PROPINSI JAWA BARAT DAFTAR HARGA BAHAN DAN UPAH PEKERJA KOTABEKASI DAFTAR HARGA BAHAN BANGUNAN
A. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33.
34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. Eo/Sf
AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA Pasir Urug Sirtu PasirTeras Pasir Pasang Kali Pasir Beton Abu Batu Batu Gosok (Apung) Batu Pecah Mesin 1/2 Batu Pecah Mesin 2/3 Batu Pecah Mesin 3/5 Batu Pecah Mesin 5/7 Batu Belah Pondasi Batu Bronjol (Untuk Bronjong) Batu Koral Beton Kali BatuTempel Hitam Batu Pinggir Beton 1Ox20x35 Batu Pinggir Beton 15x35x50 (K-225) BatuTelor Batako Kecil 8x1 Ox20 Batako Besar 8x20x30 Con Blok 8x20x40 Bata Merah Bakar Kelas I Bata Merah Bakar Kelas II Bata Merah Oven (Kiingker) Roster Beton 20x20 Roster Beton 30x30 Grass Blok 20x20 Grass Blok 30x45 Paving Blok Natural 8cm Paving Blok Warna 8cm Paving Blok Natural 6cm Paving Blok Warna Scm Kanstin Paving Blok Semen PC Tiga Roda I 50Kg Semen Putih Kanstin Jalan ukuran Besar (Bina Marga) 1bh = 60cm Readymix Beton K 300, tanpa pampa (Selang) Readymix Beton K 225, tanpa pampa (Selang) Readymix Beton K 175, tanpa pampa (Selang) Kapur Pasang/ Kapur Tembok KapurSirih SemenWarna Tanah Liat Air
AHUNXXI
m3 m3 m3 m3 m3 m3 kg m3 m3 m3 m3 m3 m3 m3 m2 bh bh m3 bh bh bh bh bh bh bh bh bh bh m2 m2 m2 m2 m1 zak zak bh m3 m3 m3 m3 kg kg m3
130.000 125.000 125,000 170.000 176.000 161.000 18.000 190.000 185.000 185.000 180.000 160.000 140.000 135.000 110.000 17.000 43.000 150.000 1.100 1.600 3.500 600 500 2.500 6.000 8.000 11.000 15.000 46.000 56.000 36.000 42.000 22.000 63.500 74.000 36.000 780.000 710.000 650.000 86.000 6.400 7.000 52.000 2.000
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
149.000 138.000 138.000 203.000 190.000 172.000 20.000 230.000 220.000 210.000 210.000 175.000 150.000 150.000 135.000 20.000 45.000 165.000 1.500 1.800 3.800 700 550 3.100 6.500 9.000 15.000 17.000 48.000 59.000 38.000 44.000 26.000 65.000 80.000 40.000 825.000 760.000 680.000 94.000 6.800 8.100 55.000
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
"tt :::0
0
"tt
~
en
~
~
Ill
)::!.
~
""'
B.
BAHAN FINISHING: LABURAN, PENGISI DAN ALATNYA
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 35. 36. 37. 38. 39. 40. 41. 42.
PlamirTembok Cat Tembok ICI Eksterior (Beton) Cat Tembok ICIInterior (Piafond dan dinding) Cat Tembok Vinilex Cat Dasar ICI untuk Interior (2 pelapis) CatTembok Sanlex Cat Tahan Asam PelapisAikali ICI (Cat Dasar Beton Eksterior) Cat Marka I Spotlight Water Profing Emulsion Water Profing Membrance Pool Cat tembok KapeTembok Kape Kayu Soligneum 1 Blok Plincote Pengawetan Kayu Pengopenan Kayu Kuas 3" Oker Oyan Olen (Pewarna Plitur) Spiritus Bahan Plitur Kripik (Sirlak India) Dempul Lain Dempul Plitur Dempul Halus /lmfra (Wood Filter) Terpentin liner A TinerB Kumpon Melamik Dempul Plastik Dempul Duco Am pel as Dempul Kayu Cap Kucing Meni Kayu/ Besi Sincromat Cat Kayu Sieve Cat Besi Sieve Cat Besi Duco Danaglos/ICI CatBron
c.
BAHAN KAYU BERIKUT BAHAN JADINYA
1. 2. 3. 4.
Bambu dia. 5 s/d 7 Bambu dia. 7 s.d 10 Bambu Gombong Kayu Papan Tarentang
34.
494
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
kg kg kg kg ltr kg kg ltr kg kg m2 bh bh bh 51tr kg m3 m3 bh kg bks bks ltr kg kg kg kg ltr ltr ltr kg kg kg kg lbr kg kg kg kg kg kg kg
12.000 92.000 58.000 16.000 40.000 14.000 43.000 48.000 47.000 38.000 82.000 18.000 6.000 7.000 41.000 28.000 320.000 351.000 9.000 25.000 4.000 2.000 12.000 150.000 22.000 27.000 29.000 6.000 16.000 20.000 26.000 40.000 33.000 40.000 3.000 23.000 20.000 32.000 44.000 44.000 84.000 35.000
13.000 98.000 62.000 18.000 45.000 15.000 45.000 50.000 50.000 41.000 85.000 22.000 7.000 8.000 43.000 32.000 330.000 360.000 12.000 28.000 5.000 3.000 15.000 160.000 25.000 34.000 40.000 8.000 20.000 22.000 28.000 42.000 37.000 45.000 4.000 25.000 22.000 35.00 45.000 45.000 86.000 37.000
bt bt bt m3
13.000 18.000 40.000 1.800.000
14.000 20.000 45.000 2.000.000
& INTERIOR
Eotst34
TAHUN
XXI 2015
0
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
, 0
m3 bt bt m1 m1 m1 m1 m1 m1 m1 m1 m1 m1
7.655.000 4.000.000 4.200.000 6.000.000 6.500.000 5.900.000 7.000.000 9.600.000 9.800.000 2.800.000 17.000.000 13.800.000 9.500.000 9.000.000 3.200.000 700.000 15.000 22.000 5.100 6.500 11.000 14.000 24.000 85.000 54.000 2.800 4.000 7.700
7.900.000 4.500.000 5.000.000 6.300.000 7.000.000 6.800.000 7.500.000 10.000.000 10.400.000 3.400.000 18.000.000 14.000.000 10.250.000 9.400.000 3.600.000 775.000 16.000 25.000 7.000 7.000 13.000 17.000 26.000 90.000 65.000 3.100 4.200 8.000
BAHAN PENUTUP RANGKA PLAFOND Bahan Plafond Eternit 4mm (Bola Dunia) Bahan Plafon Harflex 5mm 120x240 Bahan PlafondAsbes Semen 5mm Gypsum 120x240 t=9mm Ex. DN Qayabord) Gypsum 120x240 t=9mm Ex. Luar AkustikAmstrong 60x120 List Profil gypsum L= 10 CM Tepung Gypsum
m2 lbr m2 lbr lbr lbr m' kg
12.000 52.000 15.000 56.000 68.000 92.000 13.000 6.000
13.000 56.000 17.000 60.000 70.000 95.000 15.000 7.000
BAHAN KAYU LAPIS Tripleks 3mm 120x240 Tripleks4mm 120x240 Tripleks 4mm uk. pintu Tripleks 6mm 120x240 Tripleks 9mm 120x240 JabarWood4mm Bilik Bambu (tanpa kulit) Bilik Bambu (dengan kulit) Bilik Bambu Hitam Variasi (Motif)
lbr lbr lbr lbr lbr lbr m2 m2 m2
43.000 53.000 38.000 73.000 105.000 82.000 18.000 20.000 32.000
45.000 55.000 40.000 78.000 110.000 90.000 20.000 23.000 35.000
5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32.
Kayu Kamper Singkil I Kapur ( K. Samarinda Kelas II) Kayu Balok Borneo Super Kayu Papan Borneo Super Kayu Balok Kamper Medan (Kruing) Kayu Papan Kamper Medan (Kruing) Kayu Balok Kamper Banjar Kayu Papan Kamper Banjar Kayu Balok Kamper Samarinda Kayu Papan Kamper Samarinda Kayu Balok Rasamala Kayu Jati Jatim I Jateng tua dia. 70em Kayu Jati Jatim I Jateng tua dia. 40em Kayu Jati Jabar tua dia. 40em Kayu Jati Jabar tua dia. 40em kebawah Kayu Hutan Kelas I (Segeng, Mahoni, Laban) Kayu Albasia Dol ken 5 s.d 7 Dol ken 7 s.d 10 List profil kamper 1x 1em List profil kamper 2x1em List profil kamper 4x1 em List profil kamper 5x1 em List profil kamper 10x1.5em Pegangan Tangga Profil Jati Pegangan Tangga Profil Kamper Kayu reng 213 Borneo Super Kayu reng 213 kamper Banjar Kayu reng 314 Kamper Banjar
D. 1. 2. 3. 4. 5. 6. 7. 8.
E. 1. 2. 3. 4. 5. 6. 7 8. 9.
Eotst 34
TAHUN
XXI 2015
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3
m3
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
495
~
-~ (I)
~
~ ~ "'i
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
"t1 ::0 0 ~
::c:
en ~
~ ~ ~
""''
10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25.
F. 1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.
496
~
Wall Paper (Kelas Menengah) Multipleks 9mm 120x240 Multipleks 12mm 120x240 Multipleks 18mm 120x240 Playwood 18mm 120x240 Teakwood 3mm 120x240 Teakwood4mm 120x240 Teakwood 3mm uk. Pintu Teakwood 4mm uk. Pintu Gypsum Board 9mm elephant Tacon (tahan bakar) Supercon Melamin 4mm 120x240 Melamin TOK 4mm Formika 120x240 Formika ukuran Pintu
m2 lbr lbr lbr lbr lbr lbr lbr lbr lbr m2 m2 lbr lbr lbr lbr
35.000 118.000 145.000 210.000 230.000 93.000 98.000 60.000 70.000 58.000 85.000 51.000 75.000 88.000 160.000 93.000
45.000 121.000 149.000 215.000 250.000 95.000 105.000 65.000 74.000 60.000 90.000 55.000 82.000 92.000 165.000 95.000
bh bh bh bh bh bh bh bh bh bh bh m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 bh m1 m2 bh m2 m2 m2 m2
2.400 1.800 2.800 2.750 2.500 2.200 3.100 2.500 1.500 2.100 2.000 35.000 42.000 39.000 42.000 44.000 37.000 43.000 32.000 42.000 85.000 500.000 250.000 13.000 16.000 25.000 7.500 1.500.000 1.200.000 1.000.000 850.000
2.700 2.500 3.000 3.000 2.800 2.400 3.500 2.800 1.600 2.200 2.200 37.000 45.000 42.000 46.000 48.000 42.000 46.000 36.000 46.000 90.000 600.000 260.000 15.000 18.000 26.000 9.000 1.800.000 1.300.000 1.100.000 900.000
BAHAN LANTAI DAN PELAPIS DINDING Tegel PC 20x20 Plin Tegel PC 1Ox20 Tegel PC 30x30 Plin Tegel PC 15x30 Tegel Warna 20x20 Plin Tegel Warna 10x20 Tegel Warna 30x30 Plin Tegel Warna 15x30 Tegel Wafel PC 20x20 Tegel Wafel Warna 20x20 Tegel Badak PC 30x30 Poslin 11x11 Warna Standard DN Poslin 11x11 Warna Khusus DN Keramik 10x20 dan 20x20 KW I DN Putih I Poles Keramik 1Ox20 KW I DN Corak I Warna I Anti Slip Keramik 20x20 (KM) KW I DN Corakl Warnal Anti Slip Keramik 20x20 (KM) KW I DN Putih Poles Keramik 20x25 Dinding KM KW I DN Corak Keramik 30x30 KW I DN Putih Poles Keramik 30x30 KW I DN Warnal Corak (Anti Slip) Vynillantai Standard Karpel Kelas Baik LN Karpel Kelas Sedang LN Stairnosing Keramik 10120 Stairnosing Fiber Taraso Kerang 30x30 Plin taraso 1Ox30 Gran it Alam LN Uk. Besar Gran it Alam LN Uk. Kecil GranitAiam DN Uk. Besar Gran it Alam DN Uk. Kecil JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& iNTERIOR
Eotst 34
TAHUN
XXI 2015
~
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
"tt
::0 0 32. 33. 34. 35. 36. 37. 3B. 39. 40. 41. 42.
Granito Tile Essensa uk. 40x40 polis Granito Tile Essensa uk. 40x40 unpolis Marmer Alam Lampung uk. Besar (60x90em) Marmer Alam Lampung uk. Kecil (60x60em) Marmer Alam Citatah uk. Besar (60x90cm) Marmer Alam Citatah uk. Kecil (60x60em) Marmer Sintetis Granito Tile Essensa 60x60 Polis Granito Tile Essensa 60x60 unpolis Bata Karawang Campuran untuk kedap air (AM)
G. 1. 2. 3. 4. 5. 6. 7 B. 9. 10. 11. 12. 13. 14. 15. H. 1. 2. 3. 4. 5. 6. 7 B. 9. 10. 11. 12. 13. 14. 15. 16. 17. 1B. 19. 20.
BAHAN SALURAN AIR KOTORI BERSIH Grafe! U 20 em' Grafe! U 30 em' Grafe! U 40 em' Buis Beton dia. 20cm (1m') Buis Beton dia. 30cm (1m') Buis Beton dia. 40cm (1m') Buis Beton dia. 50cm (1m') Buis Beton dia. 60em (1m') Buis Beton dia. 100cm (0.50m) Buis Beton dia. BOem (0.50m) BuisTanah dia.10cm (0.50m) Buis Tanah dia. 15em (0.50m) Buis Tanah dia. 20em (0.50m) Buis Tanah dia. 25em (0.50m) lnjuk BAHAN LOGAM DAN BAHAN JADINYA Besi Beton U-24 Rata-rata Besi Beton U-39/ U-32 Rata-rata Pagar BRC Lengkap Tiang (Tanpa Pondasi) Bondek IWF Ex. ON Sll IWF Ex. Jepang Besi Profil ON Sll Besi Profil Ex. LN Besi CLip Channel Ongkos Galvanis Besi Kawat Beton KawatOuri Kawat Pengikat Kawat Bronjong 4mm KawatTembaga Ram Nyamuk Hijau Ram Kawat 1x1em Ram A yam Kawat Kasa 1x1em (Putih) Kawat Harmonika4em
Eo!S/34 TAHUN XXI 2015
m2 m2 m2 m2 m2 m2 m2 m2 m2 bh ltr
233.000 195.000 400.000 340.000 320.000 245.000 110.000 19B.OOO 225.000 2.900 1B.OOO
272.000 225.000 450.000 355.000 340.000 275.000 120.000 215.000 240.000 3.500 20.000
m1 m1 m1 m1 m1 m1 stk stk stk stk stk stk stk stk kg
23.000 30.000 42.000 40.000 53.000 70.000 84.000 101.000 140.000 125.000 9.000 12.000 14.000 16.000 9.000
26.000 35.000 45.000 45.000 56.000 74.000 90.000 110.000 150.000 132.000 10.000 14.000 16.000 1B.OOO 10.000
kg kg m2 m2 kg kg kg kg kg kg kg m1 m1 kg kg m2 m2 m2 m2 m2
9.500 9.700 130.000 120.000 12.000 13.000 12.000 11.000 11.000 3.400 1B.OOO 4.000 2.500 22.000 20.000 12.000 13.000 12.000 25.000 26.000
9.BOO 11.000 150.000 135.000 13.000 14.000 13.000 12.000 12.000 3.BOO 20.000 5.200 2.750 25.000 23.000 14.000 15.000 13.000 30.000 2B.OOO
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
497
"tt
~
C/)
....
i;
~
~ ~
""'
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
"tt
::0 0
"'t::
~
-i;; (I)
~
~ ~
""'
21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53.
I. 1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. J. 1. 2. 498
Kawai Harmonika 2cm Kawai Las Listrik WiremeshM8 WiremeshM6 Timah TimahHitam Ram NyamukAiuminium Plat Strip dia. 2x30mm (6 m1) Plat Strip dia. 3x30mm (6 m1) Plat Aluminium 0.2mm Plat Aluminium 0.3mm Plat Aluminium 0.4mm Plat Aluminium 0.5mm Plat Aluminium 0.6mm PlatAiuminium 1.0mm Kusen Aluminium Natural1.3mm t 1,3mm (4") Kusen Aluminium Warna 1.3mm t 1,3mm (4") Daun JendelaAiuminium Natural (Tanpa kaca dan Accessories) Daun JendelaAiuminium Warna (Tanpa kaca dan Accessories) Daun Pintu Aluminium Natural (Tanpa kaca dan Accessories) Daun Pintu Aluminium Warna (Tanpa kaca dan Accessories) Handle Aluminium (Tarikan PintuAiurniniurn) KaitAnginAiuminium Karel Aksesories Kusen/ Pintu Aluminium Seng Plat BJLS 30 dia. 6Dcm Seng Plat BJLS 30 dia. 90cm Plat Besi Tipis 1.2mm Plat Besi Tipis 0.8mm Plat Besi 2mm s/d 5mm Plat Besi 6mm s/d 10mm Plat Besi 1Dmm keatas Lem kuning (aibon) Lem fox
= =
m2 kg m2 m2 kg kg m2 bt bt m2 m2 m2 m2 m2 m2 m1 m1 m2 m2 m2 m2 bh ps m1 m1 m1 kg kg kg kg kg kg kg
22.000 23.000 65.000 46.000 95.000 150.000 30.000 27.000 42.000 19.000 25.000 35.000 47.000 58.000 100.000 68.000 85.000 65.000 72.000 68.000 72.000 35.000 65.000 5.000 30.000 42.000 15.000 22.000 13.000 13.000 13.000 34.000 35.000
24.000 25.000 68.000 48.000 98.000 160.000 32.000 32.000 45.000 21.000 27.000 37.000 49.000 63.000 13.000 72.000 87.000 68.000 76.000 70.000 75.000 40.000 70.000 6.000 32.000 44.000 16.000 24.000 14.000 14.000 14.000 36.000 36.000
m2 m2 m2 m2 m2 m2 m2 m2 m2 bh bh
40.000 50.000 85.000 125.000 150.000 205.000 680.000 3.000.000 845.000 20.000 35.000
42.000 56.000 90.000 135.000 160.000 215.000 700.000 3.200.000 850.000 24.000 38.000
kg kg
20.000 15.000
22.000 17.000
BAHANKACA Kaca Polos 2mm (ASAHI) Kaca Polos 3mm (ASAHI) Kaca Polos 5mm (ASAHI) Kaca Rayben 5mm (ASAHI) Kaca Rayben 8mm (ASAHI) Kaca Rayben 12mm (ASAHI) Kaca Patri Lokal Terpasang (ASAHI) Kaca Patri ex. Luar Negeri Terpasang Kaca 8mm Graver Glass Block ON 20x20 (Kedawung) Glass Block ON 20x20 Ex. LN
BAHAN PAKU DAN MUR BAUT Paku 1cm s/d 3cm Paku 4cm s/d ?em JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eo1s/
34
TAHUN
XXI 2015
~
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
1:1 ::0
0
1:1 4. 5. 6. 7 8. 9. 10. 11. 12. 13.
Paku Scm s/d 12cm Paku Beton 2cm s/d5cm Paku Skrup Paku Kait Lengkap Paku Cacing Besi Beugel Kuda-kuda DukAngker Angker Mur Baut dia. 19 panjang 60cm Mur Baut HTB dia. 19 s/d 16 (5cm) MurBaut Biasadia.19 s/d 16 (15cm) Piser dia. 12 s/d 20cm
K.
BAHAN PERPIPAAN
1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36.
Besi Pip a untuk Hydrant BSP dia. 1" Besi Pipa untuk Hydrant BSP dia. 1.25" Besi Pipa untuk Hydrant BSP dia. 1.5" Besi Pipa untuk Hydrant BSP dia. 2" Besi Pipa untuk Hydrant BSP dia. 2.5" Besi Pipa untuk Hydrant BSP dia. 3" Besi Pipa untuk Hydrant BSP dia. 4" Besi Pipa untuk Hydrant BSP dia. 6" Besi Pipa Hitam dia. 1" t=2mm Besi Pipa Hitam dia. 2" t=2mm Besi Pipa Hitam dia. 3" t=2mm Besi Pipa Hitam dia. 4" t=2mm Besi Pipa Hitam dia. 6" t=2mm Pipa GIP MediumAdia. 1/2" (6 m1) Pipa GIP Medium Adia. 3/4" (6 m1) Pipa GIP Medium A dia. 1" (6 m1) Pipa GJP MediumAdia. 11/4" (6 m1) Pipa GJP Medium A dia. 1 1/2" (6 m1) Pipa GIP Medium Adia. 1 3/4" (6 m1) Pipa GIP MediumAdia. 2" (6 m1) Pipa GJP Medium A dia. 2 1/2" (6 m1) Pipa GJP MediumAdia. 3" (6 m1) Pipa GJP MediumAdia. 4" (6 m1) Macam-macam Sambungan GIP dia. 1/2" Macam-macam Sambungan GJP dia. 3/4" Macam-macam Sambungan GJP dia. 1" Macam-macam Sambungan GJP dia. 11/4" Macam-macam Sambungan GIP dia. 11/2" Macam-macam Sambungan GIP dia. 1 3/4" Macam-macam Sambungan GIP dia. 2" Macam-macam Sambungan GJP dia. 21/2" Macam-macam Sambungan GJP dia. 3" Macam-macam Sambungan GIP dia. 4" Pipa PVC RUCIKA type AW dia. 1/2" Pipa PVC RUCIKA type AW dia. 3/4" Pipa PVC RUCIKAtypeAW dia. 1"
3.
EDISI
34
TAHUN XXI
2015
kg bh kg bh kg kg bh bh bh bh bh
15.000 400 20.000 800 28.000 15.000 3.200 28.000 8.600 4.000 2.000
17.000 500 22.000 1.000 30.000 18.000 3.600 30.000 10.000 4.500 2.500
bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bh bh bh bh bh bh bh bh bh bh bt bt bt
265.000 285.000 375.000 485.000 550.000 750.000 1.100.000 1.600.000 150.000 285.000 380.000 557.000 760.000 135.000 185.000 275.000 350.000 415.000 485.000 600.000 785.000 835.000 1.250.000 4.000 5.000 6.000 7.000 10.000 13.000 16.000 26.000 40.000 55.000 30.000 34.000 46.000
278.000 299.000 393.000 509.000 577.000 787.000 1.155.000 1.680.000 157.000 299.000 399.000 584.000 798.000 141.000 194.000 288.000 367.000 435.000 509.000 630.000 824.000 876.000 1.312.000 4.200 6.000 6.500 8.000 12.000 14.000 18.000 28.000 42.000 60.000 35.000 67.000 48.000
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
499
~
(I) .... ~
~
~ ~
""'
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
"tJ
::tJ 0
J;!
~
-
(I)
$: ~
Ill
)::.
~ """'
65. 66. 67.
Pipa PVC RUCIKA type AW dia. 11/4" Pipa PVC RUCI KA type AW dia. 1 1/2" Pipa PVC RUCIKAtypeAW dia. 2" Pipa PVC RUCIKA type AW dia. 2 1/2" Pipa PVC RUCI KA type AW dia. 3" Pipa PVC RUCIKAtypeAW dia. 4" Pipa PVC RUCI KA type AW dia. 6" Pipa PVC RUCIKAtypeAW dia. 8" Pipa PVC MASPIONABU dia. 1/2" (AW) Pipa PVC MASPION ABU dia. 3/4" (AW) Pipa PVC MAS PION ABU dia. 1" (AW) Pipa PVC MASPION ABU dia. 1 1/4" (AW) Pipa PVC MAS PION ABU dia. 11/2" (AW) Pipa PVC MAS PION ABU dia. 2" (AW) Pipa PVC MAS PION ABU dia. 2 1/2" (AW) Pipa PVC MASPION ABU dia. 3" (AW) Pipa PVC MAS PION ABU dia. 4" (AW) Macam-macam Sambungan Paralon dia. 1/2" Macam-macam Sambungan Paralon dia. 3/4" Macam-macam Sambungan Paralon dia. 1" Macam-macam Sambungan Paralon dia. 11/4" Macam-macam Sambungan Paralon dia. 1 1/2" Macam-macam Sambungan Paralon dia. 1 3/4" Macam-macam Sambungan Paralon dia. 2" Macam-macam Sambungan Paralon dia. 21/2" Macam-macam Sambungan Paralon dia. 3" Macam-macam Sambungan Paralon dia. 4" Sambungan Pipa PVC JenisAW 4" TY Lem Paralon Solatif Leideng Pipa PVC 4" berlobang jenis AW
L.
BAHAN SANITER
1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13. 14. 15. 16.
Stop Kran 3/4" KIT Stop Kran 1" KIT Stop Kran 1 1/2" KIT Stop Kran 2" KIT Stop Kran 2 1/2" KIT Stop Kran 3" KIT Check Valve 1/2" Double Neple 1/2" Water Mur 1/2" Gate Waive 1/2" Saringan Air Lt. KM Stainless Steel Apoer Bath Tube Kran Stainless Lokal Kait Shower dengan liang Shower tanpa liang Kran tembok sun eui dia. 1/2"
37, 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63.
64.
