DAFTAR HARGA UPAH DAN BAHAN
No.
Uraian
Satuan
1
2
3
Harga Satuan ( Rupiah ) 4
A 1 2 3 4 5 6 7
UPAH Mandor Kepala Tukang Tukang Pekerja Biasa Pekerja Terlatih Buruh Tak Terampil Operator Terampil
HO HO HO HO HO HO HO
144,750.00 135,100.00 115,800.00 82,025.00 86,850.00 82,025.00 86,850.00
B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
MATERIAL/BAHAN Batu Gunung Batu Padas Agregat Kasar Agregat Halus Pasir Pasangan Pasir Beton Pasir Urug Tanah Urug/Timbunan Semen Pc 50 Kg Semen Putih Paku Kayu Meranti Kayu Begisting Air Bersih PDAM Filer Aspal Solar Minyak Pelumas Bensin Kaporit Besi Tulangan Kawat Bendrat Kayu Begisting, dll Paku Semen AM Broting keramik Minyak Begisting Playwood 9 mm Scafolding Beton K -175 ( Ready Mix) Beton K -250 ( Ready Mix) Pipa PVC AW 2" ( 50 mm )
M³ M³ M³ M³ M³ M³ M³ M³ Kg Kg Kg M³ M³ M³ Kg Kg Ltr Ltr Ltr Kg Kg Kg M³ Kg Kg Bh Ltr Lbr Set M³ M³ M'
340,200.00 132,300.00 396,900.00 368,550.00 132,300.00 330,750.00 113,400.00 85,050.00 1,512.00 1,606.50 17,010.00 2,693,250.00 2,481,570.00 4,252.50 945.00 10,867.50 5,197.50 51,975.00 6,142.50 25,004.70 21,262.50 17,010.00 2,401,245.00 19,089.00 10,395.00 5,764.50 28,590.98 159,218.33 28,350.00 1,492,688.93 1,682,761.50 20,463.98
C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SEWA PERALATAN Asphalt Mixing Plant Asphalt Finisher Asphalt sprayer Buldozer D 8 Batcing Plant Concrete Mixer Truck Compressor 4000/6500 L/M Concrete Mixer 0.3 - 0.6 M3 Concrete Vibrator Dump Truck 3 - 4 M3 Excavator PC 200 / 80 - 140 HP Flat Bed Truck 3 - 4 M3 Generator Set Motor Grader GD 511A-1/S1 Wheel Loader WA 180 Three Wheel Roller 6 - 8 T Tandem Roller 6 - 8 T P. Tire Roller 8 - 10 T Vibratory Roller BW 21 Water Tanker 3000 - 4500 L Stamper Concrete Cutter Pompa Tes Concrete Pump
D. 1 2 3
PIPA & ACCESSORIES Pipa HDPE Ø 160 mm S. 8 - SDR 17 ( PN 10/PE100 ) Pipa HDPE Ø 110 mm S. 8 - SDR 17 ( PN 10/PE100 ) Pipa HDPE Ø 90 mm S. 8 - SDR 17 ( PN 10/PE100 )
M' M' M'
317,345.20 145,218.70 97,897.25
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Tee HDPE Ø 160 x 110 mm Tee HDPE Ø 160 x 90 mm Tee HDPE Ø 110 x 110 mm Tee HDPE Ø 110 x 90 mm Tee HDPE Ø 90 x 90 mm Stub Flange ( HDPE ) Ø 160 mm Stub Flange ( HDPE ) Ø 110 mm Stub Flange ( HDPE ) Ø 90 mm Gate Valve All Flange (CI) Ø 160 mm PN. 10 Gate Valve All Flange (CI) Ø 110 mm PN. 10 Gate Valve All Flange (CI) Ø 90 mm PN. 10 Street Box Ø 110 mm Street Box Ø 90 mm Bend 90° HDPE Ø 160 mm Bend 45° HDPE Ø 110 mm Bend 90° HDPE Ø 90 mm Bend 45° HDPE Ø 90 mm
Bh Bh Bh Bh Bh Bh M' M' Bh Bh Bh Bh Bh Bh Bh Bh Bh
453,180.00 404,332.50 226,590.00 223,080.00 146,445.00 624,682.50 283,822.50 229,710.00 7,202,910.00 4,316,812.50 2,352,421.50 107,250.00 79,950.00 432,217.50 181,252.50 139,425.00 118,560.00
Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Hr Ls
4,314,748.80 240,000.00 40,320.00 683,769.60 526,588.80 434,467.20 154,435.20 55,084.80 53,654.40 327,734.40 402,182.40 289,910.40 256,387.20 503,740.80 399,715.20 255,312.00 289,891.20 402,700.80 402,700.80 289,910.40 24,000.00 54,988.80 91,200.00 28,800.00
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
DOP (HDPE) Ø 160 mm DOP (HDPE) Ø 110 mm DOP (HDPE) Ø 90 mm Thrust Block Pipa GI Ø 150 mm Pipa GI Ø 100 mm Tee All Flange (CI) Ø 150 x 100 mm Bend All Flange 90°(CI) Ø 100 mm Bend All Flange 90°(CI) Ø 150 mm Flange Las (Steel) Ø 150 mm Flange Las (Steel) Ø 100 mm Wall Pipe Ø 150 mm Wall Pipe Ø 100 mm Blind Flange Ø 150 mm Box Valve Street Box Ø 160 mm Tee PVC Ø 250 x 150 mm Giboul Joint Ø 250 mm Flange Socket ( PVC ) Ø 150 mm
Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh Bh
484,477.50 270,075.00 171,405.00 58,500.00 1,098,776.25 657,657.00 497,371.88 234,019.50 417,899.63 264,907.50 167,095.50 626,983.50 443,157.00 154,976.25 243,750.00 160,875.00 2,198,625.00 605,962.50 777,660.00
REKAPITULASI RENCANA ANGGARAN BIAYA INSTANSI : DINAS CIPTA KARYA DAN TATA KOTA KEGIATAN : PENINGKATAN SARANA PRASARANA PERUMAHAN KORPRI SAMARINDA SEBERANG PEKERJAAN : PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH DI PERUM. KORPRI SAMARINDA SEBERANG LOKASI : SAMARINDA SEBERANG KOTA SAMARINDA TAHUN : 2014 NO
URAIAN PEKERJAAN
JUMLAH
1
2
3
I
PEKERJAAN PENDAHULUAN
650,000.00
II
PEKERJAAN RESERVOAR KAPASITAS 300 M³
III
PENGADAAN & PEMASANGAN PIPA
IV
PENGADAAN ACCESSORIES PIPA
V
PEKERJAAN UTILITAS
126,780,548.21
VI
PEKERJAAN UJI COBA
5,000,000.00
1,285,361,782.71 769,080,757.37 46,159,717.50
JUMLAH TOTAL SEBELUM PPN PPN 10 % JUMLAH TOTAL SETELAH PPN JUMLAH TOTAL SETELAH PPN DIBULATKAN
2,233,032,805.79 223,303,280.58 2,456,336,086.37 2,456,340,000.00
TERBILANG DUA : MILYAR EMPAT RATUS LIMA PULUH ENAM JUTA TIGA RATUS EMPAT PULUH RIBU RUPIAH
Tanjung Selor, 01 Oktober 2014 PT. LEBER KURNIA JAYA
YULIUS Direktur Utama
DAFTAR KUANTITAS DAN HARGA INSTANSI KEGIATAN
: DINAS CIPTA KARYA DAN TATA KOTA : PENINGKATAN SARANA PRASARANA PERUMAHAN KORPRI SAMARINDA SEBERANG
PEKERJAAN
: PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH
LOKASI
DI PERUM. KORPRI SAMARINDA SEBERANG : SAMARINDA SEBERANG KOTA SAMARINDA
TAHUN
: 2014
No. 1 II.3.
