TUGAS AKHIR ANALISA PENGARUH PERUBAHAN TATA GUNA LAHAN DAS TERHADAP BANJIR DENGAN PROGRAM EPA-SWMM 5.0 (STUDI KASUS WILAYAH DAS BERINGIN SEMARANG )
Diajukan Sebagai Syarat Untuk Menyelesaikan Pendidikan Tingkat Sarjana Strata 1 (S-1) Pada Jurusan Teknik Sipil Fakultas Teknik Universitas Katolik Soegijapranata
Disusun Oleh: Bagus Wirastowo
Arif Diyanto
02.12.0035
02.12.0043
FAKULTAS TEKNIK UNIVERSITAS KATOLIK SOEGIJAPRANATA SEMARANG 2007
i
Perpustakaan Unika
DAFTAR ISI Halaman Halaman Judul…………………………………………………………..
i
Lembar Pengesahan……………………………………………………..
ii
Kata Pengantar…………………………………………………………..
iii
Daftar Isi………………………………………………………………...
v
Daftar Tabel……………………………………………………………..
vii
Daftar Gambar…………………………………………………………..
viii
Daftar Lampiran ………………………………………………………..
xi
Daftar Grafik……………………………………………………………
xii
BAB I PENDAHULUAN 1.1 Latar Belakang…………………………………………………
1
1.2 Maksud dan Tujuan……...……………………………………..
1
1.3 Manfaat………………..……………………………………….
2
1.4 Lokasi………………………...………………………………...
3
1.5 Batasan Penelitian…..………………………………………….
3
1.6 Sistematika Penyusunan….…………………………………….
4
BAB II TINJUAN PUSTAKA 2.1 Uraian Umum………………………………………………….
6
2.1.1 Siklus Hidrologi…..............……………………………...
7
2.2 Inflow………………………………..........................................
10
2.2.1 Limpasan ..............……………………………………….
10
2.2.2 Infiltrasi ..............……………………………………….
12
2.2.3 Penguapan ............……………………………………….
13
2.2.4 Gambar Aliran ............…………………………………...
14
2.2.5 Daerah Aliran Sungai.…...……………………………….
15
v
Perpustakaan Unika
BAB III METODOLOGI .......................……………………………….
19
3.1 Umum………………………….............……………………….
20
3.2 Perumusan Masalah………….………………………………...
22
BAB IVPERMODELAN DAS BERINGIN…………………………….
23
4.1 Permodelan DAS Beringin Kondisi Sebenarnya......………….
24
4.2 Analisis.....................................................................………….
47
BAB V KESIMPULAN dan SARAN....................................................
50
5.1 Kesimpulan................................................................................
50
5.2 Saran..........................................................................................
52
DAFTAR PUSTAKA
53
LAMPIRAN
54
vi
Perpustakaan Unika
DAFTAR TABEL
Tabel 4.1 Data Subcathment.......................................…………………..
27
Tabel 4.2 Tabel Analisis % Impervious dengan Debit.......................…..
48
Tabel 4.3 Tabel perbandingan % Impervious dengan Debit....................
49
Tabel 5.1 Tabel perbandingan % Impervious dengan Debit....................
48
vii
Perpustakaan Unika
DAFTAR GAMBAR
Gambar 2.1 Konsep siklus hidrologi.........................................................
7
Gambar 2.2 Siklus hidrologi.....................................................................
9
Gambar 2.3 DAS Beringin........................................................................
14
Gambar 2.4 Peta DAS Beringin.................................................................
18
Gambar 3.1 Diagram Alir……...................................................................
19
Gambar 4.1 Potongan melintang saluran node 76-86................................
35
Gambar 4.2 Conduit 77..............................................................................
35
Gambar 4.3 Conduit 57..............................................................................
36
Gambar 4.4 Conduit 58..............................................................................
36
Gambar 4.5 Conduit 63..............................................................................
37
Gambar 4.6 Potongan melintang saluran node 78-86................................
37
Gambar 4.7 Conduit 55..............................................................................
38
Gambar 4.8 Conduit 56..............................................................................
38
Gambar 4.9 Conduit 60..............................................................................
38
Gambar 4.10 Conduit 61............................................................................
39
Gambar 4.11 Conduit 62............................................................................
39
Gambar 4.12 Potongan melintang saluran node 77-86..............................
40
Gambar 4.13 Conduit 54............................................................................
40
Gambar 4.14 Conduit 56............................................................................
41
Gambar 4.15 Conduit 60............................................................................
41
Gambar 4.16 Conduit 61............................................................................
41
Gambar 4.17 Conduit 62............................................................................
42
Gambar 4.18 Potongan melintang saluran node 86-25..............................
42
Gambar 4.19 Conduit 71............................................................................
43
Gambar 4.20 Conduit 70............................................................................
43
Gambar 4.21 Conduit 31............................................................................
43
viii
Perpustakaan Unika
Gambar 4.22 Conduit 74............................................................................
44
Gambar 4.23 Conduit 79............................................................................
44
Gambar 4.24 Conduit 65............................................................................
44
Gambar 4.25 Conduit 64............................................................................
45
Gambar 4.26 Conduit 68............................................................................
45
Gambar 4.27 Potongan melintang saluran node 91-25.............................
46
Gambar 4.28 Conduit 78............................................................................
46
Gambar L1.1 Potongan melintang saluran node 76-86..............................
57
Gambar L1.2 Potongan melintang saluran node 78-86..............................
58
Gambar L1.3 Potongan melintang saluran node 77-86..............................
58
Gambar L1.4 Potongan melintang saluran node 86-25..............................
59
Gambar L1.5 Potongan melintang saluran node 91-25.............................
59
Gambar L2.1 Potongan melintang saluran node 76-86..............................
63
Gambar L2.2 Potongan melintang saluran node 78-86..............................
63
Gambar L2.3 Potongan melintang saluran node 77-86..............................
64
Gambar L2.4 Potongan melintang saluran node 86-25..............................
64
Gambar L2.5 Potongan melintang saluran node 91-25.............................
65
Gambar L3.1 Potongan melintang saluran node 76-86..............................
69
Gambar L3.2 Potongan melintang saluran node 78-86..............................
69
Gambar L3.3 Potongan melintang saluran node 77-86..............................
70
Gambar L3.4 Potongan melintang saluran node 86-25..............................
70
Gambar L3.5 Potongan melintang saluran node 91-25.............................
71
Gambar L4.1 Potongan melintang saluran node 76-86..............................
75
Gambar L4.2 Potongan melintang saluran node 78-86..............................
75
Gambar L4.3 Potongan melintang saluran node 77-86..............................
76
Gambar L4.4 Potongan melintang saluran node 86-25..............................
76
Gambar L4.5 Potongan melintang saluran node 91-25.............................
77
Gambar L5.1 Potongan melintang saluran node 76-86..............................
81
Gambar L5.2 Potongan melintang saluran node 78-86..............................
81
ix
Perpustakaan Unika
Gambar L5.3 Potongan melintang saluran node 77-86..............................
82
Gambar L5.4 Potongan melintang saluran node 86-25..............................
82
Gambar L5.5 Potongan melintang saluran node 91-25.............................
83
Gambar L6.1 Potongan melintang saluran node 76-86..............................
87
Gambar L6.2 Potongan melintang saluran node 78-86..............................
87
Gambar L6.3 Potongan melintang saluran node 77-86..............................
88
Gambar L6.4 Potongan melintang saluran node 86-25..............................
88
Gambar L6.5 Potongan melintang saluran node 91-25.............................
89
Gambar L7.1 Potongan melintang saluran node 76-86..............................
93
Gambar L7.2 Potongan melintang saluran node 78-86..............................
93
Gambar L7.3 Potongan melintang saluran node 77-86..............................
94
Gambar L7.4 Potongan melintang saluran node 86-25..............................
94
Gambar L7.5 Potongan melintang saluran node 91-25.............................
95
Gambar L8.1 Potongan melintang saluran node 76-86..............................
99
Gambar L8.2 Potongan melintang saluran node 78-86..............................
99
Gambar L8.3 Potongan melintang saluran node 77-86..............................
100
Gambar L8.4 Potongan melintang saluran node 86-25..............................
100
Gambar L8.5 Potongan melintang saluran node 91-25.............................
101
Gambar L9.1 Potongan melintang saluran node 76-86..............................
105
Gambar L9.2 Potongan melintang saluran node 78-86..............................
105
Gambar L9.3 Potongan melintang saluran node 77-86..............................
106
Gambar L9.4 Potongan melintang saluran node 86-25..............................
106
Gambar L9.5 Potongan melintang saluran node 91-25.............................
107
Gambar L10.1 Potongan melintang saluran node 76-86............................
111
Gambar L10.2 Potongan melintang saluran node 78-86............................
111
Gambar L10.3 Potongan melintang saluran node 77-86............................
112
Gambar L10.4 Potongan melintang saluran node 86-25............................
112
Gambar L10.5 Potongan melintang saluran node 91-25............................
113
x
Perpustakaan Unika
DAFTAR LAMPIRAN
Lampiran 1 impervious = 10 %...............................................................
54 - 59
Lampiran 2 impervious = 20 %...............................................................
60 – 65
Lampiran 3 impervious = 30 %...............................................................
66 - 71
Lampiran 4 impervious = 40 %...............................................................
72 – 77
Lampiran 5 impervious = 50 %...............................................................
78 – 83
Lampiran 6 impervious = 60 %...............................................................
84 – 89
Lampiran 7 impervious = 70 %...............................................................
90 – 95
Lampiran 8 impervious = 80 %...............................................................
96 – 101
Lampiran 9 impervious = 90 %...............................................................
102 – 107
Lampiran 10 impervious = 100 %...........................................................
108 - 113
xi
Perpustakaan Unika
DAFTAR GRAFIK
Grafik 4.1 Debit Outflow........................................................................
30
Grafik 4.2 Debit Outflow........................................................................
34
Grafik 4.3 Perandingan % impervious dengan debit...............................
49
Grafik 5.1 Perandingan % impervious dengan debit...............................
50
Grafik L1.1 Debit Outflow........................................................................
57
Grafik L2.1 Debit Outflow........................................................................
62
Grafik L3.1 Debit Outflow........................................................................
68
Grafik L4.1 Debit Outflow........................................................................
74
Grafik L5.1 Debit Outflow........................................................................
80
Grafik L6.1 Debit Outflow........................................................................
86
Grafik L7.1 Debit Outflow........................................................................
92
Grafik L8.1 Debit Outflow........................................................................
98
Grafik L9.1 Debit Outflow........................................................................
104
Grafik L10.1 Debit Outflow......................................................................
110
xii
BAB I PENDAHULUAN Perpustakaan Unika ==========================================================
BAB I PENDAHULUAN
1.1
Latar Belakang Pada musim penghujan intensitas curah hujan tinggi sehingga debit air
pada Das Beringin ini mengalami debit maksimum, oleh karena itu jumlah air yang dapat ditangkap catchment area relatif banyak. Pada tahun 1991 (Sumber Suara Merdeka 18 September 1991) terjadi banjir yang sangat besar yang menggenangi wilayah Kecamatan Mangkang dan Tugu, hal ini disebabkan jumlah air yang banyak di tangkap oleh catchment area di daerah – daerah yang di lalui oleh DAS tersebut sehingga menyebabkan banjir. Selain itu di indikasikan banjir disebabkan karena pada daerah hulu ( Kecamatan Mijen dan Ngaliyan ) terjadi perubahan tata guna lahan, yang seharusnya dapat berfungsi sebagai peresapan air menjadi daerah yang kurang dapat meresapkan air. Sedangkan pada musim kemarau dimana curah hujan yang relatif sangat kecil menyebabkan debit pada Das Beringin mengalami penurunan pada level minimum.
1.2
Maksud Dan Tujuan Maksud : a. Penelitian ini untuk mendapatkan suatu perbandingan tentang tata guna lahan yang berada di sekitar DAS Beringin yang akan berpengaruh pada debit air yang diterima oleh DAS Beringin.
1
BAB I PENDAHULUAN Perpustakaan Unika ==========================================================
Pada kenyataanya tata guna lahan di sekitar DAS Beringin mengalami penurunan fungsi yang dari tahun ke tahun pada daerah bawah ( Mangkang dan Tugu ) mengalami banjir. Tujuan : 1. Untuk mengetahui cara pengelolaan DAS Beringin 2. Untuk mengurangi terjadinya banjir khususnya daerah hilir ( Mangkang dan Tugu ) 3. Membandingkan perubahan tata guna lahan di waktu sekarang dengan waktu lampau yang akan berpengaruh pada debit air yang akan diterima oleh DAS Beringin. 4. Dengan bantuan EPA-SWMM 5.0. diharapkan akan didapatkan hasil yang maksimal, sehingga dapat dijadikan bahan acuan dalam pengelolaan DAS Beringin dan sebagai parameter pembanding terhadap DAS yang lain
1.3
Manfaat Dengan melakukan analisa hidrologi pada DAS Beringin dengan
menggunkan model EPA-SWMM 5.0, kami diharapkan mampu untuk: 1. Mempelajari dan memahami dasar-dasar hidrologi untuk permodelan banjir. 2. Mampu mengoperasikan model hidrologi yaitu EPA-SWMM 5.0. 3. Mampu menerapkan model hidrologi EPA-SWMM 5.0 dalam aplikasi yang sebenarnya.
2
BAB I PENDAHULUAN Perpustakaan Unika ==========================================================
1.4
Lokasi Sungai Beringin merupakan sungai yang mengalir dari wilayah Kecamatan
Mijen (hulu) sampai dengan Laut Jawa (hilir). Daerah Aliran Sungai (DAS) Beringin terbagi dari 24 sub-DAS yang melewati Kecamatan Mijen, Ngaliyan Mangkang, Tugu, Semarang Barat, sampai ke Semarang Utara. Pada bagian hulu DAS Beringin, kondisi daerah sekitarnya masih berupa lahan terbuka dan areal perkebunan. Sedangkan pada daerah hilirnya berupa pemukiman penduduk dan juga berupa bangunan infrastruktur.( dapat di lihat pada gambar 1.1 ). Seiring dengan pertumbuhan populasi penduduk Semarang yang terus meningkat, maka terjadi pula perubahan tata guna lahan. Bagian hulu dari Sungai Beringin adalah daerah yang terkena imbas dari perubahan tata guna lahan tersebut. Daerah yang dulunya berupa lahan terbuka dan areal perkebunan berubah menjadi pemukiman penduduk.
1.5
Batasan Penelitian
Penelitian ini adalah untuk mendapatkan suatu perbandingan tentang tata guna lahan yang berada di sekitar DAS Beringin yang akan berpengaruh pada debit air yang akan diterima oleh DAS Beringin, Karena luasnya permasalahan, keterbatasan kemampuan, dan keterbatasan biaya, maka penelitian ini kami batasi dengan pembatasan-pembatasan sebagai berikut:
3
BAB I PENDAHULUAN Perpustakaan Unika ==========================================================
1. Penelitian di lakukan pada daerah sekitar DAS Beringin yang terkena dampak dari sungai Beringin 2. Mengunakan Program EPA-SWMM 5.0 sebagai parameter pembanding debit banjir tidak secara manual. 3. Membandingkan perubahan tata guna lahan di waktu sekarang dengan waktu lampau yang akan berpengaruh pada debit air yang akan diterima oleh DAS Beringin. 4. Mengatasi banjir pada daerah bawah “ Mangkang dan Tugu ”, yang dari tahun ke tahun mengalami penurunan. 1.6
Sistematika Penyusunan Laporan Tugas Akhir ini terdiri dari 5 (lima) bab yang sistematika
penyusunannya adalah sebagai berikut: Bab I Pendahuluan berisi tentang latar belakang, tujuan penulisan, manfaat, batasan masalah, dan sistematika penyusunan. Bab II Tinjauan Pustaka menguraikan tentang tinjauan pustaka yang terdiri dari uraian umum, siklus hidrologi, inflow ( limpasan, infiltrasi, penguapan, gambar aliran, daerah aliran sungai ) Bab III
Metodologi yaitu cara pembuatan tugas akhir.
