Lean Principles for Improved Flexibility SANMINA-SCI Tatabánya Global Services
GLOBAL SERVICES DIVISION
KVALIKON Productivity Conference April 9-10, 2008
© 2006 Sanmina-SCI Corporation. Sanmina-SCI is a trademark of Sanmina-SCI Corporation. All trademarks and registered trademarks are the property of their respective owners.
Sanmina-SCI Today We focus on delivering the highest-level quality, technology and service to our Customers 26 years of operation $10+ billion in annualized revenue 80+ plants in over 20 countries 13 million ft.2 of manufacturing capacity 48,000 employees Market Focused Organization Total manufacturing solution
Sanmina-SCI Confidential
Global Services Division
A long history of services expertise … SCI starts repairing boards for NASA in 1961 SCI starts building CTO products for HP in 1985
-
Shop Floor Data Collector is born
Repair services offered at 45 different locations CTO / Fulfillment services offered at every major geography
We recognized that … The market was demanding better service performance Customers were looking for partners that focused on superior delivery and quality in logistics and repair services Customers needed streamlined communications and simplified solutions
Sanmina-SCI Confidential
Global Services Division Charter
Order Fulfillment & Distribution
Create maximum competitive advantage for our customers by delivering best-in-class Order fulfillment Configure to order Product support Repair and disposition Repair & Disposition
integrating seamlessly to deliver end-to-end solutions 2nd
After-Market Support Services Sanmina-SCI Confidential
CTO & Stage Mfg
Product Offering Forward Logistics Hub Management Services Materials Purchasing & Planning Hub & Inventory Management Inventory visibility
Distribution & Fulfillment Services
Supply Chain Optimization Order Planning & Management Order Consolidation & Inventory Merge Pick, Pack & Ship (Domestic & International)
Real-time order tracking and reporting Custom Labels & Packaging
2nd stage manufacturing Product Configuration (Customization) Complex Integration (Configured Racks) Installation and test of hardware, apps and images Asset tagging with static or dynamic data
Sanmina-SCI Confidential
Product Offering Reverse Logistics Basic Technical Support Product registration and web-based issue resolution system Knowledge database / software downloads
Returns Management
Management of returns and repair programs Management of 3rd party repair service providers Advance replacement capabilities Triage enabled facilities
Repair Services
Reverse engineering / test development and optimization Complete materials management / tracking Full featured diagnostics labs System and board level repair
Disposition & Asset Recovery EOL disposition/remarketing (WEEE) Direct return and re-ship to the end customer
Sanmina-SCI Confidential
Global Repair Services Footprint Europe and Middle East
North America Asia Pacific Latin America San Jose, CA Louisville, CO Rapid City, SD Kenosha, WI Point Claire, CAN Raleigh, NC Huntsville, AL Dallas, TX Austin, TX Laredo, TX Guadalajara, MEX (2) Campinas, BRA LRS Managed Operations EMS Operations Sanmina-SCI Confidential
Fermoy, IRL Haukipudas, FIN Cherbourg, FRA Gunzenhausen, GER Tatabanya, HGY Szekesfehervar, HGY Lod, ISR Dubai, UAE
Fujisawa, JPN Shenzhen, PRC Kunshan, PRC Pathum Thani, TLD Penang, MYS Singapore, SGP Sydney, AUS Chennai, IND (07)
Total Solution for Our Customers Customer
Customer
Design and Engineering
Logistics / Repair
pcb fabrication
pcb assembly
backplanes
cables
memory modular solutions
optical modules
precision machining
enclosures
Component Manufacturing
Systems Design and Manufacturing
Communications
World-class Infrastructure Support Services: Supply Chain Management & Global Oracle ERP
Sanmina-SCI Confidential
Focus on Specific Key Markets
SIEMENS
microsystems
LAM
SIEMENS
Sanmina-SCI Confidential
Global Services Division Customer Portfolio Expansion
2003
Sanmina-SCI Confidential
2004
2005
2006
2007
2008
Global Repair Services Size and Scope
Logistics and Repair Services provides integrated supply chain solutions for customers around the world $2.5 billion products delivered/yr
APAC 5%
15 million units processed/yr 1.3 million sqft of operating space 2,175 dedicated resources
Sanmina-SCI Confidential
EMEA 41%
Am ericas 54%
Tatabanya Operations Consolidating as a Reverse Logistics Center Medical Systems Repair 2008
