminggu sejak permulaan plesterannya. Acian saus semen untuk semua bidang yang diplester menggunakan perbandingan perbandingan air dan semen diaduk sampai didapat campuran yang plastis, kecuali pada dinding saluran tidak diaci.
Pasal 14 Pekerjaan Beton 1. Lingkup Pekerjaan Semua jenis uraian pekerjaan Struktur yang terurai dalam daftar kuantitas dan biaya (BOQ) adalah merupakan pekerjaan beton bertulang dengan karakteristik beton K.250 dan K-175. 2. Persyaratan Bahan Bahan pasir, semen dan air mengikuti persyaratan yang telah ditentukan dalam pasal beton bertulang yang disyaratkan dalam PBI’71. Beton a. Semen Digunakan Portland Cement Jenis I yang memenuhi ketentuan NI-8 tahun 1975 dan memenuhi S-400 menurut Standar Cement Portland yang digariskan oleh Asosiasi Semen Indonesia (NI 8 tahun 1972). Semen yang telah mengeras sebagian maupun seluruhnya dalam satu zak semen, tidak diperkenankan pemakaiannya sebagai bahan campuran. Penyimpanan harus sedemikian rupa sehingga terhindar dari tempat lembab agar semen tidak cepat mengeras.
yang
b. Pasir Beton, Pasir beton yang digunakan adalah pasir beton ex. Takari, harus berupa butir-butir tajam dan keras, bebas dari bahan-bahan organis, lumpur dan sejenisnya serta memenuhi komposisi butir serta kekerasan sesuai dengan syarat-syarat yang tercantum dalam PBI 1971. c. Kerikil, harus bersih dan bermutu baik, serta mempunyai gradasi dan kekerasan sesuai yang disyaratkan dalam PBI 1971. d. Air, harus air tawar, tidak mengandung minyak, asam alkali, garam, bahan-bahan organis atau bahan-bahan lain yang dapat merusak beton atau baja tulangan. e. Besi Beton, - Mutu baja/besi beton adalah jenis besi/baja lunak dengan mutu U-24 (tegangan leleh karakteristik minimum 2400 kg/cm2). Daya lekat baja tulangan harus dijaga dari kotoran, lemak, minyak, karat lepas dan bahan lainnya. - Pembengkokan, Penyambungan dan pengangkeran besi tulangan harus sesuai dengan PBI 1971 Mutu beton. Mutu beton yang digunakan untuk elemen struktur bangunan (pondasi telapak, sloof struktur, kolom struktur, tangga, balok anak, pelat lantai, balok induk, ring balok struktur dan list plank) adalah mutu beton K-250 dan elemen bangunan non struktur (sloof praktis, kolom praktis, Sirip beton bertulang) adalah K-175. Adukan Beton, pengangkutan adukan beton dari tempat pengadukan ketempat pengecoran harus dilakukan dengan cara yang disetujui oleh Konsultan Pengawas.
Pengecoran - Pengecoran beton hanya dapat dilaksanakan atas persetujuan tertulis Konsultan pengawas. - Apabila pengecoran beton harus dihentikan, maka tempat penghentiannya harus disetujui oleh Konsultan Pengawas. Perawatan Beton Beton yang sudah dicor harus dijaga agar tidak kehilangan kelembaban untuk paling sedikit 14 (empat belas) hari. Pasal 13 Pekerjaan Lantai 1. Lingkup Pekerjaan 1.
Pasang Lantai tegel keramik 40x40 cm
2.