Bab IV Analisa dengan menggunakan Program EPA-SWMM 5.0 pada DAS Beringin.
4
BAB I PENDAHULUAN Perpustakaan Unika ==========================================================
Bab V
Kesimpulan dan Saran menguraikan kesimpulan yang didapat dari pembahasan dan saran-saran yang kiranya berguna dalam penentuan metode pencegahan kelongsoran pada tanah lempung ekspansif di Indonesia.
9/25/2007
Gambar 1.1 Lokasi DAS Beringin ( Sumber : BAPPEDA kota Semarang, 2005 )
5
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
BAB II STUDI PUSTAKA
2.1
Uraian umum Menurut Sri Harto (1993) Hidrologi merupakan ilmu yang mempelajari
seluk-beluk air, kejadian dan distribusinya, sifat alami dan sifat kimianya, serta reaksinya terhadap kebutuhan manusia. Secara umum dapat dikatakan bahwa hidrologi adalah ilmu yang menyangkut masalah kuantitas dan kualitas air di bumi, dapat dikategorikan menjadi 2 yaitu, hidrologi pemeliharaan (menyangkut data-data operasional dan peralatan teknisnya) dan hidrologi terapan (menyangkut analisis hidrologi). Secara umum analisis hidrologi merupakan satu bagian analisis awal dalam perancangan bangunan-bangunan hidraulik, baik dalam perancangan, pelaksanaan dan pengoperasiannya. Pengertian yang terkandung di dalamnya adalah bahwa informasi dan besaran - besaran yang terkandung dalam analisis hidrologi merupakan masukan penting bagi analisis selanjutnya. Di dalam hidrologi, salah satu aspek analisis yang diharapkan dihasilkan untuk menunjang perancangan bangunan-bangunan hidraulik adalah penetapan besaran-besaran rancangan, baik hujan, banjir maupun unsur-unsur hidrologi lainnya, oleh karena itu pemahaman mengenai unsur-unsur yang terkandung dalam analisis hidrologi harus benar-benar dipahami.
6
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
2.1.1. Siklus Hidrologi Memperhatikan pengertian tentang hidrologi yang telah disebutkan diatas, maka ilmu hidrologi mencakup semua air di alam. Pemahaman dan penerapan ilmu hidrologi menyangkut pemahaman mengenai proses transformasi atau pengalihragaman dari satu set masukan menjadi satu set keluaran melalui satu proses dalam siklus hidrologi. Konsep yang disebutkan diatas menjadi sederhana jika dilihat dati skema berikut ini :
masukkan
keluaran Sistem DAS
Gambar 2.1 : konsep siklus hidrologi ( Sumber : Analisis Hidrologi edisi kedua, 1993 )
Matahari merupakan sumber tenaga bagi alam. Dengan adanya tenaga tersebut, maka seluruh permukaan bumi akan mengalami penguapan, baik dari muka tanah, permukaan pepohonan (transpiration) dan permukaan air (evaporation). Sebagai akibat dari penguapan, maka terbentuk awan yang apabila keadaan klimatologi memungkinkan, awan dapat terbawa ke darat dan dapat terbentuk menjadi awan pembawa hujan (rain could). Hujan baru akan terjadi bila berat butir-butir air hujan tersebut telah lebih besar dari gaya tekan udara ke atas. Dalam keadaan klimatologis tertentu, maka air hujan yang terus melayang tersebut dapat teruapkan kembali menjadi awan. Air hujan yang sampai ke
7
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
permukaan tanah disebut hujan, dan dapat diukur. Hujan yang terjadi tersebut sebagian juga akan tertahan oleh mahkota dan dedaunan pada pepohonan dan bangunan-banguna yang selanjutnya ada yang diuapkan kembali. Bagian air ini tidak dapat diukur dan merupakan bagian air yang hilang (interception). Air yang jatuh ke permukaan tanah terpisah menjadi dua bagian, yaitu bagian yang mengalir di permukaan yang selanjutnya menjadi aliran limpasan (overland flow), yang selanjutnya dapat menjadi limpasan (run-off), yang seterusnya merupakan aliran sungai menuju ke laut. Aliran limpasan sebelum mencapai saluran dan sungai, mengalir dan tertahan di permukaan tanah dalam cekungan-cekungan, dan sampai jumlah tertentu merupakan bagian air yang hilang karena proses infiltrasi, yang disebut
sebagai tampungan-cekungan
(depression storage). Bagian lainnya masuk ke dalam tanah melalui proses infiltrasi. Tergantung dari struktur geologinya, dapat terjadi aliran mendatar yang disebut aliran antara (interflow). Bagian air ini juga mencapai sungai dan atau ke laut. Bagian lain dari air yang terinfiltrasi dapat diteruskan sebagai air perkolasi yang mencapai akuifer. Air ini selanjutnya juga mengalir sebagai aliran air tanah menuju ke sungai atau laut. Siklus Air di Bumi Air menguap ke udara dari permukaan tanah, tanaman dan laut, berubah menjadi awan setelah mengalami beberapa proses dan kemudian jatuh sebagai hujan / salju ke permukaan laut atau daratan, sebelum tiba di Bumi sebagian langsung menguap ke udara dan sebagian tiba di permukaan Bumi. Tidak semua bagian
8
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
hujan yang jatuh ke bumi mencapai permukaan tanah, sebagian akan tertahan oleh tumbuh – tumbuhan dimana sebagian akan menguap dan sebagian lagi akan jatuh / mengalir melalui dahan – dahan ke permukaan tanah. Daur hidrologi dapat disajikan secara skematik seperti gambar 2.2 berikut ini.
2
3 1
4 7
1
1
5 6
7
8
Gambar 2.2 : siklus hidrologi ( Sumber : Tugas Akhir Denny Eka dan Yoseph A, 2007 )
Keterangan : 1. Evaporasi ( Penguapan )
6. Perkulasi
2. Awan dan uap air di udara
7. Infiltrasi
3. Hujan
8. Aliran air tanah
4. Infiltrasi ( Penyerapan ) 5. Limpasan permukaan
9
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
2.2
Inflow
2.2.1. Limpasan ( RUN OFF ) Dengan memperhatikan kembali siklus hidrologi dapat diketahui bahwa air yang jatuh dipermukaan tanah sebagiam mengalir dipermukaan tanah dan menjadi aliran limpasan yang selanjutnya menjadi limpasan yang nantinya akan mengalir ke laut setelah melewati beberapa proses dengan yang keadaan berbeda setiap musim, yang disebut sebagai daur limpasan. Hoyt (meinzer, 1942) mengemukakan daur limpasan (run off cycle), yang dapat dijelaskan dengan menyederhanakannya menjadi empat tahap : a. Tahap I (pada akhir musim kering) Pada akhir musim kering dapat diamati bahwa sama sekali tidak ada masukkan air hujan (kemungkinan adanya masukan hanya lewat bawah permukaan tanah diabaikan), sehingga yang terjadi hanya keluaran berupa penguapan yang intensif dari permukaan dan terjadi dalam waktu yang reletif lamam. Kekurangan kelembaban di lapisan tanah di lapisan atas akan diganti oleh kelembaban (moisture) yang berada di lapisan bawahnya sehingga lapisan-lapisan tanah menjadi jauh lebih kering. Aliran yang terjadipada sungai-sungai hanya bersumber dari aliran air tanah pada akuifer saja. Sampai dengan tahap ini tidak pernah ada masukan (hujan), sehingga kandungan air dalam akuifer pun menjadi semakin turun karena aliran yang terus menerus ke sungai.
10
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
b. Tahap II (awal musim hujan) Akibat adanya hujan dengan jumlah air yang relatif sedikit maka permukaan menjadi basah. Sebagian besar air hujan tertahan akibat intersepsi. Apabila terjadi aliran maka akan tertampung salam tampungan permukaan misalnya sebagai tampungan-cekungan. Jumlah air ini habis menguap atau terinfiltrasi, sehingga tidak memberikan sumbangan pada limpasan permukaan.bagian air yang terinfiltrasi, jumlahnya dipandang belum mencukupi karena masih digunakan oleh massa tanah untuk mengembalikan kandungan airnya sampai maksimum, selama hal ini belum tercapai maka belum terjadi perkolasi, yang berarti belum ada tambahan air dalam akuifer, sehingga muka air dalam akuifer juga belum berubah. c. Tahap III (pada pertengahan musim hujan) Pada tahap ini hujan sudah cukup banyak sehingga terjadi beberapa perubahan pada proses hidrologi. Kapasitas intersepsi telah terlampaui. Demikian pula aliran limpasan sudah cukup besar, sehingga kapasitas tampungan pada cekungan telah terlampaui, dan terjadi limpasan permukaan. Selanjutnya dapat terjadi perubahan yang relatif cepat pada muka air sungai. Bagian air yang terinfiltrasi, jumlahnya telah cukup, dan terjadi perkolasi. Akibatnya jumlah kandungan air dalam akuifer bertambah, dengan ditandai berubahnya tinggi muka air dalam akuifer, keadaan ini berlangsung sampai akhir musim hujan
11
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
d. Tahap IV (pada awal musim kering) Pada tahap ini hujan telah berhenti sama sekali, dan sekali lagi prosesnya akan terjadi mirip pada tahap I. Hanya saja pada tahap ini keadaan DAS masih relatif basah, jika keadaan ini berlangsung terus menerus dengan tanpa mendapatkan masukkan maka keadaan akan kembali pada tahap I.
2.2.2. Infiltrasi Infiltrasi dimaksudkan sebagai proses masuknya air ke permukaan tanah. Proses ini merupakan salah satu bagian penting dalam proses hidrologi maupun dalam proses pengalihragaman hujan menjadi aliran sungai. Dalam kaitan ini terdapat dua pengertian tentang kuantitas infiltrasi, yaitu kapasitas infiltrasi adalah laju infiltrasi maksimum untuk suatu jenis tanah tertentu, dan laju infiltrasi nyata suatu jenis tanah tertentu Beberapa faktor yang mempengaruhi infiltrasi yaitu : 1. jenis tanah, 2. kepadatan tanah, 3. kelembapan tanah, 4. tutup tumbuhan, 5. dalamnya genangan di permukaan tanah, 6. pemampatan oleh curah hujan, 7. udara yang terdapat dalam tanah.
12
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
Berbeda dengan perkolasi yaitu proses aliran air di dalam tanah secara vertikal akibat gaya berat. Memang keduanya saling berpengaruh akan tetapi secara teoritik hendaknya pengertian keduanya dibedakan.
2.2.3. Penguapan ( evaporation ) Penguapan merupakan unsur hidrologi yang cukup penting dalam keseluruhan. Penguapan adalah proses perubahan dari molekul air dalam bentuk zat cair ke dalam bentuk gas. Sudah barang tentu pada saat yang sama akan terjadi pula perubahan molekul air dari gas ke zat cair, dalam hal ini di sebut pengembunan (condensation). Penguapan hanya terjadi bila terjadi perbedaan tekanan uap udara di atasnya. Dapat dimengerti bila kelambapan udara mencapai 100%, maka penguapan akan terhenti. Beberapa faktor yang mempengaruhi laju penguapan antara lain : 1. Temperatur. Untuk penguapan diperlukan sumber panas, panas tersebut bersumber dari radiasi matahari, panas yang tersedia, di atmosfer, maupun dari dalam tanah,atau massa air itu sendiri. 2. Angin. Angin berfungsi memindahkan udara yang jenuh air dan menggantikannya dengan lapisan udara lain, sehingga penguapan dapat berjalan terus. 3. Kualitas air. Salinitas air menyebabkan menurunnya laju penguapan, sebanding dengan kadar salinitas tersebut. Sebagai contoh, air laut mampunyai kandungan
13
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
garam 2-3% mempunya laju penguapan yang juga 2-3% lebih rendah dari air tawar. Penguapan yang terjadi pada tanaman disebut transpirasi sedangkan penguapan yang terjadi dari permukaan lahan yang tertutup dengan tutup tumbuhan disebut evapotranspirasi. Apabila kandungan air dalam tanah tidak terbatas, maka digunakan istilah evapotranspirasi potensial.
2.2.4.Gambar Aliran Pada tahapan ini, kita harus menggambarkan bentuk aliran air, baik saluran, tampungan, maupun pompa jika diperlukan. Untuk membantu memudahkan menempatkan letak saluran, pompa, maupun pond, biasanya terlebih dahulu gambar DAS dibuat. Gambar DAS bisa di-export melalui program Auto-Cad.
Gambar 2.3 DAS Beringin ( Sumber : Dinas PSDA, 2006 )
14
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
2.2.5.Daerah Aliran Sungai ( DAS ) Daerah Aliran Sungai (DAS) atau catchment area atau Daerah Pengaliran Sungai (DPS) merupakan daerah dimana semua airnya mengalir ke dalam suatu sungai yang dimaksudkan. Daerah ini umumnya dibatasi oleh topografi, yang berarti ditetapkan berdasar aliran air permukaan. luas daerah pengaliran, topografi, tumbuh-tumbuhan dan geologi, sangat berpengaruh terhadap debit air. Nama sebuah DAS ditandai dengan nama sungai yang bersangkutan dan dibatasai oleh titik kontrol, yang pada umumnya merupakan stasiun hidrometri. Memperhatikan hal tersebut berarti sebuah DAS merupakan bagian dari DAS lain yang membentuk satu kesatuan sestem DAS. Lazimnya, apabila terdapat titik kontrol yang dianggap penting, maka DAS ditandai dengan nama pada titik kontrol tersebut, sedangkan titik kontrol yang lain yang terletak disebelah hulunya disebut sebagai sub-DAS. Memperhatikan kembali daur hidrologi yang telah dijelaskan di atas, maka dapat diketahui bahwa air yang berada di bumi ini, langsung maupun tidak langsung berasal dari air hujan (precipitation). Hujan merupakan komponen masukan yang paling penting dalam proses hidrologi, karena jumlah kedalaman hujan (rainfall depth) ini yang dialih ragamkan menjadi aliran sungai, baik melalui limpasan permukaan, aliran antara, maupun sebagai aliran air tanah. Untuk mendapatkan perkiraan besarnya banjir yang terjadi di suatu penampang sungai tertentu, maka kedalaman hujan yang terjadi pun harus dapat diketahui pula. Dalam hal ini perlui diketahui bahwa yang diperlukan adalah besaran kedalaman hujan yang terjadi di seluruh DAS. Jadi, tidak hanya besaran
15
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
hujan yang terjadi di satu stasiun pengukuran hujan. Dalam hal ini yang diperlukan adalah data kedalaman hujan dari banyak stasiun hujan yang tersebar di seluruh DAS. Oleh karena itu diperlukan sejumlah stasiun hujan yang dipasang sedemikian rupa sehingga dapat mewakili besaran hujan di DAS tersebut. Dalam kaitan ini terdapat dua faktor penting yang sangat menentukan ketelitian pengukuran hujan, yaitu jumlah dan pola penyebaran stasiun hujan. Seperti yang telah di jelaskan di atas. Untuk melakukan pengukuran hujan diperlukan alat pengukur hujan (raingauge). Dalam pemakaian terdapat dua jenis alat ukur hujan yaitu : 1. Penakar hujan biasa (manual raingauge), Merupakan alat ukur yang paling sering digunakan, yang terdiri dari corong dan bejana, sedangkan jumlah air hujan diukur dengan bilah ukur (graduated stick). 2. Penakar hujan otomatis (automatic raingauge). Pengukuran yang dilakukan dengan cara-cara di atas adalah untuk memperoleh data hujan yang terjadi pada satu tempat saja. Akan tetapi dalam analisis umumnya yang diinginkan adalah data hujan rata-rata DAS. Untuk menghitung besaran ini dapat ditempuh dengan beberapa cara yang sampai saat ini sangat lazim digunakan, yaitu: 1. Rata-rata aljabar Cara hitungan dengan aljabar ini adalah cara yang paling sederhana, akan tetapi memberikan hasil yang kurang teliti karena setiap stasiun dianggap mempunyai bobot yang sama.