Industrial Printer Returns Depot and Direct Order Fulfillment Industrial Printer Repair Wireline Card Repair Server Advance Replacement
2007
Security Appliance Configuration, Advance Replacement and DOF Server Refurbishment, Asset Recovery and WEEE Services
2006
PC & Laptop Refurbishment, Asset Recovery and WEEE Services
2005
Wireless System Repair
Sanmina-SCI Confidential
HUNGARY - Europe is in Reach
Area: Population:
93.063 km2 10,3 M
Within the ECC
Directly connected to EU Highway system
24h distance from major European Hubs
Good access to „new”
EU ports (Koper, Triest)
Sanmina-SCI Confidential
Sanmina-SCI Hungary Facilities Tatabanya Plant 2
Tatabánya
Just at the M1 highway 65 km from Budapest 1.5 hour drive from Viena
ESD production area at two floors
Certifications
13 Dock doors / 2 ramps
ISO 9001:2000
Warehouse/shipping: 4,2k sqm
Sprinkler installation
ISO 14001
Offices area:
Compressor house
TL 9000 (in process)
Building size:
22k
Production area:
12,5k sqm
Other areas: Dedicated staff: Sanmina-SCI Confidential
sqm
3,2k sqm 1,9k sqm 250+
Generator Security System to protect physical property, intellectual property, and personnel
OSHA 18001 Waste Management (in process) M3k / Q3k
Product Offering & Technical Capabilities
GLOBAL SERVICES DIVISION
© 2006 Sanmina-SCI Corporation. Sanmina-SCI is a trademark of Sanmina-SCI Corporation. All trademarks and registered trademarks are the property of their respective owners.
Sanmina-SCI Hungary Facilities Tatabanya Capability/Program Summary Repair Program Offerings Warranty verification (SANM and non-SANM manufactured components In and out-of-warranty repairs Triage and Failure analysis Advanced replacement Direct return and re-ship to the end customer Reconfigurations, Refurbishment and Upgrades Recycling - WEEE/product cannibalization 3rd party supplier RMA/Repair management After hours order processing service (24-7) Performance trends and reporting Returns Management Management of returns and repair programs Advance replacement capabilities “Localized” Triage enabled facilities
Sanmina-SCI Confidential
Disposition & Asset Recovery EOL disposition/remarketing (WEEE) Refurbishment /Services Harvesting / Scrapping Upgrade to stock for resale
Repair Complete materials management / tracking System and Board level repair
-
RF and microwave expertise Solder Repair Calibration
Repair parts planning Forecasting and fulfillment of Field Replaceable Unit spares (FRU) Global fulfillment support: Direct ship and return, bundling, and merge-in-transit Complete systems testing: Genrad In-CircuitTest, customized testers , heat chambers, etc. Lab based, full featured diagnostics
Capabilities - Technical Tatabanya Logistics and Repair Centre has a technically diverse pool of resource of over 250 people. Technicians and engineers, dedicated for testing, repairing, process support. Warehousing, logistics, inventory and quality support.
Competences Wide range of hi-tech skills set Experience with existing telecom and PC products Tester maintenance, calibration knowledge Transfer of technology expertise Process improvement skills
Product Experience PC and Printer products Telecommunication products Digital and Analog technology RF / Wireless product repair experience Broadband / narrowband products skills
Sanmina-SCI Confidential
Capability - Engineering Support Product and Process Engineering Support
ECO handling via customer interface Product documentation and instructions for production KPI monitoring and analysis Repair process development, tooling management
FA Engineering Support
FA engineers provide continuous training for technicians with their extended experience in RF and microwave products Dedicated FA Engineers support product debugging Failure analysis and debug improvement
Test Engineering Support
Test engineers ensure high level of tester availability for production Equipment maintenance management Test system and equipment calibration
Sanmina-SCI Confidential
A few examples of current products Personal Computers
Printers
Telecoms Products 3G, DSL…
Sanmina-SCI Confidential
Servers
Lean principles applied for Improved Services
GLOBAL SERVICES DIVISION
© 2006 Sanmina-SCI Corporation. Sanmina-SCI is a trademark of Sanmina-SCI Corporation. All trademarks and registered trademarks are the property of their respective owners.