Pasang Plint keramik 10x40 cm
2. Persyaratan Bahan Tegel . keramik 40x40 cm dan, dipasang pada semua lantai gedung kantor sesuai gambar rencana, berkualitas baik dan telah mendapat persetujuan dari konsultan pengawas dan direksi, dengan kwalitas 1 (KW-1) atas persetujuan direksi dengan adukan spesi 1PC : 3 Ps. Sedangkan untuk lantai KM/WC menggunakan Tegel Keramik ukuran 20x20 dengan warna atas persetujuan direksi. Keramik dinding KM/WC mempergunakan keramik ukuran 20x25 cm corak dan warna harus mendapat persetujuan dari direksi dan konsultan pengawas. Semua contoh ubin keramik sebelum pemasangan harus dimintakan persetujuan Pengawas dan Pemberi Tugas. 3. Dasar lantai Sebelum diipasang Ubin keramik dasar lantai terlebih dahulu dilapisi dengan adukan 1 PC : 3 Ps. 4. Pemeriksaan Sebelum lantai dipasang, Kontraktor harus memeriksa semua pasangan pipa-pipa, saluran-saluran dan lain sebagainya yang harus sudah terpasang dengan baik sebelum pemasangan lantai dimulai. 5. Adukan a. Untuk adukan /campuran untuk ubin 1 PC : 3 Ps. b. Saus semen untuk acian menggunakan semen dicampur air, sehingga didapat campuran yang plastis. 6. Pemasangan a. Pemasangan lantai ubin harus rata dan tidak bergelombang. b. Pemasangan ubin granit 60x60 cm2 diusahakan untuk tidak terjadi celah (nat) diantara sambungan ubin c. Nat pasangan ubin lantai dibuat lebar maksimum 5 mm dan dicor saus PC sesuai dengan warna ubin yang terpasang d. Pekerjaan yang telah selesai tidak boleh ada retak, noda dan cacat-cacat lainnya. Apabila terjadi cacat pada lantai, maka bagian cacat tersebut harus dibongkar sampai berbentuk bujur sangkar dan pasangan baru harus rata dengan sekitarnya.
Pasal 14 Pekerjaan Pintu dan Jendela 1. Lingkup Pekerjaan Semua kusen pintu kecuali pintu masuk utama, terbuat dari bahan kayu sedang kusen untuk semua jendela dan pintu masuk utama, terbuat dari aluminium. 2. Persyaratan Bahan a. Kusen pintu kayu yang digunakan adalah kayu kelas mutu I (Kayu Lokal), ukuran jadi 5/11 dan untuk kusen aluminium menggunakan aluminium kualitas baik berwarna coklat ukuran 5/10. b. Frame aluminium untuk pasangan kaca mati pada dinding luar bangunan digunakan kusen c. Daun pintu daun Pintu Panil Jati d. Kaca mati untuk pada pintu dan jendela yang difungsikan untuk melihat aktifitas orang didalam ruangan menggunakan kaca polos tebal 5 mm, sedangkan kaca untuk mengindari terlihatnya aktifitas di dalam ruangan menggunakan kaca sand blast. Penempatan kaca mati untuk masing-masing jenis kaca disesuaikan dengan gambar rencana e. Daun pintu double teakwood menggunakan rangka kayu klas I berkualitas baik f. Bingkai daun jendela kaca dan listplank kayu menggunakan kayu klas I (kayu lokal) berkualitas baik. g. Kaca yang digunakan adalah kaca polos 5 mm dan kaca sand blast 5 mm dipsangan sesuai dengan ketentuan dalam gambar rencana h. Kayu harus betul-betul kering, tidak keropos, lurus, tidak cacat/bermata. i.
Penutup daun pintu KM/WC bagian dalam harus menggunakan tripleks berlapis aluminium berkualitas baik dan tidak cacat.
j.
Kunci pintu untuk daun pintu pada pintu dengan dua daun menggunakan kunci pintu 2 slaag jenis pengunci dan handlenya terpisah atau yang setara, sedangkan untuk pintu dengan bukaan satu daun dan pintu KM/WC menggunakan kunci pintu taman 2 slaag atau yang setara dan atas persetujuan direksi dan Konsultan pengawas. k. Engsel, gerendel dan espagnolet harus menggunakan kualitas baik dan telah mendapat persetujuan direksi dan konsultan pengawas. 