KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMAMPUAN USAHA PENUNJANG MIGAS PT. PROSERV
PERINGKAT
STATUS PERUSAHAAN : NASIONAL Akte Pendirian Perusahaan No.30 oleh Notaris Ny. Maria Anastasia Halim, S.H., Tanggal 20 Oktober 1997di Batam, dan Akta Perubahan terakhir No.2 dari Notaris Ny. Fenny, SH tertanggal 31 Oktober 2011 di Batam, sebagai berikut: − Kepemilikan Saham: 100% Asing − Organisasi Perusahaan: o Presiden Komisaris: Douglas William Moore (WNA) o Komisaris: George Joseph Trautman (WNA) o Presiden Direktur : William Alvin Dyar (WNA) o Direktur : Trevor Keneth Gurmin (WNA) o Direktur : Bradley Dean Preston (WNA) Surat Izin Usaha Kepala Badan pengusahaan Kawasan Perdagangan Bebas dan Pelabuhan Bebas Batam Nomor B/0120/BP-BTM/KA-A2/111/04/2011. Surat Keterangan Terdaftar Migas No. 0061/SKT-03/DMT/2012 tanggal 22 November 2012. Surat Badan Pengusahaan Kawasan Perdagangan Bebas dan Pelabuhan Bebas Batam No.73/2/IU/III/PMA/Perdagangan/2011 perihal Pencatatan Perubahan Nama Perusahaan semula PT. Petrotech Batam menjadi PT.Proserv. Surat Kemampuan Usaha Penunjang Migas No. 18235/19.07/DMB/2012 tanggal 27 Desember 2012 SISTEM MANAJEMEN : Sistem Manajemen Mutu ISO 9001:2008 Nomor 01 100 023810 tanggal 15 Nopember 2010 oleh Badan Sertifikasi TUV Rheinland berlaku sampai dengan 20 Oktober 2012. Sistem Manajemen Lingkungan UKL- UPL No. 125/Bapedal/REKOM/UKL-UPL/VIII/2012 tanggal 27 Agustus 2012 oleh Badan Pengendalian Dampak Lingkungan Kota Batam berlaku selama perusahaan beroperasi. Sistem Manajemen Keselamatan Kerja BS OHSAS 18001:2007 Nomor 01 113 023810 tanggal 2 Mei 2011 oleh Badan Sertifikasi TUV Rheinland berlaku sampai dengan 1 Mei 2014 KEMAMPUAN PRODUKSI DALAM NEGERI: HASIL JENIS PRODUK SPESIFIKASI PRODUKSI
Wellhead Control Panel
Chemical Injection Panel
Pneumatic/Hydraulic Wellhead Control Panels Intrument Control Panels PLC Control Panels Well Testing Control Panel Manufacturing & Engineering Corrosion Injection Package
Methanol Injection Package Test Chemical Injection Panel
Client Spec Up to 30 Well Pressure Up to 25,000Psi Dimention Customize
Client Spec Up to 10,000psi pressure
STANDAR PRODUK
SERTIFIKAT PRODUK
TKDN (%)
KAPASITAS
ANSI B16104 API 2000 AMSE B31 ASME VIII DIV.1 IEC 60068-21 TO 75 IP-55 IP-65
-
17.18 %
100 unit/tahun
16.7 %
50 unit/tahun
CE Marking ASME VIII IEC 60063-21
-
KEMAMPUAN PRODUKSI JASA : KELOMPOK JASA Konstruksi
Non Konstruksi
TENAGA KERJA
BIDANG JASA
KEMAMPUAN BIDANG JASA
Pelaksana konstruksi
Instrumentasi - Pemasangan dan pemeliharaan instrumentasi
Pekerjaan Bawah Air
-
KUALIFIKASI Tenaga Terampil : - Teknik Elektro - Teknik Mesin
Melepas karang di konstruksi bawah laut Melepas coating di konstruksi bawah laut
JUMLAH WNI WNA 3 5
-
8
-
DAFTAR PERALATAN DAN PENGALAMAN KERJA TERLAMPIR Kantor Pusat & Workshop (status: milik sendiri) Jl. Duyung Kavling III Batu Ampar – Batam 29453 Telp. 0778 412407, 0778 432113 Fax. 0778 412408 E-mail.