QCD – Seven Measures vs. Service Ind. Seven Measures (SMMT – Industry Forum)
APPLICABLE
BASELINE
TARGET
Looping: 3.3
Looping:: 2.5
RFTOT (%) Right First Time On Time
Sanmina-SCI Confidential
OTD: 75% Dev.: 25%
OTD: 85% Dev.:15%
PP: 65% Dev.: 30%
PP: 90% Dev.: 10%
Eraned/Paid (%)
QCD – Seven Measures vs. Service Ind.
APPLICABLE
Sanmina-SCI Confidential
BASELINE
TARGET
N/A
N/A
100%
120%
100%
130%
16 turns
+20 turns
Problem Statement & Scope Problem Statement Line efficiency is below the expectation due to:
Weak responsiveness to volume fluctuation, Direct workers training (cross) is not efficient,
Inefficient production planning & control Insufficient baseline measurements and standard time records, Processes are loosely defined, work instructions are not always clear and legible, Wastes all over the process:
Overproduction (sub processes) Line imbalance Walking long distances Queuing at WH Multiple administration (traveller, xTO, SFDC, pick slip, test report)
Scope
Evaluate baseline efficiency data, select the vital few product lines
Prepare VSM for key product lines, run Lean Audit & identify the wastes Improve the line efficiency by elimination of MUDA Standardizing processes and modify layout accordingly (VSM future state) Developing efficient production planning and control measures
Sanmina-SCI Confidential
Lean Self Assessment Lean Improvement Road Map Assessment
Nokia TRXx Line 4/15/2006
Target - World Class
5 S Housekeeping
0 0
Focused Factory
Visual Controls
1
Score
1
(50 Possible)
2
50
2
3
45
3
Standard Work
Poka Yoke
44
40 35
5
5
30 25
Prod. Scheduling
TPM
20 15 10 5
Balanced Production
Worker Flexibility
0 Kaizen Improvement
Sanmina-SCI Confidential
24
Problem Statement - Ihikawa Diagram
Sanmina-SCI Confidential
Problem Statement - Affinity Diagram
Sanmina-SCI Confidential
Efficiency Improvement Plan HRC Repair Efficiency Plan 100%
TARGET 90% 1. Soldering training 2. Tester capacity ut. 3. Tech training
80%
Efficiency
70% 1. Cannibalization 2. Module rep eff. 3. Tech training
60%
50%
1. Stalilize process flow based on mix 2. Improve the work ballancing 3. Module repair support and training 4. Layout change and visibility
1. Cross training 2. Work combinantion 3. ... 1. ATLCx training - volume 2. Teser availability impr. 3. Cross training
1. ALCx productivity improvement by 25% 2. TAUx material cost decrease by 15% 3. Shift rotation review (5% cost reduction) 4. AACB>AAZF efficiency up by 50%
40%
30%
20% $1.00
$10.00
$100.00 Material Cost/Unit
Sanmina-SCI Confidential
$1,000.00
The Plan – Executive Summary
Process Flow review and practical validation
Standard Worksheet (Spagetti) perparation for main lines
Time Observation for all (sub)process job elements. 12 units each shift eack subprocess
Work Combination for all subprocesses
VSM preparation for major product lines (current state review)
„7 Waste” identification - Overproduction and early production producing over repair orders. - Waiting hanging around, idle time (time when no value is added to the product) . - Transportation handling more than once, delays in moving materials, unnecessary move or handling. - Inventory - unnecessary raw materials in stores, work in process (WIP), & finished stocks . - Motion - movement of equipment or people that add no value to the product . - Over-processing - unnecessary processing or procedures (work carried out which adds no value) - Defective units producing or reworking scrap
Improvements Action list, job assignments and tracking
Workload Ballancing and VSM future state
Periodic review of Improvement Results
Sustain the gains and deploy to new programs
Sanmina-SCI Confidential
Spagetti - Example Manager or Team Leader
(Section A)
Area or Process Name
(Section B)
TALK
Person Preparing This Sheet (Section C)
80
115 110
Tuning 120
60
90
10
30%
70
20
70% 40 90
Quality Check
Sanmina-SCI Confidential
Safety Precaution
NFF 15%
Standard Work in process
Takt Time
55
Required Output
50
30
Net Time
Operator Number
Layout Modification – Example Guadalajara
Sanmina-SCI Confidential
Business Process Review – 2006 November XTO
ORACLE
SFDC
EXCEL / MANUAL RMA file from XTO report
Unit receiving Sales Order Entry side AWIP Legend: WIP
XTO Component Booking
Inventory Trans. To WIP
SFDC move PRETEST
Paper Traveller
SFDC move UPGRADE
Paper Traveller
SFDC move REPAIR
Paper Traveller
SFDC move FUT
Paper Traveller
Business VA Non VA Value Add
XTO Completiion Final Rep. Result Sales Order Backend Side Repair Report Work Order Open and BF Subinventory Transfer and Release
Invoiving Sanmina-SCI Confidential
Shipping Check With Macro OBA Check With Macro Packing Slip With Macro
DESIRED ARCHITECTURE – 2007 Feb.
