Match Making Day 2016
Animatie www.tki-windopzee.nl/page/animatie
10 februari 2016
Matchmaking dag 2016
2
Update TKI, R&D tenders en matchmaking Ernst van Zuijlen 10 februari 2016
Wind is main stream / stroom Denemarken
Duitsland
Bron: @Sustainable2050 10 februari 2016
Matchmaking dag 2016
4
10 februari 2016
Matchmaking dag 2016
5
Wind op zee in beweging •
De omgeving: • • • •
Energieakkoord Urgenda COP 21; Parijs: maximaal 1.5 tot 2⁰ C Energierapport, RLI, en Energiedialoog: In 2050: energievoorziening 100% duurzaam; economie voor 80 - 95% CO2 vrij
•
Tenders Borssele
•
Lange termijn: High level meeting • • •
EU topambtenaren in Nederland; 3 Februari 2016 Wind op zee is het powerhouse voor Noordwest Europa In 2050: 300 GW op de Noordzee: 33 turbines van 10 MW per week
10 februari 2016
Matchmaking dag 2016
6
Programma van vanmiddag 13.15
Registratie
13.30
Ernst van Zuijlen: Overzicht activiteiten TKI Wind op Zee
14.15
Bob Meijer en Michiel Zaaijer: tenderregelingen 2016
15.00
André de Boer (RVO): Beoordeling van aanvragen
15.15
Pauze
15.30
Match making in 2 rondes
17.00
Borrel
18.00
Einde
10 februari 2016
Matchmaking dag 2016
7
Doelen van het TKI wind op zee • Omzet en werkgelegenheid
•• Kostprijsreductie Kostprijsreductie • Versnelling offshore wind 174
40% 100
10 februari 2016
Matchmaking dag 2016
8
Instrumenten naast de R&D tenders • Studies ter ondersteuning van de programmering • Topsector doorsnijdende thema’s • Strategische activiteiten
10 februari 2016
Matchmaking dag 2016
9
TKI Studies: programmering Rapporten: http://www.tki-windopzee.nl/page/documenten
Recent gepubliceerd • • • • • • • •
Noise mitigation - regelgeving Windturbine ontwikkeling - next generation Wave & Tidal – synergie met wind op zee Ancillary Services - verhoging van de waarde van windstroom Service Logistics – leren van Logistiek Floating Foundations – vooronderzoek naardrijvende windturbines Tax Incentives – invloed op de Levelised Cost of Energy Cost Reduction Pathways - liggen we op schema?
10 februari 2016
Matchmaking dag 2016
10
Kostenreductie opties in Nederland What is the goal of the study? 1. Potential 2. Options for cost reduction 3. Further actions
10 februari 2016
Matchmaking dag 2016
11
Cost reduction opties Cost Reduction (areas and examples)
Supply Chain Financing Policy 10 februari 2016
Economies of Scale & Learning by doing Increased competition and Vertical Integration Contract structures Risk / Cost of Capital Financing structures Insurance
Demonstration
Technology
R&D and Innovation Programme 5 R&D Program lines TRL from 2 to 8
Permitting; predevelopment Financial support system R&D and Innovation policy Matchmaking dag 2016
12
Belangrijkste kosten drivers
10 februari 2016
Matchmaking dag 2016
13
Potentieel voor 40% reductie Offshore wind cost could be reduced by more than 40% by 2020 • Assessment of cost reduction potential across Technology, Market & Supply Chain and Finance from 2010 to 2020 (at final investment decision). • It excludes aspects such as steel prices or changes in interest rates (noncontrollable). • This takes into account the main cost reduction items (>1% LCoE reduction per item). The cost reduction potential is possibly larger if smaller items are also included.
