PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN/ AND ITS SUBSIDIARIES LAPORAN KEUANGAN KONSOLIDASI/ CONSOLIDATED FINANCIAL STATEMENTS UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 (TIDAK DIAUDIT) DAN 2008 (TIDAK DIAUDIT)/ FOR THE THREE-MONTH PERIODS ENDED MARCH 31, 2009 (UN-AUDITED) 2008 (UN-AUDITED)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN/AND ITS SUBSIDIARIES DAFTAR ISI/TABLE OF CONTENTS
Halaman/ Page
LAPORAN KEUANGAN KONSOLIDASI – Untuk periode tiga bulan yang berakhir 31 Maret 2009 dan 2008 CONSOLIDATED FINANCIAL STATEMENTS – For the three-month periods ended March 31,2009 and 2008
Neraca Konsolidasi/Consolidated Balance Sheets
1
Laporan Laba Rugi Konsolidasi/Consolidated Statements of Income
3
Laporan Perubahan Ekuitas Konsolidasi/Consolidated Statements of Changes in Equity
4
Laporan Arus Kas Konsolidasi/Consolidated Statements of Cash Flows
5
Catatan Atas Laporan Keuangan Konsolidasi/Notes to Consolidated Financial Statements
7
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN NERACA KONSOLIDASI 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah)
2009
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES CONSOLIDATED BALANCE SHEETS MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah)
Catatan/ Notes
2008
ASET
ASSETS
ASET TIDAK LANCAR Aset tetap - setelah dikurangi akumulasi penyusutan sebesar Rp 81.317.097 juta tahun 2009 dan Rp 70.704.748 juta tahun 2008 Pekerjaan dalam pelaksanaan Properti investasi Investasi jangka panjang Aset pajak tangguhan Aset tidak digunakan dalam operasi Piutang pihak hubungan istimewa Rekening dan deposito berjangka dibatasi penggunaannya Aset tidak lancar lain
NONCURRENT ASSETS Property, plant and equipment net of accumulated depreciation of Rp 81,317,097 million in 2009 and Rp 70,704,748million in 2008 Construction in progress Investment properties Long-term investments Deferred tax assets Assets not used in operations Receivables from related parties Restricted cash in banks and time deposits Other noncurrent assets
Jumlah Aset Tidak Lancar
ASET LANCAR Kas dan setara kas Investasi jangka pendek Piutang usaha - setelah dikurangi penyisihan piutang ragu-ragu sebesar Rp 428.740 juta tahun 2009 dan Rp 363.603 juta tahun 2008 Piutang subsidi listrik Piutang lain-lain Persediaan - setelah dikurangi penyisihan penurunan nilai sebesar Rp 89.971 juta tahun 2009 dan Rp 72.862 juta tahun 2008 Pajak dibayar dimuka Biaya dibayar dimuka dan uang muka
Jumlah Aset Lancar
JUMLAH ASET
195,522,323 62,530,876 138,442 526,978 9,564 1,345,400 1,635,526 5,176,928 1,482,401
3e,5 3g,6 3h,7 3j,8 3y,49 3i,9 10.52
196,920,141 25,777,028 138,442 733,690 44,942 884,573 1,381,364
11,29,55 3k,3l,3w,12
4,745,696 2,966,729
268,368,438
233,592,604
10,593,388 3,330,007
3m,13 3j,14
10,059,515 8,782,451
2,290,455 4,609,587 558,374
3n,15 3v,16 3n,17
2,463,027 22,819,474 349,601
8,733,917 169,085 1,175,515
3o,18 3y,19,49 3l,3w,20
7,400,696 87,169 1,270,564
Total Noncurrent Assets
CURRENT ASSETS Cash and cash equivalents Short-term investments Trade accounts receivable - net of allowance for doubtful accounts of Rp 428,740 million in 2009 and Rp 363,603 million in 2008 Receivables on electricity subsidy Other receivables Inventories - net of allowance for decline in value of Rp 89,971 million in 2009 and Rp 72,862 million in 2008 Prepaid taxes Prepaid expenses and advances
31,460,328
53,232,497
Total Current Assets
299,828,767
286,825,101
TOTAL ASSETS
Lihat catatan atas laporan keuangan konsolidasi yang merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi.
See accompanying notes to consolidated financial statements which are an integral part of the consolidated financial statements.
1
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN NERACA KONSOLIDASI 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES CONSOLIDATED BALANCE SHEETS MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Catatan/ Notes
2009
2008
KEWAJIBAN DAN EKUITAS
LIABILITIES AND EQUITY
EKUITAS Modal saham - nilai nominal Rp 1 juta per saham Modal dasar - 63.000.000 saham Modal ditempatkan dan disetor penuh -
EQUITY Capital stock - par value of Rp 1 million per share Authorized - 63,000,000 shares
46.107.154 saham Tambahan modal disetor
46,107,154 31,120,506
21 22
46,107,154 28,431,719
Selisih penilaian kembali aset tetap Selisih transaksi perubahan ekuitas
-
2a,3e,5,23
77,640,558
anak perusahaan Saldo laba (defisit) Ditentukan penggunaannya Tidak ditentukan penggunaannya Jumlah Ekuitas
-
2a,3b,5,2 4
59,915,695
KEWAJIBAN TIDAK LANCAR Pendapatan ditangguhkan Uang jaminan langganan Kewajiban pajak tangguhan Kewajiban jangka panjang - setelah dikurangi bagian jatuh tempo dalam satu tahun Penerusan pinjaman Hutang kepada Pemerintah Hutang sewa pembiayaan Hutang bank dan surat hutang jangka menengah Hutang obligasi Hutang listrik swasta Kewajiban imbalan kerja Hutang lain-lain Hutang pihak hubungan istimewa Hutang biaya proyek Jumlah Kewajiban Tidak Lancar KEWAJIBAN LANCAR Hutang usaha Pihak hubungan istimewa Pihak ketiga Hutang pajak Biaya masih harus dibayar Kewajiban jangka panjang jatuh tempo dalam satu tahun Penerusan pinjaman Hutang kepada Pemerintah
1,894,149 46,809,726 125,931,534
1,894,149 (78,571,556) 135,417,719
7,684,931 5,503,577 8,488,504
3r,25 26 3y,49
7,143,999 4,669,320 9,182,935
19,759,119
3q,27
14,644,204
3,084,823 18,059,971
28 3f,29
3,378,615 15,152,497
14,533,031 31,956,477 8,197,543 13,034,555 212,924 71,092 1,810,642 132,397,189
30 3s,31 32 3w,51 36 33,52 34
8,500 25,080,849 6,679,066 12,559,576 368,000 170,396 786,020 99,823,978
404,723 26,787,018 568,261 4,596,156
35,52 35,55 3y,37 38
113,324 41,710,042 881,701 2,890,814
1,784,983 293,793
3q,27 28
1,487,036 293,793
Subscribed and paid-up - 46,107,154 shares Additional paid-in capital Revaluation increment on property, plant and equipment Difference due to change of equity in subsidiaries Retained earnings (deficit) Appropriated Unappropriated Total Equity NONCURRENT LIABILITIES Deferred revenue Customers' security deposits Deferred tax liabilities Long-term liabilities - net of current maturities Two-step loans Government loans Lease liability Bank loans and medium term notes Bonds payable Electricity purchase payable Employee benefit obligations Other payables Payable to related parties Project cost payable Total Noncurrent Liabilities CURRENT LIABILITIES Trade accounts payable Related parties Third parties Taxes payable Accrued expenses Current maturities of long-term liabilities Two-step loans Government
Hutang sewa pembiayaan Hutang bank dan surat hutang jangka menengah Hutang listrik swasta Kewajiban imbalan kerja Hutang lain-lain Jumlah Kewajiban Lancar
1,308,030
3f,29
953,586
2,509,235 159,339 1,511,535 1,576,971 41,500,044
30 32 3w,51 36
12,245 120,751 1,344,731 1,775,380 51,583,403
JUMLAH EKUITAS DAN KEWAJIBAN
299,828,767
286,825,101
Lihat catatan atas laporan keuangan konsolidasi yang merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi.