TTBY LRS Proposal Serial number is the driver Single unit Jobs WO handling at backend Error proofing in the process BPR approach XTO driven solution Business process in focus
Sanmina-SCI Confidential
FTE FTE -5.00 -5.00
-10.00 -10.00
Sanmina-SCI Confidential
-15.00 -15.00
-20.00 -20.00
-25.00 -25.00 Time Time
13-Aug 13-Aug
6-Aug 6-Aug
30-Jul 30-Jul
23-Jul 23-Jul
16-Jul 16-Jul
9-Jul 9-Jul
2-Jul 2-Jul
25-Jun 25-Jun
18-Jun 18-Jun
11-Jun 11-Jun
4-Jun 4-Jun
28-May 28-May
21-May 21-May
14-May 14-May
7-May 7-May
30-Apr 30-Apr
23-Apr 23-Apr
16-Apr 16-Apr
9-Apr 9-Apr
2-Apr 2-Apr
26-Mar 26-Mar
Productivity Evolution – 2007 Mar - Aug
Indirect IndirectLabor LaborProducticity ProducticityEvolution Evolution
10.00 10.00
5.00 5.00
0.00 0.00
Delivery Preformace Evolution
Product Product"A" "A"TAT TATafter afterimprovement improvement
33.9 33.9
41.7 41.7 37.8 37.8
36.8 36.8 40.2 40.2
37.9 37.9 35.1 35.1
Repair Repair
5.3 5.3 4.4 4.4
6.6 6.6 5.4 5.4
5.5 5.5 4.3 4.3
10 10
10.5 10.5 6.0 6.0
27.2 27.2
25.6 25.6
25.5 25.5 25.0 25.0
34.2 34.2 25.6 25.6 27.3 27.3
Target Target
18.9 18.9 14.1 14.1
20 20
16.2 16.2 17.0 17.0
30 30 15.5 15.5 17.0 17.0
days days
40 40
31.4 31.4
50 50
D to D D to D
00 11 22 33 44 55 66 77 88 99 10 1011 1112 1213 1314 1415 1516 1617 1718 1819 1920 2021 2122 2223 2324 2425 2526 2627 2728 2829 29
weeks weeks
Sanmina-SCI Confidential
Aging Projection – Product transfer ‘07
RR&R's &R'sAging Aging 369 369
369 369
350 350
350 350
300 300
300 300
267 267 233 233
250 250
215 215
198 198
200 200
Days Days
200 200
250 250
15150 0 100 100
134 134
100 100
111 111 100111 96111 102 102 100 90 9393 96 90
50 50 0 0
1
1
150 150
120 120
134 134
1
1
1
8
1
8
96 96
85 85
75 75 85 85 72 67 44 62 72 39 67 44 62 52 46 39 45 4 4 52 4 1 40 38 46 45 44 33 41 40 29 38 33 29 44 1 1 1 1 1 1 1 44 1 1 1 1 1 1 1
W26 W27 W28 W29 W30 W31 W32 W33 W34 W35 W36 W37 W38 W39 W40 W41 W42 W43 W26 W27 W28 W29 W30 W31 W32 W33 W34 W35 W36 W37 W38 W39 W40 W41 W42 W43 Wks Wks
Sanmina-SCI Confidential
100 100 50 50 0 0
QQ1 1 Min Min Max Max Q3 Q3 AvAverage erage Median Median Goal Goal
Testers Gage R&R – Looping investigation LOCATION PART
Plant Sanmina-SCI Tatabanya LRS Dept: Part number: 465389a....203 Part description Drawing number n/a Eng. chg. level Tool number n/a # Cavities Description Mean Transmitted RF carrier power - Power level 0 SPEC 45.75 PLUS 0.75 Lwr Spec Limit 45.0 NOMINAL 45.75 HISTOGRAM WITHOUT LIMITS LSL
TOOL DIMENSION
Chart Title
