REKAPITULASI AKTIVITAS BUJK PERWAKILAN ASING s.d TAHUN 2010 NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
1
SINOTECH ENGINEERING CONSULTANTS, LTD.
TAIWANCHINA
KONSULTAN
PT. CATURBINA GUNA PERSADA
04/08/13
2
JAPAN OIL ENGINEERING CO., LTD
JAPAN
KONSULTAN
PT. CONNUSA ENERGINDO
12/02/13
3
RESEARCH TRIANGLE INSTITUTE
USA
KONSULTAN
N/A
21/04/12
SSANGYONG ENGINEERING & CONSTRUCTION CO., LTD.
KOREA
KONTRAKTOR
PT SSANGYONG KONSTRUKSI Indonesia
05/07/13
5
OVE ARUP & PARTNERS INTERNATIONAL LTD.
UNITED KINGDOM
KONSULTAN
N/A
28/04/11
6
KONSULTAN
N/A
Techincal Assistance Services for Supporting the Implementation of DAM Safety Assurance and Institutional Jakarta Improvement (DOISP) IBRD LOAN No. 7669-ID South Sumatera - West Java Gas Sumatera Pipeline Selatan - Jawa Barat Local government Support Program Indonesia (LSGP Project) Decentralized Basic Education Program Objective 1 (DBE PO1) Indonesia Democratic Reform Support Program (DRSP Project) Support for Poor and Disadvantages Areas (SPADA Project)
14/03/13
Belum Ada Proyek Water Resources & Irrigation Sector Management Project (WISMP) Irrigation Management Reform Implementation (IMRI) Technical Assistance for Institutional Development in Participatory Irrigation Management (IDPIM) Water Resources and Irrigation Sector Management Project (WISMP) Techincal Assistance for Jatiluhur Irrigation Management Improvement
7
8
HUBEI HONGYUAN POWER CHINA ENGINEERING CO., LTD
IDEA Consultants, Inc.
JAPAN
KONTRAKTOR
KONSULTAN
N/A
PT. WIRATMAN & Associates
LOKASI
PENGGUNA JASA
Ditjen. SDA Kemeterian Pekerjaan Umum
NILAI KONTRAK
Rp. 19,452,510,000
PT. Perusahaan Gas Negara Tbk., (PGN) Rp. 144,945,703,096
PERIODE PROYEK s.d
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
24/11/13
N/A
N/A
100%
0%
40%
60%
Feb 2004 s.d Mar 2012
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
95%
5%
95%
5%
95%
5%
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
100%
0%
N/A
N/A
30%
70%
BAPPENAS
US $ 61,876,972
30/09/09
Kemenko Kesejahteraan Rakyat
US $ 37,528,532
11/04/10
Jakarta
BAPPENAS
US $ 15,436,999
19/04/09
Jakarta
The World Bank
US $ 2,530,000
30/09/09
Jakarta Utara
PT. Jakarta Tank Terminal
Rp. 276,750,000,000
31/07/09
Tanjung Priok Tank Terminal
4
DONGSHIN ENGINEERING & CONSULTANT C. LTD. KOREA KOREA
NAMA PROYEK
28/05/13
26/04/13
Coal Fired Steam Power Plant Project PLTU 1 Project for Post-earthquake Rehabilitation of Water Resources Management Existing Facilities in Padang Water Resources Existing Facilities Rehabilitation and Capacity Improvement Project Lower Solo River Improvement Project Phase-2 Urgent Disaster Reduction Project for Mr. Bawakaraeng
N/A
Indonesia
Indonesia
Indonesia
N/A Ditjen. SDA Kemeterian Pekerjaan Umum Deputi Pengembangan Kawasan, Kementerian Perumahan Rakyat Ditjen. SDA Kemeterian Pekerjaan Umum
Jawa Timur PT. PLN (PERSERO)
Padang
JICA
Ditjen. SDA Kemeterian Kimpraswil Ditjen. SDA Jawa Timur Kemeterian Pekerjaan Umum Ditjen. SDA Sulawesi Kemeterian Pekerjaan Umum Jakarta
N/A
N/A
Rp. 33,168,381,200
31/12/09
Rp. 17,815,049,000
31/12/09
Rp. 7,009,700,000
25/04/10
Rp. 825,176,245,000
N/A
¥42.970.200
01/12/10
Rp. 81,307,739,913
01/02/10
Rp. 79,067,577,546
Nov 2013
Rp. 49,106,009,000
01/12/10
NO
NAMA
NEGARA
DONGFANG ELECTRIC 9 CORPORATION INDONESIA CHINA PROJECTS TSUKISHIMA KIKAI CO., 10 JAPAN LTD TSUKISHIMA KIKAI CO., 11 JAPAN LTD
BIDANG
PT. DALLE ENERGY
09/07/13
KONSULTAN
N/A
30/05/13
KONTRAKTOR
NEW ZAELAND
KONSULTAN
13 POLYSIUS AG
GERMANY
KONTRAKTOR
SUMITOMO MITSUI CONSTRUCTION CO., LTD.