3. Pedoman Pelaksanaan a. Kusen pintu dan jendela Ukuran kayu untuk kusen adalah 5/11 (ukuran setelah jadi). Konstruksi sambungan kayu harus rapi, tidak longgar, ikatan perkuatan harus menggunakan pen kayu keras yang sebelumnya bidang sambungan ini harus dilumuri dengan lem kayu, agar sambungannya dapat melekat dengan baik. Setiap kusen pintu harus dilengkapi angker minimal 3 buah untuk kiri kanan kusen yang melekat ke tembok. Untuk kusen jendela 2 buah di kiri kanan kusen yang melekat ke tembok. Khusus untuk kusen pintu dibawah kusen dilengkapi dengan dork yang diangker kedalam neut beton. Semua bidang kusen yang bersinggungan dengan dinding/beton dibuat alur-alur kapur, kemudian bidang tersebut diawetkan dengan cat meni 2 (dua) kali. a. Daun pintu/jendela dan Ventilasi Daun pintu dan jendela dikerjakan sesuai gambar rencana dan disarankan agar kontraktor memesan langsung pada bengkel yang memproduksi daun pintu dan
jendela. Khusus daun pintu KM/WC menggunakan daun pintu pabrikasi dari bahan formika minimal dari produksi merk Flower dan atau setaranya. Frame Jendela kaca dibuat dari aluminium disesuaikan dengan gambar detail. Kaca untuk jendela dipasang kaca bening tebal 5 mm atau kaca sand blast 5 mm sesuai dengan gambar rencana. Pasangan kaca harus memperhatikan muai susut baik dari kusen, maupun bahan kaca tersebut. c. Penggantung dan pengunci dipasang setelah kusen dan daunnya siap untuk dipasang. Pemahatan daun pintu maupun kusenya harus dilakukan dengan hati-hasi sehingga tidak merusak daun pintu atau kusen dan hasil akhir pemasangan harus rapi serta dapat berfungsi secara sempurna. Pasal 16 Pekerjaan Atap dan Plafond 1. Lingkup Pekerjaan Rangka atap dari bahan metal Zink-Aluminium sedang atap dan nol dari genteng metal, sedang untuk plafon beserta listnya terbuat dari tripleks 2,8 mm dan rangka kayu usuk kelas II 5/7cm 2. Persyaratan Bahan a. Rangka atap yaitu untuk kuda-kuda, gording, kaso dan reng semua dari bahan zink aluminium dengan spesifikasi C7580 untuk bottom dan top cremona C7570 dan reng botten 0,45 mm. b. Listplank kayu klas II c. Penutup atap genteng metal Setara Multiroof warna atas persetujuan direksi dan konsultan pengawas. 3. Pedoman Pelaksanaan Semua kayu untuk kuda-kuda dan gording diawetkan dengan residu. Pengecatan dengan residu harus dilakukan 2 x sehingga menghasilkan warna yang merata pada seluruh permukaan kayu. Konstruksi harus dibuat sesuai gambar detail, untuk ukuran kayu maupun cara penyambungannya. Sambungan kayu harus dibuat dengan penuh keahlian dengan memperhatikan peraturan yang disyaratkan dalam SK-SNI-5-10-1990-F. Konstruksi sambungan kuda-kuda harus dilengkapi dengan baut dan besi strip/plat 50.5 mm. Hasil akhir pemasangan penutup atap dan plafond harus mendapat persetujuan dari pengawas lapangan. Penutup atap dipasang setelah talang, jurai dan listpalnk telah terpasang sempurna. Penutup dan list plafond gypsum dipasang setelah penutup atap selesai terpasang. Hasi akhir pemasangan penutup atap dan plafond harus rapi dan harus mendapat persetujuan dari pengawas lapangan.
Pasal 17 Pekerjaan Cat 1. Lingkup pekerjaan Pekerjaan cat terdiri dari jenis cat yaitu cat emulsi untuk dinding dan plafon dan cat minyak untuk lisplank, kusen dan daun pintu. 2. Bahan-bahan yang digunakan harus berkualitas baik, seperti : a. Cat meni Merk ALTEX atau yang setara b. Cat kayu sekualitas Cap . EMCO c. Cat tembok dan Plafond sekualitas Cap CATYLAC d. Politur yang digunakan cap Indian 3. Pedoman pelaksanaan a. Bidang kayu yang akan dicat harus meni setelah kering didempul untuk membentuk permukaan bidang kayu menjadi rata, kemudian setelah dempul kering lalu digosok dengan amplas sampai permukaan kayu menjadi licin dan rata. Setelah permukaan kayu dibersihan dari debu, baru dioleskan cat dasar secara merata pada permukaan kayu. Pekerjaan harus betul-betul rata, dilakukan sebanyak 3 (tiga) kali.
berwarna sama dan pelalisan cat penutup
Pekerjaan cat kayu harus dilakukan lapis demi lapis waktu pengeringan jenis bahan yang digunakan.