500
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bt bh bh bh bh bh bh bh bh bh bh bh tb gl m1
56.000 80.000 130.000 180.000 245.000 410.000 725.000 1.100.000 23.000 28.000 32.000 46.000 60.000 92.000 115.000 175.000 260.000 3.000 3.500 4.000 5.000 5.500 6.000 8.000 11.000 16.000 22.000 44.000 7.000 2.000 68.000
61.000 85.000 135.000 185.000 260.000 430.000 740.000 1.200.000 24.000 32.000 35.000 48.000 65.000 95.000 120.000 185.000 265.000 4.000 4.500 5.000 6.000 6.500 6.500 9.000 13.000 18.000 24.000 48.000 7.500 2.500 75.000
bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh
75.000 100.000 170.000 250.000 450.000 680.000 50.000 7.000 10.000 60.000 30.000 120.000 55.000 200.000 150.000 50.000
85.000 115.000 185.000 265.000 465.000 705.000 60.000 8.000 12.500 63.000 35.000 125.000 60.000 240.000 185.000 60.000
& INTERIOR
Eotst 34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
., ., :::0
0
17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35.
Kran tembok ITAP dia. 1/2" Kran Bebek Sun eui 1/2" Kran bebek ITAP 1/2" Kran Panas Dingin San Eui Standard Bath Cape Washteren Tempat Sabun Poslin Wastafellengkap TOTO LW 230 Wastafel Lengkap INA Closet Jongkok Poslin warn a TOTO Closet Jongkok Standard Putih Poslin TOTO Closet Jongkok Lengkap Sistem Jet TOTO Closet Duduk Warna Standard TOTO C 240 Lengkap Wastafel Bulat Warna Standard Lengkap Toto Closet duduk warn a standard lengkap INA Urinoir Lengkap TOTO warna standard lengkap Penyekat poslin urinoir TOTO Kitchen Zink Stainless Standard Lokal (1 lubang) Kitchen Zink Stainless Stainless Non Standard Franke (1 Lubang) Kitchen Zink Stainless Stainless Non Standard Franke (2 Lubang)
M.
BAHANPENUTUPLUBANG
1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28.
Atap Plastik Gelombang 80x180 Atap Fiber Glass Tipis 80x180 (Gelombang) Atap Fiber Glass Tebal80x180 (Gelombang) AtapAiuminium Natural USR 26 (JAINDO) A tap Aluminium Warn a USR 26 (JAINDO) AtapAsbes Gelombang Kecil4mrn 80x180 AtapAsbes Gelombang Besar 5mm 105x180 Atap Tegola Kubota, Lengkap Atap Tegola Kwalitas Sedang Aluminium Foile Atap Genteng Plentong pres Bakar Kw. I Atap Genteng Plentong pres Molen Oven Kw. 1 Atap Genteng Flam pres Molen Oven Jatiwangi Bubung Genteng pres Bulat ex. Jatiwangi Genteng Bubungan ex. Jatiwangi Segi Tiga Genteng Bubungan Beton Genteng Metal (Rainbow Roof) Genteng Metal hana Nok Alas Metal (Rainbow Roof) Nok Alas Metal hana Nok Pinggir Metal (Rainbow Roof) Nok Pinggir Hana Wall Flasing (Rainbow Roof) Wall Flashing Hana Atap Genteng Beton Warna 14,5/m2 Genteng Beton Natural Sirap kelas I (801m2) Genteng Keramik Naturallntan 14,5/m2
EDISI
34
TAHUN
XXI 2015
bh bh bh bh unit bh unit unit unit unit unit unit unit bh unit bh bh bh bh
40.000 95.000 75.000 170.000 485.000 30.000 1.900.000 950.000 180.000 160.000 550.000 2.000.000 950.000 950.000 1.650.000 420.000 150.000 250.000 420.000
45.000 105.000 85.000 185.000 510.000 35.000 1.950.000 1.100.000 200.000 165.000 585.000 2.200.000 1.000.000 1.100.000 1.850.000 450.000 185.000 260.000 450.000
lbr lbr lbr m2 m2 lbr lbr m2 m2 m2 bh bh bh bh bh bh m2 m2 m1 m1 m1 m1 m1 m1 m2 m2 bh m2
23.000 38.000 65.000 135.000 150.000 35.000 46.000 285.000 170.000 8.500 950 1.100 1.200 4.500 4.000 6.000 135.000 100.000 90.000 52.000 65.000 56.000 65.000 55.000 60.000 48.000 1.300 70.000
26.000 40.000 72.000 145.000 165.000 38.000 49.000 290.000 175.000 12.000 1.100 1.250 1.300 5.000 4.500 6.500 140.000 105.000 94.000 54.000 68.000 58.000 68.000 58.000 62.000 53.000 1.500 80.000
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
501
~
(I)
.... ~
~
OJ
):!.
~
""'
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
"tt
::0 0 "tt
~
-
29. 30. 31. 32. 33.
~
34.
(I)
~
~ ~
""'
35. 36.
N. 1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13.
0. 1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25.
502
Genteng Keramik G\asur Standard 14,5/m2 Genteng Keramik G\asur Specia\14,5/m2 Genteng Keramik G\asur Premium 14,5/m2 Genteng Murando Natura\1 m2 = 20bh Genteng Murando Glasur 1m2= 20bh Bubung Murando Natural Bubung Murando G\asur Bubungan Genteng Keramik BAHAN MEKAN\KAL Jockey Pump kap. 80gln/menit 100m1 (18.6kW) Electrical Pump kap. 750gln/ menit 120 m1 (90kW) Diesel Pump kap. 750gln/ menit 120m1 (105kW) Presure Tank kap. 500\iter lengkap Hydran Box dalam gedung (lengkap) Fire House 1.5x30m + nose Exhouse Fan H 600 W 60x60cm Exhouse Fan H 350 W CFM 50x50cm Exhouse Fan H 145 W 45x45cm AC Split 3PK setara TOSHIBA AC Split 2PK setara TOSHIBA Plasma AC Split 1PK setara TOSHIBA Plasma Mesin AC Split TOSHIBA (Indoor/ Outdoor Unit) BAHAN ELEKTRICAL Kabel NYA 1x1.5 Prima (1 roll = 50m') Kabel NYA 1x2.5 Prima (1 roll = 50m') Kabel NYM 2x1.5 Prima (1 roll = 50m') Kabel NYM 3x1.5 Prima (1 ro\1 = 50m') Kabel NYM 2x2.5 Prima (1 ro\1 = 50m') Kabel NYM 3x2.5 Prima (1 ro\1 = 50m') Kabel NYM 4x2.5 Prima (1 ro\1 = 50m') Kabel NYM 2x4 Prima (1 roll= 50m') Kabel NYM 3x4 Prima (1 roll= 50m') Kabel NYM 4x4 Prima (1 roll= 50m') Kabel NYM 2x6 Supreme (1 roll = 50m') Kabel NYM 3x6 Supreme (1 roll = 50m') Kabel NYM 4x6 Supreme (1 ro\1 = 50m') Kabel NYM 2x1 0 Supreme (1 ro\1 = 50m') Kabel NYM 3x1 0 Supreme (1 roll= 50m') Kabel NYM 4x1 0 Supreme (1 ro\1 = 50m') Kabel NYM 4x16 Supreme (1 roll = 50m') Kabel NYY 2x4 Supreme (1 ro\1 = 50m') Kabel NYY 3x4 Supreme (1 roll = 50m') Kabel NYY 4x4 Supreme (1 roll= 50m') Kabel NYY 2x6 Supreme (1 roll= 50m') Kabel NYY 3x6 Supreme (1 ro\1 = 50m') Kabel NYY 4x6 Supreme (1 ro\1 = 50m') Kabel NYY 2x1 0 Supreme (1 ro\1 = 50m') Kabel NYY 3x1 0 Supreme (1 ro\1 = 50m') JuRNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
m2 m2 m2 bh bh bh bh bh
unit unit unit unit unit unit unit unit unit unit unit unit 1 BTU ro\1 ro\1 m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m' m'
& INTERIOR
80.000 110.000 140.000 2.300 2.500 4.800 6.000 12.000
90.000 120.000 150.000 2.500 2.700 5.000 7.000 13.000
35.000.000 120.000.000 300.000.000 17.500.000 3.250.000 2.500.000 900.000 600.000 450.000 8.526.000 6.648.000 3.750.000 1.600
37.000.000 122.000.000 305.000.000 18.000.000 3.350.000 2.750.000 950.000 635.000 485.000 8.672.000 6.850.000 3.850.000 1.700
225.000 275.000 5.000 5.800 6.500 8.500 12.000 11.000 14.000 16.000 18.000 20.000 24.000 19.000 30.000 32.000 42.000 20.000 24.000 32.000 26.000 36.000 44.000 38.000 54.000
240.000 285.000 5.500 6.000 7.000 8.700 13.000 12.000 16.000 18.000 19.000 22.000 26.000 21.000 32.000 35.000 45.000 22.000 26.000 35.000 29.000 38.000 46.000 40.000 60.000
EDIS/34
TAHUN
XX/2015
~
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
I
"tt :::0 0
64.
Kabel NYM 4x10 Supreme (1 roll= 50m') Kabel NYM 4x16 Supreme (1 roll= 50m') NSFB FUJI EA-100A NSFB FUJI EA-150A Rumah Panel 30x40x20cm (Kosong) Skring Kas 2 Group Biasa Skring Kas 3 Group Biasa Skring Kas 5 Group Biasa MCB 1 PHASE MCB 3 PHASE Tahanan 50A Merk Fuji Saklar Broko Tunggal Standard (1 Phase) Saklar Broko Seri Standard (1 Phase) Stop Kontak Broko Standard (1 Phase) Stop Kontak Broco 3 Phase (Out Bow) Stop Kontak Broco 3 Phase (In Bow) Stop Kontak Handle 3 Phase lnstalasi Titik Lampu I Stop kontak (upah dan alai) Lampu Pijar 25 Watt s/d 100 Watt Lampu Neon TL Phillip 20W Lampu Neon TL Phillip 40W Trafo TL 20 W (Phillip) TrafoTL40W (Phillip) Trafo TL 20 W (Sinar) Trafo TL 40 W (Sinar) Stater Neon Phillip Stater Neon Biasa Rumah TL In Bow/ Out Bow 2x20 W (Kosongan) Down Light+ SL 25 W Phillips Lampu SL Phillips 20W Lampu Sirkel TL 20W Lengkap Lampu Mercuri 80W Lampu Taman+ Tiang + Lampu 1 Buah Lampu Baret 30cm + Neon Lampu Neon Acrilic 2x40W Lengkap Jarum Penangkal Petir 16 Kawai BC (Tembaga) Pentanahan Penangkal Petir Pentanahan Panel
m' m' bh bh unit unit unit unit bh bh bh bh bh bh bh bh bh ttk bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh kg ttk ttk
68.000 84.000 530.000 1.550.000 160.000 120.000 150.000 310.000 45.000 65.000 340.000 16.000 20.000 16.000 28.000 28.000 37.000 115.000 10.000 15.000 30.000 28.000 28.000 24.000 24.000 4.000 2.500 72.000 65.000 30.000 50.000 135.000 165.000 150.000 300.000 30.000 40.000 250.000 130.000
73.000 90.000 550.000 1.600.000 175.000 130.000 160.000 320.000 50.000 70.000 350.000 18.000 22.000 18.000 30.000 30.000 42.000 120.000 12.000 17.000 34.000 30.000 30.000 26.000 26.000 5.000 3.000 95.000 75.000 35.000 54.000 150.000 200.000 160.000 325.000 35.000 50.000 265.000 140.000
P. 1. 2. 3. 4. 5. 6. 7 8.
BAHAN ALAT PENGGANTUNG DAN KUNCI Kunci Silinder ALFA untuk Pintu Aluminium Tarikan Pintu Aluminium Kunci 2 Slagg ROYAL Rei Handerson Lengkap Ret Maraton I Pi ntu Kunci 2 Slagg Silinder SEIS asli type 210 s/d 226 Kunci 2 Slaag Ancor Asli Kunci 2 Slaag ISO
bh bh bh bh unit bh bh bh
65.000 25.000 80.000 225.000 165.000 250.000 175.000 140.000
70.000 30.000 85.000 270.000 200.000 275.000 200.000 150.000
26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43.
44. 45. 46. 47. 48. 49. 50. 51. 52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63.
Eo1s1
34
TAHUN XXI
2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
503
~
(I)
~
~
~ ~
"""
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
'tl ::0
0
-
'tl
~
-
(I)
~
~
OJ :b
~
""''
9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. Q. 1. 2. 3. 4. R. 1. 2. 3. 4. 5. 6. 7 8. 9. 10. 11.
Kunci KM Bulat Kualitas Biasa Kunci KM BulatALFA Kunci 2 Slag Silinder Utama Standard Kunci Gembok Besar Kunci 2 Slag Kuda Terbang Espangolet Grendel15cm Grendel5cm Hak Angin Kait Jendela Biasa HakANgin Jendela Antik Hak Angin Sendok Stainless I Kuningan Nako Lengkap Tralis 1 Daun S\oot pintu berikut Rantai Sloot Jendela Tunggal Engsel Pintu Uni\on Standard Besar 5" Engse\ Jendela Unilon Engsel patrun Engsel Harmonika Door Closer Kelas Standard (Kelas Sedang) Door Closer Kelas Standard (Kelas Baik) Door Closer Kelas Rendah Tarikan A\mari Rata-rata Seng BJLS 30 Iebar 60cm (1 roll 50m') Seng BJLS 30 Iebar 90cm (1 roll 50m')
s.
BAHAN PENAMPUNG AIR
1. 2. 3. 4. 5. 6.
Tangki Air Fiber Glass 0.5m3 (Penguin) Tangki Air Fiber Glass 1m3 (Penguin) Tangki Air Fiber Glass 2m3 (Penguin) Bak KM Fiber 60x60 Bak teraso WC 40x40 Bak KM Teraso 60x60
504
bh bh bh bh bh ps bh bh ps ps bh dn bh bh ps ps ps m1 unit unit unit bh m1 m1
55.000 65.000 190.000 35.000 45.000 25.000 12.000 6.000 12.000 15.000 25.000 20.000 25.000 9.500 25.000 20.000 10.000 15.000 145.000 225.000 80.000 8.500 28.000 40.000
60.000 75.000 200.000 40.000 50.000 27.000 13.000 7.000 15.000 20.000 27.000 25.000 27.000 12.000 30.000 25.000 12.000 20.000 150.000 265.000 90.000 10.000 30.000 45.000
ton kg kg kg
950.000 8.300 7.400 7.800
1.100.000 8.600 7.800 8.000
unit unit unit unit unit unit unit unit unit unit unit
175.000 250.000 320.000 575.000 780.000 3.400.000 5.100.000 20.000.000 11.000.000 155.000.000 3.800.000
185.000 265.000 330.000 625.000 825.000 3.600.000 5.250.000 22.500.000 12.000.000 155.500.000 4.000.000
750.000 1.200.000 2.350.000 185.000 175.000 220.000
800.000 1.300.000 2.600.000 200.000 190.000 250.000
BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN Hotmixjadi Berikut alai dan bahan bakar (T = 5cm, 9m2) Aspal (ESO) 1 Drum 150Kg Aspal Curah Aspal RC 70 (Cilacap)
BAHAN PENGHISAP AIR SUMUR DALAM PompaKodok Pompa Dragon legal Pompa Dragon Asli Mesin Pompa Air 1OOW- San yo Mesin Pompa Air 150W- Sanyo Mesin Pompa Air 250W - Sanyo Mesin Pompa Air 450W- Sanyo Pompa Submersible Kap. 150\iter/ menit 3kW Gear Pump kap. 60\iter/ menit Deep Well dengan kelengkapannya kap. 150\iter/ me nit HandOi\Pump
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
bh bh bh bh bh bh
& INTERIOR
EoJSJ 34
TAHUN
XXI 2015
~
JOURNAL OF BUILOING CONSTRUCTION, INTERIOR & MATERIAL PRICE
I
~
0 T. 1. 2. 3. 4. 5. 6. 7 8. 9. 10.
u. 1. 2. 3. 4. 5. 6. 7 8. 9. 10.
v. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.
BIAYAQUALITYCONTROL, IZIN-IZIN, PENGUKIRAN BIASA DAN BIAYA PENYAMBUNGAN Penyambungan Listrik PLN Sondir Rata-rata Pengukuran Site+ Patak Biaya Tes Jalan (Quality Control) Biaya Tes 1 Macam Beton Biaya pengujian Bahan Agregat Biaya Pengujian Listrik+gambar+trafo &Adm lzin sumur artesis lengkap Penyambungan PDAM untuk rumah Geolistrik ALATTUKANG Palu 0,5kg Cangkul Singkup Sekrop Pengki Lingg is Roo! Meter 50 Meter (Bahan Plastik) Roo! Meter 5 Meter (Bahan Besi) Selang Plastik untuk Water Pas dia. 0,5cm Water Pas Aluminium 60 CM STANDARD RATA-RATASEWAALAT BESAR, ALAT MEKANIK TRUK, KENDARAAN RODA4 DAN LAIN NYA Sewa Me sin Gil as 8 Ton s/d 1Oton Tirud Roller 3Jam/hari Tam dam Roller 6-8 Ton 5Jam/ Hari Tamdam Roller8-10Ton 5Jam/ Hari RollerViberator- Ped 1 ton 4 Jam/ hari Roller Viberator- Self 7 ton 5 Jam/ hari Roller 3 Whelled- 8 Ton 5 Jam/ hari Roller Pneumatic 8-15 Ton 5 Jam/ hari Loader Wheeled 5 Jam/ hari Sewa Kran 30 Ton Sewa Exavator Backhoe 5 Jam/ hari Sewa Draklint Whell Loader Buldozer 4 jam/hari Ecavator Hydr 1m3 Backu Motor Grader 5 Jam/ hr Pheumatic Drill hammer 3 Jam/ hr Vibro Roller
EDISJ34 TAHUN
XXI 2015
~
(I)
1watt 1 ttk m2 ttk 1 spl 1 spl 1 watt unit unit 1 ttk
bh bh bh bh bh bh bh bh m' bh
hari hari hari hari hari hari hari hari hari hari jam jam jam jam jam jam jam hari hari
1.200 265.000 1.400 85.000 180.000 65.000 400 5.500.000 1.250.000 315.000
1.200 265.000 1.400 85.000 180.000 65.000 400 5.500.000 1.250.000 315.000
45.000 40.000 35.000 35.000 10.000 45.000 70.000
50.000 45.000 40.000 40.000 12.000 48.000 80.000
300.000 240.000 360.000 320.000 294.000 330.000 198.000 342.000 450.000 5.400.000 150.000 174.000 150.000 138.000 150.000 150.000 180.000 234.000 210.000
312.000 249.000 374.000 332.000 306.000 342.000 205.000 354.000 468.000 5.616.000 156.000 180.000 156.000 144.000 156.000 156.000 187.000 245.000 220.000
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
505
.... ~
~
~ ~""i
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
"0
::tl 0
~
-
20.
Stone Crusher
hari
210.000
220.000
(I)
21.
AMP
hari
245.000
330.000
~
22.
Teractor Equament 2Jam/hari
hari
108.000
115.000
23.
ScreningPient 5 Jam/ hari
hari
360.000
375.000
24.
Asphalt Finisher
hari
330.000
345.000
~
~ ~
""'
25.
Asphalt Melting Kalte
hari
174.000
180.000
26.
Asphalt Spayer
hari
120.000
125.000
27.
Asphal Mixing Plant
hari
300.000
312.000
28.
Sprayer Self Prop 10001 4jam/hr
hari
300.000
312.000
29.
Tamper, Viberator Plate 3Jam/hari
hari
240.000
250.000
30.
Crusher/ SCR
hari
900.000
936.000
31.
Concrete Mixer0.125m3
hari
120.000
125.000
32.
Concrete Mixer 0.5m3
hari
150.000
156.000
33.
Concrete Viberator
hari
120.000
125.000
34.
Pick Up
hari
210.000
220.000
35.
Dump Truck 3.5 Ton
hari
420.000
436.000
36.
Dump Truck 5 Ton 4 Jam/ hari
hari
480.000
500.000
37.
Flatbed Truck 3.5 Ton
hari
330.000
345.000
38.
Truck 3/4 (Colt Disel)
hari
300.000
312.000
39.
Truck Foso
hari
780.000
820.000
40.
Mesin Las Listrik 18 pk 8 jam
hari
180.000
190.000
41.
Mesin PompaAir3"
hari
120.000
125.000
42.
Stamper 8jam
hari
150.000
156.000
43.
Compresor Air
hari
120.000
125.000
44.
Pump Water (5cm) 30m3/ hari
hari
120.000
125.000
45.
TraillerTowed 1 Ton 3 Jam/hari
hari
102.000
110.000
46.
Water Tank Truck 2 Jam/ hari
hari
180.000
190.000
w.
BAHAN BAKAR DAN PELUMAS
1.
MinyakTanah
ltr
9.500
12.000
2.
Kayu Bakar dari Kayu Karel
m3
185.000
200.000
3.
Bahan Bakar Residu
ltr
1.300
1.400
4.
Minyak Solar
ltr
5.500
5.500
5.
Bensin Premium
ltr
6.500
6.500
6.
Plus Oil
ltr
1.600
1.700
7.
Oli Mesran 40 SAE
ltr
30.000
36.000
12kg
78.000
80.000
15.1 kg
82.000
86.000
8.
Elpiji/ Botol
9.
Asitilin I Botol
10.
Angin (02) I Botol
btl
90.000
93.000
11.
Kawai Las Listrik
kg
23.000
25.000
12.
Karbit
19.000
21.000
506
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eo1s1
34
TAHUN
XXI 2015
-¢>
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
I
'tl
DAFTAR HARGA UPAH KOTABEKASI
::0 0
~
-~
(I)
1.
Pekerja
hari/8jam
62.000
2.
Tukang Batu
hari/8jam
76.000
3.
Kepala Tukang Batu
hari/8jam
90.000
4.
Tukang Kayu
hari/8jam
78.000
5.
Kepala Tukang Kayu
hari/8jam
92.000
6.
Tukang Cat/ pelitur
hari/8jam
76.000
7.
Kepala Tukang Cat/ pelitur
hari/8jam
90.000
8.
Tukang Besi Beton
hari/8jam
78.000
9.
Kepala T ukang Besi Beton
hari/8jam
92.000
10.
Tukang Besi Profil
hari/8jam
78.000
11.
Kepala T ukang Besi Profil
hari/8jam
92.000
12.
Mandor
hari/8jam
105.000
13.
Operator Alat Besar
hari/8jam
109.000
14.
Pembantu Operator/ mekanik
hari/8jam
62.000
15.
SupirTruck
hari/8jam
93.000
16.
KenekTruk
hari/8jam
62.000
17.
Penjaga Malam
hari/8jam
78.000
ED/SI
34
TAHUN XXI
2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
~
~ ~ ""''
507
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
"'0 ::0
~
HARGA SATUAI\i PEKERJAAI\i KOTABEKASI
0
:!2
:;:
(I)
~
~
~ ~""'!
