KEMENTERIAN ENERGI DAN SUMBER DAYA MINERAL DIREKTORAT JENDERAL MINYAK DAN GAS BUMI KEMAMPUAN USAHA PENUNJANG MIGAS PT. REKA PATRIA EKAGUNA
PERINGKAT
Kantor Pusat dan Workshop: Alamat : Jalan Sultan Iskandar Muda, Kebayoran Lama Jakarta Selatan 12240 Telepon / Fax : (021) 29036500 / (021) 29036511 E-Mail :
[email protected] Website : www.rpe-engineering.com Penanggung Jawab : Ir. Arlan Septia Ananda Rasam (Direktur Utama)
KEBERPIHAKAN DALAM NEGERI
975 (TINGGI)
STATUS PERUSAHAAN: DALAM NEGERI Akta Pendirian Perusahaan No. 182 tanggal 18 Agustus 1990 oleh Notaris Yudo Paripurno, SH di Jakarta dan Akta perubahan terakhir No. 14 tanggal 21 April 2015 oleh Maria Gunarti, SH, M.Kn sebagai berikut : - Organisasi Perusahaan : - Kepemilikan Saham : o Komisaris Utama : Ir. Boyke Minarno o Indonesia : 100 % o Komisaris : Ir. Gammaria Gumayani Tusin Ir. Iwan Gunawan o Direktur Utama : Ir. Arlan Septia Ananda Rasam o Direktur : Ir. Budi Sarwono Ir. Yuniana Idawati Birman Prabowo Surat Ijin Usaha Perdagangan No. 01046-04/PB/P1/1.824.271 Tanggal 07 Pebruari 2014 oleh Pemprov DKI Jakarta Surat Ijin Usaha Konstruksi No. 1-002443-3171-4-01217 dan 1-002443-3171-4-01217 Tanggal 29 Juli 2015 oleh Pemprov DKI Jakarta Surat Keterangan Terdaftar (SKT) Migas No: 0148/SKT-01/DMT/2015 Tanggal 27 Mei 2015 oleh Direktorat Jenderal Migas Surat Keterangan Terdaftar (SKT) Migas No: 0149/SKT-01/DMT/2015 Tanggal 27 Mei 2015 oleh Direktorat Jenderal Migas Surat Kemampuan Usaha Penunjang Migas No. 2180/19.07/DMB/2016 Tanggal 19 Pebruari 2016 SISTEM MANAJEMEN : Sistem Manajemen Mutu : ISO 9001:2008 No. 01 100 99328 Tanggal 13 Pebruari 2015 oleh TUV Rheinland berlaku sampai dengan tanggal 12 Februari 2018 Sistem Manajemen Lingkungan : ISO 14001:2004 No. 99328 Tanggal 3 Oktober 2013 oleh TUV Rheinland berlaku sampai dengan 02 Oktober 2016 Sistem Manajemen Keselamatan Kerja : OHSAS 18001:2007 No. 01 113 99328 Tanggal 11 Maret 2014 oleh TUV Rheinland berlaku sampai tanggal 10 Maret 2017 KEMAMPUAN PRODUKSI JASA: JENIS JASA
BIDANG JASA
TENAGA KERJA KEMAMPUAN JASA Sipil/Perencanaan Rekayasa : - Jasa Desain Rekayasa untuk Konstruksi Pondasi serta Struktur Bangunan, Jasa Desain Rekayasa Lainnya.
Perencana Konstruksi : Konstruksi
Mekanikal / Perencanaan Rekayasa : - Jasa Desain Rekayasa untuk Pekerjaan Mekanikal, Jasa Desain Rekayasa untuk Proses Industrial dan Produksi, Jasa Desain Rekayasa Lainnya. Elektrikal/ Perencanaan Rekayasa : - Jasa Desain Rekayasa untuk Pekerjaan Elektrikal dalam Bangunan, Jasa Desain Rekayasa Lainnya.