loans Lease liability Bank loans and medium term notes Electricity purchase payable Employee benefit obligations Other payables Total Current Liabilities TOTAL EQUITY AND LIABILITIES
See accompanying notes to consolidated financial statements which are an integral part of the consolidated financial statements. Jakarta,
Mei/May
,2009
SETIO ANGGORO DEWO Direktur Keuangan/Finance Director
0
(0)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN LAPORAN LABA RUGI KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES CONSOLIDATED STATEMENTS OF INCOME FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah)
(Angka dalam tabel dinyatakan dalam jutaan Rupiah)
Catatan/ Notes
2009 PENDAPATAN USAHA Penjualan tenaga listrik Subsidi listrik Pemerintah Penyambungan pelanggan Lain-lain
20,894,442 9,500,461 161,252 174,084
Jumlah Pendapatan Usaha
30,730,239
BEBAN USAHA Bahan bakar dan pelumas Pembelian tenaga listrik Pemeliharaan Kepegawaian Penyusutan Lain-lain
16,405,360 6,350,475 1,376,253 1,624,338 2,765,935 878,060
Jumlah Beban Usaha
29,400,421
LABA USAHA PENGHASILAN (BEBAN) LAIN-LAIN Penghasilan bunga Beban bunga dan keuangan Kerugian kurs mata uang asing - bersih Lain-lain - bersih
Beban Lain-lain - Bersih
(245,984)
INCOME FROM OPERATIONS
47 3d,53 48
LOSS BEFORE TAX 3y,49
TAX EXPENSE NET LOSS
3z,50
Lihat catatan atas laporan keuangan konsolidasi yang merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi.
OTHER INCOME (CHARGES) Interest income Interest expense and financing charges Loss on foreign exchange - net Others - net
Other Charges - Net
(1,210,078)
(26,245)
OPERATING EXPENSES Fuel and lubricants Purchased electricity Maintenance Personnel Depreciation Others Total Operating Expenses
(2,293,912)
BEBAN PAJAK
RUGI PER SAHAM DASAR (Dalam Rupiah penuh)
42 3u,43,52 44 45 3e,5 46
97,345 (1,468,279) (1,310,577) 387,599
(964,094)
REVENUES Sale of electricity Government's electricity subsidy Customer connection fees Others Total Revenues
1,329,818
RUGI SEBELUM PAJAK
RUGI BERSIH
3t,39 3v,40 3r,25 41
BASIC LOSS PER SHARE (In full Rupiah amount)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES CONSOLIDATED STATEMENTS OF CASH FLOWS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN LAPORAN ARUS KAS KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah)
2009 ARUS KAS DARI AKTIVITAS OPERASI Penerimaan kas dari pelanggan Pembayaran kas kepada pemasok Pembayaran kas kepada karyawan Kas dihasilkan dari (digunakan untuk) aktivitas operasi Penerimaan subsidi listrik Pembayaran bunga Penerimaan bunga Kenaikan kas yang dibatasi penggunaannya Pembayaran pajak penghasilan
2008 CASH FLOWS FROM OPERATING ACTIVITIES Cash receipts from customers Cash paid to suppliers Cash paid to employees Cash generated from (used in) operations Government subsidy received Interest expense paid Interest received Increase in escrow account Income tax paid
20,365,483 (14,173,815) (1,487,073) 4,704,594 2,705,444 (624,750) 97,345 (863,197) (188,359)
20,475,751 (21,332,329) (1,550,148) (2,406,726) 1,905,131 (748,061) 429,632 (1,034,908) (677,462)
5,831,076
(2,532,394)
5,982
2,482
(9,475,236)
(1,417,902)
CASH FLOWS FROM INVESTING ACTIVITIES Proceeds from sale of fixed assets Additions to property, plant and equipment, construction in progress and assets not used in operatioan
33,704 (334) 1,726,389
(40,886) (39,030) (1,567,841)
Withdrawal (Increase) in receivables from related parties Acquisition of long-term investments Withdrawal (placement) in short-term investments
Kas Bersih Digunakan Untuk Aktivitas Investasi
(7,709,495)
(3,063,177)
Net Cash Used in Investing Activities
ARUS KAS DARI AKTIVITAS PENDANAAN Hasil emisi obligasi Pembayaran penerusan pinjaman Pembayaran hutang kepada pemerintah Perolehan hutang bank Pembayaran hutang listrik swasta
2,198,019 (261,880) (146,896) 4,341,940 (47,003)
(411,897) (158,396) (30,167) (35,234)
CASH FLOWS FROM FINANCING ACTIVITIES Proceeds from issuance of bonds Payment of two-step loans Payment of Government loans Proceeds from bank loans Payment of electricity purchase payable
Kas Bersih Diperoleh Dari Aktivitas Pendanaan
6,084,180
(635,696)
Net Cash Provided by Financing Activities
KENAIKAN (PENURUNAN) BERSIH KAS DAN SETARA KAS
4,205,761
(6,231,267)
NET INCREASE (DECREASE) IN CASH AND CASH EQUIVALENTS
16,290,782
CASH AND CASH EQUIVALENTS AT BEGINNING OF YEAR
10,059,515
CASH AND CASH EQUIVALENTS AT END OF YEAR
Kas Bersih Diperoleh Dari Aktivitas Operasi ARUS KAS DARI AKTIVITAS INVESTASI Hasil penjualan aset tetap Perolehan aset tetap, pekerjaan dalam pelaksanaan dan aset tidak digunakan dalam operasi Pencairan (Penambahan) piutang pihak hubungan istimewa Perolehan investasi jangka panjang Pencairan (penempatan) investasi jangka pendek
KAS DAN SETARA KAS AWAL TAHUN KAS DAN SETARA KAS AKHIR TAHUN
6,387,627 10,593,388
Lihat catatan atas laporan keuangan konsolidasi yang merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi.
Net Cash Provided by Operating Activities
See accompanying notes to consolidated financial statements which are an integral part of the consolidated financial statements.