10 februari 2016
Matchmaking dag 2016
14
We zijn nog niet klaar
10 februari 2016
Matchmaking dag 2016
15
Vertaling in SER-plan van aanpak
10 februari 2016
Matchmaking dag 2016
16
TKI Studies: programmering Rapporten: http://www.tki-windopzee.nl/page/documenten
Verwacht • Vooronderzoek repowering, decommissioning & life time extension • Grootschalige Roll Out en “wat na 2020 / 2023” • Contractstructuren
• Lange termijn research agenda op basis van EAWE discussie (11 topics) • Publicatie: http://www.wind-energ-sci.net/1/1/2016/ 10 februari 2016
Matchmaking dag 2016
17
Instrumenten naast de R&D tenders • Studies ter ondersteuning van de programmering • Topsector doorsnijdende thema’s • Strategische activiteiten
10 februari 2016
Matchmaking dag 2016
18
Topsector doorsnijdende thema’s Human Capital Agenda * • Communicatie en initiëren samenwerkingen; uitvoering actieplan
• Prototyping • Haalbaarheidsstudie CoE: Centre of Expertise
OWA
Internationalisering (breder dan export bevordering) • R&D samenwerking • Communicatie en informatievoorziening (website) • Export en FDI bevordering (samen met HHWE, BCC, FME, RVO) http://english.rvo.nl/file/presentation-offshore-wind-energy-netherlands-2015pptx
10 februari 2016
Matchmaking dag 2016
19
Financial engineering (and funding) Green Giraffe Core competences in equity and debt arranging, contracting, financial modeling and process management.
Offshore Wind Farm Princess Amalia
Dutch Champions
Large-scale electrical infrastructure TenneT Responsible for offshore grid in Germany and the Netherlands Vattenfall
Dutch Champions
Van Oord
VBMS
Cable laying Van Oord / VBMS / Fugro Experience in intertidal waters
Fugro
Dutch Champions
Design of special vessels GustoMSC / Damen Designs used all over the world Fred. Olsen Windcarrier
Dutch Champions
Designing special handling tools Royal IHC Hammering of piles, noise mitigation equipment Royal IHC
Dutch Champions
Ship building, repair and conversion Damen shipyards Dedicated vessels
Damen
Dutch Champions
Lifting of heavy foundations and substations Heerema / Seaway Heavy Lifting
Seaway Heavy Lifting
Heerema
Dutch Champions
Offshore crew transfer systems Ampelmann / van Aalst / Ztechnologies Full motion compensated cargo transfer (100 metric tons)
Ampelmann Operations
Dutch Champions
Ztechnologies
Chevalier Floatels
Accommodation at sea C-bed / Acta Marina / Chevalier Floatels Ampelmann Operations
Acta Marine
Dutch Champions
C-bed Floating Hotels
Testing of floating structures Marin In the Marin laboratory floating structures designed all over the world are being tested
Marin
Dutch Champions
Education, Training and Research TU Delft / ECN / TNO / Deltares / Marin / IMARES Research and developing activities covering the entire supply chain. From fundamental research to engineering science Education (PhD’s to technicians) and training Photo: Jos Beurskens
Dutch Champions
Photo: Jos Beurskens
Topsector doorsnijdende thema’s (2) • MVI (maatschappelijk verantwoord innoveren) * •
Ondersteunende rol; Matchmaking en Communicatie
• Systeemintegratie • •
Aparte tender voor studies en haalbaarheidsstudies Onderdeel (grootschalige) energieopslag – ondersteunende rol
• MKB: • • • •
Supply chain tool * Accelerator: Buccanneer InnovatieLink * Innovatie makelaars *
10 februari 2016
Matchmaking dag 2016
31
Supply Chain Tool: http://sct.tki-windopzee.nl/sct
10 februari 2016
Matchmaking dag 2016
32
Topsector doorsnijdende thema’s (2) • MVI (maatschappelijk verantwoord innoveren) * •