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
M2 M1 M2 M2 M2 M2 M3 M3 M3 M3 M3 M3 M2 M3 M3 M3 M3 M3 M2 M3 M2 M3 M3 M3
Pekerjaan Pengukurab Kembali (Site) Pekerjaan Pasangan Bouwplank Los Kerja/ Gudang Pekerjaan Kantor Oireksi Papan Nama Proyek Pagar Pengamanan Proyek Pekerjaan Galian Tanah Biasa Max. Kedalaman 1M' Pekerjaan Galian Tanah Biasa Max. Kedalaman 2M' Pekerjaan GaHan Tanah Biasa Max. Kedalaman 3M' Pekerjaan Galian Tanah berbatu/ Tanah Keras Max. Kedalaman 1 M' Pekerjaan Galian Tanah Cadas Max. Kedalaman 1 M' Pekerjaan Galian Tanah Lumpur Max. Kedalaman 1 M' Pekerjaan Striping Tebing Setinggi 1M' tebal = 20cm Pekerjaan Pembuangan Oalam Radius 15 M Urugan Tanah kembali Pekerjaan Pemadatan Tanah Setiap 20cm Pekerjaan Lapisan Pudel 1 KP : 3PP : 7 TL Untuk stabilitas tanah Pekerjaan Lapisan Pudel 1KP : 5 TL untuk stabilitas tanah Peke~aan Pemasangan Lapisan lnjuk T = 10cm Pekerjaan Perkerasan Sirtu Oipadatkan Setiap 20cm Pekerjaan Pembuatan Jalan Sementara Tebal 20cm Pekerjaan Galian Tanah Sumuran Max. Kedalaman 1OM' Urugan Pakai ala! besar tanah dari luar dipadatkan (5000m3) Urugan Pasir Urug
A001 A002 A003 A004 A005 A006 A007 A008 A009 A010 A011 A012 A013 A014 A015 A016 A017 A018 A019 A020 A021 A022 A023 A024 A025 A026
1 M3 Lantai Kerja Beton Mutu fc = 7,4 Mpa (K 100), slump (3-6)cm, w/c = 0,87 1 M3 Pasangan Pondasi Cycloof, 60% beton campuran 1PC: 2PB: 3KR dan 4QOfc,
A030 A031 A032 A033 A034 A035 A036 A037 A038 A039 A040 A041 A042 A043 A044
1M3 Pasang Pondasi sumuran dia. 100 em 1M3 Beton mutu fc=7,4 Mpa (K 100), SLUP (12+2) em, w/c=0,87 1M3 Beton mutu fc=7,4 Mpa (K 100), SLUP (12+2) em, w/c=0,78 1M3 Beton mutu fc=12,2 Mpa (K 150), SLUP (12+2) em, w/c=0,72 1M3 Beton mutu fc=14,5 Mpa (K 175), SLUP (12+2) em, w/c=0,66 1M3 Beton mutu fc=16,9 Mpa (K 200), SLUP (12+2) em, w/c=0,61 1M3 Beton mutu fc=19,3 Mpa (K 225), SLUP (12+2) em, w/c=0,58 1M3 Beton mutu fc=21,7 Mpa (K 250), SLUP (12+2) em, w/c=0,56 1M3 Beton mutu fc=24,0 Mpa (K 275), SLUP (12+2) em, w/c=0,53 1 M3 Beton Mutu fc = 26,4 Mpa (K300), slump (12+2)cm, w/c = 0.52 1M3 Beton mutu fc=28,8 Mpa (K 325), SLUP (12+2) em, w/c=0,49 1M3 Beton mutu fc=31,2 Mpa (K 350), SLUP (12+2) em, w/c=0,48 1 M3 Cor Beton K-175 Ready Mix Min 6M3 Berikut Siang 1 M3 Cor Beton K-225 Ready Mix Min 6 M3 Berikut Siang 1 M3 Cor Beton K-300 Ready Mix Min 6 M3 Berikut Siang 1OKg Besi Beton terpasang Palos/ Ulir 1Kg Pekerjaan Erection Konstruksi Kuda-kuda Besi 1 Kg Pekerjaan Baja IWF Ex. ON 1 Kg Pekerjaan Konstruksi Besi Siku/ Profil Ex. ON 10 Cm Pekerjaan Pengelasan dengan Las Listrik tebal = kawat 4mm 1 Titik Melubang Konstruksi Besi dengan Bar 1 M2 Pekerjaan Bondex 1 M2 Pekerjaan Wiremesh M8 1 M2 Bekisting dengan papan 1 M2 Bekisting Multipleks 9MM 1 M2 Bekisting Multipleks 12MM 1 M2 Pasangan Stoat Werk
508
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
3.300 51.540 586.520 696.630 806.490 335.180 54.030 66.570 79.340 71.890 109.230 87.030 3.980 23.660 18.000 39.870 242.990 195.580 71.360 184.930 109.660 97.580 101.070 193.210 707.510 2.194.460 842.120 764.170 800.970 829.840 863.980 896.590 920.980 937.110 964.780 973.390 1.005.930 1.057.370 958.740 1.027.710 1.108.170 124.640 1.670 25.370 25.370 22.330 6.930 155.450 89.150 131.940 130.080 137.810 198.420
Eotst34
3.300 57.990 654.830 781.270 899.830 361.660 54.030 66.570 79.340 71.890 109.230 87.030 3.980 23.660 18.000 39.870 261.830 201.860 201.860 201.860 342.800 97.580 107.670 218.290 765.000 2.277.150 879.270 811.100 848.780 878.240 913.170 946.380 971.500 987.760 1.051.690 1.024.360 1.057.210 1.108.750 993.220 1.085.180 1.159.900 128.440 1.670 26.630 26.630 23.710 6.930 172.710 92.700 141.460 136.490 144.510 217.890 TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
'1:1
::0 0
A068 A069 AO?O A071 A072 A073 A074 A075 A076 A077 A078 A079 A080 A081 A082 A083 A084
M3 M3 M2 1 M3 1 M3 1 M3 1 M3 1 M3 1 M3 1 M2 M2 M2 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2 M2 M2 1 M2 1 M2 1 M2 1 M2 1 M2 1 M2
Eorsr 34
Pasangan Batu Kosong (Anstamping) Pasangan Batu Bronjong Pasangan Lempengan Rumput sampai Tumbuh Pasangan Batu Belah, Camp. 1PC : 8PP Pasangan Batu Belah, Camp. 1PC : 6PP Pasangan Batu Belah, Camp. 1PC : 5PP Pasangan Batu Belah, Camp. 1PC : 4PP Pasangan Batu Belah, Camp. 1PC : 3PP Pasangan Batu Belah 1 : 4 Pakai Muka Batu Segi Enam + Siaran Pasangan Batu Tempel Hitam Dinding Keramik Ukiran 10x20cm Dinding Keramik Ukiran 20x20cm Lantai Keramik Ukiran 1Ox20cm Corak/ Anti Slip Lantai Keramik Ukiran 20x20cm Corak/ Anti Slip Lantai Keramik 30x30cm ON Putih Palos Lantai Keramik 30/30 ON Bercorakl Berwarna Lantai Granit Ukiran Besar Ex. Luar Negeri Dinding Granit Ukiran Besar Ex. Luar Negeri Lantai Granit Ukiran Besar Ex. Dalam Negeri Dinding Granit Ukiran Besar Ex. Dalam Negeri Lantai Granit Ukiran Kecil Ex. Luar Negeri Dinding Granit Ukiran Kecil Ex. Luar Negeri Lantai Granit Ukiran Kecil Ex. Dalam Negeri Dinding Granit Ukiran Kecil Ex. Dalam Negeri Lantai Granito Tile Essensa Ukuran 60x60 Polished Dinding Granito Tile Essensa Ukuran 60x60 Polished Lantai Granito Tile Essensa Ukuran 40x40 Polished Dinding Granito Tile Essensa Ukuran 40x40 Polished Lantai Marmer Ex. Lampung Ukuran Besar Dinding Marmer Ex. Lampung Ukuran Besar Lantai Marmer Ex. Lampung Ukuran Kecil Dinding Marmer Ex. Lampung Ukuran Kecil Lantai Marmer Ex. Citatah Ukuran Besar Dinding Marmer Ex. Citatah Ukuran Besar Lantai Marmer Ex. Citatah Ukuran Kecil Dinding Marmer Ex. Citatah Ukuran Kecil Pasangan Dinding Bata Merah 1PC : 2PP, tebal 112 bata Pasangan Dinding Bata Merah 1PC : 3PP, tebal 112 bata Pasangan Dinding Bata Merah 1PC : 4PP, tebal 112 bata Pasangan Dinding Bata Merah 1PC: 5PP, tebal112 bata Pasangan Dinding Bata Merah 1PC : 2PP, tebal 1 bata Pasangan Dinding Bata Merah 1PC : 3PP, tebal 1 bata Pasangan Dinding Bata Merah 1PC : 4PP, tebal 1 bata Pasangan Dinding Bata Merah 1PC : 5PP, tebal 1 bata Pasangan Dinding Bata Merah 1PC : 6PP, tebal 1 bata Pasangan Dinding Conblok 20, AD. 1PC : 3PP Pasangan Dinding Conblok 20, AD. 1PC : 4PP Plesteran 1PC: 1PP, tebal15cm Plesteran 1PC: 2PP, tebal 15cm Plesteran 1PC: 3PP, tebal 15cm Plesteran 1PC: 4PP, tebal 15cm Plesteran 1PC: 5PP, tebal 15cm Plesteran 1PC : 6PP, tebal 15cm Plesteran 1PC : 7PP, tebal 15cm Plesteran 1PC : 8PP, tebal 15cm Plesteran 1PC : 2PP, tebal 20cm Plesteran 1PC : 3PP, tebal 20cm Plesteran 1PC : 4PP, tebal 20cm
TAHUN XXI
2015
628.620 660.640 684.000 717.230 765.170 608.770 240.560 191.650 188.920 174.510 171.220 156.050 167.800 1.920.450 2.142.020 1.352.850 1.674.560 1.585.000 1.790.130 1.187.680 1.386.650 344.490 358.560 383.910 398.600 671.730 864.870 608.730 795.700 580.920 772.640 500.880 686.180 103.620 97.590 94.140 91.980 215.810 203.130 194.560 190.170 188.740 269.510 269.280 60.860 54.240 51.380 49.420 48.320 47.430 46.950 46.460 72.610 58.210 66.120
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
395.970 407.550 6.850 672.620 704.660 728.040 761.290 809.240 648.220 272.470 199.440 196.890 184.400 179.830 164.520 176.280 2.264.850 2.491.760 1.470.210 1.793.740 1.702.360 1.909.310 1.248.280 1.448.190 367.440 381.880 431.650 447.090 732.330 926.400 629.590 816.890 607.460 799.590 538.780 724.660 109.470 103.370 99.930 97.780 227.850 215.220 206.510 202.300 201.480 301.160 302.320 61.960 55.300 52.470 50.490 49.430 48.560 48.090 47.630 74.040 59.680 67.560
& INTERIOR
509
-en<: '1:1
~
~
OJ
))
~
""'
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
1 M2 Plesteran 1PC : 5PP, tebal 20cm 1 M2 Plesteran 1 PC : 6PP, tebal 20cm i 1 M2 Plesteran skoning 1PC : 2PP,Ibr 10 mm 1 M2 Plesteran ciprat 1 PC : 2PP 1 M2 Finishing siar pasangan dinding bata merah (=20m') 1 M2 Finishing siar pasangan dinding conblok ekspose (=8m') 1 M2 Finishing siar pasangan batu kali adukan 1PC :2PP 1 M2Acian PC 1 Unit septitank 2.5x1.5x2m+rembesannya (kantor type besar) 1 Unit septitank 2x1.5x2m+rembesannya (kantor type kecil) 1 Unit septitank 1.5x1x1.5m+rembesannya (rumah kapasitas kecil) M2 Pengecatan Beton ICI Eksterior M2 Pengecatan Plafond dan dinding Interior ICI M2 Pengecatan Dinding Vinilex (3x) 1 M2 Pengecatan Plafond Vinilex (3x) 1 M2 Pengecatan Dinding Sanlex (3x) 1 M2 Pengecatan Plafond Sanlex (3x) 1 M2 Pengecatan Kayu (3x) Berikut Meni 1 M2 Pengecatan Besi (3x) 1 M2 Plituran Bangunan (Biasa) M2 Plituran Meubulair 1 M2 Pasangan Rangka Plafond (50x100cm) Kayu Kamper Banjar 1 M2 Pasangan Rangka Plafond (50x100cm) Kayu Borneo Super 1 M2 Pasangan Rangka Plafond (60x60cm) Kayu Borneo Super 1 M2 Pasangan Bahan Plafond Tripleks 4mm Penutup pada rangkanya 1 M2 Pasangan Bahan Plafond Gypsum 9mm Penutup pada rangkanya 1 M2 Pasangan Bahan Plafond asbes semen 5mm Penutup pada rangkanya 1 M2 Pasangan Bahan Plafon eternit 4mm (1 x1) pada rangkanya 1 M2 Pasangan Plafond akustik uk. (60x120)cm 1 M2 Pasangan Bahan Plafon akustik uk. (60x120) em 1 M2 Pasangan list profil gypsum 1 M2 Pasangan list profil kayu kamper banjar 4x1 1 M2 Pekerjaan lisplank kayu kamper banjar 3/30 1 M2 Pekerjaan lisplank kayu kamper banjar 3/20 1 M2 Pek€ljaan dinding pemisat.'partisi teakwood rangkap, rangkap KY K. Ba~ar A112 1 M3 Kusen Kayu Kamper Banjarmasin A113 1 M3 Kusen Kayu Borneo Super A114 1 M3 Kusen Kayu Kamper Samarinda A115 1 M3 Kusen Kayu Jati Jabar Kelas 2 A 116 1 M2 Daun Pintu Panil Kayu Samarinda A117 1 M2 Daun Pintu Panil Kayu Jati Jabar Kelas 2 A118 1 M2 Daun Pintu Double Teakwood Rangka Kayu Banjar A119 1 M2 Daun Pintu Panil Teakwood Rangka Kayu Banjar 1 M2 Daun Pintu Tripleks Ukuran Pintu Lapis Aluminium (KM/WC) 1 M2 Daun Pintu Tripleks Ukuran Pintu Lapis Formika (KMIWC) Kayu Kamper 1 M2 Daun Pintu Trip leks Lapis Seng Plat (KM/W C) 1 M2 Daun Jendela Kaca (Tanpa Kaca) Kayu Kamper Samarinda 1 M2 Daun Pintu Kaca (Tanpa Kaca) Kayu Kamper Samarinda 1 M2 Daun Pintu/ Jendela Jalusi Kayu Kamper Samarinda M3 Kuda-kuda oversteik/ konsol kayu kamper banjar (expose) M3 Kuda-kuda Kayu Kamper Banjar M3 Konstruksi Gording Kamper Banjar 1 M2 Rangka Atap Genteng Beton/ Keramik K-Banjar (Hanya Rangkanya) 1 M2 Borneo
63.470 46.440 38.690 22.550 10.790 47.310 28.680 10.944.340 7.050.050 4.121.080 73.990 67.790 47.530 50.720 33.490 33.380 61.100 61.310 93.290 108.690 150.910 118.720 119.410 39.510 33.030 27.590 23.960 251.630 169.880 26.190 21.470 112.100 111.390 370.810 10.017.530 7.509.530 14.207.270 13.481.270 812.180 776.980 571.090 583.410 622.790 624.440 628.730 559.650 559.650 1.070.900 10.468.630 8.963.940 8.221.270 158.700 98.550
Eo!S/34
64.970 46.930 39.050 22.660 10.840 47.960 28.790 12.325.960 7.929.770 4.616.490 76.570 70.230 48.730 51.980 34.490 34.410 62.800 62.830 99.260 115.430 166.600 127.630 128.930 40.400 38.870 30.030 25.190 259.900 174.940 28.670 23.800 118.260 117.550 406.090 11.209.380 8.173.380 14.695.120 13.969.120 839.130 795.130 589.640 602.510 643.640 642.430 649.580 575.820 575.820 1.113.690 12.246.840 9.917.160 9.894.764 180.240 108.780 TAHUN
XX/2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
1 M2 Penutup Atap Sirap (4 Lapis) + Rangka Atap 1 M1 Pekerjaan Bubungan Atap genteng ex. Jatiwangi 1 M1 Pekerjaan Bubungan Atap genteng Beton 1 M1 Pekerjaan Bubungan Atap genteng Keramik 1 M1 Pasang Talang Datar/Jurai Seng BJLS 30, Lbr 90 CM 1 M1 Pekerjaan Pagar Depan Tralis Standard 1 M1 Pekerjaan Pagar Belakang/ Samping 1 M2 Pasang Onderlag Batu Selah T =20cm 1 M2 Amparan Batu Pecah Mesin S/7 t = 1Ocm 1 M2 Amparan Batu Pecah Mesin 2/3 t = Scm 1 M2 Lapisan Pengisi/ Penutup 1 M2 Pengaspalan Manual 1 M2 Hotmix Tangan T = 3cm (Jadi) untuk Hal & Jalan Kelas 6 Ton Kebawah 1 M2 Hotmix Pakai Alat Besar T = Scm Kelas Jalan 8 Ton Lebih 1 M2 Konstruksi Penetrasi Lengkap 1 M1 Saluran Grefe! Beton 1/2 Q 20cm + pasangan 1 M1 Saluran Grefe! Beton 1/2 Q 30cm + pasangan 1 1 1 1 1
1 1 1 1 1 1
Eotst 34
M2 Pasangan Paving Block warna 6 em M2 Pasangan Paving Block warna 8 em M2 Pasangan Paving Block Natural 6 em M2 Pasangan Paving Block Natural 8 em M3 Membongkar dinding bata M3 Membongkar dinding bata M2 Membongkar plesteran dinding M2 Membongkar genteng /sirap M2 Membongkar genteng /sirap M2 Membongkar rangka atap I reng kaso M2 Membongkar rangka atap I reng kaso M3 Membongkar Kuda-kuda Gording/ Balok M3 Membongkar Kuda-kuda Gording/ Balok M2 Membongkar plafon M2 Membongkar plafon
TAHUN
XXI 2015
232.200 100.630 10S.880 129.190 188.260
262.120 111.320 116.270 141.S40 207.320
1.212.090 1.298.180 92.1SO 41.260 26.490 1S.310
1.269.010 1.3SS.240 102.870 46.490 29.960 16.640
S6.260 68.410 119.770 139.340 194.070 221.700 130.710 146.S40 124.0SO 13S.430 146.790
S8.SOO 70.8SO 138.080 1S1.600 20S.390 23S.920
78.S90 6.290 2.S10 38.830 9.790 19.S90 871.420 SS3.300 29.100 9.100
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
134.780 1S1.7SO 128.110 139.S20 146.790 78.S90 6.290 2.S10 38.830 9.790 19.S90 871.420 SS3.300 29.100 9.100
S11
I
[ JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
~
ANAUSA HARGA SATUAN PEKERJAAN KOTABEKASI URAIAN
NO.
1
2
A001
1 M2 PEK. PENGUKURAN KEMBALI (SITE)_ Tukang Batu Pekerja
Peralatan Jumlah Keuntungan Max.
KOEF SAT. 3
4
0.0100 0.0200 0.5000
org org
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 5 6 7=!3x5l 8=!3x6l
lot
76.000.00 62.000.00 2.000.00
760.00 1.240.00 1.000.00 3.000.00 300.00
4.500.000.00 17.000.00 45.646.00
40.000.00 570.00 6.288.35 46.858.35 4.685.84 51.544.19 51.540.00
45.000.00 646.00 7.075.13 52.721.13 5.272.11 57.993.24 57.990.00
4.500.000.00 17.000.00
400.000.00 3.750.00
450.000.00 4.250.00
30.000.00 45.000.00 65.000.00 516.250.00 529.156.25
30.800.00 21.500.00 6.350.00 11.560.00 59.245.00 533.205.00 53.320.50 586.525.50 586.520.00
33.000.00 22.500.00 6.500.00 12.906.25 66.144.53 595.300.78 59.530.08
Jumlah Dibulatkan A002 1 M1 PEK. PASANGAN BOUWPLANK Kayu Borneo Super
Paku 5-7 Onokos Pasano Jumlah Keuntungan Max. Jumlah Dibulatkan A003 1 M2 LOS KERJA I G UDANG Kayu Borneo Super Paku5H7 Seng Glb BJLS 30 Triplex3 mm PC(SOkg) Peralatan Onakos Pasana
0.0100 0.0380 0.1550
0.1000 0.2500 1.1000 0.5000 0.1000 0.0250 0.1250
rri'
4.000.000.00
kg Is
15.000.00 40.570.00
rri'
4.000.000.00
kg lbr lbr zak
15.000.00 28.000.00 43.000.00 63.500.00 462.400.00 473.960.00
lot Is
Jumlah Keuntunaan Max. Jumlah Dibulatkan A004 1 M2 PEK. KANTOR DIREKSI Kayu Borneo Super
Paku5-7 Seng Glb BJLS 28 ( 80 x 180 em ) Triplex 3 mm
PC(50kg) Pasir Pasang Bata Merah Perala tan Ongkos Pasang
0.1000 0.2500 1.1000 0.5000 0.1000 0.2500 70.0000 0.0200 0.1500
rri' kg lbr lbr zak
rri' bh lot Is
4.000.000.00 15.000.00 28.000.00 43.000.00 63.500.00 170.000.00 500.00 539.900.00 550.698.00
4.500.000.00 17.000.00 30.000.00 45.000.00 65.000.00 203.000.00 550.00 605.500.00 617.610.00
Jumlah Keuntungan Max. Jumlah
'"
ADOS 1 M2 PAPAN NAMA PROYEK Kayu Borneo Super Paku5-7 Cat Minyak Penulisan Ongkos Pasang
0.1300 0.2500 1.0000 0.1250 0.1250
rri' kg Is Is Is
4.000.000 15.000.00 55.549.00 579.299.00 651.711.38
4.500.000.00 17.000.00 57.099.00 646.349.00 727.142.63
.l"ml"h Keuntunaan Max. Jumlah Dibulatkan
512
760.00
76.000.00 62.000.00 2.000.00
JuRNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
400.000.00 3.750.00 30.800.00 21.500.00 6.350.00 42.500.00 35.000.00 10.798.00 82.604.70 633.302.70
EoJSI
654.830.86 654.830.00
63.330.27 696.632.97 696.6,0.00
450.000.00 4.250.00 33.000.00 22.500.00 6.500.00 50.750.00 38.500.00 12.110.00 92.641.50 710.251.50 71.025.15 781.276.65 7R1.270.0.0_
520.000.00 3.750.00 55.549.00 72.412.38 81.463.92 733.175.,0
585.000.00 4.250.00 57.099.00 80.793.63 90.892.83 R1R0>'45
73.317.53
81.803.55 899.839.00
806.492.83 806.490.00
& INTERIOR
1.240.00 1.000.00 3.000.00 300.00 3.300.00 3.300.00
34
TAHUN
899.830.00
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
2
1 A006
KOEF SAT.
URAIAN
NO.
1 M2 PAGAR PENGAMAN PROYEK Seng Glb BJLS 28 ( 80 x 180 ) Kayu Borneo Super Paku 5 - 7 Pengecatan Cat Mlnyak 2x Bagian Luar Ongkos Pasang
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 6 5
3
4
1.4300 0.0360 0.2000 1.8000 0.2000
lbr m3 kg m2 is
28.000.00 4.000.000.00 15.000.00 37.160.00 253.928.00
28.000.00 4.500.000.00 17.000.00 38.082.67 273.988.80
40.040.000 144.000.00 3.000.00 66.888.00 50.785.60 304.713.60 30.471.36 335.184.36 335.180.00
40.040.00 162.000.00 3.400.00 68.548.80 54.797.76 328.786.56 32.878.66 361.665.22 361.660.00
0.7500 0.0250
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
46.500.00 2.625.00 49.125.00 4.912.50 54.037.50 54.030.00
45.500.00 2.625.00 49.125.00 4.912.50 54.037.50 54.030.00
0.9000 0.0450
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
55.800.00 4.725.00 60.525.00 6.052.50 66.577.50 66.570.00
55.800.00 4.7525.00 60.525.00 6.052.50 66.577.50 66.570.00
1.0500 0.0670
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
65.100.00 7.035.00 72.135.00 7.213.50 79.348.50 79.340.00
65.100.00 7.035.00 72.135.00 7.213.50 79.348.50 79.340.00
1.0000 0.0320
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
62.000.00 3.360.00 65.360.00 6.536.00 71.896.00 71.890.00
62.000.00 3.360.00 65.360.00 6.536.00 71.896.00 71.890.00
1.5000 0.0600
oh oh
62.000.00 105.000.00
66.000.00 105.000.00
93.000.00 6.300.00 99.300.00 9.930.00 109.230.00 109.230.00
93.000.00 6.300.00 99.300.00 9.930.00 109.230.00 109.230.00
1.2000 0.0450
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
74.400.00 4.725.00 79.125.00 7.912.50 87.037.50 OI.UOU.UU
74.400.00 4.725.00 79.125.00 7.912.50 87.037.50 0/.UJU.UU
Jumlah Keuntungan Max. Jumlah Dibulatkan
A007
M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 1 M' Pekerja
Mandor
Jum!ah Keuntungan Max. Jumlah Dibulatkan
A008
1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 2M' Pekerja Mander
Jumlah Keuntungan Max. Jumlah
A009
Dibulatkan 1 M3 PEK. GALl AN TANAH BIASA MAX KEDALAMAN 3M' Pekerja
Mander
Jumlah Keuntungan Max. Jumlah Dibulatkan
A010
1M3 PEK. GALIAN TANAH BERBATUITANAH KERAS MAX KEDALAMAN 1M' Pekerja
Mander Jumlah Keuntungan Max. Jumlah Dibulatkan
A011
1M3 PEK. GALl AN TANAH CADAS MAXKEDALAMAN 1M' Pekerja Mandor
Jumlah Keuntungan Max.
Jumlah Dibulatkan A012
1M3 PEK. GALIAN TANAH LUMPUR MAX KEDALAMAN 1M Pekerja Mandor
Jumlah Keuntungan Max. Jumlah
UIOUiatKan
EDIS/34 TAHUN
XXI 2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
513
f
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAl AN
1 A013
2
~ KOEF SAT.
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
3
4
0.0500 0.0050
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
3.100.00 525.00 3.625.00 362.50 3.987.50 3.980.00
3.100.00 525.00 3.625.00 362.50 3.987.50 3.980.00
0.3300 0.0100
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
20.460.00 1.050.00 21.510.00 2.151.00 23.661.00 23.660.00
20.460.00 1.050.00 21.510.00 2.151.00 23.661.00 23.660.00
0.2500 0.0083
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
15.500.00 87.150 16.371.50 1.637.15 18.008.85 18.000.00
15.500.00 871.50 16.371.50 1.637.15 18.008.65 18.000.00
0.5000 0.0500
oh oh
62.000.00 105.000.00
62.000.00 105.000.00
31.000.00 5.250.00 36.250.00 3.625.00 39.875.00
31.000.00 5.250.00 36.250.00 3.625.00 39.875.00
0.4000 0.1350 0.9480 0.8000 0.4000 0.0400 0.0800
m3 m3 m3
170.000.00 86.000.00 52.000.00 62.000.00 76.000.00 90.000.00 105.000.00
203.000.00 94.000.00 55.000.00 62.000.00 76.000.00 90.000.00 105.000.00
68.000.00 11.610.00 49.296.00 49.600.00 30.400.00 3.600.00 8.400.00 22.906.00 22.090.60 242.996.60 242.990.00
81.200.00 12.690.00 52.140.00 49.600.00 30.400.00 3.600.00 8.400.00 238.030.00 23.803.00 261.833.00 261.830.00
86.000.00 52.000.00 62.000.00 76.000.00 90.000.00 105.000.00
94.000.00 55.000.00 62.000.00 76.000.00 90.000.00 105.000.00
21.328.00 64.480.00 49.600.00 30.400.00 3.600.00 8.400.00 177.808.00 17.780.80 195.588.80 195.580.00
23.212.00 68.200.00 49.600.00 30.400.00 3.600.00 8.400.00 183.512.00 18.351.20 201.863.20 201.860.00
TAHUN
XXI 2015
1M2 PEK. STRIPPINGTEBINGSETINGGI1 M', TEBAL=20 CM Pekerja Mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
A014
1 M3 PEK. PEMBUANGAN DALAM RADIUS 15 METER Pekerja Mandor
Jumlah Keuntungan Max. Jumlah Dibulatkan
A015
1 M3 URUGAN TANAH KEMBALI Pekerja Mandor Jumlah KeuntunQan Max. Jumlah Dibulatkan
A016
1 M3 PEK PEMADATAN ATANAH SETIAP 20 CM Pekerja
Mandor Jumtah Keuntungan Max. Jumlah Dlb olk
A017
1 M3PEK.LAPISAN PUDEL 1KP:3PP:7TL UTKSTABILITASTANAH Pasir pasang Kapur Padam Tanah Liat Pekerja Tukang batu Kepala Tukang Mandor
oh oh oh oh
Jumlah KeuntunQan Max. Jumlah Dibulatkan
A018
1 M3 PEK. LAPISAN PUDEL 1 KP:5TL UTKSTABILITAS TANAH Kapur Padam 0.2480 Tanah Liat 1.2400 Pekerja 0.8000 Tukang batu 0.4000 Kepala Tukang batu 0.0400 Mandor 0.0800
m3 m3
oh oh oh oh
Jumlah Keuntungan Max. Jumlah
Dibulatkan
514
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eotst 34
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
1 A019
KOEF SAT.