Jakarta, Mei/May 2009 SETIO ANGGORO DEWO Direktur Keuangan/Finance Director
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN LAPORAN ARUS KAS KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES CONSOLIDATED STATEMENTS OF CASH FLOWS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
(Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
2009 PENGUNGKAPAN TAMBAHAN Aktivitas investasi dan pendanaan yang tidak mempengaruhi kas : Perolehan pekerjaan dalam pelaksanaan melalui: Penarikan pinjaman dan hutang biaya proyek Bantuan Pemerintah Kapitalisasi biaya pinjaman Kapitalisasi beban penyusutan Hutang lain-lain
2008 SUPPLEMENTAL DISCLOSURES Noncash investing and financing activities :
Addition of construction in progress through : 1,255,209
1,311,828
155,046
124,995
613,857
(20,149)
2,511
2,526 102,670
-
Lihat catatan atas laporan keuangan konsolidasi yang merupakan bagian yang tidak terpisahkan dari laporan keuangan konsolidasi.
Drawdown of loans and project cost payable Government equity participation Capitalization of borrowing costs Capitalization of depreciation expense Other payables
See accompanying notes to consolidated financial statements which are an integral part of the consolidated financial statements.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah)
1.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah)
UMUM
1.
a. Pendirian dan Informasi Umum
GENERAL a. Establishment and General Information
Perusahaan Perseroan (Persero) PT Perusahaan Listrik Negara (“Perusahaan”) didirikan pada tahun 1961 dalam bentuk Jawatan di dalam lingkungan Kementerian Pekerjaan Umum dan Tenaga. Perusahaan merupakan kelanjutan usaha beberapa perusahaan listrik Belanda yang diambilalih oleh Pemerintah Republik Indonesia. Perusahaan listrik Belanda tersebut meliputi NV ANIEM, NV SEM, NV OJEM, NV EMS, NV EMBALOM, NV GEBEO, NV OGEM dan NV WEMI. Berdasarkan Peraturan Pemerintah No. 19 tahun 1965, status Perusahaan berubah menjadi perusahaan yang berbadan hukum. Selanjutnya ditetapkan menjadi Perusahaan Umum (Perum) berdasarkan Peraturan Pemerintah No. 30 tahun 1970 yang dipertegas dengan Peraturan Pemerintah No. 18 tahun 1972. Kemudian berdasarkan akta No. 169 tanggal 30 Juli 1994 dari Sutjipto S.H., notaris di Jakarta, status badan hukum Perusahaan berubah menjadi Perseroan Terbatas dengan nama Perusahaan Perseroan PT Perusahaan Listrik Negara disingkat PT PLN (Persero). Akta perubahan ini disahkan dengan Keputusan Menteri Kehakiman No. C2-11.519.HT.01.01 Th.94 tanggal 1 Agustus 1994, serta diumumkan dalam Berita Negara Republik Indonesia No. 73 tanggal 13 September 1994, Tambahan No. 6731.
Perusahaan Perseroan (Persero) PT Perusahaan Listrik Negara (the Company) was established in 1961 as a unit of the Ministry of Energy and Public Works. The Company is a business continuation of several Dutch electricity companies taken over by the Government of the Republic of Indonesia. The Dutch electricity companies include among others: NV ANIEM, NV SEM, NV OJEM, NV EMS, NV EMBALOM, NV GEBEO, NV OGEM and NV WEMI. Based on Government Regulation No. 19 year 1965, the Company’s status was changed to that of a legal entity. Subsequently, based on Government Regulation No. 30 year 1970, as amended by Government Regulation No. 18 year 1972, the Company became a Perusahaan Umum (Perum). Based on notarial deed of Sutjipto, SH, notary in Jakarta, No. 169 dated July 30, 1994, the Company’s status was changed to a limited liability company and was named Perusahaan Perseroan PT Perusahaan Listrik Negara or PT PLN (Persero). This change was approved by the Minister of Justice in his decision letter No. C211.519.HT.01.01.Th.94 dated August 1, 1994 and was published in State Gazette of the Republic of Indonesia No. 73 dated September 13, 1994, Supplement No. 6731.
Anggaran dasar Perusahaan terakhir diubah berdasarkan akta No. 2 tanggal 1 Juli 2008 dari Lenny Janis Ishak S.H., notaris di Jakarta, dalam rangka penyesuaian dengan Undangundang No. 40 tahun 2007 mengenai Perseroan Terbatas. Akta perubahan ini telah memperoleh persetujuan dari Menteri Hukum dan Hak Azasi Manusia Republik Indonesia dengan Surat Keputusannya No. AHU46951.AH.01.02 Th 2008 tanggal 1 Agustus 2008.
The articles of association of the Company was recently amended by notarial deed No. 2 dated July 1, 2008 of Lenny Janis Ishak S.H., notary in Jakarta, to conform with Law No. 40 year 2007 on Limited Liability Companies. This change was approved by the Minister of Law and Human Rights of the Republic of Indonesia in his decision letter No. AHU-46951.AH.01.02 Th 2008 dated August 1, 2008.
-7-
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
b.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Sesuai dengan pasal 3 anggaran dasar Perusahaan, maksud dan tujuan Perusahaan adalah untuk menyelenggarakan usaha penyediaan tenaga listrik bagi kepentingan umum dalam jumlah dan mutu yang memadai serta memupuk keuntungan dan melaksanakan penugasan Pemerintah di bidang ketenagalistrikan dalam rangka menunjang pembangunan dengan menerapkan prinsipprinsip Perseroan Terbatas.
In accordance with article 3 of the Company’s articles of association, the scope of its activities is to operate the business of adequate supply of electricity for public use, both in terms of quantity and quality also to earn profit, and perform assignment from Government as electricity power business in order to support development by applying the principles of Limited Liability Company.
Perusahaan berdomisili di Jakarta dan memiliki 40 unit pelaksana yang tersebar di wilayah Indonesia. Kantor Pusat Perusahaan beralamat di Jl. Trunojoyo Blok M I No. 135, Jakarta.
The Company is domiciled in Jakarta, with 40 business unit offices spread all over Indonesia. The Company’s head office is located at Jl. Trunojoyo Blok M I No. 135, Jakarta.
Sesuai dengan Undang-Undang No. 19 tahun 2003 tentang “Badan Usaha Milik Negara (BUMN)”, Pemerintah wajib memberikan kompensasi atas semua biaya yang telah dikeluarkan oleh BUMN termasuk margin yang diharapkan kepada BUMN yang diberikan penugasan khusus. Perusahaan merupakan BUMN yang sedang melaksanakan penugasan khusus berupa penyediaan tenaga listrik bersubsidi kepada masyarakat (Catatan 40).
Based on Law No. 19 year 2003, regarding “State-Owned Enterprises (BUMN)”, the Government is obliged to provide compensation to these BUMN, which were appointed to perform special assignment, for all expenses which they have incurred, including expected return (margin). The Company is a BUMN, which performs a special assignment of providing electricity power with subsidy to the public (Note 40).
Pada tanggal 31 Desember 2008 dan 2007, jumlah karyawan Perusahaan dan anak perusahaan masing-masing 44.750 karyawan dan 45.225 karyawan.