16
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
2. Polygon Thiessen Cara ini memberikan bobot tertentu pada setiap stasiun hujan dengan pengertian bahwa setiap stasiun hujan dianggap mewakili hujan dalam suatu daerah dengan luas tertentu, dan luas tersebut merupakan faktor koreksi bagi hujan di stasiun yang bersangkutan. 3. Isohyet Cara lain yang diharapkan lebih baik (dengan mencoba memasukkan pengaruh topografi). Isohyet ini adalah garis yang menghubungkan tempat-tempat yang mempunyai kedalaman hujan yang sama pada saat yang bersamaan.
17
BAB II STUDI PUSTAKA Perpustakaan Unika ==========================================================
7/2/2007
Gambar 2.4 Peta DAS Beringin ( Sumber : Litbang Kompas, Robert J Kodotie, dan BPS)
18
BAB III METODOLOGI ========================================================== Perpustakaan Unika
BAB III METODOLOGI Mulai
Pengumpulan data: curah hujan dan peta topografi
A, i, Elevation, n
Masukan Gambar DAS dari Autocad ke EPA SWMM
Masukan Parameter – Parameter (curah hujan, i, n , A dan h)
Desain Saluran
Run Program
YA
Eror
Tidak Out Put berupa : Hidrograph , Run Off , Perkiraan kemampuan saluran terahadap suatu debit, Flooding
YA
Flooding
Tidak Selesai
Gambar 3.1 Diagram Alir
19
BAB III METODOLOGI ========================================================== Perpustakaan Unika
keterangan : i
: Infiltrasi ( mm/jam )
h
: Elevasi ( Meter )
n
: Koef Manning “ kekasaran saluran “
A : Luasan Area ( M ² )
EPA SWMM “ Enviromental Protection Agency Strom Water Management Model “ adalah suatu model simulasi yang dipergunakan untuk memperkirakan banyaknya run off baik pada suatu DAS (Daerah Aliran Sungai). EPA SWMM pertama kali dikembangkan pada tahun 1971 dan telah dipergunakan secara meluas di seluruh dunia untuk perencanaan, analisa, dan desain drainase, saluran pembuangan, dan sebagainya.
3.1
Umum Metodologi meupakan suatu cara atau langkah yang di gunakan untuk
memecahkan suatu permasalahan dengan mengumpulkan, mencatat, mempelajari, dan menganalisa data yang diperoleh. Untuk penelitian kasus diperlukan adanya metodologi yang berfungsi sebagai panduan kegiatan yang dilaksanakan dalam pengumpulan data di lapangan, baik data primer ( data yang diperoleh dari penelitian di lapangan ) maupun data sekunder ( studi pustaka ). Pada pemodelan dengan menggunakan EPA SWMM ada parameter yang di gunakan dalam pengolahan data, dari parameter itu kami memiliki tujuan untuk
20
BAB III METODOLOGI ========================================================== Perpustakaan Unika
membandingkan parameter – parameter apa yang dapat berpengaruh terhadap perubahan tata guna lahan disekitar DAS Beringin, adapun parameter itu adalah: Parameter tetap : •
Cura Hujan
•
Area
•
Elevasi
•
Infiltrasi
•
Width
•
% Slope
•
N – Imperv
•
N – Perv
•
Dstore – Imperv
•
Dstore – Perv
•
% Zero Imperv
Parameter bebas : •
% Imperv
•
Lebar dan tinggi saluran
•
Bentuk saluran
Setelah memaaasukan parameter – parameter di atas maka akan mendapatkan suatu out put berupa •
Report setatus
•
Flooding
•
Grafik debit 21
BAB III METODOLOGI ========================================================== Perpustakaan Unika
•
Potongan mellllintang saluran
•
Bentuk saluran
Adapun parameter tetap adalah parameter yang tidak diubah, dan perameter bebas adalah parameter yang diubah – uabah dengan tujuan untuk mendapatkan suatu perbandingan tentang tataguna lahan.
3.2
Perumusan Masalah Permasalahan yang akan diteliti dalam Tugas Akhir ini adalah tentang
Perubahan Tata Guna Lahan Das Beringin Terhadap Banjir. Tindakan – tindakan yang akan direncanakan untuk mengatasi dan meminimalisir terjadinya banjir. Untuk mengetahui permasalahan yang timbul, maka diperlukan studi penelitian yang dititik beratkan pada pengidentifikasian masalah secara lebih khusus. Dengan kata lain, penelitian dilakukan untuk mengetahui pada daerah mana yang terjadi kekurangan air atau kelebihan air.
22
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
BAB IV PEMODELAN DAS BERINGIN
4.1
Pemodelan DAS Beringin Kondisi Sebenarnya Pemodelan DAS Beringin untuk tahap pertama menggunakan EPA SWMM
Berikut data-data pada kondisi awal DAS Beringin : 1.
Menggunakan hujan dengan periode ulang 25 tahunan.
2.
Manning dari area impervious sebesar 0,012 (concrete)
3.
Manning dari area Dstore impervious sebesar 0,05 (area pemukiman)
4.
Infiltrasi Model Horton.
5.
Saluran menggunakan beton.
6.
Routing Method menggunakan kinematic wave
7.
Flow units CMS
23
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Keadaan Sebenarnya Parameter – Parameter yang dicantumkan pada Subcatchment adalah sebagai berikut :
24
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
25
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
26
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Tabel 4.1 : data subcatchment
27
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Setelah seluruh data dan parameter dari DAS Beringin untuk kondisi sebenarnya dimasukkan, maka akan didapat output seperti dibawah ini.
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) --------------------------------------------------------------**************** Analysis Options **************** Flow Units ............... CMS Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ OCT-13-2005 00:00:00 Ending Date .............. OCT-14-2005 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:15:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 20.813 631.573 1.749 -1.552
Depth mm ------208.662 0.000 6.742 204.591 0.567
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding ......... Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
Volume hectare-m --------0.000 631.574 0.000 0.000 0.000 19.594 598.554 0.000 0.000 0.176 2.098
Volume Mliters --------0.000 6315.804 0.000 0.000 0.000 195.942 5985.600 0.000 0.000 1.762
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 7.998 201.128 131.04 0.964 2 208.662 0.000 0.000 8.282 202.497 65.52 0.970 3 208.662 0.000 0.000 5.979 205.985 39.23 0.987 4 208.662 0.000 0.000 4.128 209.022 65.37 1.002 5 208.662 0.000 0.000 2.677 212.371 62.57 1.018 6 208.662 0.000 0.000 5.518 206.589 77.12 0.990 7 208.662 0.000 0.000 4.218 209.252 63.68 1.003 8 208.662 0.000 0.000 10.970 196.462 91.97 0.942 9 208.662 0.000 0.000 5.070 207.635 82.69 0.995 10 208.662 0.000 0.000 8.596 201.922 34.52 0.968
28
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
11 208.662 0.000 0.000 5.582 206.353 45.24 0.989 12 208.662 0.000 0.000 4.234 209.145 26.31 1.002 13 208.662 0.000 0.000 4.007 209.176 13.34 1.002 14 208.662 0.000 0.000 11.773 196.043 24.02 0.940 15 208.662 0.000 0.000 11.530 197.923 30.44 0.949 16 208.662 0.000 0.000 6.370 204.580 9.69 0.980 17 208.662 0.000 0.000 6.697 204.682 42.62 0.981 18 208.662 0.000 0.000 5.767 206.091 30.19 0.988 19 208.662 0.000 0.000 4.138 209.308 15.76 1.003 20 208.662 0.000 0.000 1.714 215.444 27.12 1.033 21 208.662 0.000 0.000 4.562 208.572 22.16 1.000 22 208.662 0.000 0.000 2.713 212.519 36.31 1.018 23 208.662 0.000 0.000 8.582 201.810 37.95 0.967 24 208.662 0.000 0.000 2.073 214.108 39.18 1.026 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 6.742 204.591 131.04 0.980
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.38 1.00 171.00 0 01:24 30148.20 287 42 JUNCTION 2.08 4.00 22.00 0 01:15 44099.93 680 65 JUNCTION 0.75 1.00 15.00 0 01:14 29194.82 855 76 JUNCTION 0.37 1.00 211.00 0 01:28 58274.99 279 77 JUNCTION 0.31 1.00 169.00 0 01:25 29430.31 271 78 JUNCTION 0.19 1.00 171.00 0 01:28 14311.81 167 79 JUNCTION 0.31 1.00 165.00 0 01:32 0 262 80 JUNCTION 0.24 1.00 141.00 0 01:23 25352.64 141 81 JUNCTION 0.38 1.00 127.00 0 01:22 27942.53 278 82 JUNCTION 0.44 1.00 71.00 0 01:20 28149.18 368 83 JUNCTION 0.59 1.00 55.00 0 01:15 77545.07 586 84 JUNCTION 0.44 1.00 91.00 0 01:20 66916.38 371 85 JUNCTION 0.24 1.00 103.00 0 01:24 31055.60 198 86 JUNCTION 0.59 1.00 51.00 0 01:17 24904.34 580 87 JUNCTION 0.96 1.00 7.00 0 01:06 53103.60 1375 88 JUNCTION 0.62 1.00 11.00 0 01:24 24759.37 392 89 JUNCTION 0.72 1.00 13.00 0 01:29 3850.72 215 90 JUNCTION 0.76 1.00 14.00 0 01:15 18551.97 879 91 JUNCTION 0.37 1.00 7.00 0 01:07 10962.73 470 92 JUNCTION 0.54 1.00 33.00 0 01:19 0 0 25 OUTFALL 0.96 1.00 7.00 0 01:01 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 3.35 0 01:20 4.67 1.00 1.07 692 54 CONDUIT 3.35 0 01:30 4.66 1.00 1.07 270 55 CONDUIT 4.05 0 01:32 5.74 1.00 1.06 166 56 CONDUIT 7.11 0 01:32 12.19 1.00 0.93 0 57 CONDUIT 11.14 0 05:56 15.23 1.00 1.08 285 58 CONDUIT 12.51 0 04:45 25.07 1.00 1.07 218 59 CONDUIT 5.72 0 04:40 8.03 1.00 1.06 196 60 CONDUIT 11.60 0 03:42 16.23 1.00 1.05 140 61 CONDUIT 10.00 0 07:26 13.77 1.00 1.07 370 62 CONDUIT 3.35 0 01:20 4.63 1.00 1.07 586 63 CONDUIT 7.47 0 07:24 13.30 1.00 1.07 365
29
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
64 65 68 70 71 74 77 78 79
CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT CONDUIT
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
3.35 2.38 0.03 32.87 7.08 1.68 10.50 0.03 1.68
: : : : :
0 0 0 0 0 0 0 0 0
01:29 04:46 21:37 03:00 09:12 01:48 06:02 10:07 01:52
4.62 4.45 0.04 12.13 10.53 2.73 14.52 0.09 3.51
1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
1.07 1.08 1.08 0.05 1.07 1.08 1.06 1.08 1.08
392 195 1128 0 485 850 278 316 879
60.00 sec 60.00 sec 60.00 sec 0.00 1.04
Analysis begun on: Sun Sep 23 22:03:29 2007 Total elapsed time: < 1 sec
Grafik 4.1 : debit outflow
Dari hasil output tersebut, dapat kita analisa sebagai berikut: 1.
Total hujan yang terjadi adalah sebesar 644.139 ha-m.
2.
Besarnya infiltrasi adalah sebesar 20.831 ha-m.
3.
Besarnya runoff adalah sebesar 631.573 ha-m.
4.
Terjadi banjir pada saluran.
5.
Debit outflow dari DAS Beringin adalah sebesar 39 cms.
30
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Karena terjadi banjir, maka dilakukan pendesainan saluran agar tidak terjadi banjir yang meliputi pendesainan bentuk saluran dan dimensi saluran. Maka akan menghasilkan output sebagai berikut : EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) --------------------------------------------------------------**************** Analysis Options **************** Flow Units ............... CMS Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ OCT-13-2005 00:00:00 Ending Date .............. OCT-14-2005 00:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:15:00 Wet Time Step ............ 00:15:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 60.00 sec
**************************
Volume
Depth
Runoff Quantity Continuity
hectare-m
mm
**************************
---------
-------
Total Precipitation ......
644.139
208.662
Evaporation Loss .........
0.000
0.000
Infiltration Loss ........
9.239
2.993
Surface Runoff ...........
653.989
211.853
Final Surface Storage ....
0.046
0.015
Continuity Error (%) .....
-2.971
**************************
Volume
Volume
Flow Routing Continuity
hectare-m
Mliters
**************************
---------
---------
Dry Weather Inflow .......
0.000
0.000
Wet Weather Inflow .......
653.991
6539.976
Groundwater Inflow .......
0.000
0.000
RDII Inflow ..............
0.000
0.000
External Inflow ..........
0.000
0.000
External Outflow .........
665.204
6652.112
Surface Flooding .........
0.000
0.000
Evaporation Loss .........
0.000
0.000
Initial Stored Volume ....
0.000
0.000
Final Stored Volume ......
0.033
0.325
Continuity Error (%) .....