16
OPUS INTERNATIONAL (M) MALAYSIA BERHAD
17 TOKURA CORPORATION
JAPAN
JAPAN
N/A PT. BIMATEKNO KAYATAMA KONSULTAN PT. CATURBINA GUNA PERSADA
30/05/13
NAMA PROYEK Coal Fired Steam Power Plant Project PLTU 3 BANTEN Belum Ada Proyek Belum Ada Proyek
LOKASI
Banten
20/02/13
Nias Roads, transport & City Development Planning Design (Badan Rehabilitasi dan Rekonstruksi NAD-NiasBRR)
26/04/13
KONTRAKTOR
PT HUTAMA KARYA
18/06/11
KONSULTAN
N/A
21/01/11
KONTRAKTOR
PT TAIYO SINAR RAYA TEKNIK
15/04/13
Indonesia Sanitation Sector Development Program (ISSDP) Technical Assistance for National Management Consultant (NMC) Community Based rehabilitation and Reconstruction Project (CSRRP) In Earthquake Affected Areas of D.I. Yogyakarta and Central Java
PT. PLN (PERSERO)
NILAI KONTRAK
Rp. 1,890,132,127,000
PERIODE PROYEK s.d
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
30 Nov 2010
N/A
N/A
N/A
N/A
72%
28%
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
72%
28%
Sorowako Belum Ada Proyek
PENGGUNA JASA
N/A
PT INCO ENGINEERING SERVICES 17/09/10
PT ARKONIN ENGINEERING CONSULTANTS, PT BUANA ARCHICON, PT CIRIAJASA RANCANG BANGUN, PT DIAGRAM TRIPORPOSI, PT MITRA LINGKUNGAN DUTA CONSULT, PT PERANCANG ADHINUSA, PT PILLAR PUSAKA INTI, PT WIRATMAN & ASSOCIATES, PT AMYTHAS, PT TATA GUNA PATRIA, PT SUCOFINDO, PT BIRO INSINYUR EXACTA
NETHERLAND KONSULTAN S
15
IUJK BERLAKU S.D
KONTRAKTOR
12 Beca AMEC Indonesia Ltd.
14 DHV BV The Netherlands
INDONESIAN PARTNER
N/A
Nias, NAD
Jakarta
PT International Nickel Indonesia N/A
US $ 8,681,000 N/A
BRR - NAD & Nias
Rp. 29,810,115,479
01/08/09
WSP EAP
Rp. 17,257,200,000
01/08/08
D.I Ditjen Cipata Karya, Tahap I : Rp. Yogyakarta, Kementerian 4,213,595,000 Tahap II : Jawa Tengah Pekerjaan Umum Rp. 2,480,925,000
Tahap I : Des 2007 Tahap II : Mei 2008
Wharf Extension Gunung Sitoli Port Nias
UNDP
Euro 400,000
2006 - 2008
Sea Defense, Flood Protection, Refugees and Early Warning Strategy in Aceh and Nias
Section E-1, Rorotan - Cilincing Tanjung Priok Access Road Construction Project (Phase 1) JBIC Loan IP-529 N/A New Coating Room for Employers's Tokura Sinar Joint Operation
NAD
BRR - NAD & Nias
Euro 7,200,000
2006 - 2008
Jakarta
Departemen Pekerjaan Umum
Rp. 722,700,000,000
07/07/10
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
23/03/10
95%
5%
95%
5%
95%
5%
N/A Bekasi
N/A PT Parker Metal Treatment Indonesia
N/A US $ 340,000
NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
NAMA PROYEK HAKA C - LAND DEVELOPMENT (Sakura Project) SAITAMA B - EXPANSION FACTORY
LOKASI Bogor Karawang
MPIE C - Drainage Work TMMIN B - Remove & Install Furnace
Bridgestone B - Renewal Roof B/B -4 Nissan C - Road Repair & Stock Yard
FMC B - Installation Work
PT Maligi Permata Industrial Estate PT Toyota Motor Sunter Manufacturing Indonesia PT Bridgestone Tyre Bekasi Indonesia PT Nissan Motor Purwakarta Distributor Indonesia PT FMC Santana Bekasi Petrolium Indonesia
Karawang JAPAN
KONTRAKTOR
PT KATYA MITRAKARSA
KAYABA B - Additional M/E & Civil Work MM2100 C - Road Widening MD 1
SAITAMA B - STAMPING FACTORY EXPANSION
TMMIN B - TMC AUDIT RISK LEVEL Nissan C - Filling Warehouse
19
TAIHEI DENGYO KAISHA, Ltd
JAPAN
KONTRAKTOR
PT TRUBA JAYA ENGINEERING
01/08/13
20
JAPAN PORT CONSULTANTS LTD
JAPAN
KONSULTAN
PT WIRATMAN & ASSOCIATES
16/07/13
KONTRAKTOR
Rp. 149,400,000
Mar 2009 s.d Okt 2009
Rp. 617,500,000
Agt 2009 s.d Des 2009