URAIAN
NO.
2
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
3
4
6.0000 0.1500 0.0150
kg oh oh
9.000.00 62.000.00 105.000.00
10.000.00 62.000.00 105.000.00
54.000.00 9.300.00 1.575.00 64.875.00 6.487.50 71.362.50 71.360.00
60.000.00 9.300.00 1.575.00 70.875.00 7.087.50 77.962.50 77.960.00
1.2000 0.2500 0.0250
m3 oh oh
125.000.00 62.000.00 105.000.00
138.000.00 62.000.00 105.000.00
150.000.00 15.500.00 2.625.00 168.125.00 16.812.50 184.937.50 184.930.00
165.000.00 15.500.00 2.625.00 183.725.00 18.372.00 202.097.50 202.090.00
0.2500 0.0300 0.0500 0.5000 0.1000 0.0600
m3 m3 m3 oh oh oh
160.000.00 135.000.00 170.000.00 62.000.00 105.000.00 94.050.00
175.000.00 150.000.00 203.000.00 62.000.00 105.000.00 99.900.00
40.000.00 4.050.00 8.500.00 31.000.00 10.500.00 5.643.00 99.693.00 9.969.30 109.662,30 109.660.00
43.750.00 4.500.00 10.150.00 31.000.00 10.500.00 5.994.00 105.894.00 10.589.40 116.483.40 116.480.00
1.1500 0.0250 0.2000
oh oh lot
62.000.00 105.000.00 73.925.00
62.000.00 105.000.00 73.925.00
71.300.00 2.625.00 14.785.00 88.710.00 8.871.00 97.581.00 97.580.00
71.300.00 2.625.00 14.785.00 88.710.00 8.871.00 97.581.00 97.580.00
0.6000 0.6000 5.0000 1.2000
m3 m3 m3 m3
60.525.00 65.360.00 7.250.00 30.000.00
60.525.00 65.360.00 7.250.00 35.000.00
18.157.50 19.608.00 18.125.00 36.000.00 91.890.50 9.189.05 101.079.55 101.070.00
15.157.50 19.608.00 18.125.00 42.000.00 97.890.50 9. 789.05 107.679.55 107.670.00
1.2000 0.3000 0.0100
m2 oh oh
130.000.00 62.000.00 105.000.00
149.000.00 62.000.00 105.000.00
156.000.00 18.600.00 1.050.00 175.650.00 17.565.00 193.215.00 193.210.00
178.800.00 18.600.00 1.050.00 198.450.00 19.845.00 218.295.00 218.290.00
1 M3 PEK. PEMASANGAN LAPISAN IJUK T = 10 CM lnjuk Pekerja Mandor
Jumlah Keuntungan Max. Jumlah Dibulatkan
A020
1 M3 PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CM Sirtu ( Membeli Sirtu }
Pekerja Mandor
Jumlah Keuntungan Max. Jumlah Dibulatkan
A021
1M3 PEK. PEMBUATAN JALAN SEMENTARA TEBAL 20 CM Batu Belah
Kerikil Pasir Pasang
Pekerja Mandor
Alat Bantu ( Pek. Pemadatan Tanah 1 m2 ) Jumlah Keuntungan Max. Jumlah Dibulatkan
A022
1 M3 PEK. GALIAN TANAH SUMURAN MAX KEDALAMAN 10M' Pekerja Mandor Alat Bantu
A023
Jumlah Keuntungan Max. Jumlah Dibulatkan 1 M3 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPA DATKAN (5000M31 Pek. Ga!ian (10 org) 50% Pek. Galian Tanah Berbatu (10 org) 50%
Pek. Grading Plant (10 org) 50% Beli Tanah + Angkut Max. 10 km Jumlah Keuntunqan Max. Jumlah Dibulatkan
A024
1 M3 URUGAN PASIR URUG Pasir Urug Pekerja Mandor
JumJah Keuntungan Max. Jumlah Dibulatkan
Eotst 34
TAHUN
XXI 2015
JURNAL HARGASATUAN BAHAN BANGUNAN, KONSTRUKSI
&
INTERIOR
515
I
f
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
URAIAN
1 A025
2
KOEF SAT. 3
4
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1 M3 LANTAI KERJA BETON MUTU fc=7,4 Mpa(K 100),slump (3-6)cm,wlc=0,87 Semen PC Pasir beton Split Pecah Mesin 2/3
AIR Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntunaan Max.
230.0000 893.0000 1.027.0000 200.0000 1.2000 0.2000 0.0200 0.0600
kg kg kg llr oh oh oh oh
1.270.00 125.71 137.04 2.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 135.71 162.96 51.00 62.000.00 76.000.00 90.000.00 105.000.00
292.100.00 112.262.86 140.737.04 400.00 74.400.00 15.200.00 1.800.00 6.300.00 643.199.89 64.319.99 707.519.98 707.510.00
299.000.00 121.192.86 167.362.96 10.200.00 74.400.00 15.200.00 1.800.00 6.300.00 695.455.82 69.545.58 765.001.40 765.000.00
160.000.00 1.270.00 176.000.00 185.000.00 9.500.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00
175.000.00 1.300.00 190.000.00 220.000.00 9.800.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00
76.800.00 246.380.00 54.912.00 86.580.00 1.197.000.00 32.400.00 210.800.00 64.600.00 7.650.00 17.850.00 1.994.972.00 199.497.20 2.194.469.20 2.194.460.00
84.000.00 252.200.00 59.280.00 102.960.00 1. 234. 800. 00 36.000.00 210.800.00 64.600.00 7.650.00 17.850.00 2.070.140.00 207.014 2.277.154.00 2.277.150.00
160.000.00 1.270.00 176.000.00 185.000.00 62.000.00 76.000.00 90.000.00 10' non nn
175.000.00 1.300.00 190.000.00 220.000 62.000.00 76.000.00 90.000.00 1n< non nn
76.800.00 246.380.00 54.912.00 86.580.00 210.800.00 64.600.00 7.650.00 17 A50 nn 765.572.00 76.557.20 842.129.20 842.120.00
84.000.00 252.200.00 59.280.00 102.960.00 210.800.00 64.600.00 7.650.00 17 A
313.690.00 136.900.00 109.245.71 430.00 102.300.00 20.900.00 2.520.00 8.715.00 694.700.71 69.470.07 764.170.79 764.170.00
321.100.00 162.800.00 117.935.71 1.096.50 102.300.00 20.900.00 2.520.00 8.715.00 737.367.21 73.736.72 811.103.94 811.100.00
TAHUN
XXI 2015
Jumlah Oibulatkan
A026
1 M3 PAS. PONDASI CYCLOOF,60% BETON CAMPUR 1 PC:2PB:3KR DAN 40% BATU SELAH Batu belah 15/20 cm(40%) batu belah Semen PC Pasir beton
KR (SPLIT 2/3) Besi beton
Kawai beton Pekerja Tukang Batu Kepala Tukang Batu Mandor
0.4800 194.0000 0.3120 0.4680 126.000 1.8000 3.4000 0.8500 0.0850 0.1700
m3
kg m3 m3
kg kg oh oh oh oh
Jumlah Keuntungan Max. Jumlah Oibulatkan
A026a 1 M3 PAS PONDASI SUMURAN,OIA.100CM Batu Selah 15/20 cm(40%) Semen PC Pasir beton
KR (SPLIT 213) Pekerja Tukang batu Kepala Tukang batu
Mandor Jumlah
0.4800 194.0000 0.3120 0.4680 3.4000 0.8500 0.0850 0.1700
m3
kg m3 m3 oh oh oh oh
Keuntungan Max. Jumlah Dibulatkan
A026b 1M3 BETON MUTU fc=7,4, Mpa (K100),slump (1~2)cm, wlc=0,87 Semen PC Split Pecah mesin 213 Pasir beton
AIR Pekerja Tukang Batu Kepala Tukang Batu Mander
247.0000 999.0000 869.0000 215.0000 1.6500 0.2750 0.0280 0.0830
kg kg kg llr oh oh oh oh
1.270.00 137.04 125.71 2.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 162.96 135.71 5.10 62.000.00 76.000.00 90.000.00 105.000.00
Jumlah Keuntunqan Max. Jumlah Dibulatkan
516
JURNAL HARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eo!s! 34
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
KOEF SAT.
URAl AN
1
2
3
4
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
A026c 1 M3 BETON MUTUfc=9 8 MPaiK125l.slumo 112+2\cm wlc=O 78 1.012.0000 828.0000
kg kg kg
1.270.00 137.04 125.71
1.300.00 162.96 135.71
138.681.48 104.091.43
215.0000
llr
2.00
1.6500 0.2750
oh oh
62.000.00 76.000.00
5.10 62.000.00
430.00 102.300.00
102.300.00
76.000.00
20.900.00
20.900.00
0.0280 0.0830
oh
90.000.00
2.520.00
oh
105.000.00
90.000.00 105.000.00
8.715.00
2.520.00 8.715.00
Jumlah
728.157.91
771.621.45
Keuntungan Max. Jumlah
72.815.79 800.973.70
77.162.14 848.783.59
Dibulatkan
800.970.00
848.780.00 388.700.00
276.0000
Semen PC Split Pecah Mesin 2/3
Pasir beton
AIR Pekerja
Tukang batu Kepala Tukang batu Mander
350.520.00
358.800.00 164.918.52 112.371.43 1.096.50
A026d 1 M3BETON MUTU f<:=1~2MPa(150),SLUMP(12±2)CM, WIC=0,72 Semen PC Split pecah mesin 2/3
299.0000 1.0170
Pasir beton
799.0000
Air
215.0000 1.6500
Pekerja
kg kg kg
1.270.00
1.300.00
379.730.00
137.04
162.96 135.71
139 .. 366.67
165.733.33
100.445.71 430.00
108.435.71
llr
125.71 2.00
5.10
oh oh
62.000.00 76.000.00
62.000.00 76.000.00
Kepala Tukang Batu
0.2750 0.0280
oh
90.000.00
90.000.00
Mander
0.0800
oh
105.000.00
105.000.00
Tukang Batu
20.900.00 2.520.00
20.900.00 2.520.00 8.715.00 798.400.55
Keuntungan Max.
8.715.00 754.407.38 75.440.74
Jumlah
829.848.12
79.840.05 878.240.60
Dibulatkan
829.840.00
878.240.00
414.020.00
423.800.00 167.688.89 103.142.86
Jumlah
A027
102.300.00
1.096.50 102.300.00
1M3 BETON MUTUf<:=14 5 MoaiK175l, slumo 112+2\cm,w/c=O 66 Semen PC Split pecah mesin 2/3
326.0000 .1.029.0000 760.0000
Pasir beton Air
215.0000 1.6500
Pekerja Tukang batu
0.2750
Kepala Tukang batu
0.0280 0.0830
Mander
kg kg kg
1.270.00
ltr
137.04 125.71 2.00
oh
62.000.00
oh oh oh
1.300.00 162.96 135.71
141.011.11 95.542.86
5.10 62.000.00
430.00
1.096.50
102.300.00
102.300.00
20.900.00 2.520.00
20.900.00
76.000.00
76.000.00
90.000.00 105.000.00
90.000.00 105.000.00
Jumlah Keuntungan Max. Jumlah
8.715.00 785.438.97 78.543.90 863.982.87 863.890.00
Dibulatkan
2.520.00 8.715.00 830.162.25 83.016.32 913.179.57 913.170.00
A027a 1 M3 BETON MUTU fc=16,9, Mpa (K200),~ump (12+2)om, wlc=0,61
kg kg kg
1.270.00
1.300.00
447.040.00
1.031.0000 731.0000
137.04 125.71
162.96 135.71
141.285.19
457.600.00 168.014.81
215.0000
ltr
2.00
5.10
91.897.14 430.00
99.207.14 1.096.50
1.650.0000 0.27500
oh
62.000.00 76.000.00
62.000.00 76.000.00
102.300.00 20.900.00
102.300.00
90.000.00 10' nno.nr
90.000.00 10,,000.0(
2.520.00 8.715.00
20.900.00 2.520.00 8.715.00
Jum!ah
815.087.33
860.353.46
Keuntungan Max.
81.508.73 896.596.06 896.590.00
86.035.35 946.388.80
Semen PC
352.0000
Split Pecah mesin 2/3 Pasir beton
AIR Pekerja Tukang Batu Kepala Tukang Batu Mandor
0.0280 0.8300
oh oh oh
Jum!ah Dibu!atkan
EDJSJ34 TAHUN
XXI 2015
JURNAL HARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI
&
INTERIOR
946.380.00
517
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE URAIAN
NO.
2
1 A028
~ KOEF SAT.
3
4
JUMLAH HARGASAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1 M3 BETON MUTUfc=19 3 MPa(K225I,slump 112+2)cm wlc=0,5S
87.748.57
94.728.57
162.96 135.71
ltr
2.00
oh oh oh oh
62.000.00 76.000.00
5.10 62.000.00
430.00 102.300.00
76.000.00
20.900.00
90.000.00
2.520.00 8.715.00
2.520.00
Jumlah
837.261.35
Keuntungan Max.
83.726.13 920.987.48
883.182.29 88.318.23 917.500.52
920.980.00
971.500.00
Pasir beton
AIR
371,0000 1.047,0000 698,0000 215,0000
Tukang batu
1,6500 0,2750
Kepala Tukang batu
0,0280
Mander
0,0830
Pekerja
kg kg kg
90.000.00 105.000.00
105.000.00
Jumlah Dibulatkan A028a 1M3 BETON MUTU fc=21 ,7MPa(250),SLUMP(12;':2)CM, W/C=0,5S Semen PC Split pecah mesin 2/3
Pasir beton Air
384,0000 1.039,0000 692,0000 215,0000
Pekerja
1,6500
Tukang Batu
0,2700
Kepala Tukang Batu
0,0280
Mander
0,0830
125.71
ltr
2.00 62.000.00
5.10 62.000.00
102.300.00
102.300.00
76.000.00
76.000.00
20.900.00
20.900.00
90.000.00
90.000.00
2.520.00
2.520.00
105.000.00
105.000.00
8.715.00
8. 715.00 897.964.30
oh oh oh oh
487.680.00 142.381.48 86.994.29 430.00
Jumlah
Dibulatkan A028b 1 M3 BETON MUTU fc=24,0 Mpa(K2751, slump (12+21cm,w/c=0,53 Split pecah mesin 2/3
1.026.000
Pasir beton
684.0000 215.0000
Air
Pekerja
1.6500
Tukang batu
0.2750
Kepala Tukang batu
0.0280 0.0830
499.200.00
162.96 135.71
1.300.00
851.920.77 85.192.08
406.0000
8.715.00
1.270.00 137.04
Jumlah
Semen PC
1.096.50 102.300.00 20.900.00
kg kg kg
Keuntungan Max.
169.318.52 93.914.29 1. 096.50
89.796.43
937.112.84 937.110.00
987.760.73 987.760.00 527.800.00 167.200.00
kg kg kg
1.270.00
1.300.00
515.620.00
137.04 125.71
162.96 135.71
140.600.00 85.988.57
ltr
2.00 62.000.00
5.10 62.000.00
430.00 102.300.00
1.096.50 102.300.00
76.000.00 90.000.00
76.000.00 90.000.00
20.900.00 2.520.00
20.900.00 2.520.00
105.000.00
105.000.00
oh oh oh oh
92.828.57
8715.00
8.715.00
877.073.57 87.707.36
923.360.07 92.336.01
Jumlah
964.780.93
1.015.696.08
Dibulatkan
964.780.00
1.015.690.00
Mander
Jumlah Keuntungan Max.
1 M3 BETON MUTU fc=26,4 Mpa (K 300)~1ump (12+2)cm, w/c=0,52 Semen PC
413.0000
Split Pecah mesin 2/3
kg kg kg
1.270.00 137.04
Pasir beton
1.021.000 681.0000
AIR
215.0000
llr
Pekerja
1.6500
Tukang Batu Kepala Tukang Batu
0.2750 0.0280
Mander
0.0830
oh oh oh oh
1.300.00
524.510.00
536.900.00
125.71
162.96 135.71
139.914.81 85.611.43
166.385.19 92.421.43
2.00
5.10
430.00
1.096.50
62.000.00 76.000.00
62.000.00
102.300.00
102.300.00
76.000.00
20.900.00
20.900.00
90.000.00 105.000.00
2.520.00 8.715.00
2.520.00 8.715.00
884.901.24 88.490.12
931.238.11
90.000.00 1"' noo.oo
Jumlah Keuntungan Max. Jumlah
973.391.37 973.390.00
Dibulatkan
518
482.300.00 170.622.22
1.300.00
137.04 125.71
Split Pecah Mesin 2/3
A029
471.170.00 143.477.78
1.270.00
Semen PC
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
ED!SI
34
TAHUN
93.123.11 1.024.361.93 1.024.360.00
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
KOEF SAT.
URAIAN
1
2
3
4
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 5 6 7=(3x5) 8=(3x6)
A029a 1 M3 BETON MUTUfc=28,8 MPa(K3251,slump (12!2Jcm, w/c=0,49 Semen PC Split Pecah Mesin 2/3 Pasir beton
AIR Pekerja Tukang batu Kepa!a Tukang batu
Mander Jumlah Keuntungan Max. Jumlah Dibulatkan A029b 1 M3 BETON MUTU fc=31.2MPai3501.SLUMP 12+21( M W/C=O 48 Semen PC Split pecah mesin 2/3 Pasir beton Air Pekerja Tukang Batu Kepala Tukang Batu Mander Jumlah Keuntungan Max. Jumlah Dibulatkan A030 1 M3 COR BETON 175 READY MIX MIN 6M3 BERIKUT SLANG Adukan K175 Ready mix Pekerja Tukang batu Kepala Tukang batu Mandor Alai Bantu (slang+tes Jab) Jumlah Keuntunaan Max. Jumlah Dibulatkan
A031
EDIS/
448.0000 1.000.0000 667.0000 215.0000 2.1000 0.3500 0.0350 0.1050
kg kg kg
ltr oh oh oh oh
kg kg kg
ltr oh oh oh oh
1.0000 2.5000 0.2500 0.1000 0.0100 0.0450
m3
1.0000 2.5000 0.2500 0.1000 0.0100 0.0450
m3
1.0000 2.5000 0.2500 0.1000 0.0100 0.0450
m3
oh oh oh oh tot
1.270.00 137.04 125.71 2.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 162.96 135.71 5.10 62.000.00 76.000.00 90.000.00 105.000.00
557.530.00 137.859.26 84.228.57 430.00 102.300.00 20.900.00 2.520.00 8.715.00 914.482.83 91.448.28 1.005.931.11 1.005.930.00
570.700.00 163.940.74 90.928.57 1.096.50 102.300.00 20.900.00 2.520.00 8.715.00 961.100.81 96.110.08 1.057.210.89 1.057.210.00
1.270.00 137.04 125.71 2.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 162.96 135.71 5.10 62.000.00 76.000.00 90.000.00 105.000.00
568.960.00 137.037.40 83.851.43 430.00 130.200.00 26.600.00 3.150.00 11.025.00 961.253.47 96.125.35 1.057.378.81 1.057.370.00
582.400.00 162.962.96 go.521.43 1.096.50 130.200.00 26.600.00 3.150.00 11.025.00 1.007.955.89 100.795.59 1.108.751.48 1.108. 750.00
650.000.00 62.000.00 76.000.00 90.000.00 105.000.00 834.050.00
680.000.00 62.000.00 76.000.00 90.000.00 105.000.00 864.050.00
650.000.00 155.000.00 19.000.00 9.000.00 1.050.00 37.532.25 871.582.25 87.158.23 958.740.48 958.740.00
680.000.00 155.000.00 19.000.00 9.000.00 1.050.00 38.882.25 902.932.25 90.293.23 993.225.48 993.220.00
710.000.00 62.000.00 76.000.00 90.000.00 105.000.00 894.050.00
760.000.00 62.000.00 76.000.00 90.000.00 105.000.00 944.050.00
710.000.00 155.000.00 19.000.00 9.000.00 1.050.00 40.232.25 934.282.25 93.428.23 1.027.710.48 1.027. 710.00
760.000.00 155.000.00 19.000.00 9.000.00 1.050.00 42.482.25 986.532.25 98.653.23 1.085.185.48 1.085.180.00
780.000.00 62.000.00 76.000.00 90.000.00 105.000.00 964.050.00
825.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.009.050.00
780.000.00 155.000.00 19.000.00 9.000.00 1.050.00 43.382.25 1.007.432.25 100.743.23 1.108.175.48 1.108.170.00
825.000.00 155.000.00 19.000.00 9.000.00 1.050.00 45.407.25 1.054.457.25 105.445.73 1.159.900.00 1.159.900.00
1 M3 COR BETON 225 READY MIX MIN 6M3 BERIKUT SLANG Adukan K225 Ready mix
A032
439.0000 1.006.0000 670.0000 215.0000 1.6500 0.2750 0.0280 0.0830
Pekerja Tukang batu Kepala Tukang batu Mandor Alat Bantu tslano+tes lab) Jumlah KeuntunQan Max. Jumlah Dibulatkan 1 M3 COR BETON 300 READY MIX MIN 6 M3 BERIKUT SLANG Adukan K300 Ready mix Pekerja Tukang batu Kepala Tukang batu Mandor Alat Bantu fslano+tes lab\ Jumlah Keuntunoan Max. Jumlah Oibulatkan
34
TAHUN XXI
2015
oh oh oh oh lot
oh oh oh oh lot
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
519
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAIAN
1 A033
2
~ KOEF SAT.
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
3
4
10.5000 0.1500 0.0700 0.0700 0.0070 0.0040
kg kg oh oh oh oh
9.500. 00 18.000.00 62.000.00 78.000.00 92.000.00 105.000.00
9.800.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
g9.750.00 2.700.00 4.340.00 5.460.00 644.00 420.00 113.314.00 11.331.40 124.645.40 124.640.00
102.900.00 3.000.00 4.340.00 5.460.00 644.00 420.00 116.764.00 11.676.40 128.440.40 128.440.00
0.0010 0.0010 0.0002 0.0001 0.0002 0.0200 0.0002 0.0100 0.0010 0.0002
oh oh oh oh oh oh Is It It lot
62.000.00 78.000.00 92.000.00 105.000.00 109.000.00 62.000.00 19.000.00 5.500.00 30.000.00 1.519.50
62.000.00 78.000.00 92.000.00 105.000.00 109.000.00 62.000.00 21.000.00 5.500.00 36.000.00 1.525.90
62.00 78.00 18.40 10.50 21.80 1.240.00 3.80 55.00 30.00 0.30 1.519.80 151.98 1.671.78 1.670.00
62.00 78.00 18.40 10.50 21.80 1.240.00 4.20 55.00 36.00 0.31 1.526.21 152.62 1.678.83 1.670.00
1.1500 0.0600 0.0600 0.0060 0.0030
kg oh oh oh oh
12.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.800.00 3.720.00 4.680.00 552.00 315.00 23.067 00 2.306.70 25.373 70 25.370.00
14.950.00 3. 720.00 4.680.00 552.00 315.00 24.217.00 2.421. 70 26.638.70 26.630.00
1.1500 0.0600 0.0600 0.0060 0.0030
kg oh oh oh oh
12.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.800.00 3.720.00 4.680.00 552.00 315.00 23.067.00 2.306.70 25.373.70 25.370.00
14.950.00 3.720.00 4.680.00 552.00 315.00 24.217.00 2.421.71 26.638.70 26.630.00
0.4000 0.3000 0.0400 0.0400 0.0200 0.0020 0.0020 0.1700
kg It It oh oh oh oh
23.000.00 5.500.00 30.000.00 62.000.00 78.000.00 92.000.00 105.000.00 22.500.00
25.000.00 5.500.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00 23.750.00
9.200.00 1.650.00 1.200.00 2.480.00 1.560.00 184.00 210.00 3.825.00 20.309.00 2.030.90 22.339.90 22.330.00
10.000.00 1.650.00 1.440. 00 2.480.00 1.560.00 184.00 210.00 4.037.50 21.561.50 2.156.15 23.717.65 23.710.00
EoJSJ 34 TAHUN
XXI 2015
10 KG BESI BETON TERPASANG POLOS/ULIR Besi beton po!os/ulir Kawat Beton Pekerja Tukang besi Kepala Tukang besi Mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
A034 1 KG PEK. ERECTION KONST KUDA-KUDA BESI Pekerja Tukang Besi profil Kepala Tukang besi profil Mandor Operator alat besar Pembantu operator Sewa alat Bahan bakar solar Pelumas
Alat bantu Jumlah Keuntunaan Max. Jumlah Dibulatkan A035 1 KG PEKERJAAN BAJA IWF EX ON Besi baja IWF ex DN Sll Pekerja Tukang besi profii/Tukang las Kepala Tukang besi profil Mandor Jumlah Keuntungan Max. Ju lah Dibulatkan A036 1 KG PEK. KONTRUKSI BESI SIKU/PROFIL EX.DN Besi profil I besi siku ex DN Pekerja Tukang besi profil/ tukang las Kepala Tukang besi profil Mandor Jumlah Keuntungan Max. Jumlah Uibulatkan A037 10CM PEK PENGELASAN DENGAN LASUSTRIKTBL=KAWAT 4MM Kawat las listrik Bahan bakar solar Pelumnas Pekerja Tukang besi profit Kepala Tukang besi profil Mandor Sewa alat (mesin las listrik Jum!ah Keuntungan Max. Jumlah Dibulatkan
520
jam
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE 1
KOEF SAT.