-1.720
31
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
*************************** Subcatchment Runoff Summary ***************************
--------------------------------------------------------------------------------------
Subcatchment
Total
Total
Total
Total
Total
Peak
Runoff
Precip
Runon
Evap
Infil
Runoff
Runoff
Coeff
mm
mm
mm
mm
mm
CMS
-------------------------------------------------------------------------------------1
208.662
0.000
0.000
3.463
208.632
183.03
1.000
2
208.662
0.000
0.000
3.423
210.727
79.63
1.010
3
208.662
0.000
0.000
2.703
213.066
42.74
1.021
4
208.662
0.000
0.000
1.889
213.864
69.02
1.025
5
208.662
0.000
0.000
1.428
216.541
63.66
1.038
6
208.662
0.000
0.000
2.322
212.104
86.45
1.016
7
208.662
0.000
0.000
2.086
215.167
66.15
1.031
8
208.662
0.000
0.000
4.878
207.206
155.86
0.993
9
208.662
0.000
0.000
2.307
213.634
88.65
1.024
10
208.662
0.000
0.000
3.546
210.450
42.38
1.009
11
208.662
0.000
0.000
2.661
213.752
48.07
1.024
12
208.662
0.000
0.000
2.174
215.573
27.18
1.033
13
208.662
0.000
0.000
2.314
216.588
13.61
1.038
14
208.662
0.000
0.000
4.976
207.054
40.47
0.992
15
208.662
0.000
0.000
4.511
208.024
46.38
0.997
16
208.662
0.000
0.000
2.979
212.716
10.47
1.019
17
208.662
0.000
0.000
2.969
212.330
47.46
1.018
18
208.662
0.000
0.000
2.706
213.484
32.32
1.023
19
208.662
0.000
0.000
2.164
215.824
16.23
1.034
20
208.662
0.000
0.000
1.066
218.675
27.29
1.048
21
208.662
0.000
0.000
2.204
214.700
23.20
1.029
22
208.662
0.000
0.000
1.480
216.963
36.90
1.040
23
208.662
0.000
0.000
3.563
210.440
46.29
1.009
24
208.662
0.000
0.000
1.200
217.746
39.58
1.044
-------------------------------------------------------------------------------------Totals
208.662
0.000
0.000
2.993
211.853
183.03
1.015
****************** Node Depth Summary ****************** ----------------------------------------------------------------------------------------
Node
Type
Average
Maximum
Maximum
Time of Max
Total
Total
Depth
Depth
HGL
Occurrence
Flooding
Minutes
Meters
Meters
Meters
days hr:min
ha-mm
Flooded
---------------------------------------------------------------------------------------33
JUNCTION
0.15
2.14
172.14
0
03:00
0
0
42
JUNCTION
0.24
3.12
21.12
0
03:00
0
0
65
JUNCTION
0.39
4.79
18.79
0
03:00
0
0
32
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
76
JUNCTION
0.09
1.25
211.25
0
03:00
0
0
77
JUNCTION
0.10
1.53
169.53
0
03:00
0
0
78
JUNCTION
0.14
2.23
172.23
0
03:00
0
0
79
JUNCTION
0.15
2.23
166.23
0
03:00
0
0
80
JUNCTION
0.06
0.82
140.82
0
03:00
0
0
81
JUNCTION
0.15
2.14
128.14
0
03:00
0
0
82
JUNCTION
0.12
1.60
71.60
0
03:00
0
0
83
JUNCTION
0.25
3.46
57.46
0
03:00
0
0
84
JUNCTION
0.10
1.29
91.29
0
03:00
0
0
85
JUNCTION
0.07
1.02
103.02
0
03:00
0
0
86
JUNCTION
0.28
4.50
54.50
0
02:51
0
0
87
JUNCTION
1.35
13.69
19.69
0
03:00
0
0
88
JUNCTION
0.37
4.45
14.45
0
03:01
0
0
89
JUNCTION
0.42
5.00
17.00
0
03:01
0
0
90
JUNCTION
0.42
5.00
18.00
0
03:00
0
0
91
JUNCTION
0.35
4.83
10.83
0
03:00
0
0
92
JUNCTION
0.27
3.95
35.95
0
03:00
0
0
25
OUTFALL
15.33
16.00
22.00
0
01:01
0
0
******************** Link Flow Summary ******************** -----------------------------------------------------------------------------------------
Link
Type
Maximum
Time of Max
Maximum
Length
Max/
Total
Flow
Occurrence
Velocity
Factor
Full
Minutes
CMS
days hr:min
m/sec
Flow
Surcharged
----------------------------------------------------------------------------------------31
CONDUIT
1024.72
0
03:00
13.74
1.00
0.28
0
54
CONDUIT
79.48
0
03:00
8.46
1.00
0.49
0
55
CONDUIT
42.67
0
03:00
9.68
1.00
0.82
0
56
CONDUIT
122.06
0
03:00
16.81
1.00
0.06
0
57
CONDUIT
251.73
0
03:00
26.78
1.00
0.54
0
58
CONDUIT
317.72
0
03:00
30.16
1.00
0.04
0
59
CONDUIT
86.36
0
03:00
12.87
1.00
0.20
0
60
CONDUIT
185.62
0
03:00
25.14
1.00
0.05
0
61
CONDUIT
427.61
0
03:00
28.62
1.00
0.12
0
62
CONDUIT
557.99
0
03:00
13.99
1.00
0.59
0
63
CONDUIT
363.76
0
03:00
22.66
1.00
0.20
0
64
CONDUIT
1180.74
0
03:01
16.86
1.00
0.64
0
65
CONDUIT
1120.30
0
03:01
12.74
1.00
0.59
0
68
CONDUIT
1314.47
0
03:08
0.47
1.00
0.70
0
70
CONDUIT
984.88
0
03:00
26.08
1.00
0.53
0
71
CONDUIT
958.35
0
03:00
27.17
1.00
1.03
10
74
CONDUIT
1070.89
0
03:00
9.70
1.00
0.58
0
77
CONDUIT
182.89
0
03:00
24.46
1.00
0.39
0
78
CONDUIT
24.84
0
03:07
0.31
1.00
1.00
0
79
CONDUIT
1109.99
0
03:01
9.67
1.00
0.63
0
33
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
************************* Routing Time Step Summary ************************* Minimum Time Step
:
60.00 sec
Average Time Step
:
60.00 sec
Maximum Time Step
:
60.00 sec
Percent in Steady State
:
0.00
Average Iterations per Step :
1.12
Analysis begun on:
Sun Sep 23 14:51:23 2007
Total elapsed time: 00:00:01
Grafik 4.2 : debit outflow
Dari hasil output tersebut, dapat kita analisa sebagai berikut: 1. Total hujan yang terjadi adalah sebesar 644.139 ha-m. 2. Besarnya infiltrasi adalah sebesar 9.239 ha-m. 3. Besarnya runoff adalah sebesar 653.889 ha-m. 4. Tidak terjadi banjir pada saluran. 5. Debit outflow dari DAS Beringin adalah sebesar 1237.584 cms.
34
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Potongan melintang saluran node 76 – 86
Gambar 4.2 : potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63 conduit 77
Gambar 4.3 : conduit 77
35
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 57
Gambar 4.4 : conduit 57
conduit 58
Gambar 4.5 : conduit 58
36
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 63
Gambar 4.6 : conduit 63
Potongan melintang saluran node 78 – 86
Gambar 4.7 : potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
37
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 55
Gambar 4.8 : conduit 55
conduit 56
Gambar 4.9 : conduit 56
conduit 60
Gambar 4.10 : conduit 60
38
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 61
Gambar 4.11 : conduit 61
conduit 62
Gambar 4.12 : conduit 62
39
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Potongan melintang saluran node 77 – 86
Gambar 4.13 : potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62. conduit 54
Gambar 4.14 : conduit 54
40
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 56
Gambar 4.15 : conduit 56
conduit 60
Gambar 4.16 : conduit 60
conduit 61
Gambar 4.17 : conduit 61
41
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 62
Gambar 4.18 : conduit 62
Potongan melintang saluran node 86 - 25
Gambar 4.19 : potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
42
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 71
Gambar 4.20 : conduit 71
conduit 70
Gambar 4.21 : conduit 70
conduit 31
Gambar 4.22 : conduit 31
43
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 74
Gambar 4.23 : conduit 74
conduit 79
Gambar 4.24 : conduit 79
conduit 65
Gambar 4.25 : conduit 65
44
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
conduit 64
Gambar 4.26 : conduit 64
conduit 68
Gambar 4.27 : conduit 68
45
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
Potongan melintang saluran node 91 - 25
Gambar 4.28 : potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78. conduit 78
Gambar 4.29 : conduit 78
46
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
4.2
Analisis
Grafik perbandingan antara % Impervious dengan Debit % impervious
Debit
Keterangan Belum terjadi banjir yang disebabkan karena daerah peresapan air masih mencukupi, sehingga limpasan air
10
1231.998
yang ada di permukaan tanah belum terlalu besar yang disebabkan karena air tertampung atau masuk kedalam pori – pori tanah ( Lampiran 1 ) Belum terjadi banjir yang disebabkan karena daerah peresapan air masih mencukupi, sehingga limpasan air
20
1238.219
yang ada di permukaan tanah belum terlalu besar yang disebabkan karena air tertampung atau masuk kedalam pori – pori tanah ( Lampiran 2 ) Belum terjadi banjir yang disebabkan karena daerah peresapan air masih mencukupi, sehingga limpasan air
30
1245.012
yang ada di permukaan tanah belum terlalu besar yang disebabkan karena air tertampung atau masuk kedalam pori – pori tanah ( Lampiran 3 ) Belum terjadi banjir yang disebabkan karena daerah peresapan air masih mencukupi, sehingga limpasan air
40
1250.443
yang ada di permukaan tanah belum terlalu besar yang disebabkan karena air tertampung atau masuk kedalam pori – pori tanah ( Lampiran 4 ) Belum terjadi banjir yang disebabkan karena daerah
50
1254.307
peresapan air masih mencukupi, sehingga limpasan air yang ada di permukaan tanah belum terlalu besar yang
47
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
disebabkan karena air tertampung atau masuk kedalam pori – pori tanah ( Lampiran 5 ) Terjadi
limpasan
air
dipermukaan
tanah
yang
menyebabkan air bergerak langsung ke permukaan yang 60
1251.433 lebih rendah sehingga air tidak sempat mengalami peresapan di tanah ( Lampiran 6 ) Terjadi
limpasan
air
dipermukaan
tanah
yang
menyebabkan air bergerak langsung ke permukaan yang 70
1247.464 lebih rendah sehingga air tidak sempat mengalami peresapan di tanah ( Lampiran 7 ) Terjadi
limpasan
air
dipermukaan
tanah
yang
menyebabkan air bergerak langsung ke permukaan yang 80
1240.627 lebih rendah sehingga air tidak sempat mengalami peresapan di tanah ( Lampiran 8 ) Terjadi
limpasan
air
dipermukaan
tanah
yang
menyebabkan air bergerak langsung ke permukaan yang 90
1235.237 lebih rendah sehingga air tidak sempat mengalami peresapan di tanah ( Lampiran 9 ) Terjadi
limpasan
air
dipermukaan
tanah
yang
menyebabkan air bergerak langsung ke permukaan yang 100
1228.156 lebih rendah sehingga air tidak sempat mengalami peresapan di tanah ( Lampiran 10 ) Tabel 4.2 : Tabel analisa % Impervious dengan Debit
Dari parameter – parameter % impervious di atas di ambil data % imperious dari 10 % sampai 50 %, hal ini di sebabkan karena pada kondisi % impervious di naikan maka akan terjadi peningkatan debit pada outflow. Sedangkan pada % impervious lebih dari 50 % terjadi limpasan di permukaan yang terlalu besar dan mulai terjadi banjir, maka dari hal ini air sudah tidak dapat lagi di tampung pada saluran dan kecenderungannya akan terjadi 48
BAB IV PEMODELAN DAS BERINGIN Perpustakaan Unika =================================================================
limpasan air di sekitar sungai. Sehingga menyebabkan ketidak akuratan dalam penghitungan debit di outflow.
Grafik perbandingan Debit m³/jam % impervious 1231.998 m³/jam 10 1238.219 m³/jam 20 1245.012 m³/jam 30 1250.443 m³/jam 40 1254.307 m³/jam 50 Tabel 4.3 Tabel perbandingan % Impervious dengan Debit % Impervious VS Debit Debit 1260 y = -0.0002x 3 + 0.0117x 2 + 0.4082x + 1226.9 R2 = 0.9999 1250.443
1255 1250
1254.307
1245.012
1245 1240
1238.219
1235 1231.998
1230 0
10
20
30
40
50
60
% Impervious
Grafik 4.2 : perandingan % impervious dab debit
Dari grafik di atas di dapatkan sebuah persamaan yang membandingkan antara besaran debit dan % impervious ( y = -0.0002x³ + 0.0117x² + 0.4082x + 1226.9 ) dengan R² = 0.9999 Grafik tersebut menjelaska tentang perbandingan antara debit dan % impervious, semakin tinggi % impervious yang terjadi maka akan semakin tinggi pula debit yang mengalir hal ini disebabkan karena % impervious berpengaruh terhadap peresapan dan tampungan yang akan masuk ke dalam tanah. Semakin tinggi % impervious maka akan semakin kedap pula lapisan permukaan tanah di sebabkan karena sudah terlalu banyak bangunan yang berdiri.
49
Perpustakaan Unika
BAB V KESIMPULAN DAN SARAN ==================================================================
BAB V KESIMPULAN DAN SARAN
5.1
Kesimpulan Dari hasil analisa DAS Beringin menggunakan EPA SWMM dengan kondisi
sebenarnya, pengubahan parameter – parameter yang ada “ % Impervious “, maka dapat diambil kesimpulan sebagai berikut: 1.
Pada kondisi DAS Beringin sebenarnya, terlihat flooding yang terjadi adalah 0 yang di dapat dari pendisainan saluran yang dapat menampung volume banjir yang akan terjadi dan dari kondisi tersebut dibuat parameter – parameter pembanding dengan % Impervious 10 % -100 %, maka di dapatkan perbandingan antara % impervious dengan debit, Grafik perbandingan Debit m³/jam % impervious 1231.998 m³/jam 10 1238.219 m³/jam 20 1245.012 m³/jam 30 1250.443 m³/jam 40 1254.307 m³/jam 50 Tabel 5.1 Tabel perbandingan % Impervious dengan Debit % Impervious VS Debit Debit 1260 y = -0.0002x 3 + 0.0117x 2 + 0.4082x + 1226.9 R2 = 0.9999 1250.443
1255 1250
1254.307
1245.012
1245 1240
1238.219
1235 1231.998
1230 0
10
20
30
40
50
60
% Impervious
Grafik 5.1 : perandingan % impervious dab debit
50
Perpustakaan Unika
BAB V KESIMPULAN DAN SARAN ==================================================================
yang menghasilkan persamaan debit VS % Impervious ( Hal ini dikarenakan pengaruh dari % of impervious ). Jadi pada kondisi DAS Beringin awal, air hujan lebih mudah masuk ke dalam tanah. Dari grafik di atas di dapatkan sebuah persamaan yang membandingkan antara besaran debit dan % impervious ( y = -0.0002x³ + 0.0117x² + 0.4082x + 1226.9 ) dengan R² = 0.9999 Semakin tinggi % impervious yang terjadi maka akan semakin tinggi pula debit yang mengalir hal ini disebabkan karena % impervious berpengaruh terhadap peresapan dan tampungan yang akan masuk ke dalam tanah. Semakin tinggi % impervious maka akan semakin kedap pula lapisan permukaan tanah di sebabkan karena sudah terlalu banyak bangunan yang berdiri. 2.
Dalam mengurangi banjir pada DAS Beringin dapat dilakukan dengan cara penetapan saluran yang sesuai dengan keadaan lapangan, dan dalam kenyataanya perlu memperhatikan tata guna lahan disekitar DAS Beringin sebab factor tata guna lahan sangat berpengaruh penting terhadap terjadinya banjir.
3.