Rp. 676,400,000
Mei 2009 s.d Des 2009
Rp. 240,238,000
Mar 2009 s.d Nov 2009
Jul 2009 s.d Feb 2010
Bekasi
PT Megalopolis Manunggal Industrial Development
Rp. 3,960,000,000
Mar 2009 s.d Juli 2009
PT. KOMODA
Rp1.002.500.000
Mar 2008 s.d. Jul 2008
Karawang
07/06/13
Paiton III expansion Project Consulting Services for The Urgent Rehabilitation Project of Tanjung Priok Port Construction of Railway Double Tracking of Kroya - Yogyakarta on Java Southline, Phase I
PT. SAITAMA STAMPING Rp2.679.000.000 INDONESIA PT. MALIGI PERMATA Rp1.029.679.000 INDUSTRIAL ESTATE
Sunter Jakarta PT. TMMIN Rp503.700.000 utara PT. NISSAN MOTOR DISTRIBUTOR Purwakarta Rp2.105.000.000 INDONESIA Probolinggo PT Paiton Energy Jakarta
Kutoarjo
Ditjen Tansportasi Laut
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
55%
45%
55%
45%
55%
45%
Mar 2009 s.d Des 2009
Rp. 23,274,900,000
Karawang
AUSTRALIA
Mei 2009 s.d Des 2009
PT Kayaba
EJIP West Java
E *)
Mar 2009 s.d Mar 2010
Rp. 1,030,000,000
PT Molten Aluminium Rp. 4,588,000,000 Producer Indonesia
WC *)
Sept 2009 s.d Mar 2010
Bekasi
KIIC C - ENTRENCE ROAD
21 INVENSYS RAIL PTY. Ltd
PERIODE PROYEK s.d
02/02/13
KOMODA B - NEW TRAVO ROOM
PT YASAPOLA REMAJA
NILAI KONTRAK
PT Hatmohadji & Rp. 10,180,000,000 Kawan PT Saitama Stamping Indonesia Rp. 8,209,065,000
Karawang
MAPI B - repair Works TOKYU CONSTRUCTION 18 CO., LTD
PENGGUNA JASA
Okt 2008 s.d.Mar 2009 Mar 2008 s.d okt 2008 Apr 2008 s.d Agt 2008 Feb 2008 s.d Mei 2008
US $ 14,100,000
3 tahun
10%
90%
10%
90%
10%
90%
Rp. 35,964,714,005
Feb 2010 s.d Okt 2014
N/A
N/A
N/A
N/A
N/A
N/A
Apr 2004 s.d Nov 2007 + 2 thn masa pertanggungan
75%
25%
75%
25%
50%
50%
JFE Civil Engineering and Construction Corp. dibawah pengawasan Ditjen Perhubungan Darat Rp. 84,309,262,309, Kementerian Perhubungan
NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
NAMA PROYEK
LOKASI
Consulting Services for Urgent Disaster Reduction Project for Mt. Merapi, Jawa Tengah Progo River Basin (JBIC/JICA Loan IP No. 524) Consulting Services for Urgent Disaster Reduction Project for Mt. Bawakaraeng Sulawesi (JBIC/JICA Loan IP No. 524)
22
YACHIYO ENGINEERINGCO., LTD
JAPAN
KONSULTAN
N/A
23/04/13
Consulting Services for Detailed Engineering Design and Construction Supervision of the Tanjung Priok Access Road Construction Project (JBIC/JICA Loan IP No. 529) Consulting Services I of National Geospatial Data Infrastructure Development (NSDI) Project (JBIC/JICA Loan IP No. 544) Consulting Services for Denpasar Sewerage Development Project II (DSSPII) (JICA Loan IP No. 550) Consulting Services Design and Supervision, Road Sub Project : Aceh Reconstruction Project Under JICA Loan IP-545 PLTU BANTEN LABUAN (2X300MW)
23
CHINA CHENGDA ENGINEERING CO., LTD
CHINA
KONTRAKTOR
N/A
Jakarta
Indonesia
Denpasar
NILAI KONTRAK
PERIODE PROYEK s.d
Ditjen SDA Kementerian Pekerjaan Umum
US $ 9,026,000
Agt 2006 s.d Okt 2011
Ditjen SDA Kementerian Pekerjaan Umum
US $ 8,663,000
Agt 2006 s.d Okt 2012
Ditjen Bina Marga Kementerian Pekerjaan Umum
US $ 13,789,000
Jan 2007 s.d Jun 2011
BAKOSURTANAL
US $ 3,705,000
Ditjen Cipata Karya, Kementerian US $ 4,807,000 Pekerjaan Umum
US $ 9,267,000
Jul 2009 s.d Feb 2016
Banten
PT PLN (PERSERO) KANTOR PUSAT
Rp. 1,267,728,636,730
48 Bulan
PT BOSOWA ENERGI
US $ 200,000,000
China National Electric 25 Equipment Corporation (CNEEC)
26
27
NAKAGAWA CHEMICAL EQUIPMENT Co.,Ltd.