Production Date: TRXD 12 n/a n/a Units Shopfloor passed units MINUS Upr Spec Limit HISTOGRAM WITH LIMITS
2006.02.05
0.75 46.5 USL
18 16
14
16
12 12
45.0000
46.5000
14 12
10
12
12
10 8
8
10
8
9
8 6 6 2
4
Attributive Gage R&R Start Time 6:54 7:24 7:53 8:24 8:55 9:34 10:04 10:34 11:04 11:31 Sanmina-SCI Confidential
Tester1 (974) Unit1 Unit2 Unit3 Unit4 Unit5 Unit6 Unit7 Unit8 Unit9 Unit10
Result pass pass fail fail pass pass pass pass fail fail
Tester2 (1000) Unit1 Unit2 Unit3 Unit4 Unit5 Unit6 Unit7 Unit8 Unit9 Unit10
Result pass pass fail pass pass pass pass pass fail pass
Tester3 (466) Unit1 Unit2 Unit3 Unit4 Unit5 Unit6 Unit7 Unit8 Unit9 Unit10
Result pass pass pass pass pass pass pass fail fail pass
46.050
45.750
0 45.450
0 45.150
46.249
46.127
46.005
45.883
45.761
45.639
45.517
45.395
45.273
45.151
1 0
44.850
2
1
DESCRIPTIVE STATISTICS Number of readings Lower spec limit (LSL) Nominal Upper spec limit (USL) Total sum Average readings ( X ) Maximum Minimum Readings below LSL Readings above USL Average Range (R) D2 Value n= 2 Upper capability index (CPU) Lower capability index (CPL) Capability index (Cp) Process Capability (Cpk) Capability ratio (CR) Std Deviation (n-1) Std Deviation (n) Variance (n-1) Variance (n) Performance index (PP ) Performance ratio (PR) Performance index (Ppk )
0 46.950
2 1
0 45.029
0
1
46.650
2 2
46.350
3
44.550
4
VALUES 50 45.0000 45.7500 46.5000 2,282.5600 45.6512 46.3100 45.0900 0 0 0.4784 1.1280 0.6671 0.5118 0.5895 0.5118 1.6965 0.3506 0.3471 0.1229 0.1205 0.7130 1.4025 0.6191
TAT analysis - project example
AVG TAT AVG TAT
Target Target
60 60 50 50 40 40 30 30 20 20 10 10 0
0
WK701 WK703 WK705 WK707 WK709 WK711 WK713 WK701 WK703 WK705 WK707 WK709 WK711 WK713 Sanmina-SCI Confidential
SLA SLA
Out of SLA (>30CD) Out of SLA (>30CD)
100,0% 100,0% 90,0% 90,0% 80,0% 80,0% 70,0% 70,0% 60,0% 60,0% 50,0% 50,0% 40,0% 40,0% 30,0% 30,0% 20,0% 20,0% 10,0% 10,0% 0,0% 0,0% WK701 WK703 WK705 WK707 WK709 WK711 WK713 WK701 WK703 WK705 WK707 WK709 WK711 WK713
S.sz. Gép neve, száma : Gép helye :
Gép információkat kitölteni
Gép felelıse :
KARBANTARTÁSI MUNKALAP Munka fajtája: Mechanikai Elektromos Program Probe Egyéb
Munka típusa: Megelızı Fejlesztı Hibaelhárító Project Ellenırzés
MUNKAKEZDÉS
Sorszámot beírni!
HIBA ÉSZLELV E
Maintenance „T” Card – Top side DÁTUM : ÓRA/PERC :
Idıt pontosan feljegyezni
DÁTUM : ÓRA/PERC :
HIBA LEÍRÁSA :
Megfelelı fajta, ill. típust megjelölni
A hiba rövid leírása, nem az okot, vagy az ellenintézkedési ötletet beírni!