dengan
memperhatikan
b. Pengecatan dinding dan plafond harus dilakukan menurut proses sebagai berikut : Dinding yang akan dicat harus dibersihkan dari kotoran dan debu dengan menyapunya sampai bersih. Melapis dinding dengan plamur tembok pada bagian yang berlubang sampai rata. Setelah plamir kering kemudian permukaan dinding yang akan dicat digosok dengan kertas amplas sampai permukaanya licin Pengecatan dengan cat tembok emulsi sampai rata dengan 1 lapis cat dasar dan 2(dua) kali dengan cat penutup. Pekerjaan cat tembok harus menghasilkan warna merata dan tidak terdapat belang-belang atau noda-noda mengelupas c. Pekerjaan teak oil permukaan teakwood dilakukan sebagai berikut : Membersihkan bidang teakwood yang akan diteak oil. Teakoil dioles dengan kuas cat sampai merata pada permukaan teakwood. Pengolesan teakoil dilakukan minimal 2 kali untuk mendapatkan hasil yang berkualitas baik. Saat mengoles teakoil diusahakan agar tidak mengotori dinding, kaca atau lantai (ditutup dengan kertas koran)
2. SPESIFIKASI UMUM PEKERJAAN ELEKTRIKAL 1.
UMUM
1.1. Syarat Umum 1.1.1. Pekerjaan yang dispesifikasikan dalam Bagian ini harus dilaksanakan sesuai dengan tuntutan dari Dokumen Kontrak secara keseluruhan. 1.1.2. Kontraktor harus menjalin hubungan yang baik dengan Kontraktor lain dalam pekerjaan ini, sehingga didapat hubungan yang baik untuk secara bersamasama menyelesaikan pekerjaan ini sesuai dengan jadwal dan spesifikasi yang ditentukan. 1.2. Uraian Pekerjaan 1.2.1. Ijin, Pengujian, dan Sertifikasi Bila tidak ditentulkan lain, maka nilai kontrak/pekerjaan sudah mencakup biaya dan kelengkapan dari: Semua perijinan Semua pengujian Keur dan biaya tanggungan instalasi guna keperluan pemasangan instalasi tersebut Pengurusan penyambungan Kontraktor bertanggungjawab penuh atas mutu instalasi dan peralatan yang digunakan. Semua ijin dan pemeriksaan dari Badan Pemerintah. Sertifikasi yang menyatakan bahwa semua pekerjaan yang telah dilakukannya memenuhi syarat dan standard yang disyaratkan dalam spesifikasi maupun peraturan pemerintah. 1.2.2. Merek dan Spesifikasi Bahan dan Peralatan 1.2.2.1. Seluruh bahan dan peralatan yang akan dipakai dan diadakan pengadaannya oleh Kontraktor sesuai dengan Gambar dan Spesifikasi yang telah ditentukan. 1.2.2.2. Daftar merk bahan dan peralatan yang akan digunakan harus dilampirkan dalam dokumen lelang. 1.2.2.3. Bila dikemudian hari ada kelainan antara daftar yang telah diajukan dengan yang akan dipakai, Kontraktor wajib mengajukan persetujuan kepada Direksi Lapangan. 1.2.2.4. Kontraktor wajib mengganti semua bahan dan peralatan yang telah dipasang, bila peralatan tersebut tidak sesuai dengan daftar yang diajukan atau disetujui Direksi Lapangan. 1.2.2.5. Semua penggantian merk/jenis dari bahan dan peralatan yang telah disetujui dalam daftar yang diajukan, harus dilengkapi dengan perubahan biaya dari biaya kontrak.
1.2.3. Kewajiban Pasca Instalasi 1.2.3.1. Pekerjaan kontraktor mencakup masa pemeliharaan termasuk menempatkan orang pelatih operator untuk melatih calon operator dari Pemilik Proyek dalam memeriksa, menjalankan, dan memelihara peralatan/instalasi. 1.2.3.2. Kontraktor harus menyediakan garansi.