MMC OIL & GAS ENGINEERING SDN BHD
JFE Civil Engineering 28 Construction Corporation
ITALIA
CHINA
JAPAN
MALAYSIA
JAPAN
KONTRAKTOR
KONTRAKTOR
KONTRAKTOR
PT SATYAMITRA SURYA PERKASA
PT. PENTA ADI SAMUDERA
PT. CATUR INSAN PERTIWI
KONTRAKTOR & PT.ELNUSA (PT. KONSULTAN PATRA TEKNIK)
KONTRAKTOR
PT.MURINDA IRON STEEL
PT.WIJAYA KARYA
01/02/12
PLTU II LABUAN BANTEN PLTU I JAWA TENGAH 2 X (300-400 MW) PLTU TANJUNG JATI B EXPANSION 3 & 4 PLTU I JABAR
12/04/13 MODIFICATION WORK FOR WASTE WATER TREATMENT PLANT DEMINERALIZER PLANT 25/04/12
Banten
12 Maret 2012
JABUNG GAS BOOSTER STATION PROJECT Construction of Railway Double Tracking Kroya - Yogyakarta on Java Southline, Phase I
L *)
A *)
L *)
A *)
L *)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
72%
28% N/A
N/A
N/A
N/A
85%
15%
72%
28%
Jawa Tengah
72%
28%
N/A
N/A
Indramayu
PT. PLN (Persero)
Rp1.647.300.023.978
akhir 2010
70%
30%
40%
60%
30%
70%
Bekasi
PT. JST INDONESIA
¥6.538.000
21 Agt 2009
N/A
N/A
75%
25%
80%
20%
Bekasi
PT. JST INDONESIA
¥26.492.000
07/10/09
N/A
N/A
75%
25%
80%
20%
Bekasi
PT. AJINOMOTO CALPIS BEVERAGE INDONESIA
$160.000
15/07/09
N/A
N/A
80%
20%
85%
15%
$48.200.000
26 Jan 2007 s.d. 26 Des 2008
100%
0%
100%
0%
96%
4%
Apr 2004 s.d 16 Nov 2007
N/A
N/A
N/A
N/A
N/A
N/A
DI WATER TREATMENT
25/05/13
A *)
Jawa Tengah
PT PLN (PERSERO)
M & P *)
30 Bulan
Indramayu CHIMNEYS AND 24 REFRACTORIES INTERNATIONAL
E *)
Mei 2009 s.d Sept 2014
Ditjen Bina Marga Kementerian Pekerjaan Umum
Sulawesi Selatan
WC *)
Jun 2008 s.d Des 2013
Aceh
14/09/13 COAL FIRED POWER PLANT JENEPONTO (2X125MW) PLTU I JAWA BARAT 3 X 300 MW
PENGGUNA JASA
JABUNG PT. TGI BARAT JAMBI
Kutoarjo Yogyakarta
Directorate General Rp370.153.174.703 of Railways, Ministry of Transportation ¥9.312.996.742
NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
PT. PEMBANGUNAN PERUMAHAN (PERSERO) 29 TAISEI CORPORATION
JAPAN
KONTRAKTOR
HARBIN POWER ENGINEERING Co.,Ltd.
CHINA
KONTRAKTOR
30
PT. PEMBANGUNAN PERUMAHAN TAISEI INDONESIA CONSTRUCTION PT. MITRA SELARAS HUTAMA ENERGI
NAMA PROYEK
28/02/13
Urgent Disaster Reduction Project for Mt. Bawakaraeng CP 2-2, Sabo Dam No.7.2-7.3 PT. Mitsuba Indonesia New Factory
PT.MURINDA IRON STEEL KONTRAKTOR & PT. WIJAYA KARYA KONSULTAN
19/02/13
PT.MURINDA IRON STEEL
TOSHIBA PLANT SYSTEMS JEPANG & SERVICES CORPORATION
33 KAJIMA CORPORATION
JEPANG
Urgent Disaster Reduction Project for Mt. Bawakaraeng CP 2-3, Sabo Dam No.7.4-7.5 PT. Nihon Plast Indonesia PT. Mitsuba Indonesia Expansion Factory PT. Mitsuba Indonesia Future Area Piling Works Urgent Disaster Reduction Project for Mt. Bawakaraeng CP 2-4, Sabo Dam No.7.6-7.7 N/A
PT.WIJAYA KARYA
32
KONTRAKTOR
PT. WASA MITRA ENGINEERING
09/01/12
KONTRAKTOR
N/A
02/03/13
HYUNDAI ENGINEERING & 34 KOREA CONSTRUCTION Co., Ltd
KONTRAKTOR
N/A
-
35 SHINKO PALNTECH Co., Ltd JEPANG
KONTRAKTOR
PT. UNEFECO
36 CHIYODA CORPORATION
JEPANG
KONTRAKTOR & N/A KONSULTAN
PENTA OCEAN CONSTRUCTION CO.,LTD
JEPANG
KONTRAKTOR
N/A N/A
Maintenance Work
37
PT. MURI AGUNG ABADI
NILAI KONTRAK
PERIODE PROYEK s.d
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A 19/02/13
PT.WIJAYA KARYA
JAPAN
PENGGUNA JASA
N/A
Bridge Construction in the prov. Of NTB
31 HAZAMA CORPORATION
LOKASI
07/04/13
Sumbawa Barat NTB Gowa Sulawesi Selatan Serang, Banten Gowa Sulawesi Selatan
Dit.Jen Bina Marga DPU
¥675.000.000
Des 2006 s.d Mar 2009
65%
35%
10%
90%
Dit.Jen SDA DPU