Ondersteunende rol; Matchmaking en Communicatie
• Systeemintegratie • •
Aparte tender voor studies en haalbaarheidsstudies Onderdeel (grootschalige) energieopslag – ondersteunende rol
• MKB: • • •
Supply chain tool * InnovatieLink * Innovatiemakelaars *
10 februari 2016
Matchmaking dag 2016
33
Innovatiemakelaars TKI WoZ * • • • •
Wat?: 50% kostenbijdrage inhuur innovatiemakelaars door TKI wind op zee Voor wie?: MKB - actief/ wil zijn in Wind op Zee markt Door wie?: ‘Innovatiemakelaars’ - Experts en consultants Op welk gebied?: ZIJ GINGEN U VOOR: – – – –
Ontwikkelen Business Case, Financieel advies, Subsidie advies Business Model ontwikkeling en vraagarticulatie Innovatieproces begeleiding (o.a. IP) Opzetten samenwerkingsverbanden, consortia
• Voorwaarden: – – – –
MKB doet aanvraag bij het TKI WoZ op basis goedgekeurde offerte makelaar 50% kostendekking tot max. 10.000 € bijdrage per MKB Innovatiemakelaars zijn ‘externe ‘specialiste (eigen adviseur of adviseur van TKI website) ‘Eerst komt eerst maalt’ (beperkt budget)
• Open tot: 1 november 2016 • Informatie: Martin Weissmann of http://www.tki-windopzee.nl/page/innovatiemakelaar Noot: De innovatiemanagers van InnovatieLink zijn niet te verwarren met deze Innovatiemakelaars. De managers van IL doen kortlopend en generiek innovatiebegeleiding en ‘linking’ tot 10 uur per MKB. De makelaars hebben een intensievere rol
Instrumenten naast de R&D tenders • Studies ter ondersteuning van de programmering • Topsector doorsnijdende thema’s • Strategische activiteiten
10 februari 2016
Matchmaking dag 2016
35
Strategische Werkstromen • Monitoring * •
SPARTA
• Cross overs • • • • •
Ocean energy: nu ook met TUD * Offshore energy: TKI Gas Urban turbines: TKI Urban energy Maritime meets wind (TKI Maritiem) Airborne *
• Demonstratie programma Leeghwater •
Site Borssele
10 februari 2016
Matchmaking dag 2016
36
Airborne Wind Energy
Strategische Werkstromen • Monitoring * •
SPARTA
• Cross overs • • • • •
Ocean energy: nu ook met TUD * Offshore energy: TKI Gas Urban turbines: TKI Urban energy Maritime meets wind (TKI Maritiem) Airborne *
• Demonstratie programma Leeghwater •
Site Borssele
10 februari 2016
Matchmaking dag 2016
38
Innovatie kavel Borssele 5 * Borssele Beta substation Innovatie Kavel 5
Planning (voorlopig): 2016 Informatiebijeenkomst Expression of Interest Match Making 2017 Tender 2020 Operationeel
10 februari 2016
Matchmaking dag 2016
39
Winddagen
Programma van vanmiddag 13.15
Registratie
13.30
Ernst van Zuijlen: Overzicht activiteiten TKI Wind op Zee
14.15
Bob Meijer en Michiel Zaaijer: tenderregelingen 2016
15.00
André de Boer (RVO): Beoordeling van aanvragen
15.15
Pauze
15.30
Match making in 2 rondes
17.00
Borrel
18.00
Einde
10 februari 2016
Matchmaking dag 2016
41
Matchmaking Ernst van Zuijlen 10 februari 2016
Programma van vanmiddag Match making thema
Wie
Ondersteuningsconstructies
Erik-Jan de Ridder
Optimalisatie van de windcentrale Intern elektrisch netwerk en aansluiting op het hoogspanningsnet Transport, installatie en logistiek
Michiel Zaaijer
Beheer en onderhoud
Peter Eecen
Ocean Energy
Henk Polinder
Airborne
Pim Breukelman
?
?
10 februari 2016
Bob Meijer Jan-Joost Schouten
Matchmaking dag 2016
43
Presentatie Nederland aan DG’S Energie van EU: • 3 februari bij Shell in Amsterdam • Beelden van de toekomst Noordzee: 2015 - 2050 • Animatie van 6 bij 15 meter
10 februari 2016
Matchmaking dag 2016
44
10 februari 2016
Matchmaking dag 2016
45