EEP Biogas Project
Biogas Project in Selat Panjang, Kep. Meranti
Agenda 1. Profile of Kepulauan Meranti 2. Why We Chose Selat Panjang 3. Energy Potential in Selat Panjang 4. Profile of SaraRasa Biomass 5. Map of Pak Hery’s Starch Mill 6. Participating Starch Mill Profile 7. Biogas Project Area 8. Difficulties Faced in the First 2 Phases 9. Waste Water Source 10. Conclusion
Profile of Kepulauan Meranti -
Area :
-
3,707.84 km2 -
Area of Sago Palm: 35,000
3.707,84 km2 -
Hectare -
Number of Starch Mills:
-
Total Average Production per
Luas Perkebunan Sagu: 35.000
Hektar -
76 mills -
Luas Daerah:
Jumlah Kilang Sagu: 76 kilang sagu
-
Total Produksi rata-rata Per
Year:
Tahun :
65,642 Ton
65.642 Ton
Estimated conversion waste
-
Perkiraan konversi Limbah Cair
water to be Electricity:
menjadi listrik:
13,12 MW
13,12 MW
Why We Choose Selat Panjang -
Electricity supply in Selat Panjang
-
now is 6 MW* -
The actual electricity requirement is
sekarang adalah 6 MW* -
24 MW* -
Other sources of Energy (ideally
renewable) are required
* Source : PLN, Website
Suplai Listrik di Sleat Panjang Kebutuhan Listrik untuk masyarakat adalah 24 MW*
-
Dibutuhkan sumber energi yang lain
(idealnya yang bisa diperbaharui)
* Sumber: PLN, Website
Energy Potential in Selat Panjang -
Biogas from sago starch mills
-
Biogas dari Limbah cair kilang
provides an attractive opportunity
sagu memberikan kesempatan
for Renewable Energy generation
yang menarik untuk energi
in the area
pembangkit yang bisa diperbaharui
-
Extensive biogas generation could
-
Pembangkit Biogas yang besar
fulfill the electricity demand in
dapat memenuhi kebutuhan listrik
Selat Panjang area
di daerah selat panjang
Profile of SaraRasa Biomass -
Scope and Nature of Business:
-
Biomass (Pellet Production) -
Years in Operation:
(Produk Pelet) -
2 years -
Main Office:
-
Mill Location:
Lama Berdiri: 2 tahun
-
Singapore -
Jenis Usaha/Bisnis: Biomassa
Kantor Utama: Singapura
-
Lokasi Pabrik:
Pulau Rangsang, Selat Panjang,
Pulau Rangsang,
Kepulauan Meranti
Selat Panjang, Kep. Meranti
Number of Employees:
-
Jumlah Karyawan:
5 people (in Singapore)
5 orang (di Singapura),
50 people (in Selat Panjang)
50 orang (di Selat Panjang)
Map of Pak Hery’s Starch Mill
Drying Floor
Drying Floor
Process Area
Domitory Public house
Ferry
Product Warehouse
Project Area
Participating Starch Mill Profile -
Name of Company:
-
Kilang Sagu Maju Jaya
Kilang Sagu Maju Jaya -
Nature of Business:
-
-
Location:
-
Lokasi:
Tanjung Samak, 40 minutes
Tanjung Samak, 40 menit
from Selat Panjang by boat
perlajalanan dari Selat Panjang
Owner:
-
Total Production and Water Waste
Pemilik :
Pak Hery Lie
Pak Hery Lie -
Jenis Usaha/Industri: Produksi Tepung Sagu
Sago Starch Production -
Nama perusahaan :
-
Total Produksi dan Limbah Cair per
per day:
hari:
5 ton and 800 m3
5 ton dan 800 m3
Biogas Project Area
Difficulties Faced in the First 2 Phases -
Limited transport options in the area -
-
- Lambat dan transportasi umum
Slow and infrequent public
yang masih jarang
transport -
Terbatasnya pilihan transpostasi :
Remote area of the starch mill
- Daerah kilang sagu yang jauh
(40 min by speedboat)
(40 menit memakai speedboat)
Laboratory locations in major cities
-
Lokasi test laboratory di kota-kota besar
-
waste water transportation
- transportasi limbah cair
-
Limited laboratory facilities in
- terbatasnya fasilitas laboratorium
many neighbor in cities
di kota terdekat
Waste Water Source
Conclusion
-
Selat Panjang has low electrification
-
yang rendah
rates -
-
A big alternative energy source is
Selat Panjang memiliki suplai listrik
-
Alternatif energi lain yang besar
Biogas from waste water at sago
adalah Biogas dari limbah cair pada
starch mills in the area
kilang sagu
SaraRasa recognizes a big energy
-
SaraRasa maenyadari ada suatu
potential in waste water to
potensi energi yang besar pada
electricity conversion.
limbah cari untuk dikonversi menjadi daya listrik
THANK YOU!!