[email protected],
[email protected] Web. https:\\webmail.proserv.com Contact Person. Trevor Keneth Gurmin (Direktur) Daftar Peralatan PT. Proserv NO. 1. 2.
NAMA ALAT
MEREK / TIPE
JUMLAH
TAHUN PEMBUATAN
KONDISI ALAT
STATUS KEPEMILIKAN
Marine Growth Removal tool
Kedalaman 8 m
1 unit
-
Baik
Milik sendiri
Compressor
Reciprocating Compressor/ 175 Psig
3 Unit
-
Baik
Milik sendiri
Mesin Hydraulic
1 Unit
-
Baik
Milik sendiri Milik sendiri
4
Tubing Bender Hydraulic 1” Tubing Bender ¾”
Mesin Hydraulic
3 Unit
-
Baik
5
Tubing Bender ½”
Manual
10 Unit
-
Baik
Milik sendiri
6
Tubing Bender 3/8”
Manual
30 Unit
-
Baik
Milik sendiri
7
Tubing Bender ¼”
Manual
30 Unit
-
Baik
Milik sendiri
8
Tubing Bender 12mm
Manual
2 Unit
-
Baik
Milik sendiri
9
Tubing Bender 10mm
Manual
4 Unit
-
Baik
Milik sendiri
10
Manual
4 unit
-
Baik
Milik sendiri
Vital
1 Unit
-
Baik
Milik sendiri
12
Tubing Bender 6mm Gantry Crane w/2 chain block Forklift-Mitsubishi HI
DP40KT
1 Unit
-
Baik
Milik sendiri
13
Pallet Jack
DIN/962014
3 Unit
-
Baik
Milik sendiri
14
Welding Mesin
INTEREC V200T
1 Unit
-
Baik
Milik sendiri
15
Welding Stud
PRO-Weld CD -312
1 Unit
-
Baik
Milik sendiri
3
11
a. Peralatan Utama No. 1. 2. 3 4 5 6
Compressor Tubing Bender Hydraulic 1” Tubing Bender ¾” Tubing Bender ½” Tubing Bender 3/8” Tubing Bender ¼”
12
Tubing Bender 12mm Tubing Bender 10mm Tubing Bender 6mm Kunci Pas Berbeda Ukuran Kunci Inggris Berbeda Ukuran Obeng Gepeng
13
Obeng Bunga
7 8 9 10 11
Model/type fasilitas dan peralatan
Nama fasilitas dan peralatan
Reciprocating Compressor Mesin Hydraulic Mesin Hydraulic Manual Manual Manual
Kapasitas atau ukuran fasilitas dan peralatan
Jumlah
Status kepemilikan fasilitas dan peralatan
Lokasi fasilitas dan peralatan
Keterangan
175 Psig
3 Unit
Milik Sendiri
Batam
Tersertifikasi
1”
1 Unit
Milik Sendiri
Batam
¾”
3 Unit
Milik Sendiri
Batam
½”
10 Unit
Milik Sendiri
Batam
3/8”
30 Unit
Milik Sendiri
Batam
30 Unit
Milik Sendiri
Batam
¼”
Manual
12mm
2 Unit
Milik Sendiri
Batam
Manual
10mm
4 Unit
Milik Sendiri
Batam
Manual
6mm
4 unit
Milik Sendiri
Batam
Manual
30 set
Milik Sendiri
Batam
Manual
30 set
Milik Sendiri
Batam
Manual
30 set
Milik Sendiri
Batam
Manual
30 set
Milik Sendiri
Batam
b. Peralatan Pendukung
No.
Nama fasilitas dan peralatan
3
Gantry Crane w/2 chain block Forklift-Mitsubishi HI Pallet Jack
4.
Welding Mesin
5.
Welding Stud
6
Mesin Grinda
7
Mesin Bor
8
Mesin Potong
1. 2.
