Lampiran 2 : Surat Keputusan Kepala Dinas Perhubungan Kota Samarinda Nomor : /Dishub-1-Prog/KS/IX/2012 Tanggal : 28 September 2012
RENCANA UMUM PENGADAAN KEGIATAN BARU ( DPPA ) DINAS PERHUBUNGAN KOTA SAMARINDA TAHUN ANGGARAN 2012
NO
NAMA PAKET PEKERJAAN 2
1
I
CARA PENGADAAN
VOLUME
LOKASI PEKERJAAN (PROPINSI/KAB/KOTA)
3
4
5
RENCANA PENGANGGARAN PEKERJAAN SUMBER DANA (Rp.) (APBN/APBD) 6 7
PERKIRAAN WAKTU MULAI PELAKSANAAN 8
WAKTU PELAKSANAAN (BULAN) 9
Kegiatan : Pengadaan Alat Uji Kendaraan Bermotor ( Gedung PKB HM Ardans ) 1
Alat Tulis kantor
SP
1 Paket
Kota Samarinda
5.800.350
APBD KOTA 2012
Okt - Des 2012
3 bln
2
Belanja Jasa Servis
PL
1 Paket
Kota Samarinda
98.500.000
APBD KOTA 2012
Okt - Des 2012
3 bln
3
Belanja Penggantian Suku Cadang
PL
1 Paket
Kota Samarinda
46.500.000
APBD KOTA 2012
Okt - Des 2012
3 bln
4
Belanja Penggandaan
SP
1 Paket
Kota Samarinda
2.000.000
APBD KOTA 2012
Okt - Des 2012
3 bln
5
Belanja Dokumentasi
SP
1 Paket
Kota Samarinda
3.000.000
APBD KOTA 2012
Okt - Des 2012
3 bln
6
Belanja Modal Pengadaan Radio HF / FM ( Handy Talky )
PL
4 Unit
Kota Samarinda
11.600.000
APBD KOTA 2012
Okt - Des 2012
3 bln
7
Belanja Modal Pengadaan Alat Uji Emisi ( Alat Uji PKB )
Lelang
1 Paket
Kota Samarinda
3.268.999.650
APBD KOTA 2012
Okt - Des 2012
3 bln
8
Belanja Modal Pengadaan Instalasi Listrik dan Telpon
PL
1 Paket
Kota Samarinda
60.000.000
APBD KOTA 2012
Okt - Des 2012
3 bln
KET. 10
NO
NAMA PAKET PEKERJAAN 2
1
II
CARA PENGADAAN
VOLUME
LOKASI PEKERJAAN (PROPINSI/KAB/KOTA)
3
4
5
RENCANA PENGANGGARAN PEKERJAAN SUMBER DANA (Rp.) (APBN/APBD) 6 7
PERKIRAAN WAKTU MULAI PELAKSANAAN 8
WAKTU PELAKSANAAN (BULAN) 9
Kegiatan : Penyusunan program penetapan & penyusunan pedoman penangulangan SAR kelautan dan kebandarudaraan
III
1
Alat Tulis kantor
PL
1 pkt
Samarinda
5.000.000,00
APBD KOTA 2012
Okt 2012
1 bln
2
Cetak buku pedoman
PL
25 exp
Samarinda
1.875.000,00
APBD KOTA 2012
Okt 2012
1 bln
3
Cetak map sosialisasi
PL
200 exp
Samarinda
10.000.000,00
APBD KOTA 2012
Okt 2012
1 bln
4
Cetak map dishub
PL
200 exp
Samarinda
500.000,00
APBD KOTA 2012
Okt 2012
1 bln
5
Foto copy
PL
12.500 lbr
Samarinda
2.500.000,00
APBD KOTA 2012
Okt 2012
1 bln
6
Dokumentasi
PL
1 keg
Samarinda
1.000.000,00
APBD KOTA 2012
Okt 2012
1 bln
7
Makan dan minum
PL
1200 org
Samarinda
20.000.000,00
APBD KOTA 2012
Okt - Nop 2012
2 bln
8
Kursi plastik
PL
100 bh
Samarinda
20.000.000,00
APBD KOTA 2012
Okt 2012
1 bln
- Pekerjaan persiapan
PL
1 pkt
Samarinda
13.394.300,00
APBD KOTA 2012
Okt - Des 2012
3 bln
- Pekerjaan kayu
PL
1 pkt
Samarinda
51.491.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
- Pekerjaan kuda-kuda atap
PL
1 pkt
Samarinda
95.789.700,00
APBD KOTA 2012
Okt - Des 2012
3 bln
- Pekerjaan plafon
PL
1 pkt
Samarinda
20.449.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
- Pekerjaan pengecatan
PL
1 pkt
Samarinda
18.876.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
Kegiatan : Rehabilitasi dermaga pasar pagi 1
Pemeliharaan dermaga pasar pagi / Pemeliharaan gedung kantor
KET. 10
VOLUME
LOKASI PEKERJAAN (PROPINSI/KAB/KOTA)
3
4
5
PL
1 pkt
Samarinda
1.575.000,00
- Rehabilitas bangunan fisik dan fasilitas umum terminal cargo
PL
1 pkt
Samarinda
- Rehabilitas bangunan fisik dan fasilitas umum terminal lempake
PL
1 pkt
- Rehabilitas bangunan fisik dan fasilitas umum terminal sungai kunjang
PL
- Rehabilitas bangunan fisik dan fasilitas umum terminal smd seberang - Rehabilitas bangunan fisik dan fasilitas umum pelabuhan sungai kunjang