URAIAN
NO.
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
3
4
0.0500 0.0200 0.0030 0.0010 0.2500
oh oh oh oh lot
62.000.00 78.000.00 92.000.00 105.000.00 5.041.00
62.000.00 78.000.00 92.000.00 105.000.00 5.041.00
3.100.00 1.560.00 276.00 105.00 1.280.25 6.301.25 630.13 6.931.38 6.930.00
3.100.00 1.560.00 276.00 105.00 1.260.25 6.301.25 630.13 6.931.38 6.930.00
1.0100 0.1000 0.0500 0.0300 0.0100 1.0000
m2
120.000.00 23.000.00 62.000.00 78.000.00 105.000.00 11.331.40
135.000.00 25.000.00 62.000.00 78.000.00 105.000.00 11.676.00
121.200.00 2.300.00 3.100.00 2.340.00 1.050.00 11.331.40 141.132.14 14.132.54 155.453.54 155.450.00
136.350.00 2.500.00 3.100.00 2.340.00 1.050.00 11.676.40 157.016.40 15.701.64 172.718.04 172.710.00
1.0100 0.1000 0.1000 0.0750 0.0100
m2
oh oh org
65.000.00 23.000.00 62.000.00 78.000.00 105.000.00
68.000.00 25.000.00 62.000.00 78.000.00 105.000.00
65.650.00 2.300.00 6.200.00 5.850.00 1.050.00 81.050.00 8.105.00 89.155.00 89.150.00
68.680.00 2.500.00 6.200.00 5.850.00 1.050.00 84.280.00 8.428.00 92.708.00 92.700.00
Papan terentang (2 x pakai) 75%
0.0170 0.0240
m3 m3
paku
OAOOO
kg
pekerja
0.1200 0.2700 0.1500 0.0500
oh oh oh oh
4.000.000.00 1.800.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
4.500.000.00 2.000.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
34.000.00 32.400.00 6.000.00 7.440.00 21.060.00 13.800.00 5.250.00 119.950.00 11.995.00 131.945.00 131.940.00
38.250.00 36.000.00 6.800.00 7.440.00 21.060.00 13.800.00 5.250.00 128.600.00 12.860.00 141.460.00 141.460.00
0.0170 0.3470 0.4000 0.1200 0.2700 0.1500 0.0500
m3
4.000.000.00 118.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
4.500.000.00 121.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
34.000.00 30.709.50 6.000.00 7.440.00 21.060.00 13.800.00 5.250.00 118.259.50 11.825.95 130.085.45 130.080.00
38.250.00 31.490.25 6.800.00 7. .440.00 21.060.00 13.800.00 5.250.00 124.090.25 12.409.28 136.499.28 136.490.00
1
2
A038
1 TITIK MELOMBANG KONTRUKSI BESI DENGAN BOR Pekerja
Tukang besi Profil Kepala Tukang besi Mandor Alai bantu (mesin bor listrik) Jumlah Keuntungan Max. Jumlah
Dibulatkan A039 1 M2 PEKERJAAN BONDEX Bondex Kawat las Pekerjaan Terampil Tukang besi profil Mandor
Shear connector
kg
oh oh oh Is
Jumlah Keuntungan Max. Jumlah Dibulatkan
A040
1 M2 PEKERJAAN WIREMESH M8 Wiremesh M8 Kawat las Pekerja
Tukang besi profil Mandor
kg
Jumlah Keuntunoan Max. Jum!ah
Dibulatkan
A041
1M2 BEKISTING DENGAN PAPAN Kaso 5/7 borneo sp(2 x pakai) 50%
tukang kayu kepala tukang kayu mandor Jumlah Keuntunqan Max. Jumlah
A042
Dibulatkan 1M2 BEKISTING MULTIPLEK 9 MM Kaso 5/7 borneo sp{2 x pakai) 50% Papan terentang (2 x pakai) 75% paku pekerja tukang kayu terampil kepala tukang kayu mandor
lbr kg
oh oh oh oh
Jumlah Keuntungan Max. Jum!ah Dibu!atkan
ED/S/34 TAHUN XXI
2015
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
521
j
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
URAIAN
NO. 1 A043
2
KOEF SAT. 3
4
0.0170 0.3470 0.4000 0.1200 0.2700 0.1500 0.0500
m3
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 6 5
1M2 BEKISTING MULTIPLEK 12 MM Kaso 5/7 borneo sp {2 x pakai)50% Mulliplek 12mm (12 x pakai) 75% Paku Pekerja Tukang kayu terampil
Kepala Tukang kayu Mandor
4.000.000.00 145.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
lbr kg
oh oh oh oh
4.500.000.00 149.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
Jumlah Keuntungan Max. Jumlah Dibulatkan
34.000.00
38.250.00
37.736.25 6.000.00 7.440.00 21.060.00
38.777.25 6.800.00 7.440.00 21.060.00
13.800.00 5.250.00 125.286.25 12.528.63 137.814.88 137.810.00
13.800.00 5.250.00 131.377.25 13.137.73 144.514.98 144.510.00
A044 1 M2PASANGANSTOOTWERK Kayu stool (dinding 2 x pakai) 50% papan terentang (2 xpakai)
paku pekerja Tukang kayu Kepala tukang kayu Mandor
9.0000 0.0160 0.5000 0.1500 0.2000 0.2000 0.0170
bt m3 kg
oh oh oh oh
22.000.00
25.000.00
99.000.00
112.500.00
1.800.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
2.000.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
28.800.00 7.500.00 9.300.00 15.600.00
32.000.00 8.500.00 9. 300.00 15.600.00
18.400.00 1.785.00 180.385.00 18.038.50 198.423.50 198.420.00
18.400.00 1. 785.00 198.085.00 19.808.50 217.893.50 217.890.00
160.000.00 130.000.00 62.000.00 76.000.00
175.000.00 149.000.00
192.000.00 56.160.00
62.000.00 76.000.00
48.360.00 29.640.00
210.000.00 64.368.00 48.360.00 29.640.00
90.000.00 105.000.00
90.000.00 105.000.00
3.510.00 4.095.00 333.765.00 33.376.50
3.510.00 4.095.00 359.973.00 35.997.30
367.141.50 367.140.00
395.970.30 395.970.00
150.000.00
168.000.00
180.000.00
25.000.00 59.000.00 62.000.00 105.000.00
77.000.00 88.500.00 12.400.00 2.100.00
87.500.00 88.500.00 12.400.00 2.100.00
348.000.00 34.800.00 382.800.00 382.800.00
370.500.00 37.050.00 407.550.00 407.550.00
2.400.00 2.480.00 1.050.00
2.700. 00 2.480.00 1.050.00
5.930.00 593.00 6.523.00 6.520.00
6.230.00 623.00 6.853.00 6.850.00
Jumlah Keuntungan Max. Jumlah Dibulatkan
A045
1 M3 PASANGAN BATU KOSONG (ANSTAMPING) Batu be!ah 15cm/20 em Pasir urug Pekerja
Tukang batu Kepala tukang batu Mandor
1.2000 0.4320 0.7800 0.3900 0.0390 0.0390
m3 m3
oh oh oh oh
Jumlah Keuntungan Max. Jumlah Dibulatkan
A046
1M2 PASANGANBATU BRONJONG Batu kali (balu bulat) bronjol
1.2000
m3
kawat bronjong
3.5000 1.5000 0.2000 0.0200
kg
pekerja pekerja terampil
mandor
oh oh oh
140.000.00 22.000.00 59.000.00 62.000.00 105.000.00
Jumlah Keuntungan Max.
Jumlah Dibulatkan
A047
1M2 PASANGAN LEMPENGAN RUMPUTSAMPAITUMBUH Lempengan Rumput Biasa (Teki) pekerja mandor
1.2000 0.0400 0.0100
m2
oh oh
2.000.00 62.000.00 105.000.00
Jumlah Keuntungan Max. Jumlah Dibulatkan
522
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
2.250.00 62.000.00 105.000.00
EDJSJ34 TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
2
1 A048
KOEF SAT.
URAl AN
NO.
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 6 5
3
4
1.2000 g1.0000 0.5840 1.5000 0. 7500 0.0750 0.0750
m3 kg m3 oh oh oh oh
160.000.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.ooo.nn
175.000.00 1.300.00 203.000.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
1g2.000.00 115.570.00 gg_280.00 g3.000.00 57.000.00 6.750.00 7.875.00 571.475.00 57.147.50 628.622.50 628.620.00
210.000.00 118.300.00 118.552.00 g3.000.00 57,000.00 6.750.00 7.875.00 611.477.00 61.147.70 672.624.70 672.620.00
1.2000 117.0000 0.5610 1.5000 0.7500 0.0750 0.0750
m3 kg m3 oh oh oh oh
160.000.00 1.270.00 170.000.00 62.000.00 76.000.00 go_ooo.oo 105.000.00
175.000.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1g2.000.00 148.590.00 g5.370.00 93.000.00 57.000.00 6.750.00 7.875.00 600.585.00 60.058.50 660.643.50 660.640.00
210.000.00 152.100.00 113.883.00 g3.000.00 57.000.00 6.750.00 7.875.00 640.608.00 64.060.80 704.668.80 704.660.00
1.2000 136.0000 0.5440 1.5000 0.7500 0.0750 0.0750
m3 kg m3 oh oh oh oh
160.000.00 1.270.00 170.000.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
175.000.00 1.300.00 203.000.00 62.000.00 90.000.00 105.000.00
192.000.00 172.720.00 g2.480.00 93.000.00 57.000.00 6.750.00 7.875.00 621.825.00 62.182.50 684.007.50 684.000.00
210.000.00 176.800.00 110.432.00 g3.000.00 57.000.00 6.750.00 7.875.00 661.857.00 66,185.70 728.042.70 728.040.00
1.2000 163.0000 0.5200 1.5000 0.7500 0.0750 0.0750
m3 kg m3 oh oh oh oh
160.000.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
175.000.00 1.300.00 203.000.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
1g2.000.00 207.010.00 88.400.00 93.000.00 57.000.00 6.750.00 7.875.00 652.035.00 65.203.50 717.238,50 717.230.00
210.000.00 211.900.00 105.560.00 g3.000.00 57.000.00 6.750.00 7.875.00 692.085.00 69.208.50 761.293.50 761.290.00
1.2000 202.0000 0.4850 1.5000 0.7500 0.0750 0.0750
m3 kg m3 oh oh oh oh
160.000.00 1.270.00 170.000.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
175.000.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
192.000.00 256.540.00 82.450.00 g3.000.00 57.000.00 6.750.00 7.875.00 695.615.00 69.561.50 765.176.50 765.170.00
210.000.00 262.600.00 98.455.00 93.000.00 57.000,00 6.750.00 7.875.00 735.680.00 73.568.00 809,248,00 8og.240.00
1 M3 PASANGAN BATU BELAH CAMP. 1PC : 8PP Batu Selah 15 cm/20 em
Semen PC Pasir Pasang Pekerja
Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max.
Jumlah Dibulatkan
A049
1 M3 PASANGAN BATU BELAH, CAMP.1PC: 6PP Balu Belah 15 cm/20 em Semen PC Pasir Pasang
Pekerja Tukang batu Kepala Tukang batu Mandor
Jumlah Keuntun an Max. Jum!ah Dibulatkan
A050
1 M3 PASANGAN BATU BELAH, CAMP.1PC: 5PP Batu Selah 15 cm/20 em Semen PC
Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mander Jumlah Keuntunaan Max. Jumlah Dibulatkan
A051
1 M3 PASANGAN BATU BELAH CAMP.1PC: 5PP Batu Belah 15 cm/20 em Semen PC
Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mander
Jumlah Keuntungan Max.
Jumlah Dibulatkan
A052
1 M3 PASANGAN BATU BELAH, CAMP.1PC: 4PP Batu Selah 15 cm/20 em Semen PC Pasir Pasang Pekerja Tukang batu Kepa!a Tukang batu Mandor Jum!ah Keuntungan Max. Jum!ah Dibulatkan
ED!S/34 TAHUN
XXI 2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
523
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAIAN
1 A053
2
~ KOEF SAT.
HARGASAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MNM..M) (MAXIMUM) 5 6 7=(3x5) 8=(3x6)
3
4
Batu Selah
1.5000
175.000.00
240.000.00
262.500.00
1.2500
m3 zak
160.000.00
Semen PC
63.500.00
79.375.00 59.160.00
81.250.00
1M3PA&BATUBEI.AH1:4PAKAIMUKABATUSEGIENAM+SIARAN
Pasir Pasang
0.3480
m3
170.000.00
65.000.00 203.000.00
Pekerja
1.2500
62.000.00
62.000.00
77.500.00
77.500.00
Tukang batu
1.1250
oh oh oh oh
76.000.00
76.000.00
85.500.00
85.500.00
90.000.00
90.000.00
10.125.00
10.125.00
105.000.00
105.000.00
1.774.50
1. 774.50
553.434.50
589.293.50
Kepala Tukang batu
0.1125
Mandor
0.0169
Jumlah
55.343.45
58.929.35
Jumlah
608,777.95
648.222.85
Dibulatkan
608,770.00
648.220.00
135.000.00
121.000.00
148.500.00 15.275.00 7.105.00
Keuntungan Max.
A054
1 M2 PASANGAN BATU TEMPEL HITAM Batu tempe! hitam
1.1000
m2
110.000.00
11.7500
kg
1.270.00
1.300. 00
14.922.50
Pasir Pasang
0.0350
m3
170.000.00
203.000.00
5.950.00
Pekerja
0.7000
62.000.00
43.400.00
43.400.00
0.3500
76.000.00
76.000.00
26.600.00
26.600.00
Kepala Tukang batu
0.0350
90.000.00
go.ooo.oo
3.150.00
3.150.0
Mandor
0.0350
oh oh oh oh
62.000.00
Tukang batu
105.000.00
105.000.00
Semen PC
Jumlah
21.869.75
24.770.50 272.475.50
Dibulatkan
240.560.00
272.470.00 44.520.00 12.ogo.oo
1 M2 DINDING KERAMIK UK.10 X20 CM 53.0000
bh
780.00
840.00
41.340.00
9.3000
kg
1.270.00
1.300.00
11.811.00
Pasir Pasang
0.0180
m3
170.000.00
203.000.00
3.060.00
3.654.00
Semen Warna
2.7500 o.gooo
kg
7.000.00
8.100.00
1g.250.00
22.275.00
Keramik KW 1 DN
Pekerja
Tukang batu
0.4500
Kepala Tukang batu
0.0450
Mandor
0.0450
oh oh oh oh
62.000.00
62.000.00
55.800.00
55.800.00
76.000.00
76.000.00
34.200.00
34.200.00
90.000.00
90.000.00
4.050.00
4.050.00
105.000.00
105.000.00
4.725.00
4.725.00
174.236.00
181.314.00
Jumlah Keuntun!lan Max. Jumlah Dibulatkan
17.423.60
18.131.40
191.659.60 191.650.00
199.445.40 199.440.00
1 M2 DIN DING KERAMIK UK. 20 X20 CM 26.5000
bh
1.680.00
840.00
44.520.00
48.760.00
Semen PC
9.3000
kg
1.270.00
1.300.00
11.811.00
12.090.00
Pasir Pasang
0.0180
m3
170.000.00
203.000.00
3.060.00
3654.00 15 .. 714.00
Keramik KW 1 ON
524
3.675.00 247.705.00
240.567.25
Semen PC
A056
3.675.00 218.697.50
Jumlah
Keuntungan Max.
A055
70.644.00
Semen Warna
1.9400
kg
7.000.00
8.100.00
13.580.00
Pekerja
0.0900
62.000.00
62.000.00
55.800.00
55.800.00
Tukang batu
0.4500
oh oh oh oh
76.000.00
76.000.00
34.200.00
34.200.00
Kepala Tukang batu
0.0450
Mandor
0.0450
90.000.00
90.000.00
4.050.00
4.050.00
105.000.00
105.000.00
4. 725.00
4.725.00 178.993.00
Jumlah
171.746.00
Keuntungan Max.
17.174.600
17.899.30
Jumlah
188.920.60
196.892.30
Dibulatkan
188.920.00
196.890.00
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eo/Si34 TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
3
4
53.0000 8.1900
bh kg
0.0450
m3
Semen warna
2.7500
Pekerja
0.7000 0.3500
kg oh oh oh oh
1 A057
KOEF SAT.
URAIAN
NO.
2
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MNrvt...M) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1M2 LANTAI KERAMIK UK.10X20CM CORAKIANTI SLIP Keramik 10/20 KW 1 ON Corak/anti slip Semen PC
Pasir Pasang
Tukang batu
Kepala Tukang batu
0.0350 0.0350
Mander
840.00 1.270.00 170.000.00
920.00 1.300.00
44.520.00 10.401.30
203.000.00
7.650.00
7.000.00
8.100.00
19.250.00
62.000.00
62.000.00 76.000.00
43.400.00 26.600.00
76.000.00 90.000.00 105.000.00
90.000.00 105.000.00
Jumlah Keuntungan Max.
Jumlah Dibulatkan
A058
Keramik 20/20 KW 1 DN Corak/anti slip
22.275.00 43.400.00 26.600.00
3.675.00 158.646.30
3.150.00 3.675.00 167.642.00
15.864.63 174.510.93
184.406.20
174.510.00
184.400.00
16.764.20
26.5000 10.4000
bh kg
1.760.00 1.270.00
1.920.00 1.300.00
46.640.00 13.208.00
50.880.00 13.520.00
7.650.00 11.340.00
13.122.00
9.135.00
Pasir Pasang
0.0450
m3
170.000.00
203.000.00
1.6200
Pekerja
0.7000 0.3500
kg oh oh oh oh
7.000.00 62.000.00
8.100.00 62.000.00
43.400.00
43.400.00
76.000.00
76.000.00
26.600.00
90.000.00 105.000.00
90.000.00 105.000.00
26.600.00 3.150.00
Kepala Tukang batu
0.0350 0.0350
Keuntungan Max.
3.150.00 3.675.00 155.663.00 15.566.30
Jumlah
171.229.30
16.348.20 179.830.20
Dibulatkan
171.220.00
179.830.00
Mandor
Jumlah
3.675.00 163.482.00
1M2 LANTAI KERAMIK UK. 30X30 CM ON PUTIH POLOS Keramik KW 1 DN Putih Poles
11.8700
m2
2.880.29
3.240.32
34.189.02
38.462.65
Semen PC
10.000
kg
13.000.00
m3
Semen Warna
0.0450 1.5000
1.300.00 203.000.00
12.700.00
Pasir Pasang
1.270.00 170.000.00
8.100.00
0.7000
7.650.00 10.500.00 43.400.00
9.135.00 12.160.00
Pekerja
7.000.00 62.000.00
Tukang batu
0.3500 0.0350 0.0350
Kepala Tukang batu Mander
kg oh oh oh oh
76.000.00
62.000.00 76.000.00
90.000.00 105.000.00
90.000.00 105.000.00
Jumtah Keuntunqan Max.
26.600.00 3.150.00 3.675.00 141.864.02 14.186.40 156.050.42 156.050.00
Jumlah Dibulatkan
43.400.00 26.600.00 3.150.00 3.675.00 149.572.65 14.957.26 164.529.91 164.520.00
1 M2LANTAI KERAMIK UK. 30X30CM BERCORAKIBERWARNA 11.8700
m2
Semen PC
10.000
kg
Pasir Pasang
0.0450 1.5000
m3
Keramik KW 1 ON bercorak berwarna
Semen Warna Pekerja
0.7000 0.3500
Tukang batu
kg oh oh oh oh
3.780.38 1.270.00 170.000.00
4.140.41 1.300.00 203.000.00
7.000.00 62.000.00
8.100.00 62.000.00
76.000.00 90.000.00 105.000.00
76.000.00 90.000.00 105.000.00
44.873.09 12.700.00 7.650.00 10.500.00 43.400.00
12.150.00 43.400.00 26.600.00 3.150.00 3.675.00 160.256.71
Jumlah
15.254.81 167.802.90
16.025.67 176.282.39
Dibulatkan
167.800.00
176.280.00
0.0350 0.0350
Mandor Jumlah Keuntunqan Max.
34
TAHUN XXI
2015
JURNAL HARGA8ATUAN BAHAN BANGUNAN, KONSTRUKSI
26.600.00
49.146.71 13.000.00 9.135.00
3.150.00 3.675.00 152.548.09
Kepala Tukang batu
EDISI
10.647.00 9.135.00
Semen Warna Tukang batu
A060
3.150.00
48.760.00
1M2 LANTAI KERAMIK UK. 20X20CM CORAKIANTI SLIP Semen PC
A059
I
& INTERIOR
525
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAIAN
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNM.lv1) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
3
4
1.0000 0.2600 0.0300 1.0000 0.5000 1.5000 0.0500 0.0250 0.0320
m2 zak m3 lot oh oh oh oh oh
1.500.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.691.735.00
1.800.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.995.115.00
1.500.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 4.500.00 2.625.00 54.135.52 1.745.870.52 174.587.05 1.920.457.57 1.920.450.00
1.800.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 4.500.00 2.625.00 63.843.68 2.058.958.88 205.895.87 2.264.854.55 2.264.850.00
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 0.1000 0.0480
m2 zak m3 lot oh oh oh oh oh
1.500.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.858. 110.00
1.800.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 2.161.490.00
1.500.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 10.500.00 89.189.28 1.947.299.28 194.729.93 2.142.029.21 2.142.020.00
1.800.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 10.500.00 103.751.52 2.265.241.52 226.524.15 2.491.765.67 2.491. 760.00
Pekerja Tukang batu Kepala Tukang batu Mandor
1.0000 0.2600 0.0300 1.0000 0.5000 1.5000 0.0500 0.0250
1.000.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.100.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.000.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 4.500.00 2.625.00
1.100.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 4.500.00 2.625.00
Alot Rnot"
o o??o
m2 zak m3 lot oh oh oh oh nh
1 101 70< nn
1 ?95 115 001
2
1 A061
KOEF SAT.
1M2 LANTAI GRANIT UK. BESAR EX LUAR NEGERI Granit Ex italy (setelah dipotong) Semen PC Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Manda Alat Bantu Jum!ah Keuntungan Max. Jumlah
Dibulatkan
A062
1M2 DINDtNG GRANlT UK. BESAR EX. LUAR NEGERl Granit Ex LN (setelah dipotong) Semen PC Pasir Pasang Campuran kedap air Pekerja
Tukang batu Kepala Tukang batu
Mandor Alat bantu Jumlah Keuntungan Max. Jumlah Dibulatkan
A063
1 M2 LANTAl GRANlT UK. BESAR EX DALAM NEGERl Granit Ex DN {setelah dipotong) Semen PC Pasir Pasang Campuran kedap air
Jumlah Keuntungan Max. Jumlah Dibulatkan
A064
52
"
U? ••
1.336.558.68 133.655.87 1.470.214.87 1.470.210.00
1.000.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 105.000.00 69.725.28 1.522.335.28
1.100.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 105.000.00 74.687.52 1.630.677.52
1M2 DlNDING GRANlT UK. BESAR EX DALAM NEGERl Granit Ex ON (setelah dipotong) Semen PC Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alai Bantu Jumlah
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 1.0000 0.0480
m2 zak m3 lot oh oh oh oh oh
1.0000.000.00 63.500.000 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.452.610.00
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSl
1.100.000.00 62.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.555.990.00
,., ""'
Mex
Jumlah Dibulatkan
526
~R 1~5
1.229.870.52 122.987.05 1.352.857.57 1.352.850.00
1.674.568.81 1.674.560.00
& INTERIOR
Eo!SI34 TAHUN
...
.~
.,;
1.793.745.27 1.793.740.00
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
·.
1 A065
KOEF SAT.
URAIAN
2
.