HIBAELHÁRÍTÓ 4 órán belül HIBAELHÁRÍTÓ 48 órán belül Tervszerő Megelızı
SZÜKSÉGES ALKATRÉSZEK : Sz. Alkatrész neve
Cikksz. ME Felhasznált
1. 2. 3.
Vissza
Raktártól igényelni alkatrészt, a használtat visszaküldeni!
4. 5. Karbantartás tölti ki!
Karbantartás vez. vagy megbízottja : DÁTUM :
Sanmina-SCI Confidential
Szükséges alkatrészek státusa Kiadva PO küldve
1. 2. 3. 4. 5.
1/2
Mőszakvezetı ellenjegyzése
Igénylı/Vezetı
ELVÉGEZVE
Dátum :
A HIBA OKA Gyártómérnök ellenjegyzése
Javítás rövid összefoglalása
Mérnök/Technikus: Dátum:
Kopás Szennyezıdés Csatlakozó(k) Elektromos hiba Beállítás, kalib.
Ref. egység PC program Préslevegı Munkabiztonsági Egyéb
MUNKA BE- GÉP FEJEZVE ÁTADVA
Maintenance „T” Card – Bottom side Gyártásnak visszaadva
DÁTUM : ÓRA/PERC :
DÁTUM : ÓRA/PERC :
Munka elvégzésének lejelentése
JAVÍTÁS LEÍRÁSA :
Következı l épések: Hiba ok (lehetséges) és megelızés
1. 2.
MEGELİZÉS :
3. HIBAELHÁRÍTÓ 4 órán belül HIBAELHÁRÍTÓ 48 órán belül Tervszerő Megelızı
4. MUNKARÁFORDÍTÁS : Sz. Dolgozó neve
Kódja
Kezdés
Befejezés
Hibanapló kitöltése Állásidı és hiba ok átvezetése a napi jelentésbe KAIZEN Lap kitöltése, ha fejlesztés történt „T” kártya vissza a falitáblára
Óra/Perc
1 . Munkaráfordítás lejelentése
2 . 3
QC vezetı QC engedély vagy kell? . megbízottja :
4 DÁTUM : .
IGEN
Megjegyzés:
QC tölti ki! Ha kell engedély
NEM 2/2
Sanmina-SCI Confidential
TPM Dashboard for Problem Visualization
2G BASS
DTRU
Dx200
TALK
ULTRA
3G
AXU/IFU
(2g, BCFA, DE21)
S12
FIFO
Kitöltött piros és sárga „T” kártyák
Hétfı Kedd Szerda
TMK kék „T” kártyák 2007.10.01tıl Lezárt piros és sárga „T” kártyák
Csüt. Péntek Kész Piros és sárga üres „T” kártyák
Sanmina-SCI Confidential
LITESPAN
KPI Dashboard – Example Tatabanya Capacity Saturation
Stock Coverage
Shareholder VA. 12.0%
800 700
10.0%
600
8.0%
500 400
6.0%
300
4.0%
200
2.0%
100
0.0%
0
Q1
Final Stock
Top 5 Repair Volumes
07 07 07 07 07 07 07 07 07 08 08 08 Hours Worked Total Pieces
0.0
0.2
0.4
0.6
Thousands
0.8
1.0
Jun
Product "E"
Apr
Product "C"
Apr
Mar
Jan
0
Feb
Dec
Oct
Nov
Sep
Jul
Aug
Jun
500
Apr
1,000
1,000
May
2,000
Sanmina-SCI Confidential
Product "D"
1,500
May
2,000
3,000
Mar
4,000
-
4.5k 4.0k 3.5k 3.0k 2.5k 2.0k 1.5k 1.0k 0.5k
Product "B"
2,500
Jan
3,000
5,000
Feb
3,500
Q4
A 3 months = 11.4k B 3 months = 3.9k D 3 months = 4.2k C 3 months = 3.1k
Dec
6,000
Material Material Material Material
Product "A"
Oct
7,000
4,000
Nov
4,500
Sep
8,000
Q3
Raw Mat. Forecast
Jul
Labour Efficiency
Q2
Aug
Production Plan
Jun
Orders
May
Beginning Stock
07 07 07 07 07 07 07 07 07 08 08 08 08 08 08
KPI Dashboard – Example Guadalajara
Sanmina-SCI Confidential
S.sz.