1.2.3.3. Kontraktor harus menyediakan ‘instruction manual’ 1.2.3.4. Kontraktor harus sanggup mengadakan konrak pemeliharaan bila diminta
1.2.4. Pemasangan Label Kontraktor wajib mengadakan label dari plat plastik berukuran tinggi 1,5” dan lebar seperlunya dengan huruf engraved setinggi 1” untuk panel-panel atau format yang ditentukan, untuk panel-panel dan pintu-pintu ruang instalasi, dan sebagainya. 1.3. Pekerjaan Yang Terkait Pekerjaan berbagai sistem instalasi Pekerjaan plumbing Pekerjaan plafon Pekerjaan dinding dan partisi 1.4. Acuan Peraturan Umum Instalasi Listrik (PUIL) 1977 Perubahan dan Tambahan dari Komisi Bidang Listrik Indonesia urusan PUIL – 1987 Peraturan-peraturan setempat yang dikeluarkan oleh PLN Daerah Distribusi setempat Peraturan yang dikeluarkan oleh Telkom Peraturan-peraturan dari Dinas keselamatan Kerja Daerah setempat. Persyaratan dan standard Indonesia dan internasional seperti SII, SLI, SPLN, STEL-K, BS, AS, JIS, DIN, I.E.E., I.E.C, VDE, ICEA/NEMA. 1.5. Pengajuan 1.5.1. Kontraktor wajib menyampaikan materi Pengajuan sebanyak ____ rangkap untuk mendapat persetujuan dari MK, mencakup yang disebut dalam butir-butir berikut. 1.5.2. Kontraktor wajib membuat Gambar Rencana Kerja (Shopdrawing) yang juga mencakup Detail-detail Pemasangan, layout dan Coordinated Ceiling Plan, setouts, untuk disetujui Pengawas untuk pekerjaan yang akan dilakukannya. 1.5.3. Kontraktor wajib mengajukan contoh-contoh bahan yang akan dipakai. 1.5.4. Segera setelah penunjukkan, Kontraktor wajib menyerahkan katalog sesuai dengan skedul material. 1.5.5. Material yang diajukan harus dilengkapi salinan sertifikat kesesuaian mutu dari badan standarisasi yang bersangkutan. 1.5.6. Kontraktor harus menyerahkan daftar material yang belum tercantum dalam skedul material selambat-lambatnya 2 ( dua ) minggu setelah penunjukkan pemenang lelang, untuk mendapat persetujuan dari MK. 1.5.7. Semua material yang tercantum dalam skedul material bersifat mengikat dan merupakan lampiran dokumen penawaran. 1.5.8. Kontraktor wajib menyerahkan Rencana Kerja (Time Schedule) dan rencana kerja harian/mingguan lengkap dengan jumlah tenaga kerja dan peralatannya.
1.6. Jaminan Kualitas 1.6.1. Subkontraktor hanya dapat dilakukan dengan persetujuan Pengawas/Direksi 1.6.2. Kehadiran subkontraktor harus dilaporkan kepada Pengawas/Direksi. 1.6.3. Pelaksana harus memiliki pas PLN Golongan C dan pas pemasangan dari Telkom.
1.6.4. Gambar serta Rencana Kerja ini harus tersedia di Ruang Kontraktor dan mudah diperiksa sewaktu-waktu oleh Pengawas/Direksi Lapangan. 1.6.5. Setiap kemajuan pekerjaan harus dicantumkan pada Gambar dan Rencana Kerja tersebut. 1.6.6. Kontraktor wajib menempatkan tenaga-tenaga pengawas untuk mengawasi pekerjaanya sendiri. 1.6.7. Penanggungjawab pelaksanaan pekerjaan harus selalu berada ditempat pekerjaan dan dapat mengambil keputusan penuh, demi kelancaran pekerjaan. 1.6.8. Hal-hal yang tidak tercantum dalam Gambar Rancangan, Gambar Rencana kerja, maupun Spesifikasi, tetapi hal itu diperlukan untuk kelengkapan dan kesempurnaan sistem pemasangan atau sistem kerja suatu peralatan atau instalasi, maka hal itu menjadi tanggungjawab Kontraktor untuk melangkapinya. 1.6.9. Kontraktor harus mengajukan gambar koordinasi instalasi pada plafon (coordinated ceiling plan) yang menggambarkan rencana (layout) jalur penarikan kabel dan set-out dari fixtures; dan dikoordinasikan antara berbagai jenis instalasi, rencana plafon dan pekerjaan lain yang berkaitan. 2. MATERIAL 2.1. Bahan 2.1.1. Semua peralatan yang akan digunakan harus baru dan memenuhi standard yang telah ditentukan 2.1.2. Bahan atau peralatan dari kualifikasi yang sama atau jenis yang sama harus berasal dari merek yang sama. 2.1.3. Semua kabel listrik harus memenuhi standar SII, SPLN, dan I.E.C. 2.1.4. Semua kabel listrik harus memenuhi standar SII, STEL-K, dan I.E.C 2.1.5. Semua konduit harus memenuhi BS 6099, atau standar internasional yang setara. 