KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMAMPUAN USAHA PENUNJANG MIGAS PERINGKAT PT. WorleyParsons Indonesia KEBERPIHAKAN DALAM NEGERI
RENDAH (475)
Kantor Pusat Menara Batavia 12A Floor JL. KH. Mas Mansyur Kav. 126 Jakarta 10220 Telepon / Fax : (021) 5746218/5746709 Website : www.worleyparsons.com E-Mail :
[email protected] Penanggung Jawab : Denis Lucey (Presiden Direktur) `` STATUS PERUSAHAAN : NASIONAL
Akta Pendirian Perusahaan No. 17 tanggal 6 Desember 1995 oleh Notaris H. Asmawel Amin, S.H di Bekasi dan Akta perubahan terakhir No. 17 tanggal 12 Agustus 2015 oleh Notaris Ivan Gelium Lantu, S.H., M.Kn. di Depok, sebagai berikut: - Organisasi Perusahaan - Kepemilikan Saham : o Presiden Komisaris : Andrew Peter Wood (WNA) Indonesia o : 5 % o Presiden Direktur : Denis Lucey (WNA) Asing o : 95 % o Direktur : Peter David Kingston Mellor (WNA) o Surat izin Usaha Jasa Konsultasi Konstruksi (IUJK) Penanaman Modal Asing No. 253/1/IU/PMA/2016 tanggal 2 Maret 2016 oleh Kepala BKPM Surat Keterangan Terdaftar (SKT) Migas No: 14/1/SKT-01/PMA/2017 tanggal 14 Februari 2017 Surat Kemampuan Usaha Penunjang (SKUP) Migas No. 1023/19.07/DMB/2017 Tanggal 23 Mei 2017 sampai dengan Tanggal 31 Mei 2019
SISTEM MANAJEMEN : Sistem Manajemen Mutu ISO 9001:2008 No. CERT-0088361-5 oleh SAI Global tanggal 25 September 2015 berlaku sampai dengan 22 September 2018 Sistem Manajemen Lingkungan ; Sistem Manajemen Keselamatan dan Kesehatan Kerja : KEMAMPUAN PRODUKSI JASA :
JENIS JASA Konstruksi
BIDANG JASA Perencana Konstruksi
Pengawas Konstruksi Konsultansi Lainnya
TENAGA KERJA KEMAMPUAN JASA Jasa Desain Rekayasa untuk pekerjaan teknik sipil air, jasa desain rekayasa untuk pekerjaan mekanikal dan elektrikal dalam bangunan, jasa desain rekayasa untuk proses industrial dan produksi, jasa desain rekayasa lainnya Jasa pengawas pekerjaan konstruksi dan instalasi proses dan fasilitas industri Jasa manajemen proyek terkait konstruksi pekerjaan konstruksi proses dan fasilitas industrial
KUALIFIKASI Tenaga Ahli : Ahli Madya Manajemen Proyek Ahli Madya Teknik Tenaga Listrik Ahli Madya Teknik Mekanikal Ahli Madya Teknik Bangunan Lepas Pantai Tenaga Terampil : Instrument Control Structure Designer Piping Designer
JUMLAH WNI WNA 4
-
1
-
1
-
2
-
1 2 1
-
12 DAFTAR PERALATAN DAN PENGALAMAN TERLAMPIR
DAFTAR PERALATAN SOFTWARE PT. WorleyParsons Indonesia NO.
DISCIPLINE
SOFTWARE NAME
VER SOFT
LIC. QTY
1 2 3 4 5 6 7 8 9 10 11 12
Drafter Structural Structural Electrical Mechanical Instrument Instrument Electrical Instrument Process Process Drafter
AutoCAD 2008-2014 SACS V5.3 GRL WEAP V11 Caesar II
Upon request Upon request 1 2 Upon request 2 Upon request Upon request Upon request Upon request Upon request Upon request
13
Drafter
14 15
Drafter Drafter
16 17 18 19 20 21
Structural Mechanical Project Control Process Process Pipeline
22 23 24 25 26 27 28 29
Pipeline Pipeline Pipeline Pipeline Project Control Drafter Process Pipeline / Designer
Autodesk SACS GRL WEAP ETAP Caesar Instrucalc SmartPlant-Instrumentation SPI SmartPlant-SPEL SmartPlant-Project Merger Aspentech-FLARESIM Aspentech-HYSYS Package Aveva – Plant Design Management System (PDMS) Aveva – Plant Design Multi-Discipline Supports (MDS) Aveva – Plant Design Review Aveva – Plant Design Laser Model Interface (LMI) TEKLA PV Elite Primavera PIPESIM FLARENET AGA/PRCI Level 2 Bentley AutoPIPE SAGE Profile 3D DNV FatFree In-house MathCAD & Excel software CAESAR II MCS Pipelay Incontrol V6 Microstation OLGA Fledermaus
Upon request Upon request Upon request 3 Upon request Upon request
V 3.00-00 V8i Series 5 V2.1 MathCAD 15 / Excel 2013 2011 v.2.8.1
Upon request Upon request Upon request Upon request Upon request Upon request 1 (Global) Upon request
V7
1
DAFTAR PERALATAN PT. WorleyParsons Indonesia
200 40
TAHUN PEMBUATAN 2006 - 2013 2013
KONDISI ALAT Baik Baik
STATUS KEPEMILIKAN Milik Sendiri Milik Sendiri
40
2013
Baik
Milik Sendiri
75
2013
Baik
Milik Sendiri
NO.