Perencanaan saluran mengakibatkan tidak terjadinya banjir pada DAS Beringin. Ini terlihat pada kondisi DAS Beringin masa depan (perencanaan), meskipun dengan % of impervious sama dengan kondisi DAS Beringin, tidak terjadi banjir.
4.
Perubahan fungsi dan tata guna lahan dapat menyebabkan terjadinya banjir.
5.
Parameter terpenting dalam pemodelan menggunakan EPA SWMM adalah ketepatan dalam menetukan besarnya % of impervious, desain saluran yang efisien dan efektif dan penentuan infiltrasi. 51
Perpustakaan Unika
BAB V KESIMPULAN DAN SARAN ==================================================================
5.2 1.
Saran Dalam penggunaan model EPA-SWMM, akan lebih baik bila mempunyai data lain yang dapat digunakan untuk pembanding.
2.
Dalam kaitannya dengan banjir, pemerintah hendaknya dapat bertindak lebih tegas dalam menegakkan regulasi terutama yang berkaitan dengan lingkungan dan tata ruang kota.
3.
Dalam mengurangi terjadinya banjir perlu ditanamkan
kesadaran pada masyarakat
tentang pentingnya daerah peresapan yang sangt berperan penting terhadap terjadinya banjir.
52
Perpustakaan Unika
DAFTAR PUSTAKA
Ven Te Chow, David R. Maidment, and Larry W. Mays, Applied Hydrology, McGraw-Hill Book Company, 1988. Lewis A. Rossman, Storm Water Management Model User’s Manual Version 5.0, Water Supply and Water Resources Division National Risk Management Research Laboratory Cincinnati, OH 45268, 2005. Gatot Irianto, Alih Fungsi Lahan: Dampaknya Terhadap Produksi Air dan DAS, Tabloid Sinar Tani, 2004.
G.F. Lane-Serff, Water Engineering, 2006. Adidarma. W, Martha. J.W, 1991, Mengenal Dasar-Dasar Hidrologi, PT. Gramedia Pustaka Utama, Jakarta.
Harto. S, 1981, Hidrologi Terapan Edisi Pertama, Teknik Sipil UGM, Yogyakarta.
Harto. S, 1993, Analisis Hidrologi Edisi Pertama, PT. Gramedia Pustaka Utama, Jakarta.
Sosrodarsosno. S, Takeda. K, 1990, Hidrologi Untuk Pengairan, PT. Gramedia Pustaka, Jakarta.
Sudibyo, 1993, Teknik Bendungan, PT. Gramedia Pustaka, Jakarta.
53
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
LAMPIRAN
Pemodelan DAS Beringin Dengan Menggunakan Parameter Pembanding. Setelah seluruh data dan parameter dari DAS Beringin untuk kondisi sebenarnya dimasukkan, maka akan dibuat suatu parameter pembanding, pada kasus ini kami menggunakan perubahan parameter pada % Impervious “Perubahn Tata Guna Lahan”didapat output seperti dibawah ini.
Dengan parameter Impervious = 10 %
Parameter – Parameternya adalah : •
Slope =1,3 %
•
Imperv =10%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
54
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 11.053 651.091 0.013 -2.797
Depth mm ------208.662 0.000 3.580 210.914 0.004
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding ......... Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
Volume hectare-m --------0.000 651.092 0.000 0.000 0.000 661.957 0.000 0.000 0.000 0.021 -1.672
Volume Mliters --------0.000 6510.992 0.000 0.000 0.000 6619.638 0.000 0.000 0.000 0.214
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 5.378 206.264 178.54 0.989 2 208.662 0.000 0.000 3.390 210.801 79.65 1.010 3 208.662 0.000 0.000 2.897 212.591 42.70 1.019 4 208.662 0.000 0.000 3.140 211.646 68.63 1.014 5 208.662 0.000 0.000 2.534 214.304 63.44 1.027 6 208.662 0.000 0.000 3.669 209.970 85.77 1.006 7 208.662 0.000 0.000 2.614 213.900 66.01 1.025 8 208.662 0.000 0.000 4.837 207.271 155.95 0.993 9 208.662 0.000 0.000 2.993 212.202 88.34 1.017 10 208.662 0.000 0.000 3.369 210.867 42.43 1.011 11 208.662 0.000 0.000 2.617 213.884 48.08 1.025 12 208.662 0.000 0.000 2.433 214.867 27.15 1.030 13 208.662 0.000 0.000 2.064 217.315 13.62 1.041 14 208.662 0.000 0.000 4.470 208.023 40.73 0.997 15 208.662 0.000 0.000 4.176 208.679 46.55 1.000 16 208.662 0.000 0.000 2.634 213.789 10.49 1.025 17 208.662 0.000 0.000 2.949 212.379 47.46 1.018 18 208.662 0.000 0.000 2.686 213.539 32.32 1.023 19 208.662 0.000 0.000 2.368 215.263 16.21 1.032 20 208.662 0.000 0.000 2.173 216.521 27.22 1.038 21 208.662 0.000 0.000 2.683 213.554 23.15 1.023 22 208.662 0.000 0.000 2.421 214.937 36.79 1.030 23 208.662 0.000 0.000 3.301 211.090 46.38 1.012 24 208.662 0.000 0.000 2.330 215.489 39.45 1.033 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 3.580 210.914 178.54 1.011
55
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.15 2.10 172.10 0 03:00 0 0 42 JUNCTION 0.24 3.11 21.11 0 03:00 0 0 65 JUNCTION 0.40 6.27 20.27 0 03:04 0.00 2 76 JUNCTION 0.10 1.22 211.22 0 03:00 0 0 77 JUNCTION 0.11 3.10 171.10 0 01:56 0.00 3 78 JUNCTION 0.14 2.23 172.23 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 01:51 0.00 8 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.15 2.10 128.10 0 03:00 0 0 82 JUNCTION 0.12 1.58 71.58 0 03:00 0 0 83 JUNCTION 0.25 4.90 58.90 0 01:48 0.00 2 84 JUNCTION 0.11 4.45 94.45 0 01:52 0.00 3 85 JUNCTION 0.07 1.01 103.01 0 03:00 0 0 86 JUNCTION 0.28 4.50 54.50 0 02:54 0 0 87 JUNCTION 1.37 13.66 19.66 0 03:00 0 0 88 JUNCTION 0.37 5.75 15.75 0 01:44 0.00 2 89 JUNCTION 0.43 6.20 18.20 0 03:09 0.00 4 90 JUNCTION 0.43 6.27 19.27 0 02:25 0.00 1 91 JUNCTION 0.35 4.83 10.83 0 03:00 0 0 92 JUNCTION 0.27 3.93 35.93 0 03:00 0 0 25 OUTFALL 15.33 16.00 22.00 0 01:01 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1017.66 0 03:00 13.72 1.00 0.28 0 54 CONDUIT 79.50 0 03:00 8.46 1.00 0.49 0 55 CONDUIT 42.63 0 03:00 9.67 1.00 0.82 0 56 CONDUIT 122.03 0 03:00 16.81 1.00 0.06 0 57 CONDUIT 246.80 0 03:00 26.69 1.00 0.53 0 58 CONDUIT 312.62 0 03:00 30.02 1.00 0.04 0 59 CONDUIT 85.67 0 03:00 12.84 1.00 0.20 0 60 CONDUIT 185.37 0 03:00 25.13 1.00 0.05 0 61 CONDUIT 426.75 0 03:00 28.60 1.00 0.12 0 62 CONDUIT 556.87 0 03:00 13.99 1.00 0.59 0 63 CONDUIT 358.72 0 03:00 22.57 1.00 0.19 0 64 CONDUIT 1174.41 0 03:01 16.84 1.00 0.64 0 65 CONDUIT 1114.20 0 03:01 12.72 1.00 0.59 0 68 CONDUIT 1303.86 0 03:08 0.46 1.00 0.70 0 70 CONDUIT 978.98 0 03:00 26.04 1.00 0.53 0 71 CONDUIT 951.98 0 03:00 27.15 1.00 1.02 7 74 CONDUIT 1064.80 0 03:00 9.68 1.00 0.58 0 77 CONDUIT 178.38 0 03:00 24.30 1.00 0.38 0 78 CONDUIT 24.84 0 03:08 0.30 1.00 1.00 0 79 CONDUIT 1103.97 0 03:01 9.66 1.00 0.63 0
56
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.13
Analysis begun on: Mon Sep 24 23:35:40 2007 Total elapsed time: < 1 sec
Grafik L1.1 : debit outflow
Di bawah ini gambar potongan penampang saluran :
Gambar L1.1 : potongan melintang saluran node 76 – 86
57
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L1.2 : potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
Gambar L1.3 : potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
58
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L1.4 : potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
Gambar L1.5 potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
59
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 20 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 20%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 9.436 654.082 0.032 -3.014
Depth mm ------208.662 0.000 3.057 211.883 0.010
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding ......... Evaporation Loss .........
Volume hectare-m --------0.000 654.083 0.000 0.000 0.000 665.341 0.000 0.000
Volume Mliters --------0.000 6540.903 0.000 0.000 0.000 6653.480 0.000 0.000
60
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.022 -1.725
0.000 0.223
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 4.546 207.377 180.87 0.994 2 208.662 0.000 0.000 2.899 211.766 79.90 1.015 3 208.662 0.000 0.000 2.491 213.529 42.79 1.023 4 208.662 0.000 0.000 2.692 212.599 68.81 1.019 5 208.662 0.000 0.000 2.191 215.193 63.53 1.031 6 208.662 0.000 0.000 3.130 210.948 86.10 1.011 7 208.662 0.000 0.000 2.254 214.803 66.11 1.029 8 208.662 0.000 0.000 4.098 208.331 157.37 0.998 9 208.662 0.000 0.000 2.570 213.147 88.55 1.021 10 208.662 0.000 0.000 2.882 211.830 42.56 1.015 11 208.662 0.000 0.000 2.257 214.787 48.16 1.029 12 208.662 0.000 0.000 2.108 215.730 27.19 1.034 13 208.662 0.000 0.000 1.803 217.994 13.63 1.045 14 208.662 0.000 0.000 3.793 209.051 41.02 1.002 15 208.662 0.000 0.000 3.549 209.687 46.81 1.005 16 208.662 0.000 0.000 2.273 214.697 10.51 1.029 17 208.662 0.000 0.000 2.533 213.321 47.57 1.022 18 208.662 0.000 0.000 2.316 214.455 32.38 1.028 19 208.662 0.000 0.000 2.051 216.104 16.23 1.036 20 208.662 0.000 0.000 1.892 217.278 27.24 1.041 21 208.662 0.000 0.000 2.314 214.469 23.19 1.028 22 208.662 0.000 0.000 2.097 215.797 36.84 1.034 23 208.662 0.000 0.000 2.826 212.050 46.51 1.016 24 208.662 0.000 0.000 2.023 216.316 39.50 1.037 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 3.057 211.883 180.87 1.015
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.15 2.12 172.12 0 03:00 0 0 42 JUNCTION 0.24 5.50 23.50 0 02:37 0.00 2 65 JUNCTION 0.39 4.78 18.78 0 03:00 0 0 76 JUNCTION 0.09 1.24 211.24 0 03:00 0 0 77 JUNCTION 0.10 1.53 169.53 0 03:00 0 0 78 JUNCTION 0.14 2.23 172.23 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 01:54 0.00 4 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.15 2.12 128.12 0 03:00 0 0 82 JUNCTION 0.12 1.59 71.59 0 03:00 0 0 83 JUNCTION 0.26 4.90 58.90 0 01:32 0.00 4 84 JUNCTION 0.10 4.45 94.45 0 03:10 0.00 2 85 JUNCTION 0.07 3.20 105.20 0 02:00 0.00 1 86 JUNCTION 0.27 4.50 54.50 0 02:52 0 0 87 JUNCTION 1.35 16.00 22.00 0 03:00 0.00 4 88 JUNCTION 0.37 5.75 15.75 0 02:19 0.00 4 89 JUNCTION 0.43 6.20 18.20 0 02:21 0.00 4 90 JUNCTION 0.43 6.27 19.27 0 02:21 0.00 8
61
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
91 92 25
JUNCTION JUNCTION OUTFALL
0.35 0.27 15.33
4.83 3.95 16.00
10.83 35.95 22.00
0 0 0
03:00 03:00 01:01
0 0 0
0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1023.62 0 03:00 13.74 1.00 0.28 0 54 CONDUIT 79.76 0 03:00 8.47 1.00 0.49 0 55 CONDUIT 42.72 0 03:00 9.68 1.00 0.82 0 56 CONDUIT 122.38 0 03:00 16.82 1.00 0.06 0 57 CONDUIT 249.33 0 03:00 26.74 1.00 0.54 0 58 CONDUIT 315.27 0 03:00 30.09 1.00 0.04 0 59 CONDUIT 86.01 0 03:00 12.86 1.00 0.20 0 60 CONDUIT 185.81 0 03:00 25.15 1.00 0.05 0 61 CONDUIT 428.96 0 03:00 28.64 1.00 0.12 0 62 CONDUIT 559.44 0 03:00 14.00 1.00 0.59 0 63 CONDUIT 361.51 0 03:00 22.62 1.00 0.19 0 64 CONDUIT 1180.68 0 03:01 16.86 1.00 0.64 0 65 CONDUIT 1119.93 0 03:01 12.74 1.00 0.59 0 68 CONDUIT 1315.71 0 03:08 0.47 1.00 0.70 0 70 CONDUIT 984.15 0 03:00 26.07 1.00 0.53 0 71 CONDUIT 957.47 0 03:00 27.16 1.00 1.03 9 74 CONDUIT 1070.31 0 03:00 9.69 1.00 0.58 0 77 CONDUIT 180.72 0 03:00 24.38 1.00 0.38 0 78 CONDUIT 24.84 0 03:07 0.31 1.00 1.00 0 79 CONDUIT 1109.74 0 03:01 9.67 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:36:32 2007 Total elapsed time: 00:00:01
Grafik L2.1 : debit outflow
62
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L2.1 : potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L2.2 : potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
63
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L2.3 : potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L2.4 : potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
64
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L2.5 : potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
65
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 30 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 30%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 7.899 656.445 0.060 -3.146
Depth mm ------208.662 0.000 2.559 212.648 0.019
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding ......... Evaporation Loss .........