2.1.6. Semua perlengkapan harus memenuhi standar BS, AS, JIS, DIN, I.E.E., I.E.C., atau standar internasional lainnya. 3. PELAKSANAAN 3.1. Koordinasi 3.1.1. Kontraktor wajib melakukan koordinasi dengan kontraktor pekerjaan lain yang berhubungan 3.1.2. Kontraktor wajib membuat jadwal waktu kerja yang telah dikoordinasikan dengan jadwal waktu pekerjaan lain yang berhubungan 3.1.3. Sebelum memulai pekerjaan, Kontraktor wajib memeriksa gambargambar/spesifikasi dari pekerjaan lain yang berhubungan, supaya didapat mutu pekerjaan yang baik. 3.1.4. Bila terdapat kelainan, baik dalam gambar maupun spesifikasi pekerjaannya dengan pekerjaan lain, Kontraktor wajib melaporkan kepada Direksi Lapangan. 3.1.5. Dengan koordinasi dengan kontraktor terkait, Kontraktor harus sudah memasang konduit yang berada di dalam beton sebelum pengecoran, dan konduit di dalam dinding sebelum penyelesaian dinding, dan instalasi konduit, kabel, dan sebagainya di plafon sebelum plafon ditutup. Dalam hal terjadinya kelalaian, maka Kontraktor elektrikal bertanggungjawab penuh baik untuk melaksanakan instalasi yang bersangkutan maupun untuk mengembalikan hasil pekerjaan lain (arsitektur dan struktur) kepada kualitas yang direncanakan.
3.2. Pengujian 3.2.1. Prosedur Pengujian 3.2.1.1. Kontraktor wajib memberitahukan kepada Pengawas/Dirksi bila instalasi sebagian atau keseluruhan telah seselai dipasang dan siap diuji. 3.2.1.2. Kontraktor bertanggungjawab atas pengadaan alat, tenaga dan format untuk pengujian. 3.2.1.3. Direksi Lapangan berhak memerintahkan kepada Kontraktor setiap saat, untuk melakukan pengujian bila Direksi Lapangan merasa bahwa pekerjaan tersebut sudah dapat diuji. 3.2.1.4. Pengujian sebagian pekerjaan yang sudah selesai dapat merupakan bagian dari pengujian keseluruhan, sehingga test harus ditandatangani/disahkan oleh Pihak Pemilik dan Direksi Lapangan. 3.2.1.5. Semua hasil pengujian dan pengetesan harus dibuatkan Berita Acara yang di tanda tangani oleh semua pihak. 3.2.2. Hasil pengujian yang tidak baik 3.2.2.1. Bila didapat hasil pengujian yang tidak baik, Kontraktor harus segera memperbaiki pekerjaannya. 3.2.2.2. Direksi Lapangan berhak memerintahkan kepada Kontraktor untuk membongkar pekerjaannya bila ternyata hasil uji tidak baik karena kecerobohan pekerjaan Kontraktor. 3.2.2.3. Setelah perbaikan dan dianggap memuaskan oleh Direksi Lapangan, pengujian dapat diulangi atas tanggungan biaya Kontraktor. 3.2.2.4. Bila pengujian mendapat hasil buruk sebanyak 3 ( tiga ) kali setelah diperbaiki, Kontraktor wajib membongkar pekerjaannya. 3.2.2.5. Pengujian dilakukan sampai mendapatkan hasil yang baik sesuai dengan pasal-pasal diatas. 3.3. Petunjuk Pemeliharaan 3.3.1. Kontraktor wajib melengkapi buku/brosur petunjuk pemeliharaan/perbaikan peralatan yang diadakannya. 3.3.2. Petunjuk-petunjuk tersebut harus diadakan dalam rangkap 3 ( tiga ), masingmasing dimasukkan ke dalam satu map, disusun dengan baik dan diserahkan kepada Pemilik. 3.3.3. Semua peralatan atau material yang akan dipasang diluar bangunan harus diproteksi dengan cat anti karat atau anti korosi. 3.4. Gambar Terbangun (As-built Drawings) 3.4.1. Setelah seluruh instalasi dipasang dan diuji dengan baik, Kontraktor wajib membuat gambar revisi sesuai dengan keadaan yang sebenarnya. 3.4.2. Kontraktor diwajibkan membuat dalam 5 ( lima ) set cetak biru ditambah 1 set cetak sepia, untuk diserahkan kepada Pemilik. Kalabahi, 07 Maret 2014 Konsultan Perencana PT.SIARPLAN UTAMA Perwakilan Alor
FRIT MALAIKOSA Ka.Perwakilan