As of December 31, 2008 and 2007, the Company and its subsidiaries had total number of employees of 44,750 and 45,225, respectively.
Penawaran Umum Efek Hutang Perusahaan
b. Public Offering of Bonds of the Company
Majapahit Holding B.V., Belanda, anak perusahaan yang bertujuan khusus yang sepenuhnya milik Perusahaan, menerbitkan Obligasi Terjamin (Guaranteed Notes) jatuh tempo tahun 2017 dan 2037 pada tanggal 28 Juni 2007, dan Guaranteed Notes jatuh tempo 2011 dan 2016 pada tanggal 16 Oktober 2006. Guaranteed Notes ini dicatatkan pada Bursa Efek Singapura.
Majapahit Holding B.V., Netherlands, a wholly-owned special-purpose subsidiary of the Company, issued Guaranteed Notes due 2017 and 2037 in June 28, 2007 and Guaranteed Notes due 2011 and 2016 in October 16, 2006. These Guaranteed Notes are listed in the Singapore Exchange Securities Trading Limited.
-8-
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Perusahaan juga telah beberapa kali menerbitkan Obligasi PLN, terakhir Obligasi PLN IX Tahun 2007 dan Obligasi Syariah (Sukuk) Ijarah PLN II Tahun 2007. Obligasi ini akan jatuh tempo antara tahun 2017 – 2022 dan dicatatkan pada Bursa Efek Indonesia (Catatan 31). c.
The Company also issued PLN Bonds, most recently, PLN IX Bonds Year 2007 and Syariah (Sukuk) Ijarah PLN II Bonds Year 2007. These bonds will be due between 2017 – 2022 and are listed in the Indonesian Stock Exchange (Note 31).
Susunan Pengurus dan Informasi Lain
c. Management and Other Information
Pada tanggal 31 Maret 2009 dan 2008, susunan pengurus Perusahaan adalah sebagai berikut :
As of March 31, 2009 and 2008, the Company’s management consisted of the following :
2009 Komisaris Utama Komisaris
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2008
Alhilal Hamdi Isnuwardianto Komara Djaja Rahmat Waluyanto Bambang PS Brojonegoro Lutfi Hamid
Alhilal Hamdi Isnuwardianto Komara Djaja Rahmat Waluyanto Bambang PS Brojonegoro Lutfi Hamid
President Commissioner Commissioners
Direktur Utama Wakil Direktur Utama Direktur Konstruksi Strategis Direktur Perencanaan & Teknologi Direktur Jawa-Madura-Bali Direktur Luar Jawa-Madura-Bali
Fahmi Mochtar Rudiantara Moch. Agung Nugroho Bambang Praptono Murtaqi Syamsuddin Hariadi Sadono
Fahmi Mochtar Rudiantara Moch. Agung Nugroho Bambang Praptono Murtaqi Syamsuddin Hariadi Sadono
Direktur SDM & Umum Direktur Keuangan
Supriadi Setio Anggoro Dewo
Supriadi Setio Anggoro Dewo
President Director Vice President Director Director of Strategic Construction Director of Planning & Technology Director of Java-Madura-Bali Director of Outside Java-Madura-Bali Director of Human Resource & General Affairs Director of Finance
Lutfi Hamid Bambang PS Brojonegoro Elok Tresnaningsih Maman Suparman Sugianto Syamsul Arifin Lilik Safrudin Ismail
Lutfi Hamid Bambang PS Brojonegoro Elok Tresnaningsih Maman Suparman Erman Jaya Kusuma Lalu Rusmiady Devy S Nazahar
Komisaris Independen
Komite Audit Ketua Wakil Ketua Anggota
Independent Commissioners
Audit Committee Chairman Vice Chairman Members
Total compensation of the Company’s commissioners and directors including salaries amounted to Rp 4,333 million in 2009 and Rp 1.534 million in 2008.
Perusahaan membayar kompensasi kepada dewan komisaris dan direksi Perusahaan berupa gaji sebesar Rp 4.333 juta tahun 2009 dan Rp 1.534 juta tahun 2008. Pada tanggal 31 Maret 2009 dan 2008, jumlah karyawan Perusahaan dan anak perusahaan masing-masing 44.750 karyawan dan 46.302 karyawan.
At March 31, 2009 and 2008, the Company and its subsidiaries had total number of employees of 44,750 and 46,302, respectively.
-9-
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
2.
PENERAPAN PERNYATAAN STANDAR AKUNTANSI KEUANGAN (PSAK) REVISI
a.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
ADOPTION OF REVISED STATEMENTS OF FINANCIAL ACCOUNTING STANDARDS (PSAK)
Standar yang berlaku efektif pada tahun berjalan
a.
Standards effective in the current period In the current year, the Company and its subsidiaries adopted the following revised PSAK which are effective for financial statements beginning on or after January 1, 2008:
Pada tahun berjalan, Perusahaan dan anak perusahaan menerapkan PSAK revisi berikut ini yang efektif untuk laporan keuangan dimulai atau setelah 1 Januari 2008: PSAK 13 (Revisi 2007), Properti Investasi
PSAK 13 (Revised 2007) Investment Property
PSAK 13 revisi tidak berpengaruh signifikan terhadap kebijakan akuntansi Perusahaan dan anak perusahaan. Perubahan mendasar pada standar ini, yang mengijinkan penggunaan model nilai wajar atau model biaya dalam mengukur properti investasi setelah pengukuran awal tidak mempunyai pengaruh pada laporan keuangan konsolidasi ini karena kebijakan Perusahaan dan anak perusahaan mengukur properti investasi setelah pengakuan awal telah menggunakan model biaya. Untuk tujuan penyajian laporan keuangan konsolidasi, tanah dengan nilai tercatat sebesar Rp 138.442 juta telah direklasifikasi di neraca konsolidasi dari aset tetap ke properti investasi (Catatan 7).
The revisions to PSAK 13 have had no significant impact on the Company and it’s subsidiaries’ accounting policy. The principal change to the standard, which allows the use of fair value or cost model in measuring investment property subsequent to initial recognition, has no impact on these consolidated financial statements because it has always been the Company’s and its subsidiaries’ policy to measure investment property subsequent to initial recognition using the cost model. However for presentation purposes, land with a carrying amount of Rp 138,442 million is reclassified in the consolidated balance sheet from property, plant and equipment to investment property (Note 7).