Campuran kedap air Pekerja Tukang batu
Kepala Tukang batu Man do Alai Bantu Jumlah
A067
Keuntungan Max. Jumlah Dibulatkan 1M2 DINDING GRANIT UK. KECIL EX LUAR NEGERI Granit Ex LN (setelah dipotong) Semen PC Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alai bantu Jumlah Keuntungan Max. Jumlah Dibulatkan 1M2 LANTAI GRANIT UK. KECIL EX DALAM NEGERI Granit Ex ON (sete!ah dipotong) Semen PC
Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alai Bnatu Jumlah Keuntungan Max. Jumlah Dibulatkan
A068
4
1.0000 0.2600 0.0300 1.0000 0.5000 1.5000 1.0000 0.0250 0.0320
m2 zak m3 lot oh oh oh oh lot
1.200.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.396.235.00
1.300.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.499.615.00
1.200.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 9.000.00 2.625.00 44.679.52 1.440.914.52 144.091.45 1.585.005.97 1.585.000.00
1.300.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 9.000.00 2.625.00 47.987.68 1.547.602.68 154.760.27 1.702.362.95 1.702.360.00
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 0.5000 0.0480
m2 zak m3 lot oh oh oh oh lot
1.200.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.552.860.00
1.300.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.656.240.00
1.200.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 5.250.00 74.537.28 1.627.397.28 162.739.73 1.790.137.01 1.790.130.00
1.300.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 5.250. 00 79.499.52 1.735.739.52 173.573.95 1.909.313.47 1.909.310.00
1.0000 0.2600 0.0300 1.0000 0.5000 1.5000 0.1000 0.0250 0.0320
m2 zak m3 lot oh oh oh oh lot
850.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.046.235.00
900.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.099.615.00
850.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 9.000.00 2.625.00 33.479.52 1.079. 714.52 107.971.45 1.187.685.97 1.187.680.00
900.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 9.000.00 2.625.00 35.187.68 1.134.802.68 113.480.27 1.248.282.95 1.248.280.00
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 1.0000 0.0480
m2 zak m3 lot oh oh oh oh lot
850.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.202.000.00
900.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 1.256.240.00
850.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 5.250.00 57.737.28 1.260.597.28 •n
900.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 5.250.00 60.299.52 1.316.539.52
1.386.657.01 1.386.650.00
1.448.193.47 1.448.190.00
1M2 DINDING GRAN IT UK. KECIL EXDALAM NEGERI Granit Ex DN (setelah dipotong) Semen PC Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alat Bantu Jumlah M" Jumlah Dibulatkan
EoiSI
3
1M2 LANTAI GRANIT UK. KECILEX. LUAR NEGERI Granit Ex italy {setelah dipotong) Semen PC Pasir Pasang
A066
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) ( MNI'v'LM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
34
TAHUN XXI
2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
1>1 . ., . ,
527
I
[ JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
URAIAN
NO.
1 A069
2
KOEF SAT. 3
4
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNM.M) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1M2 LANTAI GRANITO TILE ESSENZA UK. 60X60 POLISHED Granito Essenza 60x60 polished Semen PC Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alai Bantu
1.0000 0.2600 0.0300 1.0000 0.2500 0.6000 0.0500 0.0250 0.0240
m2 zak
m3
lot oh oh oh oh lot
198.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 305.835.00
215.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 326.215.00
198.000.00 16.510.00 5.100.00 18.000.00 15.500.00 45.600.00 4.500.00 2.625.00 7.340.04 313.175.04 31.317.50 344.492.54 344.490.00
215.000.00 16.900.00 6.090.00 20.000.00 15.500.00 45.600.00 4.500.00 2.625.00 7.829.16 334.044.16 33.404.42 367.448.58 367.440.00
198.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 313.435.00
215.000.00 65.000.00 203.000.0 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 333.815.00
198.000.00 16.510.00 5.100.00 18.000.00 15.500.00 53.200.00 4.500.00 2.625.00 12.537.40 325.972.40 32.597.24 358.569.64 358.560.00
215.000.00 16.900.00 6.090.00 20.000.00 15.500.00 53.200.00 4.500.00 2.625.00 13.352.60 347.167.50 34.716.76 381.884.36 381.880.00
233.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 340.835.00
272.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 383.215.00
233.000.00 16.510.00 5.100.00 18.000.00 15.500.00 45.600.00 41.500.00 2.625.00 8.180.04 349.015.04 34.901.50 383.916.54 383.910.00
272.000.00 16.900.00 6.090.00 20.000.00 15.500.00 45.600.00 4.500.00 2.625.00 9.197.16 392.412.16 39.241.22 431.653.38 431.650.00
233.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 348.435.00
272.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 390.815.00
233.000.00 16.510.00 5.100.00 18.000.00 15.500.00 53.200.00 4.500.00 2.625.00 13.937.40 362.372.40
272.000.00 16.900.00 6.090.00 20.000.00 15.500.00 53.200.00 4.500.00 2.625.00 15.632.60 406.447.60
398.609.64 398.600.00
447.092.36 447.090.00
Jumlah
Keuntungan Max. Jumlah Dibulatkan
A070
1 M2 DIN DING GRANITO TILE ESSENZA UK. 60X60 POLISHED Granito Essenza 60x60 polished Semen PC+Campuran khusus Pasir Pasang Campuran kedap air + perekat lain Pekerja
Tukang batu Kepala Tukang batu Mandor Alat Bantu
A071
Jumlah Keuntungan Max. Jumlah Dibulatkan 1M2 LANTAI GRANITO TILE ESSENZA UK. 40X40 POLISHED Granito tile Essenza 40x40 polished Semen PC + Campuran khusus
Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Atat Bnatu Jumlah Keuntungan Max.
1.0000 0.2600 0.0300 1.0000 0.2500 0.7000 0.0500 0.0250 0.0480
1.0000 0.2600 0.0300 1.0000 0.2500 0.6000 0.0500 0.0250 0.0240
m2 zak
m3
lot oh oh oh oh lot
m2 zak
m3
lot oh oh oh oh lot
Jumlah Dibu!atkan
A072
1M2 DIN DING GRANITO TILE ESSENZA UK. 40X40 POLISHED Granito tile Essenza 40x40 polished Semen PC+Campuran khusus Pasir Pasang Campuran kedap air + perekat lain Pekerja Tukang batu Kepa!a Tukang batu Mandor
Alai Bantu
1.0000 0.2600 0.0300 1.0000 0.2500 0.7000 0.0500 0.0250 0.0400
m2 zak
m3
lot oh oh oh oh lot
Jumlah
I """"'"""'"
,;;,;-;:,
MOY
Jumlah Dibulatkan
528
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eotst 34
TAHUN
A;;-;.;-A 7;
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
2
1 A073
KOEF SAT.
URAl AN
NO.
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNMJ'v1) (MAXIMUM) 6 7=(3x5) 8=(3x6) 5
3
4
400.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 591.735.00
450.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 645.115.00
400.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 4.500.00 2.625.00 18.935.52 610.670.52 61.067.05 671.735.57 671.730.00
450.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 4.500.00 2.625.00 20.643.68 665.758.68 66.575.87 732.334.55 732.330.00
1M2 LANTAI MARMER EX LAMPUNG UK. BESAR
Campuran kedap air
1.0000 0.2600 0.0300 1.0000
Pekerja
o.sooo
Tukang batu
1.5000 0.0500 0.0250 0.0320
m2 zak m3 lot oh oh oh oh lot
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 0.0250 0.0480
m2 zak m3 lot oh oh oh oh lot
400.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 750.235.00
450.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 803.615.00
400.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 2.625.00 36.011.28 786.246.28 78.624.63 864.870.91 864.870.00
450.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 2.625.00 38.573.52 842.188.52 84.218.85 926.407.37 926.400.00
1.0000 0.2600 0.0300 1.0000 0.2500 0.6000 0.0500 0.0250 0.0240
m2 zak m3 lot oh oh oh oh lot
340.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 536.235.00
355.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 554.615.00
340.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 9.000.00 2.625.00 17.159.52 553.394.52 55.339.45 608.733.97 608.730.00
355.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 9.000.00 2.625.00 17.747.68 572.362.58 57.236.27 629.598.95 629.590.00
1.0000 0.2600 0.0300 1.0000 0.2500 0.7000 0.0500 0.0250 0.0400
m2 zak m3 lot oh oh oh oh lot
340.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 690.235.00
355.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 708.615.00
340.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 2.625.00 33.131.28 723.366.28
355.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 2.625.00 34.013.52 742.628.52
Marmer Ex Lampung
Semen PC + Campuran khusus Pasir Pasang
Kepala Tukang batu
Mandor
Alai Bantu
Jumlah Keuntungan Max. Jumlah Dibulatkan
A074
1M2 DINDING MARMER EX LAMPUNG UK. BESAR Marmer Ex Lampung Semen PC + Campuran khusus Pasir Pasang Campuran kedap air
Pekerja Tukang batu Kepala Tukang batu Mander Alai Bantu
Jumlah Keuntungan Max. Jumlah Dibulatkan
A075
1M2 LANTAI MARMER EX LAMPUNG UK. KECIL Marmer Ex Lampung UK. Keci! Semen PC + Campuran khusus Pasir Pasang Campuran kedap air
Pekerja Tukang batu
Kepala Tukang batu Mandor
Alai Bantu Jumlah Keuntungan Max. Jumlah Dibulatkan
A076
1M2 DINDING MARMER EX LAMPUNG UK. KECIL Marmer Ex Lampung UK. Kecil Semen PC + Campuran khusus Pasir Pasang Campuran kedap air Pekerja
Tukang batu Kepala Tukang batu Mandor Ala! Bantu Jumlah
I """"'"""'"
M"
7? ' " "
Jum!ah
795.702.91 795.700.00
Dibulatkan EDISI
34
TAHUN
XXI 2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
" ,., " 816.891.37 816.890.00
529
j
J
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
URAIAN
2
1 A077
KOEF SAT. 3
4
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNMJ\11) (MAXIMUM) 7=(3x5) 8=(3x6) 6 5
1M2 LANTAI MARMER EXCITATAH UK. BESAR Marmer Ex Citatah uk. besar Semen PC + Campuran khusus Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor
Alai Bantu
1.0000 0.2600 0.0300 1.0000 0.5000 1.5000 0.0500 0.0250 0.0320
m2 zak
m3
lot oh oh oh oh lot
320.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 511.735.00
340.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 535.115.00
320.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 4.500.00 2.625.00 16.375.52 528.110.52 52.811.05 580.921.57 580.920.00
340.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 4.500.00 2.625.00 17.123.68 552.238.68 55.223.87 607.462.55 607.460.00
320.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 670.235.00
340.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 693.615.00
320.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 2.625.00 32.171.28 702.406.28 70.240.63 772.646.91 772.640.00
340.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 2.625.00 33.293.53 726.908.52 72.690.85 799.599.37 799.590.00
245.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 441.235.00
275.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 474.615.00
245.000.00 16.510.00 5.100.00 18.000.00 31.000.00 114.000.00 9.000.00 2.625.00 14.119.52 455.354.52 45.535.45 500.889.97 500.880.00
275.000.00 16.900.00 6.090.00 20.000.00 31.000.00 114.000.00 9.000.00 2.625.00 15.187.68 489.802.68 48.980.27 538.782.95 538.780.00
245.000.00 63.500.00 170.000.00 18.000.00 62.000.00 76.000.00 90.000.00 105.000.00 595.235.00
275.000.00 65.000.00 203.000.00 20.000.00 62.000.00 76.000.00 90.000.00 105.000.00 628.615.00
245.000.00 16.510.00 5.100.00 18.000.00 62.000.00 228.000.00 18.000.00 2.625.00 28.571.28 623.806.28 62.380.63 686.186.91 686.180.00
275.000.00 16.900.00 6.090.00 20.000.00 62.000.00 228.000.00 18.000.00 2.625.00 30.173.52 658.788.52 65.878.85 724.667.31 724.660.00
Jumlah Keuntungan Max. Jumlah Dibulatkan
A078
1M2 DINDING MARMER EX CITATAH UK. BESAR Marmer Ex Citatah uk. besar Semen PC + Campuran khusus Pasir Pasang Campuran kedap air Pekerja
Tukang batu Kepala Tukang batu Mandor
Alai Bantu
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 0.0250 0.0480
m2 zak
m3
lot oh oh oh oh lot
Jumlah Keuntungan Max. Jumlah Dibulatkan
A079
1M2 LANTAI MARMER EX CITATAH UK. KECIL Marmer Ex Citatah uk. kecil
Semen PC + Campuran khusus Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alai Bantu
A080
530
Jumlah Keuntungan Max. Jumlah Oibulatkan 1M2 DINDING MARMER EX CITATAH UK. KECIL Marmer Ex Citatah uk. kecil Semen PC + Campuran khusus Pasir Pasang Campuran kedap air Pekerja Tukang batu Kepala Tukang batu Mandor Alat Bantu Jumlah Keuntungan Max. Jumlah Dibulatkan
1.0000 0.2600 0.0300 1.0000 0.5000 1.5000 0.1000 0.0250 0.0320
1.0000 0.2600 0.0300 1.0000 1.0000 3.0000 0.2000 0.0250 0.0480
m2 zak
m3
lot oh oh oh oh lot
m2 zak
m3
lot oh oh oh oh lot
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& iNTERIOR
Eo1s1
34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
3
4
Bata Merah (5x11x22 em)
70.0000
bh
Semen PC
1 A081
KOEF SAT.
URAl AN
NO.
2
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNMJ\11) (MAXIMUM) 7=(3x5) 8=(3x6) 6 5
1M2 PASANGAN DIN DING BATAMERAH 1 PC: 2PP,TBL 1/2 BATA 500.00
550.00
35.000.00
38.500.00 24.635.00
18.9500
kg
1.270.00
1.300.00
24.066.50
Pasir Pasang
0.0380
m3
170.000.00
203.000.00
6.460.00
7.714.00
Pekerja
0.3000
oh
62.000.00
62.000.00
18.600.00
18.600.00
Tukang batu
0.1000
oh
76.000.00
76.000.00
7.600.00
7.600.00
Kepala Tukang batu
0.0100
oh
90.000.00
90.000.00
900.00
900.00
Mandor
0.0150
oh
105.000.00
105.000.00
1.575.00
1.575.00
94.201.50
99.524.00
9.420.15
9.952.40
Jumlah Keuntungan Max.
A082
Jumlah
103.621.65
109.476.40
Dibulatkan
103.620.00
109.470.00
1 M2 PASANGAN DINDING BATA MERAH 1 PC: 3PP.TBL 1/2 BATA Bata Merah (5x11x22 em)
70.0000
Semen PC
bh
500.00
550.00
35.000.00
14.3700
kg
1.270.00
1.300.00
18.249.90
38.500.00
Pasir Pasang
0.0400
m3
170.000.00
203.000.00
6.800.00
18.681.00
Pekerja
0.3000
oh
62.000.00
62.000.00
18.600.00
8.120.00
Tukang batu
0.1000
oh
76.000.00
76.000.00
7.600.00
18.600.00 7.600.00
Kepala Tukang batu
0.0100
oh
90.000.00
90.000.00
900.00
Mander
0.0150
oh
105.000.00
105.000.00
1.575.00
900.00
88.724.90
1.575.00
8.872.49
93.976.00
Jumlah Keuntungan Max.
A083
Jumlah
97.597.39
9.397.60
Dibulatkan
97.590.00
103.370.00
550.00
35.000.00
38.500.00 14.950.00
1 M2 PASANGAN DINDING BATA MERAH 1 PC: 4PP,TBL 1/2 BATA Bata Merah (5x11x22 em)
70.0000
Semen PC
bh
500.00
11.5000
kg
1.270.00
1.300.00
14.605.00
Pasir Pasang
0.0430
m3
170.000.00
203.000.00
7.310.00
8.729.00
Pekerja
0.3000
oh
62.000.00
62.000.00
18.600.00
18.600.00 7.600.00
Tukang batu
0.1000
oh
76.000.00
76.000.00
7.600.00
Kepala Tukang batu
0.0100
oh
90.000.00
90.000.00
900.00
900.00
Mandor
0.0150
oh
105.000.00
105.000.00
1.575.00
1.575.00
85.590.00
90.854.00
8.559.00
9.085.40
Jumlah Keuntungan Max.
A084
I
Jumlah
94.149.00
99.939.40
Dibulatkan
94.140.00
99.930.00
1M2 PASANGAN DINDING BATAMERAH 1 PC: 5PP,TBL 1/2BATA 70.000.00
bh
500.00
550.00
35.000.00
38.500.00
Semen PC
9.6800
kg
1.270.00
1.300.00
12.293.60
12.584.00
Pasir Pasang
0.0450
m3
170.000.00
203.000.00
7.650.00
9.135.00
Pekerja
0.3000
oh
62.000.00
62.000.00
18.600.00
18.600.00
Tukang batu
0.1000
oh
76.000.00
76.000.00
7.600.00
7.600.00
Kepala Tukang batu
0.0100
oh
90.000.00
90.000.00
900.00
900.00
Mandor
0.0150
oh
105.000.00
105.000.00
Bata Merah (5x11x22 em}
Jumlah Keuntungan Max.
1.575.00
1.575.00
83.618.60
88.894.00
8.361.86
8.889.40
Jumlah
91.980.46
97.783.40
Dibulatkan
91.980.00
97.780.00
Eotst 34
TAHUN
XXI 2015
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
531
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAIAN
2
1 A084a
1 M2 PASANGAN DIN DING BATA MERAH 1 PC: 3PP,TBL 1 BATA Bata Merah (5x11x22 em) Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatka
A084e
1 M2 PASANGAN DINDING BATA MERAH 1 PC: 5PPTBL 1 BATA Bata Merah (5x11x22 em) Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntunaan Max. Jumlah Dibulatka
A084e
4
140.0000 43.5000 0.0800 0.6000 0.2000 0.0200 0.0300
140.0000 32.9500 0.0910 0.6000 0.2000 0.0200 0.0300
bh
kg m3 oh oh oh oh
bh
kg m3 oh oh oh oh
500.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
550.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
70.000.00 55.245.00 13.600.00 37.200.00 15.200.00 1.800.00 3.150.00 196.195.00 19.619.50 215.814.50 • 215.810.00
70.000.00 56.550.00 16.240.00 37.200.00 15.200.00 1.800.00 3.150.00 207.140.00 20.714.00 227.854.00 227.850.00
500.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
550.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
70.000.00 41.846.50 15.470.00 37.200.00 15.200.00 1.800.00 3.150.00 184.666.50 18.466.65 203.133.15 203.130.00
77.000.00 42.835.00 18.473.00 37.200.00 15.200.00 1.800.00 3.150.00 195.658.00 19.565.80 215.223.80 215.220.00
140.0000 26.5500 0.0930 0.6000 0.2000 0.0200 0.0300
140.0000 22.2000 1.1020 0.6000 0.2000 0.0300
bh
kg
500.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
550.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
70.000.00 33.718.50 15.810.00 37.200.00 15.200.00 1.800.00 3.150.00 176.878.50 17.687.85 194.566.35 194.560.00
77.000.00 34.515.00 18.879.00 37.200.00 15.200.00 1.800.00 3.150.00 187.744.00 18.744.40 206.518.40 206.510.00
m3 oh oh oh oh
bh
kg
500.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
550.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
70.000.00 28.194.00 17.340.00 37.200.00 15.200.00 1.800.00 3.150.00 172.884.00 17.288.40 190.171.40 190.170.00
77.000.00 28.860.00 20.706.00 37.200.00 15.200.00 1. 800. oc 3.150.00 183.916.00 18.391.60 202.307.60 202.300.00
m3 oh oh oh oh
500.00 1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
550.00 1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
70.000.00 23.495.000 20.740.00 37.200.00 15.200.00 1.800.00 3.150.00 171.585.00 17.158.50 188.743.50 188.740.00
77.000.00 24.050.00 24.766.00 37.200.00 15.200.00 1.800.00 3.150.00 183.166.00 18.316.60 201.482.60 201.480.00
1 M2PASANGANDINDINGBATAMERAH 1 PC:6PP,TBL 1 BATA Bata Merah {5x11x22 em) Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
532
3
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MNM..M) (MAXIMUM) 5 6 7=(3x5) 8=(3x6)
1 M2PASANGAN DINDINGBATAMERAH 1 PC:4PP,TBL 1 BATA Bata Merah (5x11x22 em) Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatka
A084d
KOEF SAT.
1 M2 PASANGAN DINDING BATA MERAH 1 PC: 2PPTBL 1 BATA Bata Merah (5x11x22 em) Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
AOB4b
~
140.0000 18.5000 0.1220 0.6000 0.2000 0.0200 0.0300
bh
kg m3 oh oh oh oh
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eotst34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
URAIAN
1 A0841
KOEF SAT.
2 1 M2 PASANGAN DINDING CONBLOK 20 AD.1 PC : 3 PP Conblok 8 x 20 40 Semen PC Pasir Pasang Besi angkur dia. 8 mm Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
~084g
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNM.M) (MAXIMUM) 5 7=(3x5) 8=(3x6) 6
3
4
12.5000 30.3200 0.7280 0.2800 0.3500 0.1500 0.0150 0.0180
bh kg m3 kg oh oh oh oh
3.500.00 1.270.00 170.000.00 9.500.00 62.000.00 76.000.00 90.000.00 105.000.00
3.800.00 1.300.00 203.000.0 9.800.00 62.000.00 76.000.00 90.000.00 105.000.00
43.750.00 38.506.40 123.760.00 2.660.00 21.700.00 11.400.00 1.350.00 1.890.00 245.016.40 24.501.64 269.518.04 269.510.00
47.500.00 39.416.00 147.784.00 2.744.00 21.700.00 11.400.00 1.350.00 1.890.00 273.784.00 27.378.40 301.162.40 301.160.00
12.5000 24.2600 0.7720 0.2800 0.3500 0.1500 0.0150 0.0180
bh kg m3 kg oh oh oh oh
3.500.00 1.270.00 170.000.00 9.500.00 62.000.00 76.000.00 90.000.00 105.000.00
3.800.00 1.300.00 203.000.00 9.800.00 62.000.00 76.000.00 90.000.00 105.000.00
43.750.00 30.810.20 131.240.00 2.660.00 21.700.00 11.400.00 1.350.00 1.890.00 244.800.20 24.480.02 269.280.22 269.280.00
47.500.00 31.538.00 156.716.00 2.744.00 21.700.00 11.400.00 1.350.00 1.890.00 274.838.00 27.483.80 302.321.80 302.320.00
15.5040 0.0160 0.3000 0.1500 0.0150 0.0150
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
19.690.08 2.720. 00 18.600.00 11.400.00 1.350.00 1.575.00 55.335.08 5.533.51 60.868.59 60.860.00
20.155.20 3. 248.00 18.600.00 11.400.00 1,350.00 1.57.00 56.328.20 5.632.82 61.961.02 61.960.00
10.2240 0.0200 0.3000 0.1500 0.0150 0.0150
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300000 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
12.984.48 3.400.00 18.600.00 11.400.00 1.350.00 1.575.00 49.309.48 030.95 54.240.43 54.240.00
13.291.20 4.060.00 18.600.00 11.400.00 1.350.00 1.575.00 50.276.20 5.027.62 55.303.82 55.300.00
7. 7760 0.0230 0.3000 0.1500 0.0150 0.0150
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
9.875.52 3.910.00 18.600.00 11.400.00 1.350.00 1.575.00 46.710.52 4.671.05 51.381.57 51.380.00
110.108.80 4.669.00 18.600.00 11.400.00 1.350.00 1.575.00 47.702.80 4.770.28 52.473.08 52.470.00
1 M2 PASANGAN DINDING CONBLOK 20,AD.1 PC : 4PP Conblok 8 x 20 40 Semen PC
Pasir Pasang Besi angkur dia. 8 mm Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatkan A085 1M2 PLESTERAN 1PC: 1PP TBL 15 MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatka 085a 1M2 PLESTERAN 1PC: 2PP, TBL 15 MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah KeuntunQan Max. Jumlah Dibulatka A086 1M2 PLESTERAN 1PC: 3PP, TBL 15 MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatka
Eotst34
TAHUN
XXI 2015
JURNAL HARGASATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
533
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE URAl AN
NO. 1 AOB7
2 1 M2PL
KOEF SAT. 3
4
6.2400 0.0240 0.3000 0.1500 0.0150 0.0150
kg m3
5.1840 0.0260 0.3000 0.1500 0.0150 0.0150
kg m3
4.4160 0.0270 0.3000 0.1500 0.0150 0.0150
kg m3
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MNM.M) (MAXIMUM) 5 6 7=(3x5) 8=(3x6)
1PC:4PP.TBL 15MM
Semen PC
Pasir Pasang Pekerja Tukang batu
Kepala Tukang batu
Mandor
oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
7.924.80 4.080.00 18.600.00 11.400.00 1.350.00 1.575.00 44.929.80 4.492.98 49.422.78 49.420.00
8.112.00 4.872.00 18.600.00 11.400.00 1.350.00 1.575.00 45.909.00 4.590.90 50.499.90 50.490.00
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
6.583.68 4.420.00 18.600.00 11.400.00 1.350.00 1.575.00 43.928.68 4.392.87 48.321.55 48.320.00
6. 739.20 5.278.00 18.600.00 11.400.00 1.350.00 1.575.00 44.942.20 4.494.22 49.436.42 49.430.00
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
5.608.32 4.590.00 18.600.00 11.400.00 1.350.00 1.575.00 43.123.32
5.740.00 5.481.00 18.600.00 11.400.00 1.350.00 1.575.00 44.146.80
Jumlah Keuntungan Max. Jumlah
Dibulatkan A088
1 M2PLESTERAN 1 PC: 5PP TBL 15MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu
Ao88a
Mandor Jumlah Keuntunoan Max. Jumlah Dibulatkan 1M2 PLESTERAN 1PC: 6PP, TBL 15 MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mandor
oh oh oh oh
oh oh oh oh
Jumlah : 1\eun ungan Max.
4.JH,J6
Jumlah Dibulatka
AOa8b
1M? 01 Semen PC Pekerja Tukang batu
Kepala Tukang batu Mandor
3.9360 0.0280 0.3000 0.1500 0.0150 0.0150
kg m3
3.4560 0.0290 0.3000 0.1500 0.0150 0.0150
kg m3
oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
Jumlah Keuntungan Max. Jumlah Dibulatka
4_gg8.72 4.760.00 18.600.00 11.400.00 1.350.00 1.575.00 42.683.72 4.268.37 46.952.09 46.950.00
5.116.80 5.684.00 18.600.00 11.400.00 1.350.00 1.575.00 43.725.80 4.372.58 48.098.38 48.090.00
4.389.12 4.930.00 18.600.00 11.400.00 1.350.00 1.575.00 42.244.12 4.224.41 46.468.53 46.460.00
4.492.80 5.887.00 18.600.00 11.400.00 1.350.00 1575.00 43.304.80 4.330.48 47.635.28 47.630.00
1M2 PLESTERAN 1PC: 8PP, TBL 15 MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu
Mandor Jumlah
oh oh oh oh
Keuntungan Max. Jumlah Dibulatkan
534
48.561.48 48.560.00
1100 · 700, TBL15 MM
Pasir Pasang
A088c
..•,...,
47.435.65 47.430.00
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
EoJSJ 34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE j
URAl AN
NO. 1
2
A088d 1 M2PL Semen PC Pasir Pasang
KOEF SAT.