NAMA PAKET PEKERJAAN 2
1
IV
RENCANA PENGANGGARAN PEKERJAAN SUMBER DANA (Rp.) (APBN/APBD) 6 7
CARA PENGADAAN
NO
PERKIRAAN WAKTU MULAI PELAKSANAAN 8
WAKTU PELAKSANAAN (BULAN) 9
APBD KOTA 2012
Okt - Des 2012
3 bln
190.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
Samarinda
140.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
1 pkt
Samarinda
190.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
PL
1 pkt
Samarinda
160.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
PL
1 pkt
Samarinda
180.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
Kegiatan : Rehabilitasi terminal di kota samarinda ( Penunjang adipura ) 1
Belanja ATK
2
Belanja pemeliharaan
3
Belanja konsultasi - Perencanaan rehabilitasi bangunan fisik & fasilitas umum terminal
3 bln PL
1 pkt
Samarinda
50.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
PL
1 pkt
Samarinda
50.000.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
PL
1 Pkt
Samarinda
3.575.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
PL
1 Pkt
Samarinda
1.150.000,00
APBD KOTA 2012
Okt - Des 2012
3 bln
dan pelabuhan - Pengawasan rehabilitasi bangunan fisik dan fasilitas umum terminal & pelabuhan V
Kegiatan : Pengadaan sistem informasi pembukuan dan pelaporan uji keur pengujian kendaraan bermotor 1
Alat Tulis kantor
2
Belanja jasa kantor - Belanja biaya jaringan internet speedy
KET. 10
NO
NAMA PAKET PEKERJAAN 2
1 VI
Kegiatan : Peningkatan sarana prasarana kedinasan 1 Perbaikan Kendaraan Roda 2
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Belanja Pengadaan AC Belanja Lemari Arsip Belanja Almari Buku Belanja Almari Besi Belanja Filling Cabinet ( Lomba WTN ) Belanja Filling Cabinet ( HM. Ardans ) Belanja Kipas Angin ( SAR ) Pengadaan Alat Pendingin AC x 1 pk ( HM. Ardans ) Pengadaan Alat Pendingin AC x 1.1/2 pk ( HM. Ardans ) Pengadaan Alat Pendingin AC x 2 pk ( HM. Ardans ) Kipas Angin Gantung ( HM. Ardans ) Belanja TV LED 21 Inch ( SAR ) Pengadaan TV LED ( HM. Ardans ) Belanja Pengadaan Display Monitor Narrow Bezel 46" ( ATCS ) Belanja Wareless ( AC/DC ) SAR Kursi Plastik ( SAR ) White Board ( SAR ) Pemotong Kertas ( SAR ) Belanja Vacum Cleaner ( ATCS ) Belanja Rak Display ( ATCS ) Pengadaan Komputer Server Belanja Pengadaan Komputer/PC Belanja Pengadaan Komputer/PC Belanja Komputer/PC Komputer/PC Pengadaan Komputer/PC Belanja Pengadaan Komputer Note Book Laptop Belanja Pengadaan Printer Belanja Pengadaan Printer Multi Belanja Pengadaan Printer Printer Printer Dot Matic Belanja Pengadaan Printer Printer Dot Matrik A3 Printer Dot Matrik A4 Printer Injekt Belanja Pengadaan Monitor / Display Belanja Pengadaan UPS/Stabilizer 2 KVA
RENCANA PENGANGGARAN PEKERJAAN SUMBER DANA (Rp.) (APBN/APBD) 6 7
CARA PENGADAAN
VOLUME
LOKASI PEKERJAAN (PROPINSI/KAB/KOTA)
3
4
5
30
Samarinda Samarinda
56.800.000 13.200.000
3 Unit 1 Unit 2 Unit 10 Unit 1 Unit 10 Unit 1 Unit 2 Unit 3 Unit 1 Unit 6 Unit 1 Unit 3 Unit 2 Unit 1 Unit 100 Bh 2 Bh 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 4 Unit 2 Unit 8 Unit 7 Unit 2 Unit 1 Unit 1 Unit 3 Unit 3 Unit 8 Unit 3 Unit 2 Unit 1 Unit 1 Unit 2 Unit 1 Unit 1 Unit
Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda
15.000.000 3.500.000 7.000.000 35.000.000 2.500.000 27.000.000 425.000 11.000.000 20.100.000 7.950.000 3.600.000 3.500.000 11.700.000 77.000.000 15.000.000 20.000.000 1.000.000 3.500.000 2.000.000 18.315.000 33.000.000 8.700.000 26.300.000 18.000.000 70.800.000 77.000.000 20.000.000 10.275.000 2.000.000 6.600.000 4.800.000 17.600.000 26.400.000 5.500.000 8.500.000 2.575.000 1.970.000 27.500.000 11.000.000