NAMA
MEREK / TIPE
JUMLAH
1 2
Drawer CAD Station
3
PDMS Station
4
Specialist Engineering Work Station
Pedestal Intel Xeon series with a minimum spec of 16 GB RAM and 500GB Harddrive, DELL computers, each station is using 19 ”/ 21” Dual flat monitor screen. DELL Precision T3600 Intel Xeon series with a minimum spec of 16 GB RAM and 500GB Harddrive, DELL computers, each station is using 19 ”/ 21” Dual flat monitor screen. DELL Precision T3600 Computers (Intel i5 series computers with minimum spec of 4GB RAM for administration, accounting, management and QA dept) Dell Optiplex 7010
DAFTAR PENGALAMAN PT. WorleyParsons Indonesia NO.
NAMA PROYEK
LINGKUP PEKERJAAN
LOKASI
PERIODE
PELANGGAN
1.
FEED Study for MAC Development
To provide FEED for : 1. Provide FEED Documents 2. Preparation of EPCI bid documents for lump sum, turnkey, construction of facilities for MAC WHP including a personnel bridge, 10” export pipeline including hot tap design study for 10” export line tie-in to EJGP pipeline.
Jakarta, Indonesia
15 Agustus 2016 – 15 Februari 2017
HuskyCNOOC Madura Limited (HCML)
CAPAIAN TKDN 55.65 %
NO.
NAMA PROYEK
LINGKUP PEKERJAAN
2.
Provision of Facility Engineering Study
3.
Corrosion Under Insulation (CUI) – Real Time Radiography Services EPCM – Engineering, Procurement, Construction and Management
3. Preparation of functional specification of facilities on lease MOPU and installation procedure for Personnel Bridge and strengthening landing on MOPU braces connecting MOPU to MAC WHP. To provide Engineering Services : 1. Debottlenecking Study 2. Design Additional Well Conductor Centralizer 3. Flowlines Design Improvement 4. Project Management Provide Inspection Service for Corrosion Under Insulation (CUI) – Real Time Radiography Services for Belanak Platform
4.
5.
BP - Offshore Project Management Services
6.
Central Information Store Application Services for Tangguh Expansion Project 4420000610
CAPAIAN TKDN
LOKASI
PERIODE
PELANGGAN
Jakarta, Indonesia
20 Juni 2016 – 19 Juni 2017
Pearl Oil (Sebuku) Limited
60.32 %
Jakarta, Indonesia
18 April 2016 – 18 April 2018
ConocoPhillip s Indonesia Inc. Ltd.
33.78 %
To provide call-on basis EPCm services for Exxon Mobil oil producing facility for 3 years. The scope is mainly (90%) call-on basis engineering services to support Exxon Mobil oil operations. Covering items : 1. Project Management 2. Engineering 3. Procurement Support 4. Construction Management General Obligation (management, administration, engineering, purchasing, onshore fabrication, and offshore installation, hook-up and commissioning)
Jakarta Indonesia
30 April 2015 – 29 April 2018
ExxonMobil Cepu Limited
96.83 %
Support BP through the Bidder Technical Evaluation phase for both Line Pipe Supply and EPCI bid submissions. Prepare Execute Phase PEP draft and issue IFR (BP shall finalise document after Contractor Selection) Support to completion of remaining Quality deliverables as per EPCI Preparation MDR Review and comment to other key EPCI Preparation MDR documents as agreed Updates to Project Documents as per the Engineering Work Plan (Only applicable to non ITT documents that are not issued to bidders) PMCS Action close-out Completion of ETP Conformance Reports Provide CIS Managed Service for: 1. Set up Services 2. CIS Managed Services a. Document Library Management Services which shall consist of the Central Document Library (CDL) where all documents shall be stored and managed. b. Data Management Services Which Shall Consist the Central Tag Database (CTDB) where all Tag Data shall be stored and managed. c. Application Support Services. 3. Decommissioning and Achieving Service. 4. People Service Management
Jakarta, Indonesia
1 May 2015 – 31 Juli 2015
Reka Patria Ekaguna (RPE)
Jakarta, Indonesia
25 Juli 2014 – 23 Juni 2020
BP Berau Ltd.