Rp37.202.104.172
Apr 2007 s.d. Okt 2008
65%
35%
10%
90%
PT. Mitsuba Indonesia
Rp12.375.000.000
Okt 2007 s.d Jul 2008
90%
10%
10%
90%
Dit.Jen SDA DPU
Rp43.571.951.413
Apr 2008 s.d Okt 2009
65%
35%
10%
90%
90%
10%
10%
90%
90%
10%
10%
90%
90%
10%
10%
90%
Apr 2009 s.d Des 2010
65%
35%
10%
90%
Serang, Banten Serang, Banten
PT. Nihon Plast Indonesia PT. Mitsuba Indonesia PT. Mitsuba Indonesia
Gowa
Dit.Jen SDA DPU
Bekasi
Rp29.405.000.000 Rp24.850.000.000 N/A Rp51.730.000.000
Jul 2008 s.d Apr 2009 Okt 2008 s.d Apr 2009 Okt 2008 s.d Des 2008
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PT. NIPPON SHOKUBAI INDONESIA
Rp. 136,040,400
31/12/09
60%
40%
70%
30%
40%
60%
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
15 Sept - 15 Jan 2011
70%
30%
70%
30%
70%
30%
Anyer Cilegon
N/A 09/02/13
18/03/13
N/A Extension Factory Phase IV Project - PT. DNP Indonesia - Karawang
Karawang Jawa Barat
DAI NIPPON PRINTING INDONESIA EXTENSION
Rp. 21,600,000,000
NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
NAMA PROYEK Coal Boiler Repairment Daily Maintenance (Film Plant) Modification Work For Film Plant Tank Inspection ST - 5911B dan ST 7852
38 TAKADA CORPORATION
JEPANG
KONTRAKTOR
PT. CAHAYA ANUGRAH TAMA
13/01/11
Piping Work Wet EDC & Pump Install OD EDP Line Inspection &Repairing of ST 5911A & ST 2502 Modification & Repairment Work Supply Special Plate for ST 2101 Modification Work ISK 1 & 3 ASDM ASC 2009 (VCM Plant) ASDM ASC 2009 (PVC 1 & Utility) Inspection & Repairing Tank ST 2501C, ST 2101, VE 5403 PTA 1 PSDM 2009
39
COFFEY INTERNATIONAL DEVELOPMENT PTY. LTD
AUSTRALIA
KONSULTAN
PT FORUM BANGUN ACEH
12/07/13
Piping Work for WF AT Utility Plant Local Governance Innovations for Communities in Aceh (LOGICA 2)
40
RINKAI CONSTRUCTION CO. LTD
JAPAN
KONTRAKTOR
PT ADHI KARYA (PERSERO) TBK.
03/08/13
Dumai Port Development Project Phase III
41
YOKOGAWA BRIDGE CORP.
JEPANG
KONTRAKTOR & PT. CIGADING KONSULTAN HABEAM CENTRE
LOKASI
NILAI KONTRAK
PERIODE PROYEK s.d
Bekasi
PT. NGKI
Rp. 807,000,000
Banten
PT. ASC
Rp. 2,388,338,000
Banten
PT. ASC
Rp. 2,826,471,000
Banten
PT. ASC
Rp. 1,383,850,000
Banten
PT. MCCI
Rp. 1,383,850,000
Banten
PT. ASC
Rp. 200,000,000
Apr 2009 - Jun 2009 Apr 2009 - Des 2009 Jun 2009 - Jul 2009 Jun 2009 - Agt 2009 Jun 2009 - Agt 2009 Jul 2009 - Nov 2009 01/08/09 Agt 2009 - Sept 2009 01/09/09 Okt 2009 - Nov 2009 Okt 2009 - Nov 2009 Okt 2009 - Des 2009 Nov 2009 - Des 2009 01/12/09
Banda Aceh AusAID
AUD 17,166,673
01/06/12
Ditjen. Perhubungan laut
Rp. 232,028,854,000
Feb 2005 s.d Jul 2008
Obayashi Corporation
Rp. 4,839,160,956
Nov 2007
Banten
PT. ASC
Rp. 807,000,000
Banten
PT. MFI
US $ 148,000
Banten
PT. MFI
US $ 34,500
Banten
PT. ASC
Rp. 1,016,000,000
Banten
PT. ASC
Rp. 860,789,000
Banten
PT. ASC
Rp. 3,355,509,000
Banten
PT. ASC
Rp. 276,6665,000
Banten
PT. ASC
Rp. 100,000,000
Riau
Ciputat Flyover 19/09/12
PENGGUNA JASA
Jakarta
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
5%
95%
N/A
N/A
USD. Rp. USD. Rp. 1,712,87 64,405,9 255,58 26,391,6 1, 02,700 5 02,000 N/A
N/A
N/A
N/A
NO
NAMA
EGIS BCEOM 42 INTERNATIONAL
NEGARA PERANCIS
BIDANG KONSULTAN
INDONESIAN PARTNER PT CIPTA STRADA
IUJK BERLAKU S.D 23/05/13
PT WAHANA MITRA AMERTA, PT PERENTJANA DJAJA, PT TRIBINA MATRA KARYA CIPTA, PT LENGGOGENI PT KWARSA HEXAGON, PT CATURBINA GUNA PERSADA, PT AMYTHAS EXPERT & ASSOCIATES 43
SMEC International Pty, Ltd.