Model/type fasilitas dan peralatan Vital DP40KT DIN/962014 INTEREC V200T PRO-Weld CD -312 BOSCH, MAKITA BOSCH, MAKITA BOSCH, MAKITA
Kapasitas atau ukuran fasilitas dan peralatan
Jumlah
Status kepemilikan fasilitas dan peralatan
Lokasi fasilitas dan peralatan
Keterangan
5 Ton
1 Unit
Milik Sendiri
Batam
Tersertifikasi
4000 kg
1 Unit
Milik Sendiri
Batam
Tersertifikasi
2 ton
3 Unit
Milik Sendiri
Batam
Tersertifikasi
1 Unit
Milik Sendiri
Batam
1 Unit
Milik Sendiri
Batam
4Unit
Milik Sendiri
Batam
7 Unit
Milik Sendiri
Batam
2 Unit
Milik Sendiri
Batam
c. Peralatan Keselamatan dan Kesehatan Kerja serta Lindungan Lingkungan No. 1. 2. 3. 4 5 6
Nama fasilitas dan peralatan Instalasi Penyalur Petir Instalasi Penerangan dan Tenaga Fire Extinguser Hydraulic Flushing Unit Water Glycol Flushing Unit Simulator Electrical
Model/type fasilitas dan peralatan Konvensional 220/380 V150KVA
Kapasitas atau ukuran fasilitas dan peralatan
Jlh
Status kepemilikan fasilitas dan peralatan
Lokasi fasilitas dan peralatan
Keterangan
0.47 Ohm
1 unit
Milik Sendiri
Batam
Tersertifikasi
5 Ohm
1 Unit
Milik Sendiri
Batam
Tersertifikasi
2.5 kgs/btl
8 unit
Milik Sendiri
Batam
Tersertifikasi
6 Unit
Milik Sendiri
Batam
1 unit
Milik Sendiri
Batam
1 Unit
Milik Sendiri
Batam
No. 7 8 9 10 11 12 13 14 15
16 17 18 19 20
Nama fasilitas dan peralatan
Model/type fasilitas dan peralatan
Kapasitas atau ukuran fasilitas dan peralatan
Jlh
Status kepemilikan fasilitas dan peralatan
Lokasi fasilitas dan peralatan
1 unit
Milik Sendiri
Batam
1 Unit
Milik Sendiri
Batam
Keterangan
Simulator Pneumatic Module Test Bench Universal Thermocouple Calibrator Loop Calibrator
198094 (422)
1 unit
Milik Sendiri
Batam
Tersertifikasi
211833 (334)
1 Unit
Milik Sendiri
Batam
Tersertifikasi
RTD Calibrator Temperature Bath Digital multimeter
213794 (211) 008554-01130 (650SE) 8200038 (177)
1 unit
Milik Sendiri
Batam
Tersertifikasi
1 Unit
Milik Sendiri
Batam
Tersertifikasi
1 unit
Milik Sendiri
Batam
Tersertifikasi
Processmeter Pressure Calibrator/ Digital Dead Weigt Tester
92810020
1 Unit
Milik Sendiri
Batam
Tersertifikasi
C700 P 3049611 (30005089)
1 unit
Milik Sendiri
Batam
Tersertifikasi
24571 (TRANSCAT 4353E)
1 Unit
Milik Sendiri
Batam
Tersertifikasi
F03403
1 unit
Milik Sendiri
Batam
Tersertifikasi
5050-2707
1 Unit
Milik Sendiri
Batam
Tersertifikasi
1 unit
Milik Sendiri
Batam
Tersertifikasi
3 Unit
Milik Sendiri
Batam
Tersertifikasi
Loop Calibrator Portable ParticlePC4000 PAMAS-S40 S/N 400-1341 Hydran 4,000 liters Perlengkapan K3
0-10,000psi
Daftar Pengalaman PT. Proserv NO.
NAMA PROYEK DAN LINGKUP PEKERJAAN
LOKASI
PERIODE
PELANGGAN
1.