Rincian akun dalam laporan keuangan konsolidasi tahun 2007 yang telah direklasifikasi sehubungan dengan PSAK No. 13 (Revisi 2007) adalah sebagai berikut :
Details of accounts in the 2007 consolidated financial statements reclassified in relation to PSAK No. 13 (Revised 2007) are as follows :
2007 Sebelum reklasifikasi/ Before reclassification Aset tetap - bersih Properti investasi
198,901,833 -
- 10 -
Setelah reklasifikasi/ After reclassification 198,763,391 138,442
Property, plant and equipment - net Investment properties
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PSAK 16 (Revisi 2007), Aset Tetap
PSAK 16 (Revised 2007) Property, Plant and Equipment
PSAK 16 revisi dapat menggunakan model revaluasi (revaluation model) atau model biaya (cost model) dalam mengukur aset tetap setelah pengakuan awal dan mengharuskan antara lain pendekatan komponen (component approach) dalam menyusutkan aset serta mereview nilai residu dan umur manfaat setiap aset tetap. Pada penerapan awal, manajemen memilih untuk menggunakan model biaya. Namun manajemen menentukan bahwa tidak praktis mengestimasi dampak pendekatan komponen dan perubahan nilai residu aset baik secara retroaktif maupun prospektif dari tanggal yang lebih awal. Karenanya penerapan standar ini tidak berdampak terhadap nilai tercatat aset tetap sebelumnya. Untuk aset tertentu yang telah direvaluasi pada tahun sebelumnya sesuai dengan peraturan Pemerintah, nilai revaluasi tersebut dianggap sebagai biaya perolehan (deemed cost) untuk tujuan penerapan PSAK 16 revisi dan saldo selisih nilai revaluasi sejumlah Rp 77.640.558 juta dan selisih transaksi perubahan ekuitas anak perusahaan sebesar Rp 59.915.695 juta, yang sebelumnya disajikan terpisah pada akun ekuitas, direklasifikasi ke saldo laba pada saat penerapan awal standar ini (Catatan 23 dan 24).
The revised PSAK 16 permits the use of fair value or cost model in measuring property, plant and equipment subsequent to initial recognition, and requires among other things the component approach in depreciating the asset and a review at least annually of the residual value and useful life of the asset. On initial adoption the management has chosen to continue using the cost model. However, management has determined that it was not practicable to estimate the effect of the component approach and the changes in residual value of the asset either retroactively or prospectively from any earlier date. Accordingly, the adoption of this standard has not resulted in a change in the prior year carrying amount of the property, plant and equipment. For certain assets that have been revalued in prior year in accordance with government regulation, the revaluation amount is considered as deemed cost for the purpose of applying the revised PSAK 16, and the balance of revaluation increment on property, plant and equipment of Rp 77,640,558 million and difference due to change of equity in subsidiaries of Rp 59,915,695 million, previously presented as separate items in equity, were reclassified to retained earnings on initial adoption of the standard (Notes 23 and 24).
PSAK 30 (Revisi 2007), Sewa
PSAK 30 (Revised 2007), Leases
Penerapan PSAK 30 revisi berdampak terhadap perubahan kebijakan akuntansi sewa. Perubahan mendasar dari standar ini, dimana klasifikasi dari sewa pembiayaan (finance lease) atau sewa operasi (operating lease) tergantung dari pengalihan secara substantial seluruh risiko dan manfaat, tidak berdampak terhadap laporan keuangan periode sebelumnya. Manajemen menetapkan tidak terdapat sewa operasi yang signifikan pada awal penerapan yang diklasifikasi sebagai sewa pembiayaan menurut standar revisi.
The adoption of the revised PSAK 30 resulted in a change in accounting policy for leases. The principal change to the standard, which is the finance or operating lease classification of the arrangement depending on the transfer of substantially all the risks and rewards, had no impact on prior year financial statements. Management has determined that there are no significant operating leases on initial adoption that would have been classified as finance lease under the revised standard.
- 11 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Selanjutnya pada tanggal 16 September 2008, Dewan Standar Akuntansi Keuangan (DSAK) mengeluarkan Interpretasi Standar Akuntansi Keuangan (ISAK) 8, tentang Penentuan Apakah Suatu Perjanjian Mengandung Suatu Sewa dan Pembahasan Lebih Lanjut Ketentuan Transisi PSAK 30 (Revisi 2007). Interpretasi ini memberikan panduan untuk menentukan apakah suatu perjanjian merupakan sewa atau mengandung sewa yang harus diperlakukan sesuai dengan PSAK 30 (Revisi 2007). Interpretasi ini diterapkan untuk laporan keuangan periode yang berakhir setelah tanggal dikeluarkannya interpretasi ini.
Furthermore, on September 16, 2008, the Financial Accounting Standard Board (DSAK) issued Interpretation of Financial Accounting Standard (ISAK) 8, regarding Determining Whether an Arrangement Contains a Lease and Further Discussion Clarifying Transition of PSAK 30, (Revised 2007). This interpretation provides guidance for determining whether an arrangement is or contains lease that should be accounted for in accordance with PSAK 30 (Revised 2007). This interpretation is applicable for financial statements with period ending after the date this interpretation was issued.
Penyelenggaraan usaha tenaga listrik di Indonesia dikendalikan oleh Pemerintah dan dilaksanakan oleh Perusahaan sebagai Badan Usaha Milik Negara selaku Pemegang Kuasa Usaha Ketenagalistrikan. Pemegang Kuasa Usaha Ketenagalistrikan dan setiap pemegang Izin Usaha Ketenagalistrikan untuk kepentingan umum harus memastikan ketersediaan tenaga listrik di setiap wilayah operasinya.
The electric power business in Indonesia is controlled by the Government and carried-out by the Company as a state-owned enterprise, which serves as the holder of Electricity Business Proxy. The holder of Electricity Business Proxy and each holder of Electricity Business License for public use must ensure the adequacy of electric power supply in each of their operating areas.
Perusahaan dan anak perusahaan mengadakan perjanjian jual beli tenaga listrik (PPA dan ESC) dengan penyedia dan pengembang tenaga listrik swasta (IPP). IPP tersebut merupakan pemegang Izin Usaha Ketenagalistrikan untuk kepentingan umum, yang dapat diserahkan kepada entitas usaha lain dengan tanggung jawab untuk menghasilkan tenaga listrik guna kepentingan umum.
The Company and its subsidiaries entered into power purchase agreements (PPA) and energy sales contracts (ESC) with Independent Power Producers (IPPs). Those IPPs that supply electricity to the Company are holders of Electricity Business License for public use, which may be granted to other business entities with responsibility to generate electricity for public use.
Berdasarkan evaluasi manajemen, Perjanjian Jual Beli Tenaga Listrik tersebut dilakukan dalam rangka pelaksanaan penjaminan ketersediaan tenaga listrik untuk kepentingan umum oleh Pemerintah melalui Perusahaan, yang dikecualikan dalam ruang lingkup interpretasi tersebut, sebagaimana ditegaskan dalam surat Ketua Badan Pengawas Pasar Modal dan Lembaga Keuangan (Bapepam – LK) No. S-2366/BL/2009 tanggal 30 Maret 2009.
Based on management assessment, those Power Supply Contracts were entered into to enable the Government, through the Company, to carry out its undertaking of supplying electricity as a public service, which is exempted under the scope of the interpretation as confirmed in a letter No. S-2366/BL/2009 dated March 30, 2009 from the Chairman of the Capital Market and Financial Institutions Supervisory Agency (Bapepam-LK).
- 12 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
b.
Standar ini telah diterbitkan tetapi belum diterapkan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
b.