Volume hectare-m --------0.000 656.446 0.000 0.000 0.000 667.997 0.000 0.000
Volume Mliters --------0.000 6564.532 0.000 0.000 0.000 6680.036 0.000 0.000
66
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.033 -1.765
0.000 0.335
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 3.762 208.302 182.54 0.998 2 208.662 0.000 0.000 2.431 212.515 80.08 1.018 3 208.662 0.000 0.000 2.102 214.245 42.86 1.027 4 208.662 0.000 0.000 2.264 213.333 68.94 1.022 5 208.662 0.000 0.000 1.861 215.877 63.60 1.035 6 208.662 0.000 0.000 2.618 211.714 86.35 1.015 7 208.662 0.000 0.000 1.911 215.497 66.19 1.033 8 208.662 0.000 0.000 3.400 209.197 158.38 1.003 9 208.662 0.000 0.000 2.165 213.870 88.70 1.025 10 208.662 0.000 0.000 2.417 212.578 42.66 1.019 11 208.662 0.000 0.000 1.913 215.482 48.22 1.033 12 208.662 0.000 0.000 1.791 216.397 27.22 1.037 13 208.662 0.000 0.000 1.544 218.543 13.64 1.047 14 208.662 0.000 0.000 3.154 209.881 41.22 1.006 15 208.662 0.000 0.000 2.957 210.492 47.00 1.009 16 208.662 0.000 0.000 1.926 215.392 10.52 1.032 17 208.662 0.000 0.000 2.136 214.041 47.64 1.026 18 208.662 0.000 0.000 1.960 215.155 32.42 1.031 19 208.662 0.000 0.000 1.747 216.759 16.25 1.039 20 208.662 0.000 0.000 1.617 217.878 27.26 1.044 21 208.662 0.000 0.000 1.957 215.169 23.22 1.031 22 208.662 0.000 0.000 1.783 216.462 36.88 1.037 23 208.662 0.000 0.000 2.372 212.794 46.61 1.020 24 208.662 0.000 0.000 1.722 216.962 39.54 1.040 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 2.559 212.648 182.54 1.019
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.15 2.13 172.13 0 03:00 0 0 42 JUNCTION 0.24 5.50 23.50 0 02:36 0.00 2 65 JUNCTION 0.39 6.27 20.27 0 02:29 0.00 2 76 JUNCTION 0.10 3.00 213.00 0 03:05 0.00 4 77 JUNCTION 0.10 1.54 169.54 0 03:00 0 0 78 JUNCTION 0.14 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 02:20 0.00 4 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.15 2.13 128.13 0 03:00 0 0 82 JUNCTION 0.13 5.00 75.00 0 02:39 0.00 2 83 JUNCTION 0.25 4.90 58.90 0 01:44 0.00 2 84 JUNCTION 0.10 4.45 94.45 0 01:48 0.00 2 85 JUNCTION 0.07 1.02 103.02 0 03:00 0 0 86 JUNCTION 0.27 4.50 54.50 0 02:50 0 0 87 JUNCTION 1.35 16.00 22.00 0 02:40 0.00 4 88 JUNCTION 0.36 4.46 14.46 0 03:01 0 0 89 JUNCTION 0.42 5.01 17.01 0 03:01 0 0
67
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
90 91 92 25
JUNCTION JUNCTION JUNCTION OUTFALL
0.42 0.35 0.27 15.33
6.27 4.83 3.96 16.00
19.27 10.83 35.96 22.00
0 0 0 0
03:19 03:00 03:00 01:01
0.00 0 0 0
2 0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1027.77 0 03:00 13.75 1.00 0.28 0 54 CONDUIT 79.94 0 03:00 8.48 1.00 0.49 0 55 CONDUIT 42.79 0 03:00 9.68 1.00 0.82 0 56 CONDUIT 122.63 0 03:00 16.83 1.00 0.06 0 57 CONDUIT 251.15 0 03:00 26.77 1.00 0.54 0 58 CONDUIT 317.18 0 03:00 30.15 1.00 0.04 0 59 CONDUIT 86.25 0 03:00 12.87 1.00 0.20 0 60 CONDUIT 186.14 0 03:00 25.16 1.00 0.05 0 61 CONDUIT 430.56 0 03:00 28.68 1.00 0.12 0 62 CONDUIT 561.30 0 03:00 14.01 1.00 0.59 0 63 CONDUIT 363.54 0 03:00 22.66 1.00 0.19 0 64 CONDUIT 1185.28 0 03:01 16.88 1.00 0.64 0 65 CONDUIT 1124.26 0 03:01 12.75 1.00 0.60 0 68 CONDUIT 1324.15 0 03:08 0.48 1.00 0.71 0 70 CONDUIT 988.06 0 03:00 26.10 1.00 0.53 0 71 CONDUIT 961.42 0 03:00 27.17 1.00 1.03 12 74 CONDUIT 1074.36 0 03:00 9.70 1.00 0.58 0 77 CONDUIT 182.40 0 03:00 24.44 1.00 0.39 0 78 CONDUIT 24.84 0 03:07 0.32 1.00 1.00 0 79 CONDUIT 1113.92 0 03:01 9.68 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:37:17 2007 Total elapsed time: < 1 sec
68
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Grafik L3.1 : debit outflow
Di bawah ini gambar potongan penampang saluran :
Gambar L3.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L3.2 : potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
69
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L3.3 : potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L3.4 : potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
70
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L3.5 : potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
71
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 40 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 40%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 6.446 658.330 0.098 -3.219
Depth mm ------208.662 0.000 2.088 213.259 0.032
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow .........
Volume hectare-m --------0.000 658.332 0.000 0.000 0.000 670.041
Volume Mliters --------0.000 6583.388 0.000 0.000 0.000 6700.480
72
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Surface Flooding ......... Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.000 0.000 0.071 -1.789
0.000 0.000 0.000 0.712
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 3.029 209.090 183.57 1.002 2 208.662 0.000 0.000 1.988 213.107 80.20 1.021 3 208.662 0.000 0.000 1.731 214.797 42.90 1.029 4 208.662 0.000 0.000 1.857 213.904 69.03 1.025 5 208.662 0.000 0.000 1.541 216.388 63.65 1.037 6 208.662 0.000 0.000 2.134 212.331 86.50 1.018 7 208.662 0.000 0.000 1.583 216.018 66.25 1.035 8 208.662 0.000 0.000 2.745 209.925 159.01 1.006 9 208.662 0.000 0.000 1.780 214.430 88.80 1.028 10 208.662 0.000 0.000 1.977 213.169 42.72 1.022 11 208.662 0.000 0.000 1.584 216.004 48.26 1.035 12 208.662 0.000 0.000 1.488 216.897 27.24 1.039 13 208.662 0.000 0.000 1.295 218.963 13.65 1.049 14 208.662 0.000 0.000 2.553 210.571 41.35 1.009 15 208.662 0.000 0.000 2.399 211.152 47.12 1.012 16 208.662 0.000 0.000 1.595 215.915 10.53 1.035 17 208.662 0.000 0.000 1.757 214.597 47.70 1.028 18 208.662 0.000 0.000 1.620 215.684 32.45 1.034 19 208.662 0.000 0.000 1.453 217.252 16.26 1.041 20 208.662 0.000 0.000 1.354 218.333 27.28 1.046 21 208.662 0.000 0.000 1.618 215.696 23.24 1.034 22 208.662 0.000 0.000 1.482 216.961 36.90 1.040 23 208.662 0.000 0.000 1.942 213.379 46.68 1.023 24 208.662 0.000 0.000 1.436 217.452 39.56 1.042 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 2.088 213.259 183.57 1.022
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.15 2.14 172.14 0 03:00 0 0 42 JUNCTION 0.24 5.50 23.50 0 02:35 0.00 2 65 JUNCTION 0.38 4.79 18.79 0 02:59 0 0 76 JUNCTION 0.09 1.25 211.25 0 03:00 0 0 77 JUNCTION 0.11 3.10 171.10 0 01:54 0.00 1 78 JUNCTION 0.14 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 01:56 0.00 6 80 JUNCTION 0.06 3.80 143.80 0 01:50 0.00 2 81 JUNCTION 0.15 2.14 128.14 0 03:00 0 0 82 JUNCTION 0.13 5.00 75.00 0 01:38 0.00 4 83 JUNCTION 0.25 3.48 57.48 0 03:00 0 0 84 JUNCTION 0.10 1.30 91.30 0 03:00 0 0 85 JUNCTION 0.07 1.02 103.02 0 03:00 0 0 86 JUNCTION 0.28 4.50 54.50 0 02:49 0 0 87 JUNCTION 1.36 16.00 22.00 0 01:26 0.00 4 88 JUNCTION 0.36 4.46 14.46 0 03:00 0 0 89 JUNCTION 0.42 6.20 18.20 0 03:06 0.00 2
73
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
90 91 92 25
JUNCTION JUNCTION JUNCTION OUTFALL
0.43 0.35 0.27 15.33
6.27 4.84 4.50 16.00
19.27 10.84 36.50 22.00
0 0 0 0
01:30 03:00 03:00 01:01
0.00 0 0 0
6 0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1027.18 0 02:59 13.75 1.00 0.28 0 54 CONDUIT 80.07 0 03:00 8.48 1.00 0.49 0 55 CONDUIT 42.83 0 03:00 9.69 1.00 0.82 0 56 CONDUIT 122.80 0 03:00 16.84 1.00 0.06 0 57 CONDUIT 252.28 0 03:00 26.80 1.00 0.54 0 58 CONDUIT 318.37 0 03:00 30.18 1.00 0.04 0 59 CONDUIT 86.41 0 03:00 12.87 1.00 0.20 0 60 CONDUIT 186.36 0 03:00 25.17 1.00 0.05 0 61 CONDUIT 431.56 0 03:00 28.70 1.00 0.12 0 62 CONDUIT 562.48 0 03:00 14.02 1.00 0.59 0 63 CONDUIT 364.80 0 03:00 22.68 1.00 0.20 0 64 CONDUIT 1187.23 0 03:00 16.88 1.00 0.64 0 65 CONDUIT 1124.38 0 03:00 12.75 1.00 0.60 0 68 CONDUIT 1329.37 0 03:08 0.49 1.00 0.71 0 70 CONDUIT 987.53 0 02:59 26.17 1.00 0.53 0 71 CONDUIT 968.34 0 03:01 27.46 1.00 1.04 13 74 CONDUIT 1073.71 0 02:59 9.72 1.00 0.58 0 77 CONDUIT 183.43 0 03:00 24.48 1.00 0.39 0 78 CONDUIT 24.84 0 03:07 0.32 1.00 1.00 0 79 CONDUIT 1114.08 0 03:00 9.68 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:38:04 2007 Total elapsed time: < 1 sec
74
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Grafik L4.1 : debit outflow
Di bawah ini gambar potongan penampang saluran :
Gambar L4.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L4.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
75
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L4.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L4.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
76
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L4.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
77
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 50 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 50%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 5.082 659.796 0.148 -3.243
Depth mm ------208.662 0.000 1.646 213.734 0.048
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow .........
Volume hectare-m --------0.000 659.797 0.000 0.000 0.000 671.543
Volume Mliters --------0.000 6598.043 0.000 0.000 0.000 6715.501
78
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Surface Flooding ......... Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.000 0.000 0.110 -1.797
0.000 0.000 0.000 1.098
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 2.349 209.754 183.96 1.005 2 208.662 0.000 0.000 1.572 213.567 80.26 1.024 3 208.662 0.000 0.000 1.380 215.202 42.93 1.031 4 208.662 0.000 0.000 1.474 214.336 69.07 1.027 5 208.662 0.000 0.000 1.238 216.748 63.68 1.039 6 208.662 0.000 0.000 1.681 212.817 86.57 1.020 7 208.662 0.000 0.000 1.270 216.389 66.28 1.037 8 208.662 0.000 0.000 2.137 210.532 159.25 1.009 9 208.662 0.000 0.000 1.416 214.846 88.85 1.030 10 208.662 0.000 0.000 1.564 213.626 42.75 1.024 11 208.662 0.000 0.000 1.269 216.375 48.28 1.037 12 208.662 0.000 0.000 1.200 217.247 27.25 1.041 13 208.662 0.000 0.000 1.055 219.256 13.65 1.051 14 208.662 0.000 0.000 1.994 211.140 41.40 1.012 15 208.662 0.000 0.000 1.879 211.690 47.17 1.015 16 208.662 0.000 0.000 1.276 216.290 10.53 1.037 17 208.662 0.000 0.000 1.399 215.008 47.72 1.030 18 208.662 0.000 0.000 1.296 216.065 32.47 1.035 19 208.662 0.000 0.000 1.172 217.595 16.27 1.043 20 208.662 0.000 0.000 1.096 218.645 27.29 1.048 21 208.662 0.000 0.000 1.295 216.078 23.25 1.036 22 208.662 0.000 0.000 1.195 217.308 36.92 1.041 23 208.662 0.000 0.000 1.537 213.829 46.71 1.025 24 208.662 0.000 0.000 1.157 217.789 39.58 1.044 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 1.646 213.734 183.96 1.024
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.15 2.14 172.14 0 03:00 0 0 42 JUNCTION 0.24 3.15 21.15 0 03:01 0 0 65 JUNCTION 0.39 4.82 18.82 0 03:01 0 0 76 JUNCTION 0.10 1.25 211.25 0 03:00 0 0 77 JUNCTION 0.11 3.10 171.10 0 02:03 0.00 1 78 JUNCTION 0.14 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 02:00 0.00 3 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.15 2.14 128.14 0 03:00 0 0 82 JUNCTION 0.12 1.60 71.60 0 03:00 0 0 83 JUNCTION 0.26 4.90 58.90 0 03:15 0.00 2 84 JUNCTION 0.10 1.30 91.30 0 03:00 0 0 85 JUNCTION 0.07 1.02 103.02 0 03:00 0 0 86 JUNCTION 0.28 4.50 54.50 0 02:49 0 0 87 JUNCTION 1.37 16.00 22.00 0 03:46 0.00 2 88 JUNCTION 0.36 4.46 14.46 0 03:02 0 0 89 JUNCTION 0.43 6.20 18.20 0 01:25 0.00 3
79
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
90 91 92 25
JUNCTION JUNCTION JUNCTION OUTFALL
0.43 0.35 0.28 15.33
6.27 4.84 4.50 16.00
19.27 10.84 36.50 22.00
0 0 0 0
01:41 03:00 02:59 01:01
0.00 0 0 0
4 0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1043.08 0 03:01 13.81 1.00 0.28 0 54 CONDUIT 80.12 0 03:00 8.48 1.00 0.49 0 55 CONDUIT 42.86 0 03:00 9.69 1.00 0.82 0 56 CONDUIT 122.89 0 03:00 16.84 1.00 0.06 0 57 CONDUIT 252.72 0 03:00 26.80 1.00 0.54 0 58 CONDUIT 318.84 0 03:00 30.20 1.00 0.04 0 59 CONDUIT 86.48 0 03:00 12.88 1.00 0.20 0 60 CONDUIT 186.47 0 03:00 25.18 1.00 0.05 0 61 CONDUIT 431.99 0 03:00 28.71 1.00 0.12 0 62 CONDUIT 562.99 0 03:00 14.03 1.00 0.60 0 63 CONDUIT 365.31 0 03:00 22.69 1.00 0.20 0 64 CONDUIT 1184.87 0 02:59 16.88 1.00 0.64 0 65 CONDUIT 1123.83 0 03:02 12.77 1.00 0.60 0 68 CONDUIT 1331.72 0 03:08 0.49 1.00 0.71 0 70 CONDUIT 1001.09 0 03:01 26.36 1.00 0.54 0 71 CONDUIT 990.27 0 03:00 27.11 1.00 1.07 12 74 CONDUIT 1078.89 0 03:01 9.76 1.00 0.59 0 77 CONDUIT 183.82 0 03:00 24.49 1.00 0.39 0 78 CONDUIT 24.84 0 03:07 0.32 1.00 1.00 0 79 CONDUIT 1115.91 0 03:02 9.71 1.00 0.64 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:38:40 2007 Total elapsed time: < 1 sec
Grafik L5.1 : debit outflow
80
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L5.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L5.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
81
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L5.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L5.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
82
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L5.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
83
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 60 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 60%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 3.815 660.850 0.211 -3.219
Depth mm ------208.662 0.000 1.236 214.075 0.068
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow .........