Uraian Pekerjaan 2 Pekerjaan pipa & Accessories
Harga
Jumlah
Satuan
Volume
Satuan (Rupiah)
Harga (Rupiah)
3
4
5
6
II.3.1. Pekerjaan unit Pipa Inlet 1 2
Pipa GI Ø 100 mm Pipa GI Ø 150 mm
M' M'
6.00 3.00
657,657.00 1,098,776.25
3,945,942.00 3,296,328.75
3 4
Bend All Flange 90º (CI) Ø 100 mm Tee All Flange (CI) Ø 150 x 100 mm
Bh Bh
4.00 2.00
234,019.50 497,371.88
936,078.00 994,743.75
5
Gate Valve All Flange (CI) Ø 100 mm
Bh
2.00
4,316,812.50
8,633,625.00
6
Flange Las (Steel) Ø 150 mm
Bh
3.00
264,907.50
794,722.50
7
Flange Las (Steel) Ø 100 mm
Bh
12.00
167,095.50
2,005,146.00
8 9
Blind Flange Ø 150 mm Wall Pipe Ø 100 mm
Bh Bh
1.00 2.00
154,976.25 443,157.00
154,976.25 886,314.00
10 11
Box Valve Tee PVC Ø 250 x 150 mm
Bh Bh
2.00 1.00
243,750.00 2,198,625.00
487,500.00 2,198,625.00
12
Giboul Joint Ø 250 mm
Bh
2.00
605,962.50
1,211,925.00
13 14
Flange Socket ( PVC ) Ø 150 mm Stub Flange ( HDPE ) Ø 160 mm
Bh Bh
1.00 1.00
777,660.00
777,660.00
15 16
Gate Valve All Flange (CI) Ø 160 mm Street Box Ø 160 mm
Bh Bh
1.00 1.00
7,202,910.00 160,875.00
7,202,910.00 160,875.00
M'
6.00
657,657.00
3,945,942.00
II.3.2. Pekerjaan unit Pipa Outlet 1 Pipa GI Ø 100 mm 2 3
Bend All Flange 90º (CI) Ø 100 mm Flange Las (Steel) Ø 100 mm
Bh Bh
3.00 9.00
234,019.50 167,095.50
702,058.50 1,503,859.50
4
Wall Pipe Ø 100 mm
Bh
3.00
443,157.00
1,329,471.00
6,592,657.50 1,671,598.50
II.3.3. Pekerjaan unit Pipa Overflow 1 2
Pipa GI Ø 150 mm Bend All Flange 90º (CI) Ø 150 mm
M' Bh
6.00 4.00
1,098,776.25 417,899.63
3
Flange Las Ø 150 mm
Bh
6.00
264,907.50
1,589,445.00
4
Wall PipeI Ø 150 mm
Bh
2.00
626,983.50
1,253,967.00
M' Bh
12.00 2.00
1,098,776.25 626,983.50
13,185,315.00 1,253,967.00
Bh Bh Bh
2.00 6.00 2.00
7,202,910.00 264,907.50 243,750.00
14,405,820.00 1,589,445.00 487,500.00
II.3.4. Pekerjaan unit Pipa Penguras 1 Pipa (GI) Ø 150 mm 2 Wall Pipe Ø 150 mm 3 4 5
Gate Valve All Flange (CI) Ø 160 mm Flange Las Ø 150 mm Box Valve Jumlah Sub Total II.3
DAFTAR KUANTITAS DAN HARGA INSTANSI KEGIATAN
: DINAS CIPTA KARYA DAN TATA KOTA : PENINGKATAN SARANA PRASARANA PERUMAHAN KORPRI SAMARINDA SEBERANG
PEKERJAAN
: PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH
LOKASI
DI PERUM. KORPRI SAMARINDA SEBERANG : SAMARINDA SEBERANG KOTA SAMARINDA
TAHUN
: 2014 Harga
Jumlah
No.
Uraian Pekerjaan
Satuan
Volume
Satuan (Rupiah)
Harga (Rupiah)
1
2
3
4
5
6
I.