Standards in issue not yet adopted
Pada tanggal persetujuan laporan keuangan, pernyataan standar berikut telah diterbitkan namun belum berlaku:
At the date of authorization of these financial statements, the following standards were in issue but not yet effective:
PSAK 14 (Revisi 2008), Persediaan
PSAK 14 (Revised 2008), Inventories
Pada bulan September 2008, DSAK mengeluarkan standar akuntansi untuk persediaan, yang mengganti PSAK 14, Persediaan.
In September 2008, DSAK issued the revised accounting standard for inventories, which supersedes PSAK 14, Inventories.
Perubahan mendasar pada standar ini termasuk antara lain Perusahaan harus menggunakan rumus biaya yang sama terhadap semua persediaan yang memiliki sifat dan kegunaan yang sama, dan pembelian persediaan dengan persyaratan penyelesaian tangguhan (deferred settlement terms), perbedaan antara harga beli untuk persyaratan kredit normal dan jumlah yang dibayarkan diakui sebagai beban bunga selama periode pembiayaan.
The principal changes to the standard include among other things the requirement to use the same cost formula for all inventories having similar nature and use to the Company, and for purchase of inventories with deferred settlement terms, the difference between the purchase price for normal credit terms and the amount paid is recognized over the period of financing.
Standar ini berlaku efektif untuk laporan keuangan yang dimulai pada atau setelah 1 Januari 2009. Penerapan lebih dini dianjurkan.
This standard is effective for financial statement beginning on or after January 1, 2009. Earlier application is encouraged.
Manajemen sedang mengevaluasi dampak dari standar ini terhadap laporan keuangan konsolidasi.
Management is evaluating the effect of this standard on the consolidated financial statements.
PSAK 50 (Revisi 2006), Instrumen Keuangan: Penyajian dan Pengungkapan
PSAK 50 (Revised 2006), Financial Instruments: Presentation and Disclosures In December 2006, DSAK issued PSAK 50 (Revised 2006), Financial Instruments: Presentation and Disclosures, which supersedes the presentation and disclosure requirements of PSAK 50 (1998), Accounting for Investments in Certain Securities, and PSAK 55 (Revised 1999), Accounting for Derivatives and Hedging Activities.
Pada bulan Desember 2006, DSAK mengeluarkan PSAK 50 (Revisi 2006), Instrumen Keuangan: Penyajian dan Pengungkapan, menggantikan ketentuan penyajian dan pengungkapan yang diatur dalam PSAK 50 (1998), Akuntansi Investasi Efek Tertentu, dan PSAK 55 (Revisi 1999), Akuntansi Instrumen Derivatif dan Aktivitas Lindung Nilai.
- 13 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Tujuan standar revisi ini adalah untuk menetapkan prinsip-prinsip penyajian dan pengungkapan instrumen keuangan sebagai kewajiban atau ekuitas dan saling hapus aset keuangan dan kewajiban keuangan. Standar ini berlaku terhadap klasifikasi instrumen keuangan dari perspektif penerbit, dalam aset keuangan, kewajiban keuangan, dan instrumen ekuitas; pengklasifikasian yang terkait dengan suku bunga, dividen, kerugian dan keuntungan; dan keadaan dimana aset keuangan dan kewajiban keuangan akan saling hapus. Prinsip-prinsip dalam standar ini melengkapi prinsip untuk pengakuan dan pengukuran aset keuangan dan kewajiban keuangan dalam PSAK 55 (Revisi 2006), Instrumen Keuangan: Pengakuan dan Pengukuran. Standar ini diterapkan secara prospektif untuk periode yang dimulai pada atau setelah tanggal 1 Januari 2010.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
The objective of the revised standard is to establish principles for the presentation and disclosures of financial instruments as liabilities or equity and for offsetting financial assets and financial liabilities. It applies to the classification of financial instruments, from the perspective of the issuer, into financial assets, financial liabilities and equity instruments; the classification of the related interests, dividends, losses and gains; and the circumstances in which financial assets and financial liabilities should be offset. The principles in this standard complement the principles for recognizing and measuring financial assets and financial liabilities in PSAK 55 (Revised 2006), Financial Instruments: Recognition and Measurement. This standard should be applied prospectively for periods beginning on or after January 1, 2010. Management is evaluating the effect of this standard on the consolidated financial statements.
Manajemen sedang mengevaluasi dampak dari standar ini terhadap laporan keuangan konsolidasi. PSAK 55 (Revisi 2006), Instrumen Keuangan: Pengakuan dan Pengukuran
PSAK 55 (Revised 2006), Financial Instruments: Recognition and Measurement In December 2006, DSAK issued PSAK 55 (Revised 2006), Financial Instruments: Recognition and Measurement.
Pada bulan Desember 2006, DSAK mengeluarkan PSAK 55 (Revisi 2006), Instrumen Keuangan: Pengakuan dan Pengukuran. Standar ini menetapkan prinsip-prinsip dasar pengakuan dan pengukuran aset keuangan, kewajiban keuangan dan kontrak pembelian atau penjualan item non keuangan. Standar ini juga menetapkan pedoman untuk penghentian pengakuan; jika aset dan kewajiban keuangan dinilai pada nilai wajar, bagaimana menentukan nilai wajar dan mengevaluasi penurunan nilai; serta akuntansi lindung nilai.
This standard establishes the principles for recognizing and measuring financial assets, financial liabilities and some contracts to buy or sell non-financial items. The standard also provides guidance on derecognition, when financial assets and liabilities may be measured at fair value, how to determine fair value and assess impairment, as well as hedge accounting.
Standar ini menggantikan ketentuan pengakuan dan pengukuran yang diatur dalam standar akuntansi tertentu yang telah diterbitkan sebelumnya.
This standard supersedes the principles of financial instruments recognition and measurement prescribed in certain previously issued accounting standards.
- 14 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Entitas harus menerapkan standar ini secara prospektif untuk laporan keuangan yang mencakup periode yang dimulai pada atau setelah 1 Januari 2010. Penerapan standar lebih dini diperkenankan. Dalam ketentuan transisi, entitas dapat melakukan penyesuaian perlakuan akuntansi instrumen keuangan yang ada pada akhir periode laporan keuangan sebelum tanggal efektif dengan ketentuan yang ada dalam standar ini dan dampak penyesuaian tersebut diakui dalam laba rugi atau ekuitas periode berjalan.
Entities shall apply this standard prospectively for financial statements covering the periods beginning on or after January 1, 2010. Early application is permitted. Among the transitional provisions on initial application, entities are allowed to recognize either in profit or loss or in equity the effect of the recognition and measurement prescribed by the standard to financial instruments existing before the effective date of the standard.
Management is evaluating the effect of this standard on the consolidated financial statements.
Manajemen sedang mengevaluasi dampak dari standar ini terhadap laporan keuangan konsolidasi.
3.
IKHTISAR KEBIJAKAN AKUNTANSI PENTING a.
SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Penyajian Laporan Keuangan Konsolidasi
a. Consolidated Presentation
Financial
Statement
Laporan keuangan konsolidasi disusun dengan menggunakan prinsip dan praktek akuntansi yang berlaku umum di Indonesia yaitu Standar Akuntansi Keuangan dan Peraturan Bapepam No. VIII.G.7 tanggal 13 Maret 2000.