AUSTRALIA
KONSULTAN
15/04/13 PT DENKA KRISNA CENDIKIA, PT LENGGOGENI, PT HIWAY INDOTEK
NAMA PROYEK EASTERN INDONESIA NATIONAL ROADS
LOKASI
PERIODE PROYEK s.d
Makassar
Technical Assisstance for Support the Project Managemnet Unit Second East Indonesia Region Transport Project (EIRTP-2)
N/A
Kementerian Pekerjaan Umum
Rp. 30,279,370,000
30/06/09
Technical Assisstance in Supporting Bridging Program of DAM Operational Improvement and Safety Project (DOISP)
N/A
Kementerian Pekerjaan Umum
Rp. 6,307,200,000
31/08/08
Indonesia
Kementerian Pekerjaan Umum
Technical Assisstance for Support the Project Managemnet Unit Eastern Indonesia National Road Improvement Project (EINRIP)
Consulting Services for Infrastructure Reconstruction Enabling Program
N/A
NILAI KONTRAK
Kementerian Pekerjaan Umum
Second Water and Sanitation for Low Income Communitieas(WSLIC-2) Project
PT MITRA LINGKUNGAN DUTACONSULT, PT ARKONIN ENGINEERING MANGGALA PRATAMA
PENGGUNA JASA
N/A
Rp. 23,995,500,000
N/A
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Departemen Kesehatan Republik Rp. 6,894,380,000 Indonesia
31/12/06
N/A
Badan Rehabilitasi dan Rekonstruksi NAD (BRR)
Rp. 31,861,478,220
31/10/09
Bangka Belitung
PT PLN (PERSERO)
Rp. 410,138,467,860
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Sulawesi Selatan
Kementerian Pekerjaan Umum
Rp. 54,604,050,313
28/02/10
60%
40%
60%
40%
25%
75%
PLTU BANGKA BELITUNG 2X30 MW
CHINA SHANGHAI (GROUP) CORPORATION 44 FOR FOREIGNECONOMIC & TECHNOLOGICAL COOPERATION
CHINA
PT TRUBA ALAM KONTRAKTOR & MANUNGGAL KONSULTAN ENGINEERING
TAKENAKA CIVIL 45 ENGINEERING & CONSTRUCTION CO.LTD
JAPAN
KONTRAKTOR
PT NINDYA KARYA (PERSERO)
16/07/13
18/08/13
CONTRACT PACKAGE NO. 3 CONSTRUCTION OF DARAHA BRIDGE AND TWO (2) OF SABO DAMS (CD-1 AND CD-2)
NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
NAMA PROYEK
LOKASI
PENGGUNA JASA
NILAI KONTRAK
PERIODE PROYEK s.d
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
90%
10%
PT HOGY INDONESIA Phase-4 Project Bekasi
PT Hogy Indonesia
PT Indonesia Nippon Seiki Factory Hoist Crane & Road Works Concrete Road Pavement and Drainage Canteen Extension, Flag Pole, Road Renovation, Recondition Paving Road, U-Ditch Work at Green Area
Banten
PT Indonesia Nippon Seiki
Repairing Existing Factory Zone 4
46 SHIMIZU CORPORATION
JAPAN
KONTRAKTOR
PT SHIMIZU BANGUN CIPTA KONTRAKTOR
09/08/13
Repairing Existing Factory and Additional Works Repairing and Piling Works - Zone I New Machine Foundation Cap 1600 Ton PGA Storage & Modification Junction Box Area at Factory Renovation of Existing Drainage Works at Factory Road Repairing at Factory C & D
Tangerang
PT Mitsuba Indonesia
PT Yamaha Motor Parts Manufacturing Indonesia, Renovation and Extension of Office Building
DAEWOO ENGINEERING COMPANY JAPAN BRIDGE & 48 STRUCTURE INSTITUTE, INC 47
KOREA
KONTRAKTOR
N/A
03/09/13
Variation for Canteen Gravity Casting Factory Extension Gravity Casting Renovation Works Add. Work of Gravity Casting Extension Factory Add. Work of Gravity Casting Factory Renovation New Gear & Acceleration Factory Building Add. Work New Gear & Acceleration Factory Building Belum Ada Proyek
Karawang
Rp. 90,248,320,000
14/08/09
Rp. 2,299,407,000
Maret 2009
Rp. 11,842,000,000
April 2010
Rp. 3,760,818,087
September 2009
Rp. 955, 486,982
November 2009
Rp. 910,331,518
N/A
Rp. 3,491,497,400
Januari 2010
Rp. 1,100,000,000
Februari 2009
Rp. 1,942,545,569,62
Agustus 2009
Rp. 9,710,000,000
Desember 2009
Rp. 543,000,000
Desember 2009
Rp. 11,342,605,000
Mei 2009
Rp. 200,000,000 Rp. 6,140,900,000 PT Yamaha Motor Rp. 4,230,000,000 Parts Manufacturing Rp. 1,256,000,000 Indonesia
Maret 2009 April 2010 April 2010 Mei 2010
Rp. 560,000,000
Mei 2010
Rp. 17,359,100,000
Mei 2010
Rp. 1,314,000,000
Mei 2010
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Jawa Barat
7 Persons
Rp. 37,786,940,000
Desember 2011
N/A
N/A
N/A
N/A
N/A
N/A
Belum Ada Proyek JAPAN
KONSULTAN
N/A
09/08/13
49
TOKYO GAS ENGINEERING JAPAN CO., LTD
KONSULTAN
PT PROSYS BANGUN PERSADA
15/06/11
50
KATAHIRA & ENGINEERS INTERNATIONAL
JAPAN
KONSULTAN
PT VIRAMA KARYA
21/10/13
51
JAPAN TRANSPORTATIONS JAPAN CONSULTANTS, INC.