Volume hectare-m --------0.000 660.852 0.000 0.000 0.000 672.521
Volume Mliters --------0.000 6608.589 0.000 0.000 0.000 6725.283
84
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Surface Flooding ......... Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.000 0.000 0.139 -1.787
0.000 0.000 0.000 1.389
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 1.728 210.293 183.70 1.008 2 208.662 0.000 0.000 1.183 213.893 80.25 1.025 3 208.662 0.000 0.000 1.049 215.466 42.93 1.033 4 208.662 0.000 0.000 1.116 214.634 69.07 1.029 5 208.662 0.000 0.000 0.950 216.967 63.69 1.040 6 208.662 0.000 0.000 1.260 213.177 86.56 1.022 7 208.662 0.000 0.000 0.971 216.615 66.29 1.038 8 208.662 0.000 0.000 1.579 211.020 159.12 1.011 9 208.662 0.000 0.000 1.075 215.122 88.85 1.031 10 208.662 0.000 0.000 1.177 213.950 42.75 1.025 11 208.662 0.000 0.000 0.971 216.602 48.29 1.038 12 208.662 0.000 0.000 0.922 217.450 27.25 1.042 13 208.662 0.000 0.000 0.821 219.422 13.66 1.052 14 208.662 0.000 0.000 1.479 211.591 41.38 1.014 15 208.662 0.000 0.000 1.398 212.110 47.15 1.017 16 208.662 0.000 0.000 0.977 216.518 10.53 1.038 17 208.662 0.000 0.000 1.064 215.279 47.73 1.032 18 208.662 0.000 0.000 0.991 216.299 32.47 1.037 19 208.662 0.000 0.000 0.905 217.788 16.27 1.044 20 208.662 0.000 0.000 0.853 218.821 27.30 1.049 21 208.662 0.000 0.000 0.990 216.312 23.26 1.037 22 208.662 0.000 0.000 0.918 217.510 36.93 1.042 23 208.662 0.000 0.000 1.160 214.145 46.71 1.026 24 208.662 0.000 0.000 0.894 217.977 39.59 1.045 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 1.236 214.075 183.70 1.026
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.15 2.14 172.14 0 03:00 0 0 42 JUNCTION 0.25 5.50 23.50 0 02:35 0.00 2 65 JUNCTION 0.39 4.79 18.79 0 02:59 0 0 76 JUNCTION 0.10 1.25 211.25 0 03:00 0 0 77 JUNCTION 0.11 1.54 169.54 0 03:00 0 0 78 JUNCTION 0.14 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 01:43 0.00 6 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.15 2.14 128.14 0 03:00 0 0 82 JUNCTION 0.13 5.00 75.00 0 01:32 0.00 2 83 JUNCTION 0.26 4.90 58.90 0 02:03 0.00 2 84 JUNCTION 0.10 4.45 94.45 0 01:49 0.00 1 85 JUNCTION 0.08 3.20 105.20 0 01:58 0.00 1 86 JUNCTION 0.28 4.50 54.50 0 02:49 0 0 87 JUNCTION 1.41 16.00 22.00 0 01:30 0.00 4
85
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
88 89 90 91 92 25
JUNCTION JUNCTION JUNCTION JUNCTION JUNCTION OUTFALL
0.37 0.43 0.44 0.35 0.28 15.33
4.46 5.01 6.27 4.84 4.50 16.00
14.46 17.01 19.27 10.84 36.50 22.00
0 0 0 0 0 0
03:00 03:00 01:30 03:00 03:00 01:01
0 0 0.00 0 0 0
0 0 5 0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1027.88 0 02:59 13.75 1.00 0.28 0 54 CONDUIT 80.12 0 03:00 8.48 1.00 0.49 0 55 CONDUIT 42.86 0 03:00 9.69 1.00 0.82 0 56 CONDUIT 122.88 0 03:00 16.84 1.00 0.06 0 57 CONDUIT 252.46 0 03:00 26.80 1.00 0.54 0 58 CONDUIT 318.59 0 03:00 30.19 1.00 0.04 0 59 CONDUIT 86.47 0 03:00 12.88 1.00 0.20 0 60 CONDUIT 186.48 0 03:00 25.18 1.00 0.05 0 61 CONDUIT 431.85 0 03:00 28.70 1.00 0.12 0 62 CONDUIT 562.85 0 03:00 14.02 1.00 0.60 0 63 CONDUIT 365.06 0 03:00 22.69 1.00 0.20 0 64 CONDUIT 1188.04 0 03:00 16.89 1.00 0.65 0 65 CONDUIT 1125.15 0 03:00 12.76 1.00 0.60 0 68 CONDUIT 1330.26 0 03:08 0.49 1.00 0.71 0 70 CONDUIT 988.20 0 02:59 26.18 1.00 0.53 0 71 CONDUIT 968.85 0 03:01 27.46 1.00 1.04 13 74 CONDUIT 1074.44 0 02:59 9.72 1.00 0.58 0 77 CONDUIT 183.57 0 03:00 24.49 1.00 0.39 0 78 CONDUIT 24.84 0 03:07 0.32 1.00 1.00 0 79 CONDUIT 1114.84 0 03:00 9.68 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:39:09 2007 Total elapsed time: < 1 sec
Grafik L6.1 : debit outflow
86
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L6.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L6.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
87
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L6.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L6.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
88
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L6.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
89
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 70 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 70%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 2.653 661.465 0.289 -3.147
Depth mm ------208.662 0.000 0.859 214.274 0.093
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding .........
Volume hectare-m --------0.000 661.467 0.000 0.000 0.000 672.937 0.000
Volume Mliters --------0.000 6614.739 0.000 0.000 0.000 6729.440 0.000
90
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.000 0.171 -1.760
0.000 0.000 1.707
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 1.170 210.695 182.81 1.010 2 208.662 0.000 0.000 0.826 214.080 80.19 1.026 3 208.662 0.000 0.000 0.741 215.579 42.91 1.033 4 208.662 0.000 0.000 0.783 214.784 69.03 1.029 5 208.662 0.000 0.000 0.680 217.031 63.68 1.040 6 208.662 0.000 0.000 0.875 213.403 86.46 1.023 7 208.662 0.000 0.000 0.692 216.689 66.28 1.038 8 208.662 0.000 0.000 1.076 211.378 158.61 1.013 9 208.662 0.000 0.000 0.759 215.252 88.81 1.032 10 208.662 0.000 0.000 0.823 214.133 42.72 1.026 11 208.662 0.000 0.000 0.692 216.676 48.28 1.038 12 208.662 0.000 0.000 0.661 217.500 27.25 1.042 13 208.662 0.000 0.000 0.599 219.460 13.66 1.052 14 208.662 0.000 0.000 1.013 211.912 41.28 1.016 15 208.662 0.000 0.000 0.962 212.399 47.06 1.018 16 208.662 0.000 0.000 0.696 216.595 10.53 1.038 17 208.662 0.000 0.000 0.750 215.401 47.71 1.032 18 208.662 0.000 0.000 0.705 216.384 32.46 1.037 19 208.662 0.000 0.000 0.649 217.828 16.27 1.044 20 208.662 0.000 0.000 0.616 218.851 27.30 1.049 21 208.662 0.000 0.000 0.704 216.396 23.25 1.037 22 208.662 0.000 0.000 0.659 217.558 36.92 1.043 23 208.662 0.000 0.000 0.811 214.318 46.67 1.027 24 208.662 0.000 0.000 0.646 218.013 39.59 1.045 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 0.859 214.274 182.81 1.027
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.16 2.13 172.13 0 03:00 0 0 42 JUNCTION 0.25 3.12 21.12 0 02:59 0 0 65 JUNCTION 0.41 6.27 20.27 0 02:29 0.00 2 76 JUNCTION 0.10 1.25 211.25 0 03:00 0 0 77 JUNCTION 0.11 3.10 171.10 0 02:02 0.00 1 78 JUNCTION 0.15 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.15 3.30 167.30 0 03:06 0.00 2 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.16 2.13 128.13 0 03:00 0 0 82 JUNCTION 0.13 5.00 75.00 0 01:33 0.00 2 83 JUNCTION 0.26 4.90 58.90 0 02:45 0.00 2 84 JUNCTION 0.11 4.45 94.45 0 01:32 0.00 2 85 JUNCTION 0.07 1.02 103.02 0 03:00 0 0 86 JUNCTION 0.28 4.50 54.50 0 02:50 0 0 87 JUNCTION 1.44 13.72 19.72 0 03:00 0 0 88 JUNCTION 0.38 4.45 14.45 0 03:00 0 0 89 JUNCTION 0.44 6.20 18.20 0 02:46 0.00 4 90 JUNCTION 0.44 6.27 19.27 0 02:18 0.00 4
91
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
91 92 25
JUNCTION JUNCTION OUTFALL
0.36 0.28 15.33
4.84 4.50 16.00
10.84 36.50 22.00
0 0 0
03:00 03:00 01:01
0 0 0
0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1026.07 0 02:59 13.75 1.00 0.28 0 54 CONDUIT 80.05 0 03:00 8.48 1.00 0.49 0 55 CONDUIT 42.84 0 03:00 9.69 1.00 0.82 0 56 CONDUIT 122.79 0 03:00 16.84 1.00 0.06 0 57 CONDUIT 251.52 0 03:00 26.78 1.00 0.54 0 58 CONDUIT 317.63 0 03:00 30.16 1.00 0.04 0 59 CONDUIT 86.37 0 03:00 12.87 1.00 0.20 0 60 CONDUIT 186.38 0 03:00 25.17 1.00 0.05 0 61 CONDUIT 431.14 0 03:00 28.69 1.00 0.12 0 62 CONDUIT 562.05 0 03:00 14.02 1.00 0.59 0 63 CONDUIT 364.05 0 03:00 22.67 1.00 0.20 0 64 CONDUIT 1185.88 0 03:00 16.88 1.00 0.64 0 65 CONDUIT 1123.14 0 03:00 12.75 1.00 0.60 0 68 CONDUIT 1326.00 0 03:08 0.48 1.00 0.71 0 70 CONDUIT 986.25 0 02:59 26.17 1.00 0.53 0 71 CONDUIT 967.78 0 03:01 27.46 1.00 1.04 12 74 CONDUIT 1072.36 0 02:59 9.72 1.00 0.58 0 77 CONDUIT 182.67 0 03:00 24.45 1.00 0.39 0 78 CONDUIT 24.84 0 03:07 0.32 1.00 1.00 0 79 CONDUIT 1112.72 0 03:00 9.67 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:39:36 2007 Total elapsed time: 00:00:01
Grafik L7.1 : debit outflow
92
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L7.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L7.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
93
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L7.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L7.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
94
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L7.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
95
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 80 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 80%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 1.609 661.561 0.381 -3.014
Depth mm ------208.662 0.000 0.521 214.306 0.124
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding .........
Volume hectare-m --------0.000 661.563 0.000 0.000 0.000 672.687 0.000
Volume Mliters --------0.000 6615.699 0.000 0.000 0.000 6726.938 0.000
96
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.000 0.206 -1.713
0.000 0.000 2.055
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 0.683 210.934 181.28 1.011 2 208.662 0.000 0.000 0.504 214.096 80.05 1.026 3 208.662 0.000 0.000 0.459 215.520 42.87 1.033 4 208.662 0.000 0.000 0.482 214.760 68.94 1.029 5 208.662 0.000 0.000 0.428 216.916 63.65 1.040 6 208.662 0.000 0.000 0.529 213.464 86.27 1.023 7 208.662 0.000 0.000 0.434 216.584 66.24 1.038 8 208.662 0.000 0.000 0.634 211.577 157.71 1.014 9 208.662 0.000 0.000 0.468 215.206 88.72 1.031 10 208.662 0.000 0.000 0.502 214.147 42.65 1.026 11 208.662 0.000 0.000 0.434 216.571 48.25 1.038 12 208.662 0.000 0.000 0.418 217.377 27.24 1.042 13 208.662 0.000 0.000 0.384 219.363 13.66 1.051 14 208.662 0.000 0.000 0.601 212.076 41.10 1.016 15 208.662 0.000 0.000 0.575 212.529 46.91 1.019 16 208.662 0.000 0.000 0.436 216.493 10.53 1.038 17 208.662 0.000 0.000 0.464 215.349 47.66 1.032 18 208.662 0.000 0.000 0.440 216.289 32.44 1.037 19 208.662 0.000 0.000 0.411 217.701 16.26 1.043 20 208.662 0.000 0.000 0.395 218.733 27.29 1.048 21 208.662 0.000 0.000 0.440 216.302 23.23 1.037 22 208.662 0.000 0.000 0.417 217.435 36.91 1.042 23 208.662 0.000 0.000 0.496 214.320 46.60 1.027 24 208.662 0.000 0.000 0.408 217.887 39.58 1.044 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 0.521 214.306 181.28 1.027
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.16 2.12 172.12 0 03:00 0 0 42 JUNCTION 0.25 3.12 21.12 0 03:00 0 0 65 JUNCTION 0.42 6.27 20.27 0 02:30 0.00 2 76 JUNCTION 0.11 3.00 213.00 0 02:48 0.00 4 77 JUNCTION 0.11 3.10 171.10 0 01:55 0.00 1 78 JUNCTION 0.15 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.16 3.30 167.30 0 01:47 0.00 8 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.16 5.00 131.00 0 03:06 0.00 2 82 JUNCTION 0.14 5.00 75.00 0 02:27 0.00 2 83 JUNCTION 0.29 4.90 58.90 0 01:36 0.00 14 84 JUNCTION 0.11 4.45 94.45 0 01:33 0.00 4 85 JUNCTION 0.08 1.02 103.02 0 03:00 0 0 86 JUNCTION 0.29 4.50 54.50 0 02:51 0 0 87 JUNCTION 1.50 13.70 19.70 0 03:00 0 0 88 JUNCTION 0.39 4.45 14.45 0 03:01 0 0 89 JUNCTION 0.45 5.00 17.00 0 03:01 0 0 90 JUNCTION 0.46 6.27 19.27 0 02:21 0.00 4
97
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
91 92 25
JUNCTION JUNCTION OUTFALL
0.37 0.29 15.33
4.84 3.95 16.00
10.84 35.95 22.00
0 0 0
03:00 03:00 01:01
0 0 0
0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1025.93 0 03:00 13.74 1.00 0.28 0 54 CONDUIT 79.91 0 03:00 8.48 1.00 0.49 0 55 CONDUIT 42.80 0 03:00 9.68 1.00 0.82 0 56 CONDUIT 122.62 0 03:00 16.83 1.00 0.06 0 57 CONDUIT 249.88 0 03:00 26.75 1.00 0.54 0 58 CONDUIT 315.94 0 03:00 30.11 1.00 0.04 0 59 CONDUIT 86.18 0 03:00 12.86 1.00 0.20 0 60 CONDUIT 186.17 0 03:00 25.16 1.00 0.05 0 61 CONDUIT 429.83 0 03:00 28.66 1.00 0.12 0 62 CONDUIT 560.56 0 03:00 14.01 1.00 0.59 0 63 CONDUIT 362.28 0 03:00 22.63 1.00 0.19 0 64 CONDUIT 1183.20 0 03:01 16.87 1.00 0.64 0 65 CONDUIT 1122.30 0 03:01 12.75 1.00 0.60 0 68 CONDUIT 1318.47 0 03:08 0.47 1.00 0.71 0 70 CONDUIT 986.04 0 03:00 26.08 1.00 0.53 0 71 CONDUIT 959.45 0 03:00 27.17 1.00 1.03 10 74 CONDUIT 1072.27 0 03:00 9.70 1.00 0.58 0 77 CONDUIT 181.13 0 03:00 24.40 1.00 0.39 0 78 CONDUIT 24.84 0 03:07 0.31 1.00 1.00 0 79 CONDUIT 1111.89 0 03:01 9.67 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.12
Analysis begun on: Mon Sep 24 23:40:01 2007 Total elapsed time: 00:00:01
Grafik L8.1 : debit outflow
98
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L8.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L8.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
99
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L8.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L8.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
100
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L8.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
101
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 90 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 90%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 0.707 660.960 0.491 -2.797
Depth mm ------208.662 0.000 0.229 214.111 0.159
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow ......... Surface Flooding ......... Evaporation Loss .........