The consolidated financial statements have been prepared using accounting principles and reporting practices generally accepted in Indonesia, which are Statements of Financial Accounting Standards and Bapepams Rule No. VIII.G.7 dated March 13, 2000. Such consolidated financial statements are not intended to present the financial positions and cash flows in accordance with accounting principles and reporting practices generally accepted in other countries and jurisdictions.
Dasar penyusunan laporan keuangan konsolidasi, kecuali untuk laporan arus kas, adalah dasar akrual. Mata uang pelaporan yang digunakan untuk penyusunan laporan keuangan konsolidasi adalah mata uang Rupiah. Laporan keuangan konsolidasi tersebut disusun berdasarkan nilai historis, kecuali beberapa akun tertentu disusun berdasarkan pengukuran lain sebagaimana diuraikan dalam kebijakan akuntansi masingmasing akun tersebut.
The consolidated financial statements, except for the consolidated statements of cash flows, are prepared under the accrual basis of accounting. The reporting currency used in the preparation of the consolidated financial statements is the Indonesian Rupiah, while the measurement basis used is the historical cost, except for certain accounts which are measured on the bases described in the related accounting policies.
- 15 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Laporan arus kas konsolidasi disusun dengan menggunakan metode langsung dengan mengelompokkan arus kas dalam aktivitas operasi, investasi dan pendanaan.
b.
The consolidated statements of cash flows are prepared using the direct method with classifications of cash flows into operating, investing and financing activities.
Prinsip Konsolidasi
b.
Principles of Consolidation
Laporan keuangan konsolidasi menggabungkan laporan keuangan Perusahaan dan entitas yang dikendalikan oleh Perusahaan dan anak perusahaan (termasuk entitas bertujuan khusus). Pengendalian dianggap ada apabila Perusahaan mempunyai hak untuk mengatur dan menentukan kebijakan finansial dan operasional dari investee untuk memperoleh manfaat dari aktivitasnya. Pengendalian juga dianggap ada apabila Perusahaan memiliki baik secara langsung atau tidak langsung melalui anak perusahaan lebih dari 50% hak suara, kecuali pengendalian atas anak perusahaan tersebut bersifat sementara atau terdapat pembatasan jangka panjang yang mempengaruhi kemampuan anak perusahaan untuk memindahkan dana ke Perusahaan.
The consolidated financial statements incorporate the financial statements of the Company and entities controlled by the Company and its subsidiaries (including a special purpose entity). Control is achieved where the Company has the power to govern the financial and operating policies of the investee entity so as to obtain benefits from its activities. Control is presumed to exist when the Company owns directly or indirectly through subsidiaries, more than 50% of the voting rights, except where control on the subsidiary is intended to be temporary or the subsidiary operates under severe long-term restrictions which significantly impair its ability to transfer fund to the Company.
Hasil akuisisi atau penjualan anak perusahaan selama tahun berjalan dari tanggal efektif akuisisi atau sampai dengan tanggal efektif penjualan termasuk dalam laporan laba rugi konsolidasi.
The results of subsidiaries acquired or disposed of during the year are included in the consolidated statements of income from the effective date of acquisition or up to the effective date of disposal, as appropriate.
Penyesuaian dapat dilakukan terhadap laporan keuangan anak perusahaan agar kebijakan akuntansi yang digunakan sesuai dengan kebijakan akuntansi yang digunakan oleh Perusahaan.
Where necessary, adjustments are made to the financial statements of the subsidiaries to bring the accounting policies used in line with those used by the Company. Intercompany balances and transactions, including unrealized gains or losses on intercompany transactions, are eliminated to reflect the financial position and the results of operations of the Company and its subsidiaries as one business entity.
Saldo dan transaksi material termasuk keuntungan/kerugian yang belum direalisasi atas transaksi antar perusahaan dieliminasi untuk mencerminkan posisi keuangan dan hasil usaha Perusahaan dan anak perusahaan sebagai satu kesatuan usaha.
- 16 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perubahan nilai investasi akibat perubahan ekuitas anak perusahaan berasal dari transaksi modal antara anak perusahaan dengan perusahaan lain diakui sebagai bagian dari ekuitas pada akun “Selisih transaksi perubahan ekuitas anak perusahaan”, dan diakui sebagai pendapatan atau beban pada saat pelepasan investasi yang bersangkutan.
c.
Changes in the value of investments due to changes in the equity of subsidiaries arising from capital transactions of such subsidiaries with other parties are recognized in equity as “difference due to changes of equity in subsidiaries”, and recognized as income or expenses in the period when the investments are disposed of.
Penggunaan Estimasi
c.
Penyusunan laporan keuangan konsolidasi sesuai dengan prinsip akuntansi yang berlaku umum di Indonesia mengharuskan manajemen membuat estimasi dan asumsi yang mempengaruhi jumlah aset dan kewajiban yang dilaporkan dan pengungkapan aset dan kewajiban kontinjensi pada tanggal laporan keuangan serta jumlah pendapatan dan beban selama periode pelaporan. Realisasi dapat berbeda dengan jumlah yang diestimasi. d.
Use of Estimates The preparation of consolidated financial statements in conformity with accounting principles generally accepted in Indonesia requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the consolidated financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could be different from these estimates.
Transaksi, Saldo dan Penjabaran Laporan Keuangan Dalam Mata Uang Asing
d.
Pembukuan Perusahaan dan anak perusahaan, kecuali Majapahit Holding B.V. (MH) dan Majapahit Finance B.V. (MF) diselenggarakan dalam mata uang Rupiah. Transaksi-transaksi selama tahun berjalan dalam mata uang asing dicatat dengan kurs yang berlaku pada saat terjadinya transaksi.
Foreign Currency Transactions, Balances and Translation The books of accounts of the Company and its subsidiaries, except for Majapahit Holding B.V. (MH) and Majapahit Finance B.V. (MF), are maintained in Indonesian Rupiah. Transactions during the year involving foreign currencies are recorded at the rates of exchange prevailing at the time the transactions are made. At balance sheet date, monetary assets and liabilities denominated in foreign currencies are adjusted to reflect the rates of exchange prevailing at that date. The resulting gains or losses are credited or charged to current operations, except those foreign exchange differences which are capitalized as borrowing costs.
Pada tanggal neraca, aset dan kewajiban moneter dalam mata uang asing disesuaikan untuk mencerminkan kurs yang berlaku pada tanggal tersebut. Keuntungan atau kerugian kurs yang timbul dikreditkan atau dibebankan dalam laporan laba rugi tahun yang bersangkutan, kecuali selisih kurs mata uang asing yang dikapitalisasi sebagai biaya pinjaman. Kegiatan usaha MH dan MF merupakan bagian integral dari kegiatan usaha Perusahaan, dengan demikian pembukuan MH dan MF yang diselenggarakan dalam mata uang asing dijabarkan dalam mata uang Rupiah dengan menggunakan prosedur yang sama dengan Perusahaan.
Operating activities of MH and MF are an integral part of the Company’s activities, hence the books of accounts of MH and MF, which are maintained in foreign currency, are translated into Rupiah using the same procedures adopted by the Company.
- 17 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
e.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Aset Tetap
e.