PL
PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL Lelang Terbuka Lelang Terbuka Lelang Terbuka Lelang Terbuka Lelang Terbuka PL PL PL PL PL PL PL PL PL PL PL PL PL
APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012 APBD KOTA 2012
PERKIRAAN WAKTU MULAI PELAKSANAAN 8
WAKTU PELAKSANAAN (BULAN) 9
Jan - Des 2012 Jan - Des 2012 Jan - Des 2012 Jan - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012
12 bln 12 bln 12 bln 12 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln
KET. 10
NO
NAMA PAKET PEKERJAAN
1 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71
2 Belanja Pengadaan UPS/Stabilizer : Stavolt Motor 3000 Va UPS 1200 Va Pengadaan Hard Disk External Instalasi Jaringan Komputer Server & Internet Pengadaan Jaringan Listrik Stationer Belanja Pengadaan Aplikasi Wall Map Display Belanja Pengadaan Software Pengadaan Meja Kerja Belanja Pengadaan Meja Kerja Belanja Meja Kerja Belanja Pengadaan Meja Rapat Pengadaan Kursi Kerja Belanja Pengadaan Kursi Kerja Belanja Pengadaan Kursi Kerja Belanja Pengadaan Kursi Rapat Belanja Pengadaan Kursi Tunggu Pengadaan Tong Sampah Belanja Bak Sampah Belanja Kontainer Sampah Pembuatan Tangki Penampungan Air Belanja Pengadaan Kamera Belanja Pengadaan Kamera Digital Belanja Pengadaan Handycam Belanja Pengadaan LCD Pengadaan Megaphone Portable Penanam Pohon Peneduh & Tanaman Penghijauan Ter. Cargo Penanam Pohon Peneduh & Tanaman Penghijauan Ter. Lempake Penanam Pohon Peneduh & Tanaman Penghijauan Ter. Sei Kunjang Penanam Pohon Peneduh & Tanaman Penghijauan Ter. Seberang Penanam Pohon Peneduh & Tanaman Penghijauan Pel.Sei Kunjang Penanam Pohon Peneduh & Tanaman Penghijauan Pel.Ps Pagi
CARA PENGADAAN
VOLUME
LOKASI PEKERJAAN (PROPINSI/KAB/KOTA)
3 PL PL PL Paket Paket Set Paket PL PL PL PL PL PL PL PL PL Lelang Terbuka Lelang Terbuka Lelang Terbuka PL PL PL PL PL PL Paket Paket Paket Paket Paket Paket
4 2 Unit 2 Unit 3 Unit 1 Unit 1 Unit 1 Unit 1 Unit 20 Bh 8 Bh 10 Bh 1 Unit 20 Unit 8 Bh 10 Bh 8 Bh 10 Unit 10 Unit 300 Unit 7 Unit 6 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit 1 Unit
5 Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda Samarinda
RENCANA PENGANGGARAN PEKERJAAN SUMBER DANA (Rp.) (APBN/APBD) 6 7 6.000.000 APBD KOTA 2012 3.800.000 APBD KOTA 2012 8.730.000 APBD KOTA 2012 19.500.000 APBD KOTA 2012 23.500.000 APBD KOTA 2012 3.850.000 APBD KOTA 2012 62.500.000 APBD KOTA 2012 35.000.000 APBD KOTA 2012 10.000.000 APBD KOTA 2012 15.000.000 APBD KOTA 2012 5.000.000 APBD KOTA 2012 19.000.000 APBD KOTA 2012 8.000.000 APBD KOTA 2012 9.000.000 APBD KOTA 2012 4.000.000 APBD KOTA 2012 25.000.000 APBD KOTA 2012 6.000.000 APBD KOTA 2012 90.000.000 APBD KOTA 2012 315.000.000 APBD KOTA 2012 102.000.000 APBD KOTA 2012 6.000.000 APBD KOTA 2012 4.750.000 APBD KOTA 2012 6.950.000 APBD KOTA 2012 10.000.000 APBD KOTA 2012 11.700.000 APBD KOTA 2012 60.000.000 APBD KOTA 2012 50.000.000 APBD KOTA 2012 64.000.000 APBD KOTA 2012 50.000.000 APBD KOTA 2012 50.000.000 APBD KOTA 2012 50.000.000 APBD KOTA 2012
PERKIRAAN WAKTU MULAI PELAKSANAAN 8 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012 Okt - Des 2012
Samarinda,28 September 2012 Kepala Dinas Perhubungan Kota Samarinda
Drs. HERMANTO,M.Hum NIP. 19580420 198503 1 018
WAKTU PELAKSANAAN (BULAN) 9 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln 3 bln
KET. 10