PEKERJAAN PENDAHULUAN
1
Papan Nama Proyek
Ls
1.00
650,000.00
Jumlah Total I II. II.1 1
650,000.00
PEKERJAAN RESERVOAR KAPASITAS 300 M³ Pekerjaan Bongkaran Reservoar Exsisting Bongkaran Beton
Ls
1.00
6,250,000.00
Jumlah Sub Total II.2 II.2. 1 2 3 4 5 6 7 8 9 10 11 12
6,250,000.00 6,250,000.00
Pekerjaan Beton Reservoar Begisting Lantai dan Dak Reservoar Begisting Dinding Reservoar Besi Tulangan Beton polos untuk Reservoar Lantai Kerja Beton K - 175 Lantai Dasar Reservoar Beton K - 250
M² M² Kg M³ M³
260.25 132.00 ### 14.10 35.24
206,878.25 176,743.00 24,103.55 1,714,151.28 1,904,223.85
53,840,064.18 23,330,075.81 465,662,893.81 24,169,532.98 67,104,848.47
Dinding Reservoar Beton K - 250 Plat Penutup Reservoar Beton K - 250 Beton Pengaduk Beton K - 250 Tutup Manhole Reservoar Vent GIP Ø 50 mm Pasangan Keramik 30 x 30 untuk Lantaidan Dinding Reser Tangga Monyet u/ naik Reservoar ( Stainles Steel )
M³ M³ M³ Bh Bh M² Bh
33.76 21.15 27.80 6.00 4.00 429.60 2.00
1,904,223.85 1,904,223.85 1,904,223.85 250,000.00 200,000.00 286,070.37 2,500,000.00
64,286,597.18 40,274,334.43 52,937,423.03 1,500,000.00 800,000.00 122,895,828.80 5,000,000.00
Jumlah Sub Total II.2 II.3. II.3.1. 1 2 3 4 5 6
650,000.00
Pekerjaan pipa & Accessories Pekerjaan unit Pipa Inlet Pipa GI Ø 100 mm Pipa GI Ø 150 mm Bend All Flange 90º (CI) Ø 100 mm Tee All Flange (CI) Ø 150 x 100 mm Gate Valve All Flange (CI) Ø 100 mm Flange Las (Steel) Ø 150 mm
921,801,598.69
M' M' Bh Bh Bh Bh
6.00 3.00 4.00 2.00 2.00 3.00
657,657.00 1,098,776.25 234,019.50 497,371.88 4,316,812.50 264,907.50
3,945,942.00 3,296,328.75 936,078.00 994,743.75 8,633,625.00 794,722.50
7
Flange Las (Steel) Ø 100 mm
Bh
12.00
167,095.50
2,005,146.00
8 9
Blind Flange Ø 150 mm Wall Pipe Ø 100 mm
Bh Bh
1.00 2.00
154,976.25 443,157.00
154,976.25 886,314.00
10 11
Box Valve Tee PVC Ø 250 x 150 mm
Bh Bh
2.00 1.00
243,750.00 2,198,625.00
487,500.00 2,198,625.00
12
Giboul Joint Ø 250 mm
Bh
2.00
605,962.50
1,211,925.00
13 14
Flange Socket ( PVC ) Ø 150 mm Stub Flange ( HDPE ) Ø 160 mm
Bh Bh
1.00 1.00
777,660.00 624,682.50
777,660.00 624,682.50
15 16
Gate Valve All Flange (CI) Ø 160 mm Street Box Ø 160 mm
Bh Bh
1.00 1.00
7,202,910.00 160,875.00
7,202,910.00 160,875.00
M'
6.00
657,657.00
3,945,942.00
II.3.2. Pekerjaan unit Pipa Outlet 1 Pipa GI Ø 100 mm 2 3
Bend All Flange 90º (CI) Ø 100 mm Flange Las (Steel) Ø 100 mm
Bh Bh
3.00 9.00
234,019.50 167,095.50
702,058.50 1,503,859.50
4
Wall Pipe Ø 100 mm
Bh
3.00
443,157.00
1,329,471.00
6,592,657.50 1,671,598.50
II.3.3. Pekerjaan unit Pipa Overflow 1 2
Pipa GI Ø 150 mm Bend All Flange 90º (CI) Ø 150 mm
M' Bh
6.00 4.00
1,098,776.25 417,899.63
3
Flange Las Ø 150 mm
Bh
6.00
264,907.50
1,589,445.00
4
Wall PipeI Ø 150 mm
Bh
2.00
626,983.50
1,253,967.00
M' Bh
12.00 2.00
1,098,776.25 626,983.50
13,185,315.00 1,253,967.00
Bh Bh Bh
2.00 6.00 2.00
7,202,910.00 264,907.50 243,750.00
14,405,820.00 1,589,445.00 487,500.00
II.3.4. Pekerjaan unit Pipa Penguras 1 Pipa (GI) Ø 150 mm 2 Wall Pipe Ø 150 mm 3 4 5
Gate Valve All Flange (CI) Ø 160 mm Flange Las Ø 150 mm Box Valve Jumlah Sub Total II.3
II.4 1 2 3 4 5 6 7
Pekerjaan Turap Pasangan Batu Gunung Galian Tanah Besi Tulangan Beton polos untuk Pasangan Turap Cor Beton K - 250 untuk Lantai, Sloof, Kolom & Balok Pasangan Batu Gunung Plesteran Turap Urugan Tanah Pipa PVC AW Ø 50 mm
83,823,099.75
M³ Kg M³ M³ M² M³ M'
15.12 1,909.10 20.74 173.93 247.80 67.20 24.00
69,528.25 24,103.55 1,904,223.85 954,368.25 47,757.40 128,115.00 20,463.98
Jumlah Sub Total II.4 Jumlah Total II III. III.1 1 2
PENGADAAN & PEMASANGAN PIPA Pipa HDPE Ø 160 mm S. 8 - SDR 17 ( PN 10/PE100 ) Pengadaan Pipa Pemasangan Pipa
1,051,267.14 46,016,101.86 39,491,698.43 165,993,269.72 11,834,283.72 8,609,328.00 491,135.40 273,487,084.27 1,285,361,782.71
M' M'
700.00 700.00
317,345.20 90,170.25
222,141,640.00 63,119,173.54
III.2 1 2 III.3 1 2
Pipa HDPE Ø 110 mm S. 8 - SDR 17 ( PN 10/PE100 ) Pengadaan Pipa
M'
790.00
145,218.70
114,722,773.00
Pemasangan Pipa
M'
790.00
47,344.15
37,401,881.79
M' M'
2,414.00 2,414.00
97,897.25 39,507.59
236,323,961.50 95,371,327.54
Pipa HDPE Ø 90 mm S. 8 - SDR 17 ( PN 10/PE100 ) Pengadaan Pipa Pemasangan Pipa Jumlah Total III
769,080,757.37
IV.