KONSULTAN
PT DARDELA YASA GUNA (DARDELA)
29/10/10
Domestic Gas Market Development Project The North Java Corridor Flyover Project
Railway Double Tracking of Cikampek Cirebon on Java North Line, Segment III
Banten
Kementerian Pekerjaan Umum
Rp. 34,552,399,215
2011
N/A
N/A
N/A
N/A
N/A
N/A
Cirebon
Kementerian Perhubungan
Rp. 11,194,715,000
2013
N/A
N/A
N/A
N/A
N/A
N/A
NO
NAMA
NEGARA
BIDANG
INDONESIAN PARTNER
IUJK BERLAKU S.D
NAMA PROYEK
LOKASI
Tanjung Jati 'B' Coal-Fired Power Plant Expansion Project Unit 3 & 4 of 2 x 660 MW 52 FICHTNER GmbH & Co. KG JERMAN
KONSULTAN
PT KWARSA HEXAGON
23/04/13
Jepara
Community Water Services and Health
53
POYRY ENVIRONMENT GmbH
JERMAN
KONSULTAN
N/A
12/10/13 Transaction Advisory Services for Tukad Unda Water Supply Project
Technical Assistance Services for Supporting the Implementation Management and Supervision of the Dam Operational Improvement and Safety Project (DOISP)
55 C. LOTTI & ASSOCIATI
56 MITSUI & CO., LTD.
ITALIA
JAPAN
KONSULTAN
PT DARMA DEDANA CIPTA CONSULTANTS, PT TRITUNGGAL PATRYAKSA, PT WIRATMAN & ASSOCIATES, PT KOGAS DRIYAP KONSULTAN, PT BINA KARYA (PERSERO), PT SEHAT PRATAMA SEJATI, PT CIPTA SANITA MANDIRI, PT TRICON JAYA, PT JASA MITRA MANUNGGAL, PT MUTIARA WIYATADARMA CONSULTANT, PT REKA DESINDO MANDIRI
KONTRAKTOR & PT TRUBA JAYA KONSULTAN ENGINEERING
Technical Assistance on Procurement and Financial Management for SPADA Project - Support for Poor and Disadvantaged Areas Program
21/10/13 Technical Assistance for Basin Water Resources Management (BWRM)
Technical Assistance for Development of Fiscal and Cost Recovery Policy on Water Resources Management
18/02/12
Technical Assistance for Public Private Partnership in Water Sector: Water Conveyance Paiton III expansion Coal Fired Power Plant
PENGGUNA JASA
Sumitomo Corporation as an IPP (independent power producer) USD 1,680,000,000 through PT Central Java Power (special purpose company)
Jakarta, Jambi, Kemeterian Bengkulu, Kesehatan Palangkaraya, and Pontianak Jakarta, Klungkung, Denpasar
NILAI KONTRAK
IRSDP, Directorate PPP Development, Bappenas
Rp. 1,736,732,000
PERIODE PROYEK s.d
November 2008 April 2012
Oktober 2010 s.d Januari 2012
Pulau Jawa, Lampung, NTB, Sulawesi Kementerian Selatan, Pekerjaan Umum Kalimantan Timur
Rp. 16,382,900,000
November 2013
Jakarta, Bengkulu, Lampung, Kalimantan Kementerian Barat, Perkembangan Kalimantan Daerah Tertinggal Tengah, NTT, Maluku, Maluku Utara
Rp. 10,022,291,400
September 2010
Pulau Jawa, Lampung, NTB, Sulawesi Kementerian Selatan, Pekerjaan Umum Kalimantan Timur
Rp. 8,332,083,000
Mei 2010
Jakarta, Pulau Jawa, Pulau Sumatera, BAPPENAS Sulawesi Selatan, NTT
Rp. 872,900,000
Februari 2010
BAPPENAS - P2MPD Rp. 1,248,000
Probolinggo PT Paiton Energy
US $ 143,525,000
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
N/A
N/A
N/A
N/A
52%
48%
N/A
N/A
N/A
N/A
N/A
N/A
80%
20%
N/A
N/A
20%
80%
N/A
N/A
N/A
N/A
N/A