Marine growth removal on the Ekofisk
Ekofisk
2.
Marine growth removal on the Troll C
North Sea
2010
Deep Ocean Conocophillips Nemo – Statoil
3.
Marine growth removal on the Gudrun Marine growth removal on the Northern Canyon Marine growth removal on the Valhall South
North Sea
2010
Linjebygg
North Sea
2010
Deep Ocean
4. 5. 6. 7. 8.
NO.
1.
2.
Marine growth removal on the Norne Marine growth removal on the Mongstad Raffeneri Marine growth removal on the Valhaa IP NAMA PEKERJAAN SESUAI JUDUL KONTRAK Phase-36 Project 6 Ea Wellhead Control Panel Su Tu Den Northeast Project Wellhead Control Panel (WHCP-2820)
3.
Panna Mukta Project 2 Ea Chemical Injection Panel
4
EPCC of PLDP-A Drilling Platform
VOLUME KERJA
2010-2011
BP – BIS Industrier 2010 Mongstad
2009-2010
North Sea
2009
PEMBERI KERJA/ NOMOR DAN TANGGAL KONTRAK
Six (6) Wellhead Control Panel
Chevron Thailand Exploration & Production / P.O. No. CVX36-7004 Tgl. 21 April 2009
Wellhead Control Panel
Cuu Long Joint Operating Company / P.O. No. 3392008/PTSC-MC/MHH Tgl. 27 Juni 2008
Chemical Injection Panel for PK and SWP Fusible Plug Loop Panel FPP-8100
British Gas Exploration & Production India Limited / PO No. BG2-7003 Tgl. 7 Agustus 2008 PC Vietnam Limited / Po. No. 326-2008/PTSC MC/MHH Tgl. 25 Juni 2008
Statoil Dong Energy – BIS Industrier BP – Can
LOKASI KERJA
PERIODE PELAKSANAAN
Thailand
2008-2009
Vietnam
2008-2009
India
2008-2009
Vietnam
2008
NO.
NAMA PEKERJAAN SESUAI JUDUL KONTRAK
5
ANDP-D Platform Siprod Alarm Panel LP-0002
6 7
8 9 10
Bongkot Field Development Project – Phase 3H4A Phase-37, Chevron ESD Control Panel System & Chemical Injection Pump Phase-37B Project Chevron Thailand Phase-39 Project Chevron Thailand
VOLUME KERJA
Siprod Alarm Panel Wellhead Control Panel for WPS1, WPSX & WPXX
PEMBERI KERJA/ NOMOR DAN TANGGAL KONTRAK Petronas Carigali Sdn Bhd. / PO. No. RFY016-0154/ Tgl. 14 April 2008 Thai Nippon Steel Eng. & Construction Corp. LTd/ PO. No. THAI-3H4A-GEN-17-040001 / Tgl. 16 Januari 2009
Wellhead Control Panel, qty : 2
Cuel Limited / P.O No. CVX37-7004
ESD Control Panel, qty : 20 Chemical Injection, qty : 20
Halliburton
Five (5) Wellhead Control Panel Six (6) Wellhead Control Panel
Cuel Limited / P.O. No. CVX37B-7001 Tgl. 18 May 2010 Chevron Thailand / P.O. No. CVX39-7001 Tgl. 9 Juli 2010 Cuel limited / P.O. No. CHC7001 Tgl 9 September 2010 McDermott / P.O. No. 0244SS190056
LOKASI KERJA
PERIODE PELAKSANAAN
Malaysia
2008
Thailand
2009-2010
Thailand
2009-2010
Woldwide
2009-2010
Thailand
2010
Thailand
2010
Thailand
2010
Australia
2010
Malaysia
2010
Malaysia
2010
11
Surya – B SYB-1-0150
One (1) Wellhead Control Panel
12
Kipper Tuna Turrum Project
11 WHCP /HPU
BSA – GAS Control Module BSA – OIL Control Module