Volume hectare-m --------0.000 660.961 0.000 0.000 0.000 671.593 0.000 0.000
Volume Mliters --------0.000 6609.683 0.000 0.000 0.000 6715.995 0.000 0.000
102
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.245 -1.645
0.000 2.446
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 0.282 210.941 179.10 1.011 2 208.662 0.000 0.000 0.223 213.876 79.85 1.025 3 208.662 0.000 0.000 0.208 215.222 42.81 1.031 4 208.662 0.000 0.000 0.217 214.498 68.81 1.028 5 208.662 0.000 0.000 0.198 216.587 63.60 1.038 6 208.662 0.000 0.000 0.231 213.288 86.00 1.022 7 208.662 0.000 0.000 0.201 216.259 66.18 1.036 8 208.662 0.000 0.000 0.266 211.545 156.40 1.014 9 208.662 0.000 0.000 0.211 214.921 88.57 1.030 10 208.662 0.000 0.000 0.222 213.923 42.54 1.025 11 208.662 0.000 0.000 0.201 216.246 48.21 1.036 12 208.662 0.000 0.000 0.194 217.072 27.22 1.040 13 208.662 0.000 0.000 0.184 219.135 13.66 1.050 14 208.662 0.000 0.000 0.255 212.009 40.85 1.016 15 208.662 0.000 0.000 0.246 212.425 46.67 1.018 16 208.662 0.000 0.000 0.201 216.169 10.52 1.036 17 208.662 0.000 0.000 0.210 215.057 47.58 1.031 18 208.662 0.000 0.000 0.203 215.969 32.40 1.035 19 208.662 0.000 0.000 0.192 217.380 16.26 1.042 20 208.662 0.000 0.000 0.189 218.450 27.29 1.047 21 208.662 0.000 0.000 0.203 215.980 23.21 1.035 22 208.662 0.000 0.000 0.194 217.107 36.89 1.040 23 208.662 0.000 0.000 0.220 214.086 46.50 1.026 24 208.662 0.000 0.000 0.191 217.570 39.55 1.043 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 0.229 214.111 179.10 1.026
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.16 2.11 172.11 0 03:00 0 0 42 JUNCTION 0.26 5.50 23.50 0 01:46 0.00 2 65 JUNCTION 0.42 4.78 18.78 0 03:00 0 0 76 JUNCTION 0.10 1.23 211.23 0 03:00 0 0 77 JUNCTION 0.11 1.53 169.53 0 03:00 0 0 78 JUNCTION 0.15 2.24 172.24 0 03:00 0 0 79 JUNCTION 0.15 2.23 166.23 0 03:00 0 0 80 JUNCTION 0.06 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.16 2.11 128.11 0 03:00 0 0 82 JUNCTION 0.13 1.59 71.59 0 03:00 0 0 83 JUNCTION 0.27 4.90 58.90 0 01:50 0.00 4 84 JUNCTION 0.12 4.45 94.45 0 01:51 0.00 4 85 JUNCTION 0.08 3.20 105.20 0 02:01 0.00 1 86 JUNCTION 0.29 4.50 54.50 0 02:53 0 0 87 JUNCTION 1.57 16.00 22.00 0 03:14 0.00 2 88 JUNCTION 0.40 4.44 14.44 0 03:01 0 0 89 JUNCTION 0.47 6.20 18.20 0 01:50 0.00 2 90 JUNCTION 0.47 6.27 19.27 0 02:23 0.00 3 91 JUNCTION 0.37 4.83 10.83 0 03:00 0 0
103
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
92 25
JUNCTION OUTFALL
0.29 15.33
3.94 16.00
35.94 22.00
0 0
03:00 01:01
0 0
0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1021.27 0 03:00 13.73 1.00 0.28 0 54 CONDUIT 79.71 0 03:00 8.47 1.00 0.49 0 55 CONDUIT 42.74 0 03:00 9.68 1.00 0.82 0 56 CONDUIT 122.35 0 03:00 16.82 1.00 0.06 0 57 CONDUIT 247.54 0 03:00 26.70 1.00 0.53 0 58 CONDUIT 313.53 0 03:00 30.04 1.00 0.04 0 59 CONDUIT 85.90 0 03:00 12.85 1.00 0.20 0 60 CONDUIT 185.85 0 03:00 25.15 1.00 0.05 0 61 CONDUIT 427.92 0 03:00 28.62 1.00 0.12 0 62 CONDUIT 558.38 0 03:00 14.00 1.00 0.59 0 63 CONDUIT 359.75 0 03:00 22.59 1.00 0.19 0 64 CONDUIT 1177.94 0 03:01 16.85 1.00 0.64 0 65 CONDUIT 1117.07 0 03:01 12.73 1.00 0.59 0 68 CONDUIT 1307.55 0 03:08 0.46 1.00 0.70 0 70 CONDUIT 981.08 0 03:00 26.05 1.00 0.53 0 71 CONDUIT 954.72 0 03:00 27.16 1.00 1.03 8 74 CONDUIT 1067.11 0 03:00 9.69 1.00 0.58 0 77 CONDUIT 178.94 0 03:00 24.32 1.00 0.38 0 78 CONDUIT 24.84 0 03:08 0.30 1.00 1.00 0 79 CONDUIT 1106.76 0 03:01 9.66 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.13
Analysis begun on: Mon Sep 24 23:40:31 2007 Total elapsed time: < 1 sec
Grafik L9.1: debit outflow
104
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L9.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L9.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
105
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L9.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L9.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
106
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L9.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
107
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Dengan parameter Impervious = 100 %
Parameter – Parameternya adalah : •
Slope = 1,3 %
•
Imperv = 100%
•
N – Imperv = 0,012
•
N – Perv = 0,012
•
Dstore – Imperv = 0,05
•
Dstore – Perv = 0,05
•
Zero Imperv = 25 %
EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.007) ---------------------------------------------------------------
**************** Analysis Options **************** Flow Units ............... Infiltration Method ...... Flow Routing Method ...... Starting Date ............ Ending Date .............. Antecedent Dry Days ...... Report Time Step ......... Wet Time Step ............ Dry Time Step ............ Routing Time Step ........
CMS HORTON KINWAVE OCT-13-2005 00:00:00 OCT-14-2005 00:00:00 0.0 00:15:00 00:15:00 01:00:00 60.00 sec
************************** Runoff Quantity Continuity ************************** Total Precipitation ...... Evaporation Loss ......... Infiltration Loss ........ Surface Runoff ........... Final Surface Storage .... Continuity Error (%) .....
Volume hectare-m --------644.139 0.000 0.000 659.121 0.617 -2.422
Depth mm ------208.662 0.000 0.000 213.515 0.200
************************** Flow Routing Continuity ************************** Dry Weather Inflow ....... Wet Weather Inflow ....... Groundwater Inflow ....... RDII Inflow .............. External Inflow .......... External Outflow .........
Volume hectare-m --------0.000 659.121 0.000 0.000 0.000 669.278
Volume Mliters --------0.000 6591.280 0.000 0.000 0.000 6692.850
108
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Surface Flooding ......... Evaporation Loss ......... Initial Stored Volume .... Final Stored Volume ...... Continuity Error (%) .....
0.000 0.000 0.000 0.285 -1.584
0.000 0.000 0.000 2.846
*************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Coeff Subcatchment mm mm mm mm mm CMS -------------------------------------------------------------------------------------1 208.662 0.000 0.000 0.000 210.410 176.23 1.008 2 208.662 0.000 0.000 0.000 213.224 79.59 1.022 3 208.662 0.000 0.000 0.000 214.569 42.72 1.028 4 208.662 0.000 0.000 0.000 213.839 68.63 1.025 5 208.662 0.000 0.000 0.000 215.992 63.53 1.035 6 208.662 0.000 0.000 0.000 212.652 85.62 1.019 7 208.662 0.000 0.000 0.000 215.646 66.09 1.033 8 208.662 0.000 0.000 0.000 210.989 154.67 1.011 9 208.662 0.000 0.000 0.000 214.264 88.38 1.027 10 208.662 0.000 0.000 0.000 213.270 42.40 1.022 11 208.662 0.000 0.000 0.000 215.632 48.14 1.033 12 208.662 0.000 0.000 0.000 216.486 27.20 1.037 13 208.662 0.000 0.000 0.000 218.785 13.65 1.049 14 208.662 0.000 0.000 0.000 211.430 40.50 1.013 15 208.662 0.000 0.000 0.000 211.827 46.36 1.015 16 208.662 0.000 0.000 0.000 215.551 10.50 1.033 17 208.662 0.000 0.000 0.000 214.402 47.48 1.028 18 208.662 0.000 0.000 0.000 215.343 32.36 1.032 19 208.662 0.000 0.000 0.000 216.843 16.24 1.039 20 208.662 0.000 0.000 0.000 218.014 27.28 1.045 21 208.662 0.000 0.000 0.000 215.355 23.18 1.032 22 208.662 0.000 0.000 0.000 216.549 36.85 1.038 23 208.662 0.000 0.000 0.000 213.430 46.35 1.023 24 208.662 0.000 0.000 0.000 217.048 39.53 1.040 -------------------------------------------------------------------------------------Totals 208.662 0.000 0.000 0.000 213.515 176.23 1.023
****************** Node Depth Summary ****************** ---------------------------------------------------------------------------------------Average Maximum Maximum Time of Max Total Total Depth Depth HGL Occurrence Flooding Minutes Node Type Meters Meters Meters days hr:min ha-mm Flooded ---------------------------------------------------------------------------------------33 JUNCTION 0.17 2.09 172.09 0 03:00 0 0 42 JUNCTION 0.26 3.10 21.10 0 03:00 0 0 65 JUNCTION 0.44 6.27 20.27 0 03:04 0.00 2 76 JUNCTION 0.11 3.00 213.00 0 01:52 0.00 4 77 JUNCTION 0.11 3.10 171.10 0 02:06 0.00 1 78 JUNCTION 0.15 2.23 172.23 0 03:00 0 0 79 JUNCTION 0.16 3.30 167.30 0 02:00 0.00 2 80 JUNCTION 0.07 0.82 140.82 0 03:00 0 0 81 JUNCTION 0.17 2.08 128.08 0 03:00 0 0 82 JUNCTION 0.14 1.58 71.58 0 03:00 0 0 83 JUNCTION 0.28 4.90 58.90 0 01:29 0.00 2 84 JUNCTION 0.13 4.45 94.45 0 01:37 0.00 8 85 JUNCTION 0.08 1.01 103.01 0 03:00 0 0 86 JUNCTION 0.30 4.50 54.50 0 02:55 0 0 87 JUNCTION 1.62 13.65 19.65 0 03:00 0 0 88 JUNCTION 0.41 4.43 14.43 0 03:01 0 0 89 JUNCTION 0.48 6.20 18.20 0 03:09 0.00 2
109
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
90 91 92 25
JUNCTION JUNCTION JUNCTION OUTFALL
0.48 0.38 0.30 15.33
6.27 4.83 3.92 16.00
19.27 10.83 35.92 22.00
0 0 0 0
03:26 03:00 03:00 01:01
0.00 0 0 0
2 0 0 0
******************** Link Flow Summary ******************** ----------------------------------------------------------------------------------------Maximum Time of Max Maximum Length Max/ Total Flow Occurrence Velocity Factor Full Minutes Link Type CMS days hr:min m/sec Flow Surcharged ----------------------------------------------------------------------------------------31 CONDUIT 1015.39 0 03:00 13.70 1.00 0.27 0 54 CONDUIT 79.44 0 03:00 8.46 1.00 0.49 0 55 CONDUIT 42.65 0 03:00 9.67 1.00 0.82 0 56 CONDUIT 121.99 0 03:00 16.81 1.00 0.06 0 57 CONDUIT 244.46 0 03:00 26.64 1.00 0.53 0 58 CONDUIT 310.35 0 03:00 29.95 1.00 0.04 0 59 CONDUIT 85.52 0 03:00 12.83 1.00 0.20 0 60 CONDUIT 185.41 0 03:00 25.13 1.00 0.05 0 61 CONDUIT 425.35 0 03:00 28.57 1.00 0.12 0 62 CONDUIT 555.45 0 03:00 13.98 1.00 0.59 0 63 CONDUIT 356.40 0 03:00 22.53 1.00 0.19 0 64 CONDUIT 1170.80 0 03:00 16.82 1.00 0.64 0 65 CONDUIT 1109.73 0 03:01 12.71 1.00 0.59 0 68 CONDUIT 1292.86 0 03:08 0.44 1.00 0.69 0 70 CONDUIT 974.06 0 03:00 26.04 1.00 0.52 0 71 CONDUIT 948.56 0 03:00 27.15 1.00 1.02 6 74 CONDUIT 1060.48 0 03:00 9.68 1.00 0.58 0 77 CONDUIT 176.05 0 03:00 24.21 1.00 0.37 0 78 CONDUIT 24.84 0 03:08 0.29 1.00 1.00 0 79 CONDUIT 1100.21 0 03:01 9.65 1.00 0.63 0
************************* Routing Time Step Summary ************************* Minimum Time Step Average Time Step Maximum Time Step Percent in Steady State Average Iterations per Step
: : : : :
60.00 sec 60.00 sec 60.00 sec 0.00 1.13
Analysis begun on: Mon Sep 24 23:41:03 2007 Total elapsed time: < 1 sec
Grafik L10.1 debit outflow
110
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Di bawah ini gambar potongan penampang saluran :
Gambar L10.1: potongan melintang saluran node 76 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 76 ke node 86, dan melalui conduit 77, 57, 58 dan 63.
Gambar L10.2: potongan melintang saluran node 78 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 78 ke node 86, dan melalui conduit 55, 56, 60, 61 dan 62.
111
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L10.3: potongan melintang saluran node 77 – 86
Dari gambar di atas dapat diketahui desain saluran secara melintang yang menghubungkan dari node 77 ke node 86, dan melalui conduit 54, 56, 60, 61 dan 62.
Gambar L10.4: potongan melintang saluran node 86 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 86 ke node 25, dan melalui conduit 71, 70, 31, 74, 79, 65, 64 dan 68.
112
BAB IV PEMODELAN DAS BERINGIN
LAMPIRAN
Perpustakaan Unika =================================================================
Gambar L10.5: potongan melintang saluran node 91 - 25
Dari gambar di atas dapat diketahui desain saluran secara melitang yang menghubungkan dari node 91 ke node 25, dan melalui conduit 78.
113