PENGADAAN ACCESSORIES PIPA
1 2
Tee HDPE Ø 160 x 110 mm Tee HDPE Ø 160 x 90 mm
Bh Bh
3.00 5.00
453,180.00 404,332.50
1,359,540.00 2,021,662.50
3
Tee HDPE Ø 110 x 110 mm
Bh
1.00
226,590.00
226,590.00
4 5
Tee HDPE Ø 110 x 90 mm Tee HDPE Ø 90 x 90 mm
Bh Bh
7.00 3.00
223,080.00 146,445.00
1,561,560.00 439,335.00
6 7
Stub Flange ( HDPE ) Ø 160 mm Stub Flange ( HDPE ) Ø 110 mm
Bh Bh
1.00 6.00
624,682.50 283,822.50
624,682.50 1,702,935.00
8
Stub Flange ( HDPE ) Ø 90 mm
Bh
10.00
229,710.00
2,297,100.00
9 10
Gate Valve All Flange (CI) Ø 110 mm PN. 10 Gate Valve All Flange (CI) Ø 90 mm PN. 10
Bh Bh
3.00 5.00
4,316,812.50 2,352,421.50
12,950,437.50 11,762,107.50
11 12 13
Street Box Ø 110 mm Street Box Ø 90 mm Bend 90° HDPE Ø 160 mm
Bh Bh Bh
3.00 5.00 2.00
107,250.00 79,950.00 432,217.50
321,750.00 399,750.00 864,435.00
14 15 16 17 18
Bend 45° HDPE Ø 110 mm Bend 90° HDPE Ø 90 mm Bend 45° HDPE Ø 90 mm DOP (HDPE) Ø 160 mm DOP (HDPE) Ø 110 mm
Bh Bh Bh Bh Bh
4.00 3.00 10.00 1.00 4.00
181,252.50 139,425.00 118,560.00 484,477.50 270,075.00
725,010.00 418,275.00 1,185,600.00 484,477.50 1,080,300.00
19 20
DOP (HDPE) Ø 90 mm Thrust Block
Bh Bh
14.00 57.00
171,405.00 58,500.00
2,399,670.00 3,334,500.00 46,159,717.50
Jumlah Total IV V 1 2 3
PEKERJAAN UTILITAS Cor Beton 1 PC : 2 Psr : 3 Krl ( untuk crosing jalan ) Bongkaran Cor Beton Boring Jalan Di Batu Padas
M³ M³ M'
44.55 44.55 30.00
1,320,403.50 581,637.43 1,401,487.50
Jumlah Total V VI 1
PEKERJAAN UJI COBA Pengetesan dan Commisioning sistem Jaringan Perpipaan Jumlah Total VI
58,823,975.93 25,911,947.28 42,044,625.00 126,780,548.21
Ls
1.00
5,000,000.00
5,000,000.00 5,000,000.00
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Galian Tanah
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
A
TENAGA KERJA
1 2
Mandor Pekerja
HO HO Total A
B
C.
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
0.0270 0.8000
144,750 82,025
JUMLAH (Rupiah)
3,908 65,620 69,528
MATERIAL
Total B
-
Total C
-
PERALATAN
HARGA SATUAN (A + B + C )
69,528
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN
NO.
: Cor Beton 1 Pc : 2 Psr : 3 Krl : M³
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN
JUMLAH
(Rupiah)
(Rupiah)
A 1
TENAGA KERJA Pekerja
HO
2.0000
82,025
164,050
2 3
Tukang Mandor
HO HO
1.0000 0.3500
115,800 144,750
115,800 50,663
HO
0.0350
135,100
4,729
4
Kepala Tukang Total A
335,241
B 1
MATERIAL Semen Portland
Kg
336.0000
1,512
508,032
2 3
Pasir Beton Koral Beton
M³ M³
0.5400 0.8100
330,750 368,550
178,605 298,526
Total B HARGA SATUAN ( A + B )
985,163 1,320,404
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN
NO.
: Urugan Tanah Kembali : M³
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN
JUMLAH
(Rupiah)
(Rupiah)
A 1
TENAGA KERJA Pekerja
HO
0.2000
82,025
16,405
2
Mandor
HO
0.0200
144,750
2,895
Total A B
19,300
MATERIAL
Total B HARGA SATUAN ( A + B )
19,300
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN
NO.