Wellhead Control Modul Qty: 1 Wellhead Control Module Qt:1
Bumi Wangsa / P.O. No.: 09-353/VP-0809-034 Bumi Wangsa / PO. No.: 10-387/VP-0510-081
15
BSA – Water Control Module
Wellhead Control Module Qyt:1
Bumi Wangasa / P.O No.: 10-386/VP-0510082
Malaysia
2010
16
Pneumatic Pressure Switch c/w Manifold
Wellhead Platform Qty : 30
Sime Darby Engineering / Po. No. F-ON/2046/4500058571 - FON/2046/4500058580
Malaysia
2010
17
ESD Control panel System & Chemical Injection Pump
WHCP
Halliburton / P.O No.:
Woldwide
2010
18
WHCP Stand Alone
WHCP Qty : 1
Ampo – Brunai / P.O No.: 5366
Brunei
2010
19
WHCP Long & Short string forSC-SSV, SSV-1 & SSV-2
WHCP Qty : 15
Shinba / P.O No.: P-07808 Tgl 27 September 2010
Brunei
2010
20
HYDRAULIC POWER UNIT CL 5000 WELL TIE IN PROJECT HPU 78UZ-YYY
WHCP Qty : 1
Shinba / P.O No.: P-07807 Tgl 27 September 2010
Brunei
2010
21
MLJ-107 WELLHEAD SHUTDOWN VALVE (SCSSV)
Wellhead Shutdown Valve Qty : 1
Shinba / P.O No.: P 07747
Brunei
2010
22
WELLHEAD CONTROL PANEL SIX (6) WELLS
WHCP Qty : 1
PTTEP Siam / P.O. No.: OS143847 Tgl 6 September 2010
Brunei
2010
WHCP Qty : 1
Shinba / P.O. No.: P-07863 Tgl 19 oktober 2010
Thailand
2010
Wellhead Control Panel Qty: 1 & Chemical Injection Panel Qty : 1
BG Exploration & Production India / Contract No.: 2010/B/PM/PRJ/1257
India
2010
Phase-39, Chevron
Wellhead Control Panel, qty : 6
Cuel Limited / P.O No. CVX39-7001
Thailand
2010
Phase-41, Chevron
Wellhead Control Panel, qty : 4
Cuel Limited / P.O No. CVX41-7001
Thailand
2011
13 14
23
24
25
26
WELLHEAD CONTROL PANEL LONG & SHORT STRING FOR SC-SSV, SSV-1 & SSV-2 Wellhead Control Extension & Chemical Distribution Extension panel
NO.
27
28 29 30
31
32
33
34
35
36 37
38
39
NAMA PEKERJAAN SESUAI JUDUL KONTRAK
PEMBERI KERJA/ NOMOR DAN TANGGAL KONTRAK
LOKASI KERJA
PERIODE PELAKSANAAN
WHCP QTY : 1 unit for BMB & 1 unit for CKD
Carigali Hess Operating Company Sdn. Bhd
Malaysia
2011
Phase-42, Chevron
WHCP QTY: 4ea
Cuel Limited/ P.O No. CVX42-7001
Thailand
2011
Phase-43, Chevron
WHCP QTY: 8ea
Cuel Limited / P.O No.: CVX43-7002
Thailand
2011
EXPRO-VIETNAM-CIP P.O No.: 4500353098
Vietnam
2011
Petroknowledge Sdn Bhd P.O No.: 125/2011
Malaysia
2011
Thailand
2011
Thailand
2011
Thailand
2011
PTTEP Siam Ltd P.O No.: OS150611
Thailand
2011
5ea WHCP
PTTEP Siam Ltd P.O No.: OS148778
Thailand
2011
Corrossion Inhibitor Injection, qty: 2ea
PT. Sempec Indonesia P.O No.: Proc/PHE0558/ME/LOI/002
Indonesia
2011
1ea Inland Sampling System, 1ea Sample Enclosure , 2ea Sample Canister
Tanker Pacific Offshore Terminal Pte Ltd. P.O No.: 800-CN296996
Singapore
2011
WHCP
PT. NISCONI Indonesia P.O. No.: ID-SMK-ALL2045-170301-AMD01
Indonesia
2011
Aker Solutions Malaysia Sdn Bhd. P.O No.: 4500405290