KUALIFIKASI Tenaga Ahli : - Ahli Manajemen Proyek-Madya - Ahli Teknik Bangunan GedungUtama - Ahli Teknik Bangunan GedungMadya - Ahli Teknik Tenaga ListrikMadya - Ahli Teknik Mekanikal-Madya - Ahli K3L
JUMLAH WNI WNA 2
-
1
-
3 1 2 1 10
-
JENIS JASA
Konstruksi
BIDANG JASA
Pengawas Konstruksi :
TENAGA KERJA KEMAMPUAN JASA Layanan Jasa Manajemen Proyek / Konsultansi Lainnya : - Jasa Manajemen Proyek Terkait Konstruksi Bangunan, Jasa Manajemen Proyek Terkait Pekerjaan Teknik Sipil Lainnya, Jasa Manajemen Proyek Terkait Konstruksi Pekerjaan Konstruksi Proses dan Fasilitas Produksi
DAFTAR PERALATAN DAN PENGALAMAN TERLAMPIR
KUALIFIKASI Tenaga Terampil : - HSE Manager - Project Engineer - Structural Engineer - Lead Electrical Engineer - Piping Engineer - Lead Piping Engineer - Lead Process Engineer - Process Engineer - Sr. Process Safety Engineer - Process Safety Engineer - Lead Instrument and Control Engineer - Instrument and Control Engineer - Instrument Drafter - Electrical Drafter - Piping Drafter - Sr. Civil / Structure Designer - Sr. Mechanical & Piping Designer - Sr. Piping Designer
JUMLAH WNI WNA 1 1 1 1 1 1 1 1 1 1
-
1 1 1 1 1 1 1 18
-
DAFTAR PERALATAN SOFTWARE PT. REKA PATRIA EKAGUNA NO.
NAMA SOFTWARE
KEGUNAAN
VERSI
TAHUN LISENSI
P6
2012
2014
2014
Project Management, Planning & Schedule 1
PRIMAVERA
Project Management, Planning & Schedule, Project Planner for scheduling and costing
Computer Aided Design 2 Auto-CAD 2D Drawings 3D Design Plant Design Management System and includes; - Add on software for PDMS to check & manage clashes 3 - Clash Manager - Add on software for PDMS to compare Smartplant P&ID - P&ID Manager and 3D Model Interface Application to Engineering Software database Plant Information solution, that brings together information from diverse applications & data sources (Primarily: PDMS, SPI & SI PID) and provides a unified digital profile Aveva VNET or Intergraph 4 of the physical plant. The solution feature includes Smart Plant Foundation capabilities to search tagged items, equipments, check data association characteristics, logical function & physical location. Process and Process Safety Design Process Simulation (Steady State and Dynamic modules) 5 HYSYS along with Heat and Material Balance data extraction file inclusive of extension to relevant software. 6 PRO/II Alternative process simulation software for specific system FLARESIM/Flare system 7 Flare Radiation and flare height calculation Analyzer Flare Network Calculation (Back Pressure, Flare load, 8 FLARENET stream max velocity and etc Gas Dispersion Analysis, Stack height Calculation, Ground 9 PHAST Level Concentration Calculation, and etc. 10 Smart Plant PID P&ID Generation Heat Exchanger Thermal / Mechanical Design, All of the software modules are provided with the license such as 11 HTRI or HTFS Shell & Tube, Plate Fin, Plat Frame, Air Cooler, Re-boiler, double pipe, fired heater, and etc, Other Heat Exchanger type design may use software approved by Company. 12 PIPESIM Pipeline Steady State Hydraulic Design
2013
NA
8.8
2016
NA NA Include Hysys NA NA
NA
NA
13
Multiflash/ PVTSIM
Hydrate Prediction and hydrate curve
NA
14
OLGA
Process Simulation
NA
Steady state fire water calculation
NA
Structural analysis
NA
Project Base
Pressure Vessel & Heat Exchanger Design Storage tank design or re-design, to verify or modify integrated function or existing storage tanks required in the project.
2013
2014
2013
2013
Piping Stress Analysis
2013
2014
15 Pipenet Structural Engineering 16
STAAD Pro
Mechanical Engineering 17 PVELITE or equivalent 18
ETANK 2000
Piping Engineering 19 CAESAR II Instrumentation 20
Instrucalc
Sizing software for checking control valves, PSV, flow elements etc. This is to ensure that Vendor submitted calculations are verified. SPI shall be used for checking Thermowell wake frequency calculations.
21
SmartPlant Instrumentation (INtools)
Instrumentation Engineering database (Refer to SPI Implementation plan). Database manager and report generator for Instrument Index, I/O list, Datasheets, SRS etc.
22 exSILentia 23 Reliability Analysis Electrical 24 ETAP(min ver 7.5.1) 25
Luxicon
Commissioning Phase 26 Zenator by Falcon Global
NA
NA
SIL verification and calculation.