30 %
NO.
NAMA PROYEK
LINGKUP PEKERJAAN
CAPAIAN TKDN
LOKASI
PERIODE
PELANGGAN
Jakarta, Indonesia
18 Agustus 2014 - 31 Agustus 2016
Total E&P Indonesie
75 %
Jakarta, Indonesia
21 July 2014 - 20 November 2014
PremierOil Natuna Sea B.V.
98.75 %
Jakarta, Indonesia
13 Mei 2014 – 12 November 2015
BP BERAU LTD.
45 %
which shall consist of the provisions and management of experienced personnel as required by company.
7.
Provision of Engineering Services (High Level)
8.
Provision of QRA for ORF
9.
Technical Support For Offshore Facilities EPCI Preparation
In addition to above also to provide 1. Training 2. CIS Managed Service (Hosting, Maintenance, Data management, Application Support Service) 3. Decommissioning and Archiving 4. People Service Management 5. Specific Deliverable to Contract Exhibit B Section 8 Project for Screening & Conceptual Studies, Pre-project Study, FEED, Detailed engineering studies and EPSC Contract / Project preparation. Concept study using MOPU for offshore minimalist Platform. Pemping System Section 1 Project (WNTS to Pemping) will be executed by Premier Oil Natuna Sea 8.V. ("Company"). The development requires connection of a new pipeline tied to the West Natuna Transportation System (WNTS) trunk line at Subsea Tie-in 8 (SSTI-8). A subsea pipeline end manifold (PLEM) structure shall be installed adjacent to SSTI-8 to isolate the new pipeline from the WNTS trunk line and to allow for future subsea pigging of the pipeline. Onshore Receiving Facilities (ORF) will be constructed on Pemping Island to reduce the WNTS trunk line gas pressure and fiscally meter the gas throughput. Pemping Island is located about 30 minutes North West from 8atam Island by boat. The plot plan layout of Pemping ORF is shown in Figure 2 below. To Perform Quantitative Risk Assessment for 1. Pipeline Kilometer Post (KP 0.0 to KP 4.4 Where the pipeline will be concrete coated sitting on the seabed. 2. Onshore Receiving Facility (ORF) to define quantitative risk of process and nonprocess hazard from Pemping ORF Facilities. The Report of Consultant shall identify and evaluates the potential risk associated with the ORF with Respect to the Personnel on site, asset equipment, structural Integrity and also other parties in the vicinity of the ORF. The Tangguh Expansion Project will comprise a development of new offshore facilities and onshore facilities on a brown-field site. The onshore facilities development will include one additional liquefaction train with capacity of 3.8 mtpa and is expected to include provisions for further expansion in the future, an onshore receiving facility, expanded jetty, LNG storage, utilities, boil off gas recovery, flares, infrastructure to support logistics and associated
NO.
10.
NAMA PROYEK
Offshore Gas Production Facilities (GPF) Follow on FEED
LINGKUP PEKERJAAN increased temporary and permanent workforce. Significant standardization is planned, where appropriate, incorporating lessons learned from past experience in developing the Tangguh Project Phase 1, and compliance with COMPANY's Engineering Technical Practices ("ETPs"). The offshore facilities development will include additional platforms, pipelines and wells required to develop gas to fill an integrated three trains development. The offshore facilities will be developed in a number of phases, and designed to accommodate future sources of gas supply. This AGREEMENT shall focus on the first phase of offshore facilities development covering the construction of offshore Gas Production Facilities ("GPF") which will include the construction of WDA and ROA platforms, pipelines and umbilical. This AGREEMENT is prepared with the overall objective of performing EPCI Preparation for the GPF facilities in order to provide all related matters required for preparing and processing open tender of Engineering, Procurement, Construction and Installation ("EPCI") of the offshore GPF. Covering : 1. EPCI and Linepipe Tender Preparation Support 2. Engineering Design and Updates(Offshore pipeline, onshore tie in) 3. Feed Design for VRB infill Modifications 4. EPCI Execution Phase Preparation(develop AVL, develop EPCI Contractor Management Strategy) 5. EPCI Tender and Evaluation Support 6. EPCI Phase Preparation This is a follow on Offshore GPF FEED for the Tangguh Expansion Project The work includes: 1. Project Management and ITT, Coordination of all interfaces which directly impact the ITT Package workscope. 2. Prepare Process Safety related drawings 3. Prepare ROA & WDA Structural Drawings
LOKASI
PERIODE
PELANGGAN
Jakarta, Indonesia
09 Desember 2013 – 2 Desember 2015
BP BERAU LTD.
CAPAIAN TKDN
45 %