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MAXIMUM) (MINIMUM) (MAXIMUM) (MNM.M) 5 6 7=(3x5) 8=(3x6)
3
4
13.6320 0.0270 0.4000 0.2000 0.0200 0.0220
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
10.3680 0.0310 0.2600 0.2000 0.0200 0.0130
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
8.3200 0.0320 0.4000 0.2000 0.0200 0.0220
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1PC:2PP.TBL 20 MM
Pekerja
Tukang batu Kepala Tukang batu Mander
Jumlah Keuntungan Max. Jumlah Dibu!atkan A088e 1M2 PLESTERAN 1 PC: 3PP TBL 20MM Semen PC Pasir Pasang Pekerja Tukang batu Kepala Tukang batu Mander Jumlah Keuntunoan Max.
24.800.00 15.200.00 1.800.00 2.310.00 66.012.64 6.601.26 72.613.90 72.610.00
17.721.60 5.481.00 24.800.00 15.200.00 1.800.00 2.310.00 67.312.60 6.731.26 74.043.86 74.040.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
13.167.36 5.270.00 16.120.00 15.200.00 1.800.00 1.365.00 52.922.36 5.292.24 58.214.60 58.210.00
13.478.40 6.293.00 16.120.00 15.200.00 1.800.00 1.365.00 54.256.40 5.425.54 59.682.04 59.680.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
10.566.40 5.440.00 24.800.00 15.200.00 1.800.00 2.310.00 60.116.40
10.816.00 6.496.00 24.800.00 15.200.00 1.800.00 2.310.00 61.422.00
Jumlah Dibulatkan A088f 1 M2 PLESTERAN 1PC : 4PP, TBL 20 MM Semen PC Pasir Pasang Pekerja
Tukang batu Kepa!a Tukang batu Mandor Jumlah Mumungan Max. Jumlah Dibulatka i
A088o 1 M2DO
j
Semen PC Pekerja
Tukang batu
Kepa!a Tukang batu Mander
b.l4L.LU
67.554.20 67.560.00
6.9120 0.0350 0.4000 0.2000 0.0200 0.0220
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
8778.24 5.950.00 24.800.00 15.200.00 1.800.00 2.310.00 58.838.24 5.883.82 64.722.06 64.720.00
8.985.60 7.105.00 24.800.00 15.200.00 1.800.00 2.310.00 60.200.60 6.020.06 66.220.66 66.220.00
5.8880 0.0360 D.4000 0.0200 0.0200 0.0220
kg m3 oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
7.477.76 6.120.00 24.800.00 15.200.00 1.800.00 2.310.00 57.707.76 5.770.78 63.478.54 63.470.00
7.654.40 7.308.00 24.800.00 15.200.00 1.800.00 2.310.00 59.072.40 5.907.24 64.979.64 64.970.00
Jumlah Keuntungan Max. Jumlah Dibulatka
A088h 1 M2 PLESTERAN 1PC : 6PP, TBL 20 MM Semen PC Pasir Pasang Pekerja
Tukang batu Kepala Tukang batu Mander
Jumlah Keuntungan Max. Jumlah Dibulatkan
TAHUN
0.011.04
66.128.04 66.120.00
1PC: 5PP. TBL 20 MM
Pasir Pasang
Eotst 34
17.312.64 4.5go.oo
XXI 2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
535
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE URAIAN
NO.
1
2
AOBBi 1M? PI O
~ KOEF SAT. 3
4
0.5000 0.0130 0.0800 G.4000 0.0400 0.0040
kg m3
4.3200 0.0060 0.3000 0.1000 0.0100 0.0150
kg m3
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNM1v1) (MAXIMUM) 5 6 7=(3x5) 8=(3x6)
; 1PC:1PP. LBR 10 MM
Semen PC
Pasir Pasang Pekerja
Tukang batu Kepala Tukang batu Mandor
oh oh oh oh
1.270.00 170.000.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
635.00 2.210.00 4.g6o.oo 30.400.00 3.600.00 420.00 42.225.00 4.222.50 46.447.50 46.440.00
650.00 2.63g.oo 4.g60.00 30.400.00 3.600.00 420.00 42.669.00 4.266.90 46,g35.90 46.930.00
1.270.00 170.000.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 203.000.00 62.000.00 76.000.00 90.000.00 105.000.00
5.486.40 1.020.00 18.600.00 7.600.00 900.00 1.575.00 35.181.40 3.518.14 38.699.54 38.690.00
5.616.00 1.218.00 18.600.00 7.600.00 goo.oo 1.575.00 35.509.00 3.550.90 39.059.90 39.050.00
Jumlah Keuntungan Max. Jumlah Dibulatkan A088j 1M2 PLESTERAN CIPRAT 1 PC: 2PP, Semen PC Pasir Pasang Pekerja
Tukang batu Kepala Tukang batu Mandor
oh oh oh oh
.l.,mloh
Keuntungan Max. Jumlah Dibulatkan
A088k 1 M2FINISHINGSIAR PASANGANDINDINGBATAMERAH(=20M) Semen PC Pasir Pasang Pekerja Tukang batu
Kepala Tukang batu
3.1080 0.1500 0.0750 0.0080 0.0080
oh oh oh oh
kg
1.6000 0.0700 0.0350 0.0040 0.0040
oh oh oh oh
1.270.00 62.000.00 76.000.00 90.000.00 105.000.00
1.300.00 62.000.00 76.000.00 90.000.00 105.000.00
3.g47.16 g.300.00 5.700.00 720.00 840.00 20.507.16 2.050.72 22.557.88 22.550.00
4.040.40 g.300.00 5.700.00 720.00 840.00 20.600.00 2.060.04 22.660.44 22.660.00
1.270.001 62.000.00 76.000.00 go.ooo.oo 105.000.00
1.300.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
2.032.00 4.340.00 2.660.00 360.00 420.00 9.812.00 981.20 10.793.20 10.790.00
2.080.00 4.340.00 2.660.00 360.00 420.00 9.860.00 986.00 10.846.00 10.840.00
1.270.00 170.000.00 62.000,00 76.000.00 go.ooo.oo 105.000.00
1.300.00 62.000.00 76.000.00 go.ooo.oo 105.000.00
8.051.80 2.040.00 18.600.00 11.400.00 1.350.00 1.575.00 43.016.80 4.301.68 47.318.48 47.310.00
8.242.00 2.436.00 18.600.00 11.400.00 1.350.00 1.575.00 43.603.00 4.360.30 47.963.30 47.960.00
Mandor
Jumlah
Keuntungan Max. Jumlah Dibulatka A0881 1M2 ANISHINGSIAR PASANGAN DINDINGCONBI.OK EKSI'OSE(.sM) Semen PC Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Keuntungan Max. Jumlah Dibulatka A088m 1M2 FINISHINGSIAR PASANGAN BATU KALIADUKAN 1PC:2PP Semen PC Pasir Pasang Pekerja
Tukang batu Kepala Tukang batu Mandor Jumtah Keuntungan Max. Jumtah Dibulatkan
536
6.3400 0.0120 0.0300 0.1500 0.0150 0.0150
kg
kg m3
oh oh oh oh
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
Eotst 34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
1 A089
KOEF SAT.
URAIAN
NO.
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MNfVLM) (MAXIMUM) (MAXIMUM) (MINIMUM) 7=(3x5) 8=(3x6) 5 6
3
4
Semen PC
3.2500
kg
1.270.00
1.300.00
4.127.50
4.225.00
2 1M2ACIAN PC Pekerja
0.2000
oh
62.000.00
62.000.00
12.400.00
12.400.00
Tukang batu
0.1000
oh
76.000.00
76.000.00
7.600.00
7.600.00
Kepala Tukang batu
0.0100
oh
go.ooo.oo
go.ooo.oo
goo.oo
goo.oo
Mander
0.0100
oh
105.000.00
105.000.00
1.050.00
1.050.00
26.077.50
26.175.00
2.607.75
2.617.50
Jumlah
28.685.25
28.792.50
Dibulatkan
28.680.00
28.7go.oo
453.g37.50
453.g37.50
Jumlah
Keuntungan Max.
A090
1 UNIT SEPTITANK 2, 5 X1,5 X2M+REMBESANYA(Kantor Type Besar) Galian Tanah
7.5000
m3
60.525.00
60.525.00
Pasir Urug
0.3570
m3
130.000.00
149.000.00
46.410.00
53.193.00
Lanta Kerja t::: 10 em
3.7500
m3
64.319.99
69.545.58
241.199.96
260.795.93
Pas. Bata 1PC : 2 PS + Plesteran
25.000
m3
94.201.50
99.524.00
2.355.037.50
2.488.10
Plat beton penutup & balok
0.5000
m3
9.237.034.97
9.589.059.25
4.618.517.48
4.794.529.62
Pipa PVC 4" jenis AW + sambungan
9.0000
m1
44.000.00
48.000.00
396.000.00
432.000.00
Pipa GIP 1 1/2"
2.0000
m1
69.166.67
435.000.00
138.333.33
870.000.00
Galiantanah untuk rembesan
5.6250
m3
60.525.00
60.525.00
340.453.13
340.453.13
Pas. ljuk
9.0000
kg
9.000.00
10.000.00
81.000.00
90.000.00
Urugan kerikil 3,5 em
1.7500
m3
34.500.00
36.500.00
60.375.00
63.875.00
Pipa PVC
6.0000
m1
68.000.00
75.000.00
408.000.00
450.000.00
Urugan kemball perataan tanah
1.8750
m3
16.371.50
16.371.50
30.696.56
30.696.56
Tambahan Upah
0.0850
is
9.169.960.47
10.327.580.74
4~
Ber!obang jenis AW
779.446.64
877.844.36
9.949.407.10
11.205.425.11
994.940.71
1.120.542.51
Jumlah
10.944.347.82
12.325.967.62
Dibulatkan
10.944.340.00
12.325.960.00
272.362.50
272.362.50
Jumlah Keuntungan Max.
A091
1 UNIT SEPTITANK 2, 5 X1,5 X1,5 M+REMBESANYA(Kantor TypeKecil) Galian Tanah
4.5000
60.525.00
60.525.00
Pasir Urug
0.2142
m3
130.000.00
149.000.00
27.846.00
31.915.80
Lanta Kerja 1=10 em
2.2500
m3
63.319.99
69.545.58
144.719.98
156.477.56
Pas. Bata 1PC : 2 PS + Plesteran
15.0000
m3
94.201.50
99.524.00
1.413.022.50
1.492.860.00
Plat beton penutup & balok
0.30000
m3
9.237.034.97
9.589.059.25
2.771.110.49
2.876.717.77
5.4000
m1
44.000.00
48.000.00
237.600.00
259.200.00
Pipa PVC 4" jenis AW + sambungan
ED!SI
m3
Pipa GIP 1 1/2"
1.2000
m1
69.166.67
435.000.00
83.000.00
522.000.00
Galiantanah untuk rembesan
3.3750
m3
60.525.00
60.525.00
204.271.88
204.271.88
Pas. ljuk
5.4000
kg
9.000.00
10.000.00
48.600.00
54.000.00
Urugan keriki! 3,5 em
1.0500
m3
34.500.00
36.500.00
36.225.00
38.325.00
Pipa PVC 4n Ber!obang jenis AW
9.0000
m1
68.000.00
75.000.00
612.000.00
675.000.00
Urugan kembali perataan tanah
1.1250
m3
16.371.50
16.371.50
18.417.94
18.417.94
Tambahan Upah
0.0920
is
5.869.176.28
6.601.548.45
539.964.22
607.342.46
Jumlah
6.409.140.50
7.208.890.00
Keuntungan Max.
640.9143.05
720.889.09
Jumlah
7.050.054.55
7.929.779.99
Dibulatkan
7.050.050.00
7.929. 770.00
34
TAHUN
XXI 2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
&
INTERIOR
537
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAl AN
1 A092
2
Pipa GIP 1 112" Galiantanah untuk rembesan Pas. !juk Urugan kerikil 3,5 em Pipa PVC 4" Berlobang jenis AW Urugan kembali perataan tanah Tambahan Upah Jumlah Keuntungan Max. Jumlah Dibulatkan
2.2500 0.1071 1.1250 7.5000 0.1500 9.0000 0.6000 1.6875 2.7000 0.5250 9.0000 0.5625 0.0650
m3 m3 m2 m3 m3 m1 btg m3 kg m3 m1 m3 is
60.525.00 130.000.00 64.319.99 94.201.50 9.237.034.97 44.000.00 69.166.67 60.525.00 9.000.00 34.500.00 68.000.00 16.371.50 3.517. 788.14
60.525.00 149.000.00 69.545.58 99.524.00 9.589.059.25 48.000.00 435.000.00 60.525.00 10.000.00 36.500.00 75.000.00 16.371.50 3.940.674.22
138.181.25 13.923.00 72.359.99 706.511.25 1.385.555.25 396.000.00 41.500.00 102.135.94 24.300.00 18.122.50 612.000.00 9.208.97 228.656.23 3.746.444.37 374.644.44 4.121.088.81 4.121.080.00
136.181.25 15.957.90 78.238.78 746.430.00 1.438.358.89 432.000.00 261.000.00 102.135.94 27.000.00 19.162.50 675.000.00 9.208.97 256.143.82 4.196.818.05 419.681.80 4.616.499.85 4.616.490.00
0.2500 0.1250 0.0100 0.5000 0.1600 0.2800 0.0300 0.0100 0.0250
It It bh lbr oh oh oh oh lot
92.000.00 48.000.00 18.000.00 3.000.00 62.000.00 76.000.00 90.000.00 105.000.00 65.630.00
98.000.00 50.000.00 22.000.00 4.000.00 62.000.00 76.000.00 90.000.00 105.000.00 67.920.00
23.000.00 6.000.00 180.00 1.500.00 9.920.00 21.280.00 2.700.00 1.050.00 1.640.75 67.270.75 6.727.08 73.997.83 73.990.00
24.500.00 6.250.00 220.00 2.000.00 9.920.00 21.280.00 2.700.00 1.050.00 1.698.00 69.618.00 6.961.80 76.579.80 76.570.00
0.2500 0.1250 0.0100 0.5000 0.2000 0.3000 0.0300 0.0100 0.0250
It It bh lbr oh oh oh oh lot
58.000.00 40.000.00 18.000.00 3. 000.00 62.000.00 76.000.00 90.000.00 105.000.00 60.130.00
62.000.00 45.000.00 22.000.00 4. 000.00 62.000.00 76.000.00 90.000.00 105.000.00 62.295.00
14.500.00 5.000.00 180.00 1.500.00 12.400.00 22.800.00 2.700. 00 1.050.00 1.503.25 61.533.25 6.163.33 67.796.58 67.790.00
15.500.00 5.625.00 220.00 2.000.00 12.400.00 22.800.00 2.700.00 1.050.00 1.557.38 63.852.38 6.385.24 70.237.61 70.230.00
0.1750 0.1600 0.0100 0.5000 0.1600 0.2800 0.0300 0.0100 0.0450
kh kg bh lbr oh oh oh oh lot
16.000.00 12.000.00 18.000.00 3.000.00 62.000.00 76.000.00 90.000.00 105.000.00 41.350.00
18.000.00 13.000.00 22.000.00 4.000.00 62.000.00 76.000.00 90.000.00 105.000.00 42.400.00
2.800.00 1.920.00 180.00 1.500.00 9.920.00 21.280.00 2.700.00 1.050.00 1.860. 75 43.210.75 4.321.08 47.531.83 47.530.00
3.150.00 2.080.00 220.00 2.000.00 9.920.00 21.280.00 2.700.00 1.050.00 1.908.00 44.308.00 4.430.80 48.738.80 48.730.00
1 M2 PENGECATAN DIN DING VINILEX 3X Cat tembok Vinilex Planmir tembok rol cat ampelas pekerja tukang cat kepala tukang cat mandor steger werk Jumlah Keuntungan Max. Jum!ah Dibulatkan
538
4
1M2 PENGECATAN PLAFON DAN DIN DING INTERIOR ICI Cat tembok ICI Cat dasar sebelum pengecatan rol cat ampelas pekerja tukang cat kepa!a tukang cat mandor steger werk Jumlah Keuntunoan Max. Jumlah Dibulatkan
A095
3
1M2 PENGECATAN BETON ICI EKSTERIOR Cat tembok ICI Alkali lCI sebelum pengecatan rol cat ampelas pekerja tukang cal kepala tukang cat mandor steger werk Jumlah Keuntungan Max. Jumlah Dibulatkan
A094
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNM1v1) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1 UNIT SEPTITANK 1 X1,5 X2M+REMBESANYA (Rumah Kapasitas KecUl Galian Tanah Pasir Urug Lanla Kerja 1=10 em Pas. Bata 1PC : 2 PS + Plesteran Plat beton penutup & balok Pipa PVC 4" jenis AW + sambungan
A093
KOEF SAT.
JURNAL HARGA 8ATUAN BAHAN 8ANGUNAN, KONSTRUKSI
& INTERIOR
Eotst 34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
URAIAN
NO.
z
1 A096
KOEF SAT.
3
4
0.2000 0.1600 0.0100 0.0500 0.2000 0.2800 0.0300 0.0100 0.0425
kg kg bh lbr oh oh oh oh lot
16.000.00 12.000.00 18.000.00 3.000.00 62.000.00 76.000.00 90.000.00 105.000.0 44.230.00
18.000.00 13.000.00 22.000.00 4.000.00 62.000.00 76.000.00 90.000.00 105.000.00 45.330.00
3.200.00 1.920.00 180.00 1.500.00 12.400.00 21.280.00 2.700.00 1.050.00 1.879.78 46.109.78 4.610.98 50.720.75 50.720.00
3.600.00 2.080.00 220.00 2.000.00 12.400.00 21.280.00 2.700.00 1.050.00 1.926.53 47.256.53 4.725.65 51.982.18 51.980.00
0.1750 0.1600 0.0100 0.5000 0.1040 0.1820 0.0195 0.0100 0.0450
kg kg bh lbr oh oh oh oh lot
14.000.00 12.000.00 18.000.00 3.000.00 62.000.00 76.000.00 90.000.00 105.000.00 29.135.00
15.000.00 13.000.00 22.000.00 4.000.000 62.000.00 76.000.00 90.000.00 105.000.00 30.010.00
2.450.00 1.920.00 180.00 1.500.00 6.448.00 13.832.00 1.755.00 1.050.00 1.311.08 30.446.08 3.044.61 33.490.68 33.490.00
2.625.00 2.080.00 220.00 2.000.00 6.448.00 13.832.00 1.755.00 1.050.00 1.350.45 31.360.45 3.136.05 35.496.50 34.490.00
0.2000 0.1600 0.0100 1.0000 0.5000 0.1040 0.1820 0.0195 0.0100
kg kg bh lot lbr oh oh oh oh
14.000.00 12.000.00 18.000.00 862.50 3.000.00 62.000.00 76.000.00 90.000.00 105.000.00
15.000.00 13.000.00 22.000.00 900.00 4.000.00 62.000.00 76.000.00 90.000.00 105.000.00
2.800.00 1.920.00 180.00 862.50 1.500.00 6.448.00 13.832.00 1.755.00 1.050.00 30.347.50 3.034.75 33.382.25 33.380.00
3.000.00 2.080.00 220.00 900.00 2.000.00 6.448.00 13.832.00 1.755.00 1.050.00 31.285.00 3.128.50 34.413.50 34.410.00
20.000.00 23.000.00 44.000.00 3.000.00 6.000.00 9.000.00 62.000.00 76.000.00 90.000.00 105.000.00
22.000.00 25.000.00 45.000.00 4.000.00 8.000.00 12.000.00 62.000.00 76.000.00 90.000.00 105.000.00
3.340.00 1.909.00 8.800.00 1.200.00 900.00 450.00 12.400.00 22.800.00 2.700.00 1.050.00 55.549.00 5.554.90 61.103.90 61.100.00
3.674.00 2.075.00 9.000.00 1.600.00 1.200.00 600.00 12.400.00 22.800.00 2.700.00 1.050.00 57.099.00 5.709.90 62.808.90 62.800.00
1 M2 PENGECATAN PLAFON VINILEX 3X
Cat tembok Vinilex Plamir tembok rol cat ampelas pekerja tukang cat kepala tukang cat
mandor steger werk Jumlah Keuntungan Max. Jumlah Dibulatkan
A097
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNMJ'vl) (MAXIMUM) 6 7=(3x5) 8=(3x6) 5
1M2 PENGECATAN DIN DING SAN LEX 13X\ Cat tembok Sanlex Plamir tembok rol cat ampe!as pekerja tukang cat kepala tukang cat
mandor steger werk Jumlah Keuntungan Max.
Jumlah Dibulatkan
A098
1M2 PENGECATAN PLAFON SAN LEX I3XI Cat tembok Sanlex Plamir tembok rol cat steger werk ampelas pekerja tukang cat kepala tukang cat mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
A099
1 M2 PENGECATAN KAYU 13XI BERIKUT MENI Meni kayu Plamir kayu Cat kayu merk SEIV ampelas kayu Minyak cat terpentin Kwas 3"
pekerja tukang cat kepala tukang cat mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
EDIS/
34
TAHUN XXI
2015
0.1670 0.0830 0.2000 0.4000 0.1500 0.0500 0.2000 0.3000 0.0300 0.0100
JURNAL HARGASATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
539
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE URAl AN
NO.
HARGA SAT. HARGA SAl JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MNM..M) (MAXIMUM) 6 7=(3x5) 8=(3x6) 5
3
4
Meni besi
0.1670
kg
20.000.00
22.000.00
cat besi merk SEIV
0.2000
kg
44.000.00
45.000.00
3.340.00 8.800.00
ampelas Besi
D.4000 0.1500
lbr
3.000.00
4.000.00
1.200.00
1.600.00
minyak cat thiner B
11r
20.000.00
22.000.00
3.000.00
3.300.00
2
1 A100
KOEF SAT.
1M2 PENGECATAN BESI (3X)
Kwas 3"
0.0500
bh
9.000.00
12.000.00
450.00
600.00
0.2000
oh
62.000.00
62.000.00
12.400.00
12.400.00
tukang cat
0.3000
oh
76.000.00
76.000.00
22.800.00
22.800.00
kepala tukang cat
0.0300
oh
90.000.00
90.000.00
2.700.00
2.700.00
mandor
0.0100
oh
105.000.00
105.000.00
1.050.00
1.050.00
55,740.00
57.124.00
Jumlah
5.574.00
5.712.40
Jumlah
61.314.00
62.836.40
Dibulatkan
61,310.00
62.830.00
1M2 PLITURAN BANGUNAN (BIASA) Dempul plitur {dempul dasar)
0.0300
kg
27.000.00
34.000.00
810.00
1.020.00
wood filler
0.2000
kg
29.000.00
40.000.00
5.800.00
8.000.00 560.00
oker putih
0.0200
kg
25.000.00
28.000.00
500.00
oker warna
0.0100
kg
25.000.00
28.000.00
250.00
280.00
batu apung (gosok)
0.1000
kg
18.000.00
20.000.00
1. 800.00
2.000.00 32.000.00
siriak ex india
0.2000
kg
150.000.00
160.000.00
30.000.00
kwas 3"
0.0100
bh
9.000.00
12.000.00
90.00
120.00
spirtus
0.2000
11r
12.000.00
15.000.00
2.400.00
3.000.00
ampelas kayu
0.1000
lbr
3.000.00
4.000.00
300.00
400.00
pekerja
0.2500
oh
62.000.00
62.000.00
15.500.00
15.500.00
tukang cat plitur
0.2850
oh
76.000.00
76.000.00
21.660.00
21.660.00
kepala tukang cat /plitur
0.0400
oh
0.0200
oh
90.000.00 105.000.00
3.600.00 2.100.00
3.600.00
mandor
90.000.00 105.000.00
84,810.00
90.240.00
Jumlah Keuntungan Max.
A102
2.100.00
8.481.00
9.024.00
Jumlah
93.291.00
99.264.00
Dibulatkan
93,290.00
99.260.00
1M2 PLITURAN BANGUNAN (BIASA) Dempu! plitur (dempul dasar)
0.0300
kg
27.000.00
34.000.00
810.00
1.020.00
wood filler
0.2000
kg
29.000.00
40.000.00
5.800.00
8.000.00
melamik
0.3500
kg
40.000.00
42.000.00
14.000.00
14.700.00
oker pulih
0.0200
kg
25.000.00
28.000.00
500.00
560.00
oker warna
0.0100
kg
25.000.00
28.000.00
250.00
280.00
ba1u apung (gosok)
0.1000
kg
18.000.00
20.000.00
1.800.00
2.000.00 32.000.00
siriak ex india
0.2000
kg
150.000.00
160.000.00
30.000.00
kwas
0.0100
bh
9.000.00
12.000.00
90.00
120.00
spirtus
0.2000
ltr
12.000.00
15.000.00
2.400.00
3.000.00
ampelas kayu
0.1000 0.2500
lbr
3.000.00
4.000.00
300.00
400.00
pekerja
oh
62.000.00
62.000.00
15.500.00
15.500.00 21.660.00
3~
tukang cat plitur
0.2850
oh
76.000.00
76.000.00
21.660.00
kepala tukang cat /plitur
0.0400
oh
90.000.00
90.000.00
3.600.00
3.600.00
mandor
0.0200
oh
105.000.00
105.000.00
2.100.00
2.100.00
98.810.00
104.940.00
Jumlah
Keuntungan Max.