törekvés lentrıl felfelé mindenki bevonása nem kötelezı! minden javaslat értékes bevezetés elıtt jóváhagyott javaslatok
Beadás dátuma : Beadó :
MUNKATÁRSI ÖTLET
Bevezethetı ? IGEN NEM
Aláírás :
MUNKATÁRSI MEGJEGYZÉS Bevezetés határideje : Mellékletek száma :
ÖTLET / MEGJEGYZÉS LEÍRÁSA :
GYÁRIGAZGATÓ SZAKTERÜLETI vagy megbízottja : ELEMZÉST
KÉREK DÁTUM :
Sanmina-SCI Confidential
BEVEZETÉS IGAZOLVA BEVEZETVE
Kaizen activities: TEIAN Card
1. 2. 3. 4. 5.
DÁTUM : Aláírás : DÁTUM : Aláírás :
TEIAN Card – cont. Bónuszt megkaptam :
minden bevezetett javaslat jutalmazásban részesül
a jutalom azonnali „kp” (500 Ft-os TESCO jegy)
pontos megfogalmazást igényel, de JUST DO IT!!
a T- kártya 5 perc alatt kitölthetı
„nyitott doboz” tábla filozófia
ÉRTÉKELÉS Anyagmegtakarítás
Minıségjavítás
Egészség,biztonság
Környezet
Bónuszt tudomásul vettem : Eszközkarbantartás és Épületkarbantartás és Teljesítményjavítás fejlesztés fejlesztés Irodai munka javítása
Költségcsökkentés
SZAKTERÜLETI VÉLEMÉNYEZÉS:
Hetes kimutatások
Megvalósíthatóság :
Dátum :
Aláírás :
Gazdaságossági számítás :
Dátum :
Aláírás :
ELFOGADVA : BEVEZETÉSÉRT FELELİS :
TOVÁBBI VIZSGÁLAT : KAIZEN INDÍTÁS : NEM BEVEZETHETİ : GYÁRIGAZGATÓ :
Sanmina-SCI Confidential
Dátum :
Egyéb
„T” Card Tracking - example
Ssz
Beadás
Javaslattevı
dátuma pivot
Dolgozói sz.
07/01/02
258649
Név e
(J) Javaslat/ (M) megjegyzés rövid J/M leírása Pivo
Kiértékelı
Kiértékelésre továbbítva
Kiértékelve pivot
Bevezethetı Pivot
Jutalmazható
☺ ☺ ☺ ☺ ☺ ☺ ☺
002
07/01/02
256759
003
07/01/04
259680
004
07/01/05
250105
Juhász Miklósné
LF-es BGA tárolása NITRO szekrényben kell történjen.
J
Körmyezetvédelem
07/01/05
07/01/11
005
07/01/05
259605
Kotroczó Péter
A DX200-as soron megfelelı dokumentációk biztosítása
M
Mérnökség
07/01/05
07/01/11
006
07/01/05
259357
Kószó Tamás
Alapvetı anyagok biztosítása
J
Vezetıség
07/01/05
07/01/09
007
07/01/09
259269
Kunicek Zsolt Zenehallgatás lehetıvé tétele
J
Vezetıség
07/01/09
07/01/09
☺ ☺ ☺ ☺ ☺
07/01/11
07/01/11
☺
☺
07/01/11
07/01/11
☺
☺
001
Konrád Péter Mérnöki munkahelyek áthelyezése
J
Vezetıség
07/01/02
07/01/03
Hulladékanyagok újrahasznosítása az Ultra soron
J
Mérnökség
07/01/03
07/01/05
Teljesítmény arányos munkaidı
J
Vezetıség
07/01/04
07/01/09
Téczeli Mihály Fazekas László
Padok az öltözıbe
008
07/01/11
259535
Knapp Andrásné
Mérnökség
Leves, fızelék külön kapható legyen
HR J
Munkaeszközök javítása
009
07/01/11
Sanmina-SCI Confidential
259493
Kıvári Ákos www.sporoljgazt.hu
Mérnökség
J
Mérnökség
„T” Card Evaluation Follow-Up
Status of T-cards T-cards
Under Under implamentatio implamentatio n; 19; 17% n; 19; 17%
Status19;of Ongoing; Ongoing; 19; 17% 17%
Not Not rewarded; 37; rewarded; 37; 32% 32%
Rewarded; Rewarded; 55; 48% 55; 48% Won't be Won't be rewarded; 23; rewarded; 23; 20% 20%
Closed; 77; Closed; 77; 66% 66%
Acceptable Acceptable
☺☺
45; 30% 45; 30%
103; 70% 103; 70%
Sanmina-SCI Confidential
Reward Reward
Cost Costsaving savingwwith ithTT-cards -cards $100,000 $100,000 $90,000 $90,000 $80,000 $80,000 $70,000 $70,000 $60,000 $60,000 $50,000 $50,000 $40,000 $40,000 $30,000 $30,000 $20,000 $20,000 $10,000 $10,000 $0 $0
$80,108 $80,108
$22,811 $22,811
Cost saving/year Cost saving/year
Investment Investment
Kaizen Form
Kaizen javaslatok kiértékeléséhez
jelentısebb megtakarítást eredményezı projektek kezeléséhez
jutalmazás: 500Ft hónap dolgozója!!