: Pembuangan Sisa Galian : M³
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN
JUMLAH
(Rupiah)
(Rupiah)
A 1
TENAGA KERJA Pekerja
HO
0.4080
82,025
33,466
2
Mandor
HO
0.0180
144,750
2,606
Total A B
36,072
MATERIAL Total B
C 1
PERALATAN Flat Bed Truck
8
Alat Bantu
-
Jam
0.0600
289,910
17,395
Ls
1.0000
1,000
1,000
Total C
18,395
HARGA SATUAN ( A + B + C )
54,466
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Bongkaran Beton
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
A
TENAGA KERJA
1 3
Mandor Pekerja
SATUAN
HO HO
KUANTITAS
HARGA SATUAN (Rupiah)
0.0330 6.6670
144,750 82,025
Total A B
JUMLAH (Rupiah)
4,777 546,861 551,637
MATERIAL Total B
C 1
PERALATAN Alat Bantu
-
Ls Total C
HARGA SATUAN (A + B + C)
1.0000
30,000
30,000 30,000 581,637
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Beton Tumbuk 1 Pc : 3 Psr : 5 Krl
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0800 0.0250
144,750 135,100
11,580 3,378
3 4
Tukang Pekerja
HO HO
0.2500 1.6500
115,800 82,025
28,950 135,341
Total A
179,249
B
MATERIAL
1 2
Koral Beton Pasir Beton
M³ M³
0.8700 0.5200
368,550 330,750
320,639 171,990
3
Semen Portland
Kg
218.0000
1,512
329,616
Total B HARGA SATUAN ( A + B )
822,245 1,001,493
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Beton Bertulang
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Tukang Besi
HO HO
0.1622 0.2200
144,750.00 115,800.00
23,478.45 25,476.00
3 4
Pekerja Terampil Pekerja Biasa
HO HO
0.4865 2.5946
86,850.00 82,025.00
42,252.53 212,822.07
Total A
202,686.03
B
MATERIAL
1 2
Kerikil Beton Pasir Beton
M³ M³
1.0095 0.5905
368,550.00 330,750.000
372,051.23 195,307.88
3 4
Semen Besi Tulangan
Kg Kg
350.2703 110.0000
1,512.00 21,262.50
529,608.69 2,338,875.00
5 6
Kawat Bendrat Kayu Begisting, dll
Kg M³
2.2000 0.1000
17,010.00 2,401,245.00
37,422.00 240,124.50
7
Paku
Kg
0.8000
19,089.00
15,271.20
Total B
3,728,660.49
C
PERALATAN
1 2
Concrete Mixer Concrete Vibrator
Jam Jam
0.9730 0.9730
55,084.80 53,654.40
53,597.51 52,205.73
3 4
Water Tank Truck Alat Bantu
Jam LS
0.0633 1.0000
289,910.40 1,500.00
18,351.33 1,500.00
Total C HARGA SATUAN ( A + B + C )
125,654.57 4,057,001.09
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Pasangan Batu Gunung / Batu Kali 1 Pc : 4 Psr
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0750 0.0750
144,750 135,100
10,856 10,133
3 4
Tukang Batu Pekerja
HO HO
0.7500 1.5000
115,800 82,025
86,850 123,038
Total A
230,876
B
MATERIAL
1 2
Batu Gunung / Batu Kali Pasir Pasangan
M³ M³
1.2000 0.5200
340,200 132,300
408,240 68,796
3
Semen
Kg
163.0000
1,512
246,456
Total B C
723,492
PERALATAN
Total C HARGA SATUAN (A + B + C)
954,368
Boring Jalan Di Batu Padas / 1m 7.500 6.000
OH OH
Pekerja Tukang
9.000 1.000
M³ Ls
Air Alat Bantu
Jumlah
82,025 115,800
615,187.50 694,800.00
3,500 60,000.00
31,500.00 60,000.00
1,401,487.50
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Urugan Tanah Biasa (menggunakan tenaga orang)
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
A
TENAGA KERJA
1 2
Mandor Pekerja
SATUAN
HO HO
KUANTITAS
HARGA SATUAN (Rupiah)
0.0100 0.3000
144,750 82,025
Total A B
MATERIAL
1
Tanah Urug
C
1,448 24,608 26,055
M³ Total B
JUMLAH (Rupiah)
1.2000
85,050
102,060 102,060
PERALATAN
Total C HARGA SATUAN (A + B + C)
128,115
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Pasang Lantai Keramik 30 x 30 cm
SATUAN PEMBAYARAN
: M²
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0350 0.0350
144,750 135,100
5,066 4,729
3 4
Tukang Pekerja
HO HO
0.3500 0.7000
115,800 82,025
40,530 57,418
Total A
107,742
B
MATERIAL
1
Semen Broting utk Pemasangan Keramik keramik
Kg Bh
10.0000 11.8700
10,395 5,765
103,950 68,425
Pasir Pasangan
M³
0.0450
132,300
5,954
Total B
178,328
HARGA SATUAN (A + B )
286,070
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Pekerjaan Tulangan Beton Polos
SATUAN PEMBAYARAN
: Kg
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0003 0.0007
144,750 135,100
43 95
3 4
Tukang Pekerja
HO HO
0.0070 0.0070
115,800 82,025
811 574
Total A B
MATERIAL
1 2
Besi Polos Kawat Bendrat
1,523
Kg Kg
1.0500 0.0150
21,263 17,010
22,326 255
Total B
22,581
HARGA SATUAN (A + B )
24,104
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Pekerjaan Begisting Untuk Dinding
SATUAN PEMBAYARAN
: M²
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0050 0.0330
144,750 135,100
724 4,458
3 4
Tukang Pekerja
HO HO
0.3300 0.3000
115,800 82,025
38,214 24,608
Total A
68,004
B
MATERIAL
1 2
Kayu Meranti Paku
M³ Kg
0.0183 0.4000
2,693,250 17,010
49,286 6,804
3 4
Minyak Begisting Playwood 9 mm
Ltr Lbr
0.2000 0.1167
28,591 159,218
5,718 18,581
5
Scafolding
Set
1.0000
28,350
28,350
Total B
108,739
HARGA SATUAN (A + B )
176,743
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Pekerjaan Begisting Untuk Lantai / Dak
SATUAN PEMBAYARAN
: M²
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0060 0.0330
144,750 135,100
869 4,458
3 4
Tukang Pekerja
HO HO
0.3300 0.3200
115,800 82,025
38,214 26,248
Total A
69,789
B
MATERIAL
1 2
Kayu Meranti Paku
M³ Kg
0.0183 0.4000
2,693,250 17,010
49,286 6,804
3 4
Minyak Begisting Playwood 9 mm
Ltr Lbr
0.2000 0.1167
28,591 159,218
5,718 18,581
5
Scafolding
Set
2.0000
28,350
56,700
Total B
137,089
HARGA SATUAN (A + B )
206,878
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Beton K - 175 ( Ready Mix)
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0800 0.0250
144,750 135,100
11,580 3,378
3 4
Tukang Pekerja
HO HO
0.2500 1.6500
115,800 82,025
28,950 135,341
Total A B
MATERIAL
1
Beton K - 175
179,249
M³
1.0000
1,492,689
Total B C 1
PERALATAN Concrete Pump
2
Concrete Vibrator Total C HARGA SATUAN (A + B + C)