NA NA
Power System Studies Lighting Calculation, including Scotopic feature to be included
14.1
Preferred system completion software package
NA
Project Base
2015 Free
DAFTAR PERALATAN PT. REKA PATRIA EKAGUNA NO. 1
NAMA ALAT Outside micrometer
MEREK/TIPE
JUMLAH
TAHUN PEMBUATAN
KONDISI ALAT
STATUS KEPEMILIKAN
Mitutoyo 0”-1”, 0”-6”, 6”-12”, 12”-18”
4
-
Baik
Milik sendiri
LOKASI
PERIODE
PEMBERI KERJA
JAKARTA
Dec 2014 – April 2015
DURI, PEKANBAR U
Mar 2015 – Sept 2015
PT. CHEVRON PACIFIC INDONESIA
90,12%
JAKARTA
Aug 2014 – Dec 2014
PT. ADIPROTEK ENVIRODUNIA
100%
JAKARTA
13 May 2014 – Ongoing
PT. ETI for PT. PLN (Persero)
100%
DAFTAR PENGALAMAN PT. REKA PATRIA EKAGUNA NO.
NAMA PROYEK/ SPESIFIKASI PEKERJAAN FEED STUDY FOR MDK DEVELOPMENT, Contract Reference No. 332003958 Perform Front End Engineering & Design services necessary for the preparation of EPCI bid documents for lump sum, turnkey, construction of facilities.
KOMITMEN TKDN
• Develop detailed Project Execution Plan. • Refine the cost estimates developed
1
2
3
4
during the conceptual study. Feedback and inclusion of COMPANY input will be required throughout this process. Prior to finalization of estimate this shall be reviewed and approved by COMPANY. • Develop basic engineering designs for the Offshore Platform, Topsides Processing Facilities and subsea pipeline sufficient to allow progression to detailed design. The minimum deliverable list for FEED design refers to the Section 4. • Develop a project schedule that reflects the project contracting strategy defined by the Project Management Team (PMT) • Identify long lead materials and equipment and produce specifications and requisition packages for those items. • Prepare a proposed qualified vendor list with proven track record for long lead and critical items. • Prepare technical section for the ITB for the EPCI contract; this technical section is to be divided in major elements of work to be reviewed and approved by Company prior to issue. PMSS NDD PROJECT, BID NO. C1317586 The scope of work covers Construction Supervision Support Services, Engineering Services, Business Services/Project Controls services and various other professional and technical support services which may be required to oversee certain critical aspects of the work related to activities of North Duri Development Projects and others, as requested by Company. DETAIL ENGINEERING DESIGN FOR PRE-TREATMENT SYSTEM (BALANCE OF PAQUES BLEED WATER SYSTEM) - Produce detail design datasheet, drawing and MTO required for pre-treatment system with basic design from paques. - Perform required calculationto get the best operational and reliability. PROCUREMENT OF GAS PROCESSING FACILITY, CNG TRANSPORTATION AND DECOMPRESSING FACILITY TO SUPPLY GAS POWER PLANT IN LOMBOK - Produce overall design including specification, datasheet, drawing and MTO required for detail design of CNG Plant Development. - Perform calculation and simulation required to get the proper sizing and operation. - Conduct HAZOP/HAZID Meeting for the
Husky-CNOOC Madura Ltd.
100%
NO.