Sanmina-SCI Confidential
The TEAM Makes it Happen….
Sanmina-SCI Confidential
BACKUP
GLOBAL SERVICES DIVISION
© 2006 Sanmina-SCI Corporation. Sanmina-SCI is a trademark of Sanmina-SCI Corporation. All trademarks and registered trademarks are the property of their respective owners.
LRS MOR – Quality Operating System
Benchmarking / Standardization
Strategy Define Direction Goals and Objectives
Quarterly Business Review (QBR)
Set Targets Weekly Dashboard (KPIs)
Monthly Operations Review (MORe)
Monitor/Alert
Continuously Improve
Communicate & Feed Back
Closed loop, proactive analysis, feedback, and refinement
Sanmina-SCI Confidential
MOR Agenda KPI Review Finance
-
Gross Profit
-
Gross Margin
-
Net Inventory Turns
-
Share Holder Value
Business Development -
Qtr to Qtr Growth
Customer Satisfaction -
CSO and CSI Results
Inventory -
Actual Total Inventory vs Plan
-
Inventory over 90 days w/o Demand
Sanmina-SCI Confidential
E3K Program
AR AR Past Dues
Quality
FQA/OBA RMA - PPM’s / Re-Returns Scrap Inventory Accuracy
OTD to Promise to Pure Lot (Order/RMA)
-
Operational Excellence
Continuous Improvement Six Sigma Projects Lean Initiatives (RIE)
MORe Conclusions Feedback Overall Results
MOR template
Sanmina-SCI Confidential
Q3K /Internal Benchmarking Program
Q3K: Corporate Quality audit of plant-level processes Drive global consistency and company directives Identify Best Practices Focus on Continuous Improvement
Global Intra-company Benchmarking Program: Web-based data collection used for trend analysis of all plants, company-wide. Each plant is ranked on 30+ common metrics; highlighting performance and driving improvement Metrics include multiple functional areas: Quality, Financial, Operational, Service, and Health, Safety and Employee Satisfaction.
Sanmina-SCI Confidential
Balanced Scorecard
Sanmina-SCI Confidential
Balanced Scorecard
Sanmina-SCI Confidential
Customer Satisfaction Surveys
Sanmina-SCI Confidential
Customer Satisfaction Index is trended
Issues identified are used to drive our continuous improvement program
Automatic distributions and escalation via e-mail.
Translates into product quality improvement, improved visibility into customer issues, faster response and problem resolution.
Automatic reporting for effective trend analysis of product issues and timeliness of response. (Reports display info by plant, by customer, by issue, by date, etc.)
Continuous Improvement Program Lean Enterprise Expand assessment of lean implementation:
-
Set-Up Reduction
-
Cycle Time & Inventory Reduction
Implement “Pull” Systems Floor Space Utilization (Factory Layout)
5S implementation
-
Plants are measured to this goal Plant (internal) 5S audit and Corporate 5S audit program
Improvement by employee involvement Kaizen
Sanmina-SCI Confidential
Continuous Improvement Program
Six Sigma Internal Green Belt and Black Belt Certification Formal Continuous Improvement Projects Cross Functional Project Teams Projects Shared Between Sites Project Value Verified by Finance
Sanmina-SCI Confidential
Leader Operational Excellence
Operations Excellence Program Elements
Broad, Deep, Strong Foundations Sanmina-SCI Confidential