1,492,689 1,492,689
Ls
1.0000
28,800
28,800
Jam
0.2500
53,654
13,414 42,214 1,714,151
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Beton K - 250 ( Ready Mix)
SATUAN PEMBAYARAN
: M³
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0800 0.0250
144,750 135,100
11,580 3,378
3 4
Tukang Pekerja
HO HO
0.2500 1.6500
115,800 82,025
28,950 135,341
Total A B
MATERIAL
1
Beton K - 250
179,249
M³
1.0000
1,682,762
Total B C 1
PERALATAN Concrete Pump
2
Concrete Vibrator Total C HARGA SATUAN (A + B + C)
1,682,762 1,682,762
Ls
1.0000
28,800
28,800
Jam
0.2500
53,654
13,414 42,214 1,904,224
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN
: Pasangan Plesteran 1 : 4, t = 15 mm
SATUAN PEMBAYARAN
: M²
NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN (Rupiah)
JUMLAH (Rupiah)
A
TENAGA KERJA
1 2
Mandor Kepala Tukang
HO HO
0.0100 0.0150
144,750 135,100
1,448 2,027
3 4
Tukang Pekerja
HO HO
0.1500 0.2000
115,800 82,025
17,370 16,405
Total A B
MATERIAL
1 2
Pasir Pasangan Semen
37,249
M³ Kg
0.0200 5.2000
132,300 1,512
2,646 7,862
Total B
10,508
HARGA SATUAN (A + B )
47,757
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN : Pemasangan Pipa Lengkap HDPE Ø 160 mm SATUAN PEMBAYARAN: M' NO. A 1 2
URAIAN Galian Tanah Pekerja Biasa Mandor
SATUAN
HO HO
KUANTITAS
HARGA SATUAN
JUMLAH
(Rupiah)
(Rupiah)
3.6450 0.1220
82,025 144,750
Sub Total A B 1 2
Pekerjaan Membuang Tanah eks Galian Pekerja Biasa Mandor
316,641
HO HO
0.2380 0.0070
82,025 144,750
Sub Total B C 1
Pekerjaan Urugan Tanah Dipadatkan Pekerja Biasa
1 2 3 4 5
Pekerjaan Pemasangan Pipa Pipa PE Ø 150 mm per 6m' Pekerja Biasa Tukang Pipa Mandor Alat Bantu, dll Acessories
Jam
1.0800
82,025
1 2 3 4 5
Pekerjaan Pengetesan Pipa Luas Penampang Pipa A=¼.3.14.d² Volume air (v) Volume Air terpakai (2.8 . V) Pekerja Biasa Mandor Alat Bantu, dll Air Bersih / PDAM Disinfeksi
HO HO HO Ls Ls
0.1200 0.4000 0.0170 1.0000 1.0000
82,025 115,800 144,750 20,000 15,000
Biaya Pemasangan per batang
G
BIAYA PEMASANGAN PER M¹ ( 1/6 X F )
9,843 46,320 2,461 20,000 15,000 93,624
HO HO Ls M³ Ls
0.0600 0.0300 1.0000 0.1060 1.0000
82,025 144,750 10,000 3,500 2,000
Sub Total E F
88,587 88,587
Sub Total D E
19,522 1,013 20,535
Sub Total C D
298,981 17,660
4,922 4,343 10,000 371 2,000 21,635 541,021
90,170
ANALISA HARGA SATUAN PEMBAYARAN JENIS PEKERJAAN : Pemasangan Pipa Lengkap HDPE Ø 110 mm SATUAN PEMBAYARAN: M' NO.
URAIAN
SATUAN
KUANTITAS
HARGA SATUAN
JUMLAH
(Rupiah)
(Rupiah)
JADWAL WAKTU PELAKSANAAN PELAKSANAAN : DINAS CIPTA KARYA DAN TATA KOTA
KEGIATAN PEKERJAAN
: PENINGKATAN SARANA PRASARANA PERUMAHAN KORPRI SAMARINDA SEBERANG : PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH
LOKASI TAHUN
DI PERUM. KORPRI SAMARINDA SEBERANG : SAMARINDA SEBERANG KOTA SAMARINDA : 2014
NO
URAIAN PEKERJAAN
%
1
PEKERJAAN PENDAHULUAN
II
PEKERJAAN RESERVOAR KAPASITAS 300 M³
57.56
III
PENGADAAN & PEMASANGAN PIPA
34.44
IV
PENGADAAN ACCESSORIES PIPA
2.07
V
PEKERJAAN UTILITAS
5.68
VI
PEKERJAAN UJI COBA
0.22
BOBOT REALISASI KOMULATIF
0.03
100.00
2
Keterangan 9
10
0.03
MASA PELAKSANAAN
I
BOBOT RENCANA BOBOT RENCANA KOMULATIF BOBOT REALISASI
Jangka Waktu Pelaksanaan 75 Hari Kalender Periode Minggu 3 4 5 6 7 8
Prosentase
100 14.39
14.39
14.39
14.39
4.31
4.31
4.31
4.31
1.42
1.42
1.42
75 4.31
4.31
4.31
4.31
0.52
0.52
0.52
0.52
1.42 0.22
0.03 0.03 -
18.70 18.72 -
20.11 38.84 -
20.11 58.95 -
20.11 79.07 -
6.24 85.31 -
4.82 90.13
4.82 94.95
-
-
4.82 99.78 -
Tanjung Selor, 01 Oktober 2014 PT. LEBER KURNIA JAYA
YULIUS Direktur Utama
0.22 100.0 -
AKHIR PELAKSANAAN
INSTANSI
50 25
0
REKAPITULASI PERHITUNGAN TKDN
PAKET PEKERJAAN LOKASI
: PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH DI PERUM. KORPRI SAMARINDA SEBERANG : SAMARINDA SEBERANG KOTA SAMARINDA NILAI KONTRAK² ( Rp )
URAIAN PEKERJAAN Barang 1. Material Langsung ( Bahan Baku ) 2. Peralatan ( Barang Jadi ) A. Sub Total Barang Jasa 3. Manajemen Proyek Dan Perekayasaan 4. Alat Kerja/Fasilitas Kerja 5. Kontruksi Dan Fabrikasi 6. Jasa Umum B. Sub Total Jasa C. = Total ( A + B )
TKDN Gabungan %
TOTAL LN
DN
% KDN
Rp
TKDN
Rp
(%)
Barang Nihil
769,080,757.37
769,080,757.37
100
Nihil
46,159,717.50
46,159,717.50
100
769,080,757.37
815,240,474.87
34.4
46,159,717.50
2.1
815,240,474.87
36.5
650,000.00
0.0
Jasa Nihil
650,000.00
650,000.00
100
Nihil
-
-
100
Nihil
1,412,142,330.92
1,412,142,330.92
100
1,412,142,330.92
63.2
Nihil
5,000,000.00 1,417,792,331 2,233,032,805.79
5,000,000.00
100
5,000,000.00 1,417,792,330.92 2,233,032,805.80
0.2 63.5 100.0
Capaian nilai TKDN di atas dinyatakan sendiri oleh :
-
:
Tanjung Selor, 01 Oktober 2014 PT. LEBER KURNIA JAYA
YULIUS Direktur Utama
-
SCHDULLE PABRIK
Kepada Yth Pokja …………………………….. Satuan Kerja ………………………….. ……………………………………………… ……………………………………………… Perihal No. Surat Untuk Paket Lokasi
: : : :
Schedule Pabrik No. 529/SP - HDPE/IX/2014 CV/PT ………………
PEMBANGUNAN PRASARANA DAN SARANA AIR BERSIH DI PERUM. KORPRI SAMARINDA SEBERANG : SAMARINDA SEBERANG KOTA SAMARINDA
No
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
650,000
Prosentase %
Minggu 1
10.00
5.000
5.00
5.00
2
Minggu 3
4
1
2
Ket. 3
4 5.000
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00
1.667
5.00
1.67
1.667 1.67
5.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. Priok menggunakan Truck - Pengangkutan dari Pelabuhan Tj. Priok ke Pelabuhan Samarinda lewat Kapal - Pembongkaran Pipa di Pelabuhan Samarinda - Pengangkutan Pipa dari Pel. Samarinda ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA SAMARINDA KALIMANTAN TIMUR
80.00 10.00
10.00
10.00
2.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
Gresik, ……………………………………..