5
6
7
8
NAMA PROYEK/ SPESIFIKASI PEKERJAAN facility. - Prepare and submit all deliverables required for the construction CNG Plant Gressik and Lombok (not include the CNG Carrier). PROJECT MANAGEMENT SUPPORT SERVICES CONTRACT – CONTRACT NO. C1040964 Provide project management support services to support works related to activities of North Duri Development area and covers construction supervision super services, engineering services, business services / project control services and various other professional and technical support servives which may be required to oversee certain critical aspects of the work related to activities of North Duri Development Projects and others JASA KONSULTAN KAJIAN DESAIN DAN OPERASI ONSHORE RECEIVING FACILITY (ORF) SEBAGAI PERSIAPAN PENINGKATAN TEKANAN OPERASI Perform study to evaluate ability of existing Muara Karang Onshore Receiving Facilities (ORF) to handle increased gas pressure from Floating Storage and Regasification Unit (FSRU), and responsible in designing modification and/or additional facilities in ORF if required. PROFESSIONAL ENGINEERING SERVICES FOR EXISTING FACILITIES AND PIPELINES MODIFICATION, CONTRACT NO.: 332003205 Provide reimbursable engineering services to support offshore oil and gas production facilities modifications, gas compression, gas plant facilities and their tie-ins in the three business units of the COMPANY: North Business Unit (NBU), South Business Unit (SBU), Central Business Unit (CBU) and facilities of Gas Plant and Power Plant under Power Gas and Facilities (PGF) department. TECHNICAL SERVICES CONTRACT FOR TECHNICAL DOCUMENT CONTROL, CONTRACT NO. STC-0632 - To perform As-Built drawing verification to process drawings, structural drawings,, mechanical static drawings, and to COMPANY's critical drawing categories, that includes but not limited to One Line Diagram (OLD), Area Classification (ACL), Equipment Location Plan (EQL), Safety Analysis Function Evaluation Chart (SAFE), Piping & Instrument Diagram (PID), Process Flow Diagram (PFD), which consist of approximately 1500 drawings as a result of approved facility modification - To perform updating and redrawing on approximately 1800 sheets of COMPANY engineering drawing that includes but not limited to process drawings, mechanical static drawings, electrical drawings, instrumentation drawings, and structural drawings. - To perform the development of COMPANY's Guidelines and Operating & Maintenance Procedures upon required; and perform periodic revision to
PEMBERI KERJA
KOMITMEN TKDN
July 1 , 2013 – June th 30 , 2016
PT. CHEVRON PACIFIC INDONESIA (PT.CPI)
90,29%
JAKARTA
Jul 2014 – Nov 2014
PT. NUSANTARA REGAS
100%
JAKARTA
Apr '12 – May ‘14
CNOOC SES Ltd.
100%
JAKARTA
Aug ’11 – Aug ‘14
PT PERTAMINA HULU ENERGI ONWJ
100%
LOKASI
PERIODE
DURI, PEKANBAR U
st
NO.
9
10
11
NAMA PROYEK/ SPESIFIKASI PEKERJAAN approximately 1826 documents within the scope of COMPANY that includes wells, subsea flow-lines, risers, structures, topsides, and the marine / terminal and offloading system - To acquire International / Industrial Standards, Local Standards, and Local Regulation which required and requested by COMPANY. - To perform document controlling activities both in projects and day-to-day operations as defined in Technical Document Control procedure. Technical Services Contract for Tangguh Engineering Services, Contract No.: 4400000275 Provide the specific discipline specialist or perform engineering management, design, studies, drafting, reproduction, set-up and provide expertise of project management, engineering & cost estimation, assist project Installation & Construction including Commissioning, and unit start-up, integrity engineering & management and other related services to execute and support various modifications of company's existing gas related facilities at the Tangguh Offshore (Platform Topside Surface) and Onshore LNG Plant Facilities. PEMBUATAN FRONT END ENGINEERING DESIGN (FEED) FASILITAS PRODUKSI STASIUN PENGUMPUL BUNYU , NIBUNG FIELD BUNYU PT PERTAMINA EP REGION KTI, CONTRACT NO.: 3900184696 - To establish the selection of process equipment this shall be implemented to achieve product quality as per Pertamina EPs requirement of quality product. - To provide all data and information based on the approved deliverables list which later on shall be the basis for EPC projects. - To estimate and optimize the reliable and reasonable schedule for the execution of the EPC projects that shall cover all angles during project execution and sequences. - To establish the capital investment that shall be based from MTO from all discipline engineering and project cost estimation derived from reliable sources compiled. - To provide a tender document that is comprehensive for EPC contractor to understand the whole aspects of the project execution. Front End Engineering Design for Surface Facilities of Bayan-A Field, Contract No. 011/MKI/CON/2010 Provide and Perform Engineering Management, Design, Studies, Drafting and Cost Estimation and Other Related Service to Execute the Front End Engineering Design (FEED) for the new Surface Facilities at Bayan Field (Process Control System, Flaring System, Pipeline Distribution System, Electrical Power and Distribution, Compression System, Fire Water System, Instrument and Utility Air System, Water Dumping System)
LOKASI
PERIODE
PEMBERI KERJA
KOMITMEN TKDN
JAKARTA
Oct' 10 – July 2013
BP Berau Ltd.
100%
JAKARTA
Sep '12 – Feb '13
PT Pertamina EP
100%
JAKARTA
Oct '10 – Jan '11
Manhattan Kalimantan Investment Pte. Ltd.
100%