N/A
Mei 2007 s.d Mei 2011
Rp. 4,768,750,000
Jakarta
WC *)
Desember 2008
April 2012
NO
NAMA
NEGARA
INDONESIAN PARTNER
BIDANG
IUJK BERLAKU S.D
PT INDEC INTERNUSA
NAMA PROYEK Participation Irrigation Sector Project
57
Euroconsult Mott MacDonald
Belanda
KONSULTAN
58
Lahmeyer International GmbH
JERMAN
KONSULTAN
N/A
09/09/13
59
RSEA Engineering Corporation
TAIWANCHINA
KONTRAKTOR
PT. SARANG TEKNIK
20/11/10
CHINA
KONTRAKTOR
N/A
08/07/10
CHINA
KONSULTAN/ KONTRAKTOR
N/A
05/11/10
PERANCIS
KONSULTAN
07/09/10
Belum Ada Proyek
LOKASI Jakarta, Serang, Lampung, Bandung, Cirebon, Surabaya, Sulawesi Selatan
PT CIPTA STRADA
23/05/13
JEPANG
KONTRAKTOR
PT TOSPLANT ENGINEERING
18/09/10
64 SHANGHAI ELECTRIC
CHINA
KONTRAKTOR
PT. PLN (PERSERO)
09/10/10
KONTRAKTOR
-
01/09/10
65 TOBISHIMA CORPORATION JEPANG
66 NIHON SEKKEI INC.
JEPANG
KONSULTAN
PT. CAKRA MANGGILINGAN JAYA
MITSUBISHI HEAVY INDUSTRIES, LTD
JEPANG
KONTRAKTOR
PT. WIJAYA KARYA
TOSHIBA TECHNICAL 68 SERVICES INTERNATIONAL JEPANG CORPORATION
KONSULTAN/ KONTRAKTOR
PT. TOSPLANT ENGINEERING Indonesia
Keterangan*): WC : Working Capital E : Equipment M/P : Management/Personal A : Asing L : Lokal
Rp. 30,603,030,000
WC *)
E *)
M & P *)
A *)
L *)
A *)
L *)
A *)
L *)
Januari 2007 s.d April 2011
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
DKI Jakarta
Satker BBWS Ciliwung-Cisadane Kemen Pekerjaan Umum
Rp185.173.300.000
03/12/2007 s.d 14/12/2009
55%
45%
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
PAITON, JAWA TIMUR
PT PLN Persero
Jan 2012
N/A
N/A
N/A
N/A
N/A
N/A
52,86%
47,14%
N/A
N/A
N/A
N/A
03/07/05
N/A
N/A
N/A
N/A
N/A
N/A
$623.683.412
-
N/A
N/A
N/A
N/A
N/A
N/A
-
-
N/A
N/A
N/A
N/A
N/A
N/A
Rp37.349.669.000
01/09/14
N/A
N/A
N/A
N/A
N/A
N/A
¥3.487.397.888
20/08/07
N/A
N/A
N/A
N/A
N/A
N/A
¥1.003.800.000
NOV 2011
N/A
N/A
N/A
N/A
N/A
N/A
Belum Ada Proyek
63 TOSHIBA CORPORATION
67
Kementerian Pekerjaan Umum
PERIODE PROYEK s.d
NILAI KONTRAK
N/A
Pembangunan Kanal Timur Paket 25
CHINA HARBOUR 60 ENGINEERING COMPANY LTD. BUT. CCCC SECOND 61 HARBOR CONSULTANTS CO.,LTD EGIS BCEOM 62 INTERNATIONAL
PENGGUNA JASA
18/03/10
29/12/10
23/10/10
PLTU 2 JAWA TIMUR (PAITON BARU) 1X550MW POWER PLANT PROJECT EASTERN INDONESIA NATIONAL ROADS TANJUNG JATI B EXPANTION PROJECT (Unit 3 & 4 of Coal Fired Power Plant) FOR COAL POWER STEAM POWER PLANT PROJECT 300-400 MW CLASS FOR PLTU 2 JAWA BARAT CONSULTING SERVICE FOR DEVELOPMENT OF WORLD CLASS UNIVERSITY OF Indonesia
Makassar
Kementerian Pekerjaan Umum
Jepara-Jawa Central Java Power Tengah PELABUHAN RATU -JAWA PT. PLN (Persero) BARAT -
-
University Of Indonesia, University Of Depok Indonesia Campus
DEPOK DEPOT CONSTRUSTION DEPOK, JAWA DINAS Pekerjaan PROJECT JABOTABEK RAILWAY SYSTEM BARAT Umum, DEPOK TANJUNG JATI B 2X660 MW COAL FIRED POWERPLANT EXPANSION PROJECT
JEPARA, JAWA TENGAH
PT. CENTRAL JAVA POWER/SUMITOM O CORPORATION
US $ 1,453,270 Rp83.701.719.640 US $ 59.312.000
Mid of 2012