Malaysia
2011
UK
2011
Saudi Aramco
2011
Malaysia
2012
Brunei
2012
Thailand
2012
CHESS BMB & CKD Wellhead Platform
EXPRO-VIETNAM-CIP Petroknowledge-Sample Cylinders PTTEP-Bonglot Field Development –Phase 3H4A
Well Control Module Bongkot & Arthit Field Development / Bongkot Wellhead Booster Compressor Phase BC3 Well Control Module
Well Control Module Pertamina PHE ONWJ New Field Development
TPOT-Sampling Products South Mahakam Field Development Project Phase 1&2 SMK 1&2/EPSCI
40
AKER-KL-->HPU & Mobile Test Unit
41
HPU C/W Control Panel
42
Aramco Safaniya FieldPhase1
43
Panel for Xmas Tree Testing Area
44
AMDP17 CPRA & Well Tie –In
45
Chess Bulan-B Wellhead Platform
VOLUME KERJA
Chemical Injection Pump skid ( 10K Psi), qty: 2ea Sample Cylinder: 10ea: Prolight Sample Cylinder 10ea WP-23 Solenoid Supply Pump Line Modification ; 3Lot Material for Modification Well Control Panl Six(6) well control module , Qty: 1ea 3Lot Materials for Logic Modification BC3 fro WP9, WP17, WP3 Wellhead Control Panel Six(6) well control module , Qty: 1ea
1ea HPU, 1ea Mobile Pressure Test HPU c/w Control Panel ; 1ea Multi Function Containerized System, 1ea 20 way control panel 2ea HPU, 2ea Subsea Umbilical 5ea Water test Pump, 1ea Hydraulic Satelite System, contontrols 5ea Wellhead Contro Module ( API 500#Gas Well) WHCP Qty: 1ea
Thai Nippon Steel Eng. & Construction Corp. LTd/ PO. No. THAI-3H4A-GEN-17-040001B-5 PTTEP Siam Ltd P.O No.: OS149491 Thai Nippon Steel Eng. & Construction Corp. LTd/ PO No.: Thai-BC3-GEN-17-040011
Hydrafit Subsea (UK) Ltd P.O.No.: 20220 Saudi Arabian Oil Company P.o No.: 0923-D5854DD312745-00 Aker Solution Malaysia Sdn Bhd-Selangor. P.O No.: 4500397561 Brunei Shell Petroleoum sdn bhd. P.O No.: P08866 Carigali Hess Operating Company Sdn Bhd. P.O No: CHC1201-7002-draft
NO.
NAMA PEKERJAAN SESUAI JUDUL KONTRAK
VOLUME KERJA
PEMBERI KERJA/ NOMOR DAN TANGGAL KONTRAK Carigali Hess Operating Company Sdn Bhd. P.O No: CKG-IN-PO-0004-01 Carigali Hess Operating Company Sdn Bhd. P.O No: CKG-IN-PO-0004-02
46
Chess BMB & CKD Wellhead Paltform
Booster Pump Qty: 2ea
47
Chess BMB & CKD Wellhead Paltform
Commissioning Spare Part Qty: 1ea
48
Su Tu Field Development- Su Tu Trang Long Term Production Test Program
Booster Pump for Whcp. Qty: 1ea
Cuu Long Joint Operating Company P.O No.: PTSCMC-TM/MHH-E
49
Control Panel for HCCR Valves
Control Panel For HCCR Valves. Qty: 3ea
Schlumberger-Dynamic Pressure Management-PT. M-i Indonesia P.O No.: 13464 Rev.01
50
Malampaya Phase 2 ( MP2) Development
Methanol Injection Skid Qty: 20ea
Shell Philippines Exploration BV P.O No: 4511318206
LOKASI KERJA
PERIODE PELAKSANAAN
Thailand
2012
Thailand
2012
Vietnam
2012
Indonesia
2012
Philippines
2012