540
9.000.00
pekerja
Keuntungan Max.
A101
3.674.00
9.881.00
10.494,00
Jumlah
108.691.00
115.434.00
Dibulatkan
108.690.00
115.430.00
JuRNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
EDJS/
34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
URAIAN
NO.
2
1 A103
KOEF SAT.
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MNMJ'v1) (MAXIMUM) 5 7=(3x5) 8=(3x6) 6
3
4
0.0154 0.2000 0.1500 0.3000 0.0300 0.0750
m3 kg oh oh oh oh
5.900.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
6.800.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
90.860.00 3.000.00 9.300.00 23.400.00 2.760.00 7.875.00 137.195.00 13.719.50 150.914.50 150.910.00
104.720.00 3.400.00 9.300.00 23.400.00 2.760.00 7.875.00 151.455.00 15.145.00 166.600.50 166.600.00
0.0154 0.2000 0.1500 0.3000 0.0300 0.0750
m3 kg oh oh oh oh
4.000.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
4.500.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
61.600.00 3.000.00 9.300.00 23.400.00 2. 760.00 7.875.00 107.935.00 10.793.50 118.728.50 118.720.00
69.300.00 3.400.00 9.300.00 23.400.00 2.760.00 7.875.00 116.035.00 11.603.50 127.638.50 127.630.00
0.0163 0.2500 0.2000 0.3000 0.0300 0.0100
m3 kg oh oh oh oh
4.000.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
4.500.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
65.200.00 3.750.00 12.400.00 23.400.00 2.760.00 1.050.00 108.560.00 10.856.00 119.416.00 119.410.00
73.350.00 4.250.00 12.400.00 23.400.00 2.760.00 1.050.00 117.210.00 11.721.00 128.931.00 128.930.00
0.3750 0.0300 0.1000 0.1000 0.0100 0.0050
lbr kg oh oh oh oh
53.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
55.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
19.875.00 600.00 6.200.00 7.800.00 920.00 525.00 35.920.00 3.592.00 39.512.00 39.510.00
20.625.00 660.00 6.200.00 7.800.00 920.00 525.00 36.730.00 3.673.00 40.403.00 40.400.00
0.3640 0.1100 0.1000 0.0500 0.0050 0.0050
lbr kg oh oh oh oh
46.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
60.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
16.744.00 2.200.00 6.200.00 3.900.00 460.00 525.00 30.029.00 3.002.90 33.031.90 33.030.00
21.840.00 2.420.00 6.200.00 3.900.00 460.00 525.00 35.345.00 3.534.50 38.879.50 38.870.00
1M2PAS.RANGKAPI.AFON(50X100CM),KAYUKAMPERBANJAR Kaso-kaso 5/7 kamper banjar paku 7cm-10cm pekerja tukang kayu kepala tukang kayu mandor Jumlah
A104
Keuntunqan Max. Jumlah Dibulatkan 1M2PAS. RANGKAPLAFON (50X100CM\ KAYU BORNEO SUPER Kaso-kaso 5/7 borneo super paku 7cm-10cm pekerja tukang kayu
kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah
A105
Dibulatkan 1M2PAS. RANGKAPLAFON (60X60CM), KAYU BORNEO SUPER Kaso-kaso 5/7 borneo super paku 7cm-10cm
pekerja tukang kayu kepala tukang kayu
mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
A106
1M2PASBAHANPI.AFONTRIP!.EK-PEN\JTUPF\IIDARANGKANYA Triplek 4mm (120x240 em) paku triplek pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jum!ah Dibulatkan
A107
1M2PASBAHANPLNON GYPSUM BOARD 9MM PENUTUP PADA RANGKANYA Gypsum boaed 9mm (120x240) paku skrup pekerja tukang kayu kepala tukang kayu
mandor Jumlah Keuntungan Max.
Jumlah Dibulatkan
EDIS/34 TAHUN
XXI 2015
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
541
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE URAl AN
NO.
2
1 A108
KOEF SAT. 3
4
1.1000 0.0100 0.0300 0.0700 0.0070 0.0040
m2 kg
1.1000 0.0100 0.0300 0.0700 0.0070 0.0040
m2 kg
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1 M2 PAS. BAHAN PLAFON ASSES SEMEN 5 MM PENUTUP PAnA YA
OA"r.""
Asbes semen 5mm Paku triplek pekerja tukang kayu kepala tukang kayu
I manrlor
oh oh oh oh
15.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000 00
17.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
16.500.00 200.00 1.860.00 5.460.00 644.00 420.00 25.084.00 2.508.00 27.592.40 27.590.00
18.700.00 220.00 1.860.00 5.460.00 644.00 420.00 27.304.00 2.730.00 30.034.40 30.030.00
12.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.200.00 200.00 1.860.00 5.460. 00 644.00 420.00 ?1 7R4 nn
14.300.00 220.00 1.860.00 5.460.00 644.00 420.00
Jumlah Keuntunoan Max. Jumlah Dibulatkan
A109
1 M2PAS. BAHAN PLAFON ETERNIT 4MM(1X1) PADA RANGKANYA Granit 4mm {1x1} paku tripleks pekerja tukang kayu kepala tukang kayu
oh oh oh oh
moon<
23.960.00
"·"·'"
"••• nn 2.290.40 "104.40 25.190.00
2.178.40
Jumlah
M, Jumlah Dibulatkan
A109a 1 M2PAS. PLAFON LAMBRIZINGKAYU KAMfERBANJAR. TBL9MM Kayu papan kamper banjar paku tripleks
pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
0.0150 0.0100 0.8000 0.8000 0.0800 0.0400
m3 kg
1.5000 0.0500 0.1000 0.1000 0.0100 0.0050
m3 kg
oh oh oh oh
7.000.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
7.500.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
105.000.00 200.00 49.600.00 62.400.00 7.360.00 4.200.00 228.760.00 22.876.00 251.636.00 251.630.00
112.500.00 220.00 49.600.00 62.400.00 7.360.00 4.200.00 236.280.00 23.628.00 259.908.00 259.900.00
92.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
95.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
138.000.00 1.000.00 6.200.00 7.800.00 920.00 525.00 154.445.00 15.444.50 169.889.50 16g.880.00
142.500.00 1.100.00 6.200.00 7.800.00 920.00 525.00 15g.045.00 15.g04.50 174.g49.50 174.940.00
13.000.00 6.000.00 62.000.00 78.000.00 92.000.00 105.000.00
15.000.00 7. 000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.650.00 900.00 3.720.00 4.680.00 552.00 315.00 - 23.817.M 2.381.70 26.198.78 ?6.190.00
15.750.00 1.050.00 3.720.00 4.680.00 552.00 315.00 -26.067.0.0 2.606. 70 28.673.70 ,. 070 00
A109b 1M2PASPLAFON AKUSTIK UK. (60X120) CM Akustik uk. 60x120 em paku trip!ek pekerja tukang kayu kepa!a tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
oh oh oh oh
A109c 1M2PAS LIST PROFIL GYPSUM List profil gypsum L-10 CM Tepung gypsum pekerja tukang kayu kepala tukang kayu mandor
1.0500 0.1500 0.0600 0.0600 0.0060 0.0030
m' kg
oh oh oh oh
Jumlah Keuntungan Max. Jumlah
Oibulalkan
542
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
Eotst 34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
NO.
URAl AN
KOEF SAT.
2
1
A109d 1M' PAS. LIST PROFIL KAYU KAMPER BANJAR 4X1 list profil kamper banjar 4x1 Paku triplek
3
4
1.0500 0.0100 0.0500 0.0500 0.0050 0.0030
m'
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 5 7=(3x5) 8=(3x6) 6 11.000.00 20.000.00 62.000.00 78.000.00 92.000.00 105.000.00
13.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
11.550.00 200.00 3.100.00 3.900.00 460.00 315.00 19.525.00 1.952.50 21.477.50 21.470.00
13.650.00 220.00 3.100.00 3.900.00 460.00 315.00 21.645.00 2.164.50 23.809.30 23.800.00
7.000.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
7.500.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
77.000.00 750.00 6.200.00 15.600.00 1.840.00 525.00 101.915.00 10.191.50 112.106.50 112.100.00
82.500.00 850.00 6.200.00 15.600.00 1.840.00 525.00 107.515.00 10.751.50 118.266.50 118.260.00
7.000.000.00 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
7.500.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
75.600.00 1.500.00 6.200.00 15.600.00 1.840.00 525.00 101.265.00 10.126.50 111.391.50 111.390.00
81.000.00 1.700.00 6.200.00 15.600.00 1.840.00 525.00 106.865.00 10686.50 117.551.50 117.550.00
5.900.000.00 15.000.00 98.000.00 35.000.00 62.000.00 78.000.00 92.000.00 105.000.00
6.800.000.00 17.000.00 105.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
165.200.00 2.250.00 84.280.00 19.600.00 12.400.00 46.800.00 5.520.00 1.050.00
190.400.00 2.550. 00 90.300.00 20.160.00 12.400.00 46.800.00 5.520.00 1.050.00
.luml'h
' " 1nn nn
"o 1Rn nn
Keuntungan Max. Jumlah Dibulatkan
33.710.00 370.810.00 370.810.00
36.918.00 406.098.00 406.090.00
7.080.000.00 18.750.00 35.000.00 372.000.00 1.404.000.00 165.600.00 31.500.00 9.106.850.00 910.685.00 10.017535.00 10.017530.00
8.160.000.00 21.250.00 36.000.00 372.000.00 1.404.000.00 165.600.00 31.500.00 10.190.350.00 1.019.035.00 11.209.385.00 11.209.380.00
pekerja tukang kayu kepala tukang kayu mandor Jumlah
kg oh oh oh oh
Keuntungan Max. Jumlah Dibulatkan
A110
1 M1 PEKERJAAN LIST PLANGK KAYU KAMPER BANJAR 3130 Kayu papan 3x30 em kamper banjar paku5-7cm pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntunaan Max. Jumlah Dibulatkan
A111
0.0110 0.0500 0.1000 0.2000 0.0200 0.0050
m3
0.0108 0.0100 0.1000 0.2000 0.0200 0.0050
m3
kg oh oh oh oh
1M2 PEKERJAAN LIST PLANK KAYU KAMPER BANJAR 3/20
Kayu papan 3x20 em kamper banjar paku 5 - 7 em pekerja tukang kayu kepala tukang kayu mandor Jumlah KeuntunQan Max. Jumlah Dibulatkan A111a 1M2 Fl\5. DIN DING PEMISAH /PARTS! TEAKWOOD RANGKAP,
kg oh oh oh oh
RANGKA KAYU KAMPER BANJAR Kayu kamper banjar uk. 6/12 em Paku 5-10 em Teakwood 4mm uk. 120x240 em
Lem pulih (FOX) pekerja tukang kayu kepala tukang kayu mandor
A112
m3
kg lbr
kg oh oh oh oh
1 M3 KUSEN KAYU KAMPER BANJAR Kayu kamper banjar Paku 10 em Lem putih FOX pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
EDISJ
0.0280 0.1500 0.8600 0.5600 0.2000 0.6000 0.0600 0.0100
34
TAHUN
XXI 2015
1.2000 1.2500 1.0000 6.0000 18.0000 1.8000 0.3000
m3
kg kg oh oh oh oh
5.900.000.00 15.00.00 35.000.00 62.000.00 78.000.00 92.000.00 105.000.00
6.800.000.00 17.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
543
I
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE URAIAN
NO. 1
2
KOEF SAT. 3
4
1.2000 1.2500 1.0000 6.0000 18.0000 1.8000 0.3000
m3
1.1000 1.2500 1.0000 7.000D 21.0000 2.1000 0.35DO
m3
1.100D 1.2500 1.0DDO 7.0000 21.DOOO 2.1 ODD 0.3500
m3
0.0400 0.50DO 1.0000 3.0000 0.30DO O.D500
m3
D.0400 0.5000 1.0000 3.0000 0.300D 0.0500
m3
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 5 6
1 M3KUSEN KAYU BORNEO SUPER
A113
Kayu balok borneo super Paku 10 em
Lem putih FOX pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
4.000.000.0C 15.DOO.OC 35.000.0 62.000.0 78.000.0 92.DOO.O 1D5.000.0
4.500.000.00 17.DOO.OO 36.DOO.OO 62.000.DO 78.000.00 92.000.00 105.000.00
4.800.000.00 18.750.00 35.000.DO 372.DOO.OD 1.404.DOO.OO 165.600.00 31.500.00 6.826.850.00 682.685.00 7.509.535.00 7.509.530.00
5.400.000.00 21.250.00 36.000.DO 372.000.00 1.404.DOO.OO 165.600.00 31.500.00 7.430.350.00 743.035.00 8.173.385.00 8.173.380.00
9.80D.DOO.O 15.0DO.D 35.000.0 62.000.0 78.000.0 92.000.0 105.000.00
10.000.000.DD 17.000.00 35.DOO.OO 62.000.00 78.000.00 92.000.DO 1D5.DOO.OO
10.560.00 18.750.00 35.0DO.DO 434.000.00 1.638.000.00 193.200.0D 36. 75D. DO 12.915.700.00 1.291.570.00 14.207.270.00 14.207.270.00
11.000.000.00 21.250.00 36.0DO.DO 434.000.0D 1.638.DOD.OO 193.200.00 36.750. DO 13.359.200.00 1.335.920.00 14.695.120.00 14.695.120.00
9.000.00D.OO 15.000.0 35.DOO.O 62.000.0 78.DOO.O 92.DDO.O 1D5.DDO.D
9.400.000.00 17.0DO.DO 36.000.0D 62.000.00 78.000.0D 92.00D.OD 105.0DO.OD
9.900.000.DO 18.75D.OD 35.000.00 434.DOD.OO 1.638.000.00 193.200.00 36.750.00 12.255.700.00 1.225.570.00 13.481.270.00 13.481.270.00
1D.340.000.00 21.250.0D 36.00D.OD 434.00D.OO 1. 638. DOD. DO 193.200.00 36.750.00 12.699.200.00 1.269.920.00 13.969.120.DO 13.969.120.00
9.800.DDD.O 10.400.0DO.OO 35.000.0 36.0DO.DO 62.000.00 62.000.DO 78.000.00 78.000.00 92.000.00 92.000.00 105.DDO.O 105.0DO.DD
392.0DO.OD 17.50D.OO 62.000.00 234.000.00 27.600.00 5.25D. OD 738.350.00 73.835.00 812.185.00 812.180.00
416.000.00 18.00D.OD 62.00D.OO 234.000.00 27.600.00 5. 250. DO 762.850.00 76.285.00 839.135.00 839.130.00
9.000.000.0 35.000.0 62.000.0 78.000.0 92.000.0 105.000.0
360.000.00 17.5DO.DO 62.000.00 234.000.00 27.600.00 5.250.00 706.350.00 70.635.00 776.985.00 776.980.00
376.000.DO 18.000.00 62.000.00 234.000.0D 27. 60D. OD 5.250.00 722.850.00 72.285.00 795.135.00 795.130.00
kg kg oh oh oh oh
A114 1M3 KUSEN KAYU KAMPER SAMARINDA Kayu Balok kamper samerinda paku 10 em
lem pulih FOX pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
kg kg oh oh oh oh
1 M3 KUSEN KAYU JATI JABAR KLAS 2
A115
Kayu balok jati jabar kls 2
PAKU 10 CM Lem putih FOX pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
kg kg oh oh oh oh
1M2 DAUM PINTU PANIL KAYU SAMARINDA
A116
Papan kayu kamper samarinda
Lem putih (FOX) pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntunaan Max. Jumlah Dibulatkan
A117
kg oh oh oh oh
1 M3 DAUN PINTU PANIL KAYU JATI JABAR KLS 2 Rangka + panil kayu jati jabar kls 2 Lem putih FOX pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntung~m Max. I
kg oh oh oh oh
9.400.000.00 36.DOO.OO 62.000.00 7B.DOO.OO 92.000.00 105.000.00
Jumlah Dibulatkan
544
JURNAL HARGA SATUAN BAHAN BANGUNAN, KoNSTRUKSI
& INTERIOR
Eotst 34
TAHUN
XXI 2015
JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE
2
1 A118
KOEF SAT.
URAIAN
NO.
JUMLAH HARGA SAT. HARGA SAT. JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 7=(3x5) 8=(3x6) 6 5
3
4
0.0250 1.0000 0.3000 0.0300 0.8000 2.4000 0.2400 0.0400
m3 lbr kg kg oh oh oh oh
7.000.000.0 70.000.0 35.000.0 20.000.0 62.000.0 78.000.0 92.000.0 105.000.0
7.500.000.00 74.000.00 36.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
175.000.00 70.000.00 10.500.00 600.00 49.600.00 187.200.00 22.080.00 4.200.00 519.180.00 51.918.00 571.098.00 571.090.00
187.500.00 74.000.00 10.800.00 660.00 49.600.00 187.200.00 22.080.00 4.200.00 536.040.00 53.604.00 589.644.00 589.640.00
0.0256 1.0000 0.5000 0.0300 0.8000 2.4000 0.2400 0.0400
m3 lbr kg kg oh oh oh oh
7.000.000.0 70.000.0 35.000.0 20.000.0 62.000.0 78.000.0C 92.000.00 105.000.00
7.500.000.00 74.000.00 36.000.00 22.000.00 62.000.00 78.000.00 92.000.00 105.000.00
179.200.00 70.000.00 17.500.00 600.00 49.600.00 187.200.00 22.080.00 4.200.00 530.380.00 53.038.00 583.418.00 583.410.00
192.000.00 74.000.00 18.000.00 660.00 49.600.00 187.200.00 22.080.00 4.200.00 547.740.00 54.774.00 602.514.00 602.510.00
0.0250 1.0000 1.8000 0.0300 0.8000 0.8500 2.5500 0.2550 0.0430
m3 lbr m2 kg kg oh oh oh oh
7.000.000.0 38.000.0 25.000.0 20.000.0 35.000.0 62.000.00 78.000.00 92.000.00 105.000.0
7.500.000.00 40.000.00 27.000.00 22.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
175.000.00 38.000.00 45.000.00 600.00 28.000.00 52.700.00 198.900.00 23.460.00 4.515.00 566.175.00 56.617.50 622.792.50 622.790.00
187.500.00 40.000.00 48.600.00 660.00 28.800.00 52.700.00 198.900.00 23.460.00 4.515.00 585.135.00 58.513.50 643.648.50 643.640.00
0.0250 1.0000 0.5000 0.0300 0.8000 0.8500 2.5500 0.2550 0.0430
m3 lbr lbr kg kg oh oh oh oh
7.000.000.0 38.000.0 93.000.00 20.000.0 35.000.0 62.000.00 78.000.00 92.000.00 105.000.0
7.500.000.00 40.000.00 95.000.00 22.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
175.000.00 38.000.00 46.500.00 600.00 28.000.00 52.700.00 198.900.00 23.460.00 4.515.00 567.675.00 56.767.50 624.442.50 624.440.00
187.500.00 40.000.00 47.500.00 660.00 28.800.00 52.700.00 198.900.00 23.460.00 4.515.00 584.035.00 58.403.50 642.834.50 642.430.00
1M2DAUN PINTU DDUBLETEAKWOODRANGKAKAYU BANJAR Rangka papan kayu banjar Teakwood 4mm uk. pintu (90x220 em) Lem putih FOX
Paku triplek (1-2,5 em) pekerja
tukang kayu kepala tukang kayu mandor
Jumlah Keuntungan Max.
Jumlah Dibulatkan
A119
AIIN PINT PANIL T 1 Rangka papan kayu banjar Teakwood 4mm uk. pintu (90x220 em)
Lem putih FOX Paku triplek (1·2,5 em) pekerja tukang kayu kepala tukang kayu
mandor
Jumlah Keuntungan Max. Jumlah Dibulatkan
A120
1 M2 DAUN PINTUTRIPLEK UK PINTU LAPISALUMUNIUM IKMINC Rangka papan kayu kamper banjar
Triplek 4mm ( ukuran pintu) Alumunium shett 0,3 mm Paku triplek Lem putih FOX pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibulatkan
A121
1M2 DAUM PINTUTRIPLEK UK. PINTU LAPIS FORMIKA (KM/ WCI KAYU KAMPER BANJAR Rangka papan kayu kamper banjar Triplek 4mm (ukuran plntu) Formika
Paku Triplek (1·2.5 em) Lem putih (FOX) pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntunaan Max. Jumlah Dibulatkan
EoiSI
34
TAHUN XXI
2015
JURNAL HARGA SATUAN BAHAN BANGUNAN, KONSTRUKSJ
& INTERIOR
545
I JOURNAL OF BUILDING CONSTRUCTION, INTERIOR & MATERIAL PRICE NO.
URAIAN
1
2
A122
1 M2DAUN PINTUTRIPLEK LAPIS SENG PLAT (KMIWC) Rangka papan kayu kamper banjar Triplek 4mm (ukuran pintu)
Seng pial BJLS30 Paku triplek
Lem pulih FOX pekerja tukang kayu kepala tukang kayu mandor
KOEF SAT. 3
4
HARGA SAT. HARGA SAT. JUMLAH JUMLAH (MINIMUM) (MAXIMUM) (MINIMUM) (MAXIMUM) 5 6 7={3x5) 8=(3x6)
M2 kg kg oh oh oh oh
7.000.000.00 38.000.00 28.000.00 20.000.00 35.000.00 62.000.00 78.000.00 92.000.00 105.000.00
7.500.000.00 40.000.00 30.000.00 22.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
175.000.00 38.000.00 50.400.00 600.00 28.000.00 52.700.00 198.800.00 23.460.00 4.515.00 571.575.00 57.157.50 628.732.50 628.730.00
187.500.00 40.000.00 54.000.00 660.00 28.800.00 52.700.00 198.900.00 23.460.00 4.515.00 590.535.00 59.053.50 649.588.50 649.580.00
0.0240 0.3000 0.8000 2.4000 0.2400 0.0400
m3 kg oh oh oh oh
9.800.000.00 35.000.00 62.000.00 78.000.00 92.000.00 105.000.00
10.400.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
235.200.00 10.500.00 49.600.00 187.200.00 22.080.00 4.200.00 508.780.00 50.878.00 559.658.00 559.650.00
249.600.00 10.800.00 49.600.00 187.200.00 22.080.00 4.200.00 523.480.00 52.348.00 575.828.00 575.820.00
0.0240 0.3000 0.8000 2.4000 0.2400 0.0400
m3 kg oh oh oh oh
9.800.000.00 35.000.00 62.000.00 78.000.00 92.000.00 105.000.00
10.400.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
235.200.00 10.500.00 49.600.00 187.200.00 22.080.00 4.200.00 508.780.00 50.878.00 559.658.00 559.650.00
249.600.00 10.800.00 49.600.00 187.200.00 22.080.00 4.200.00 523.480.00 52.348.00 575.828.00 575.820.00
0.0640 0.5000 1.0000 3.0000 0.3000 0.0500
m3 kg oh oh oh oh
9.800.000.00 35.000.00 62.000.00 78.000.00 92.000.00 105.000.00
10.400.000.00 36.000.00 62.000.00 78.000.00 92.000.00 105.000.00
627.200.00 17.500.00 62.000.00 234.000.00 27.600.00 5.250.00 973.550.00 97.355.00 1.070.905.00 1.070.900.00
665.600.00 18.000.00 62.000.00 234.000.00 27.600.00 5.250.00 1.012.450.00 101.245.00 1.113.695.00 1.113.690.00
1.2000 15.0000 5.6000 6.7000 20.1000 2.0100 0.3350
m3 kg kg oh oh oh oh
5. 900.000.00 9.976.25 15.000.00 62.000.00 78.000.00 92.000.00 105.000.00
6.800.000.00 45.000.00 17.000.00 62.000.00 78.000.00 92.000.00 105.000.00
7.080.000.00 149.643.71 84.000.00 415.400.00 1.567.800.00 184.920.00 35.175.00 9.516.938.71 951.693.87 10.468.632.58 10.468.630.00
8.160.000.00 675.000.00 95.200.00 415.400.00 1.567.800.00 184.920.00 35.175.00 11.133.495.00 1.113.349.50 12.246.844.50 12.246.840.00
0.0250 1.0000 1.8000 0.0300 0.8000 0.8500 2.5500 0.2550 0.0430
m3 lbr
Jumlah Keuntungan Max. Jumlah Dibulatkan
A123
1M2 DAUN JENDELA KACA (TANPA KACA) KAYU KAMPER SAMAR!NDA Rangka Kayu kamper Samarinda Lem putih FOX pekerja tukang kayu kepala tukang kayu
mandor Jumlah Keuntungan Max. Jumlah Dibulatkan A124 1M2DAUNPINTU KACA(TANPAKACA)KAYUKAMPERSAMARINDA Rangka kayu kamper samarinda Lem putih FOX pekerja
tukang kayu kepala tukang kayu
mandor Jumlah Ke ntunoan Max.
Jumlah Dibulatkan
A125
1M2 DAUM PINTU/ JENDELAJALUSIKAYUKAMPER SAMARJNDA Rangka Kayu kamper Samarinda
Lem pulih (FOX) pekerja
tukang kayu kepala tukang kayu
mandor Jumlah Keuntungan Max. Jumlah Oibulatkan
A126
1M3 KUDA-KUDA OVERSTEKIKONSOL KAYU KAMPER BANJAR (EXSPOSE) Kayu Balok Kamper banjar Besi strip tbl 5 em Paku 8 -12 em pekerja tukang kayu kepala tukang kayu mandor Jumlah Keuntungan Max. Jumlah Dibu!atkan
546
JURNAL HARGA 8ATUAN BAHAN BANGUNAN, KONSTRUKSI
& INTERIOR
EDIS/34 TAHUN