PT. TJAKRINDO MAS
………………….. Direktur
Jumlah Harga (Rp)
769,730,757
1.667
1.667
1.667
1.667
1.67
2.00
10.00
10.00
10.00
5.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
11.17 65.16
6.17 71.33
6.17 77.50
7.50 85.00
5.00
100.00
10.00 10.00
3.33 13.33
20.33 33.66
20.33 54.00
SCHDULLE PABRIK
Kepada Yth POKJA ULP PENINGKATAN PELAYANAN AIR BERSIH LAPAS NARKOBA BAYUR, SAMARINDA ( ABT ) LOKASI KOTA SAMARINDA
Perihal No. Surat Untuk Paket Lokasi
: : : :
Schedule Pabrik No. 529/SP - HDPE/IX/2015 CV. TIRTA PANDAWA
PENINGKATAN PELAYANAN AIR BERSIH LAPAS NARKOBA BAYUR, SAMARINDA ( ABT ) : KOTA SAMARINDA
No
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
Jumlah Harga (Rp) 650,000
Prosentase %
Minggu 1
10.00
5.000
5.00
5.00
2
Minggu 3
4
1
2
Ket. 3
4 5.000
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00
1.667
5.00
1.67
1.667 1.67
5.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. PERAK menggunakan Truck - Pengangkutan dari Pelabuhan Tj. Priok ke Pelabuhan Samarinda lewat Kapal - Pembongkaran Pipa di Pelabuhan Samarinda - Pengangkutan Pipa dari Pel. Samarinda ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA SAMARINDA KALIMANTAN TIMUR
80.00 10.00
10.00
10.00
2.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
769,730,757
1.667
1.667
1.667
1.667
1.67
2.00
10.00
10.00
10.00
5.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
11.17 65.16
6.17 71.33
6.17 77.50
7.50 85.00
5.00
100.00
10.00 10.00
3.33 13.33
20.33 33.66
20.33 54.00
SCHDULLE PABRIK
Kepada Yth POKJA ULP PENINGKATAN PELAYANAN AIR BERSIH LAPAS NARKOBA BAYUR, SAMARINDA ( ABT ) LOKASI KOTA SAMARINDA
Perihal No. Surat Untuk Paket Lokasi
: : : :
Schedule Pabrik No. 530/SP - HDPE/IX/2015 CV. UNDAGHI TIRTA SELARAS
PENINGKATAN PELAYANAN AIR BERSIH LAPAS NARKOBA BAYUR, SAMARINDA ( ABT ) : KOTA SAMARINDA
No
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
Jumlah Harga (Rp) 650,000
Prosentase %
Minggu 1
10.00
5.000
5.00
5.00
2
Minggu 3
4
1
2
Ket. 3
4 5.000
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00
1.667
5.00
1.67
1.667 1.67
5.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. PERAK menggunakan Truck - Pengangkutan dari Pelabuhan Tj. Priok ke Pelabuhan Samarinda lewat Kapal - Pembongkaran Pipa di Pelabuhan Samarinda - Pengangkutan Pipa dari Pel. Samarinda ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA SAMARINDA KALIMANTAN TIMUR
80.00 10.00
10.00
10.00
2.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
769,730,757
1.667
1.667
1.667
1.667
1.67
2.00
10.00
10.00
10.00
5.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
11.17 65.16
6.17 71.33
6.17 77.50
7.50 85.00
5.00
100.00
10.00 10.00
3.33 13.33
20.33 33.66
20.33 54.00
SCHDULLE PABRIK
Kepada Yth POKJA PENGEMBANGAN AIR MINUM ULP KALIMANTAN TIMUR
Perihal No. Surat Untuk Paket
: : : :
Lokasi
: KABUPATEN MALINAU
No
Schedule Pabrik No. 4531/SP - HDPE/IX/2015 PT. FILIA PRATAMA
P/P PIPA HDPE DIA. 300 - 150 MM, SEPANJANG 9 KM TANJUNG NGANGA KABUPATEN MALINAU
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
Jumlah Harga (Rp) 650,000
Prosentase %
Minggu 1
10.00
5.000
5.00
5.00
2
Minggu 3
4
1
2
Ket. 3
4 5.000
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00
1.667
5.00
1.67
1.667 1.67
5.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. PERAK menggunakan Truck - Pengangkutan dari Pelabuhan Tj. PERAK ke Pelabuhan Tanjung Selor lewat Kapal - Pembongkaran Pipa di Pelabuhan Tanjung Selor - Pengangkutan Pipa dari Pel. Tanjung Selor ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA BULUNGAN KALIMANTAN UTARA
80.00 10.00
10.00
10.00
2.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
769,730,757
1.667
1.667
1.667
1.667
1.67
2.00
10.00
10.00
10.00
5.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
11.17 65.16
6.17 71.33
6.17 77.50
7.50 85.00
5.00
100.00
10.00 10.00
3.33 13.33
20.33 33.66
20.33 54.00
SCHDULLE PABRIK
Kepada Yth POKJA PENGEMBANGAN AIR MINUM ULP KALIMANTAN TIMUR
Perihal No. Surat Untuk Paket Lokasi
: : : :
Schedule Pabrik No. 4529/SP - HDPE/IX/2015 PT. FILIA PRATAMA
P/P PIPA HDPE DIA. 250 - 75 MM SEPANJANG 12.2 KM IKK SABANDAR DAN IKK PIMPING KABUPATEN BULUNGAN : KABUPATEN BULUNGAN
No
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
Jumlah Harga (Rp) 650,000
Prosentase %
Minggu 1
10.00
5.000
5.00
5.00
2
Minggu 3
4
1
2
Ket. 3
4 5.000
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00
1.667
5.00
1.67
1.667 1.67
5.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. PERAK menggunakan Truck - Pengangkutan dari Pelabuhan Tj. PERAK ke Pelabuhan Tanjung Selor lewat Kapal - Pembongkaran Pipa di Pelabuhan Tanjung Selor - Pengangkutan Pipa dari Pel. Tanjung Selor ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA BULUNGAN KALIMANTAN UTARA
80.00 10.00
10.00
10.00
2.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
769,730,757
1.667
1.667
1.667
1.667
1.67
2.00
10.00
10.00
10.00
5.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
11.17 65.16
6.17 71.33
6.17 77.50
7.50 85.00
5.00
100.00
10.00 10.00
3.33 13.33
20.33 33.66
20.33 54.00
SCHDULLE PABRIK
Kepada Yth POKJA PENGEMBANGAN AIR MINUM ULP KALIMANTAN TIMUR
Perihal No. Surat Untuk Paket Lokasi
: : : :
Schedule Pabrik No. 4520/SP - HDPE/IX/2015 PT. LEBER KURNIA JAYA
P/P PIPA HDPE DIA. 250 - 75 MM SEPANJANG 12.2 KM IKK SABANDAR DAN IKK PIMPING KABUPATEN BULUNGAN : KABUPATEN BULUNGAN
No
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
Jumlah Harga (Rp) 650,000
Prosentase %
Minggu 1
10.00
5.000
5.00
5.00
2
Minggu 3
4
1
2
Ket. 3
4 5.000
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00
1.667
5.00
1.67
1.667 1.67
5.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. PERAK menggunakan Truck - Pengangkutan dari Pelabuhan Tj. PERAK ke Pelabuhan Tanjung Selor lewat Kapal - Pembongkaran Pipa di Pelabuhan Tanjung Selor - Pengangkutan Pipa dari Pel. Tanjung Selor ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA BULUNGAN KALIMANTAN UTARA
80.00 10.00
10.00
10.00
2.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
769,730,757
1.667
1.667
1.667
1.667
1.67
2.00
10.00
10.00
10.00
5.00
2.00
2.00
2.00
2.50
2.50
2.50
2.50
11.17 65.16
6.17 71.33
6.17 77.50
7.50 85.00
5.00
100.00
10.00 10.00
3.33 13.33
20.33 33.66
20.33 54.00
SCHDULLE PABRIK
Kepada Yth POKJA PENGEMBANGAN AIR MINUM ULP KALIMANTAN TIMUR
Perihal No. Surat Untuk Paket Lokasi
: : : :
Schedule Pabrik No. 4520/SP - HDPE/IX/2015 PT. LEBER KURNIA JAYA
P/P PIPA HDPE DIA. 250 - 75 MM SEPANJANG 12.2 KM IKK SABANDAR DAN IKK PIMPING KABUPATEN BULUNGAN : KABUPATEN BULUNGAN
No
Uraian Pekerjaan
I
PEKERJAAN PERSIAPAN
II
Jumlah Harga (Rp) 650,000
Prosentase %
1
2
3
4
5
6
7
8
10.00
0.714
0.714
0.714
0.714
0.714
0.714
0.714
5.00
0.71
0.71
0.71
0.71
0.71
0.71
0.71
1.250
1.250
1.250
1.250
9
10
11
1.250
1.250
769,080,757
#
Pengajuan Material Approval
#
Proses Order - Proses Produksi - Pemeriksaan dan uji Barang di Pabrik - Pengepakan Pipa & Pemberian Nomor
#
10.00 5.00
1.250 1.00
5.00
Proses Pengiriman Barang - Pengangkutan dari Pabrik Ke Pelabuhan Tj. PERAK menggunakan Truck - Pengangkutan dari Pelabuhan Tj. PERAK ke Pelabuhan Tanjung Selor lewat Kapal - Pembongkaran Pipa di Pelabuhan Tanjung Selor - Pengangkutan Pipa dari Pel. Tanjung Selor ke Lokasi Tujuan menggunakan Truck, meliputi : # KOTA BULUNGAN KALIMANTAN UTARA
80.00 10.00
- Berita Acara Serah Terima Barang
10.00
Jumlah Rencana Rencana Komulatif Realisasi Realisasi Komulatif Deviasi
1.00
1.250 1.00
1.00
1.00
1.67
1.67
1.67
5.00
5.00
10.00
1.11
10.00 10.00
769,730,757
-
-
2.68 12.32
3.68 16.00
100.00
1.43 1.43
1.43 2.86
1.43 4.28
2.68 6.96
2.68 9.64
2.25 18.25
3.92 22.16
8.92 31.08
10.03 41.11
Ket. 12
1.11
13
1.11
14
1.11
15
16
17
18
19
20
21
0.714
0.714
0.714
0.714
0.714
0.714
0.714
1.11
1.11
1.11
1.11
1.11
10.00 5.00
5.00
10.00
1.11 42.22
1.11 43.33
1.11 44.44
1.83 46.27
1.83 48.09
1.83 49.92
1.83 51.74
16.83 68.57
5.71 74.28
10.71 85.00