Property, Plant and Equipment
Aset tetap yang dimiliki untuk digunakan dalam produksi atau penyediaan barang atau jasa atau untuk tujuan administratif dicatat berdasarkan biaya perolehan setelah dikurangi akumulasi penyusutan dan akumulasi kerugian penurunan nilai. Aset tetap termasuk material cadang utama dan peralatan siap pakai dengan manfaat ekonomis lebih dari satu tahun yang diperuntukkan untuk menjaga kelangsungan, kestabilan operasi instalasi dan mesin pembangkit listrik dalam rangka memproduksi serta mendistribusikan tenaga listrik.
Property, plant and equipment held for use in the production or supply of goods or services, or for administrative purposes, are stated at cost, less accumulated depreciation and any accumulated impairment losses. Property, plant and equipment include major spare parts and stand-by equipment, with economic benefits of more than one year, which are used to ensure the continuity and stability of the power plant operations and electricity installations necessary to produce and distribute electricity.
Aset tetap perolehan sebelum tahun 2002, telah dinilai kembali berdasarkan peraturan pemerintah yang berlaku. Pada penerapan awal PSAK 16 (Revisi 2007), nilai aset yang dinilai kembali pada periode sebelumnya sesuai dengan standar sebelumnya dianggap sebagai biaya perolehan (deemed cost) dan selisih penilaian kembali yang disajikan secara terpisah dalam akun ekuitas direklasifikasi ke saldo laba.
Property, plant and equipment acquired before 2002 were revalued in accordance with Government regulation. In line with the initial adoption of PSAK 16 (Revised 2007), the previous revalued amount of certain assets under the previous standard is considered as deemed cost, and the balance of the revaluation surplus previously reported as separate line item in equity is reclassified into retained earnings.
Penyusutan dihitung dengan menggunakan metode garis lurus berdasarkan taksiran masa manfaat ekonomis aset tetap sebagai berikut :
Depreciation is computed using the straightline method based on their estimated economic useful lives as follows : Tahun/Years
Bangunan umum, waduk dan prasarana Instalasi dan mesin pembangkit Perlengkapan transmisi Perlengkapan distribusi Perlengkapan umum Kendaraan bermotor Material cadang Perlengkapan pengolahan data dan telekomunikasi
10 – 47 13 – 30 37 15 – 37 4–8 3–5 10 – 25 5 – 10
Masa manfaat ekonomis, nilai residu dan metode penyusutan direview setiap akhir tahun dan pengaruh dari setiap perubahan estimasi tersebut berlaku prospektif.
Buildings, reservoir and infrastructure Installations and power plant Transmission equipment Distribution equipment General equipment Motor vehicles Spare parts Telecommunication and data processing equipment The estimated useful lives, residual values and depreciation method are reviewed at each year end, with the effect of any changes in estimate accounted for on a prospective basis.
- 18 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
f.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Aset sewaan disusutkan berdasarkan taksiran masa manfaat ekonomis yang sama dengan aset tetap – pemilikan langsung atau disusutkan selama jangka waktu yang lebih pendek antara periode masa sewa dan umur manfaatnya.
Leased assets are depreciated over their expected useful lives on the same basis as property, plant and equipment – direct acquisitions or where shorter, depreciated over the term of the relevant lease.
Tanah dinyatakan berdasarkan biaya perolehan atau nilai penilaian kembali dan tidak disusutkan.
Land is stated at cost or revalued amount and is not depreciated.
Beban pemeliharaan dan perbaikan dibebankan pada laporan laba rugi konsolidasi pada saat terjadinya. Biaya-biaya lain yang terjadi selanjutnya yang timbul untuk menambah, mengganti atau memperbaiki aset tetap dicatat sebagai biaya perolehan aset jika dan hanya jika besar kemungkinan manfaat ekonomis di masa depan berkenaan dengan aset tersebut akan mengalir ke entitas dan biaya perolehan aset dapat diukur secara andal. Aset tetap yang sudah tidak digunakan lagi atau yang dijual dikeluarkan dari kelompok aset tetap berikut akumulasi penyusutannya. Keuntungan atau kerugian dari penjualan aset tetap tersebut dibukukan dalam laporan laba rugi konsolidasi pada tahun yang bersangkutan.
The cost of maintenance and repairs is charged to operations as incurred. Other costs incurred subsequently to add to, replace part of, or service an item of property, plant and equipment, are recognized as asset if, and only if it is probable that future economic benefits associated with the item will flow to the entity and the cost of the item can be measured reliably. When assets are retired or otherwise disposed of, their carrying values and the related accumulated depreciation and any impairment loss are removed from the accounts and any resulting gain or loss is reflected in the current operations.
Sewa
f. Leases
Sewa diklasifikasikan sebagai sewa pembiayaan jika sewa tersebut mengalihkan secara substantial seluruh risiko dan manfaat yang terkait dengan kepemilikan aset. Sewa lainnya, yang tidak memenuhi kriteria tersebut, diklasifikasikan sebagai sewa operasi.
Leases are classified as finance leases whenever the terms of the lease transfer substantially all the risks and rewards of ownership to the lessee. All other leases are classified as operating leases.
Aset yang diperoleh melalui sewa pembiayaan, pada awalnya dicatat sebesar nilai wajar aset sewaan yang ditentukan pada awal kontrak atau, jika lebih rendah, sebesar nilai kini dari pembayaran sewa minimum. Kewajiban kepada lessor disajikan di dalam neraca konsolidasi sebagai kewajiban sewa pembiayaan.
Assets held under finance leases are initially recognized as assets at their fair value at the inception of the lease or, if lower, at the present value of the minimum lease payments. The corresponding liability to the lessor is included in the consolidated balance sheet as a finance lease obligation.
- 19 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
g.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pembayaran sewa harus dipisahkan antara bagian yang merupakan beban keuangan dan bagian yang merupakan pengurangan dari kewajiban sewa sehingga mencapai suatu tingkat bunga yang konstan (tetap) atas saldo kewajiban. Rental kontijen dibebankan pada periode terjadinya.
Lease payments are apportioned between finance charges and reduction of the lease obligation so as to achieve a constant rate of interest on the remaining balance of the liability. Contingent rentals are recognized as expenses in the periods in which they are incurred.
Pembayaran sewa operasi diakui sebagai beban dengan dasar garis lurus (straight-line basis) selama masa sewa, kecuali terdapat dasar sistematis lain yang dapat lebih mencerminkan pola waktu dari manfaat aset yang dinikmati pengguna. Rental kontijen diakui sebagai beban di dalam periode terjadinya.
Operating lease payments are recognized as an expense on a straight-line basis over the lease term, except where another systematic basis is more representative of the time pattern in which economic benefits from the leased asset are consumed. Contingent rentals arising under operating leases are recognized as an expense in the period in which they are incurred.
Dalam hal insentif diperoleh dalam sewa operasi, insentif tersebut diakui sebagai kewajiban. Keseluruhan manfaat dari insentif diakui sebagai pengurangan dari biaya sewa dengan dasar garis lurus kecuali terdapat dasar sistematis lain yang lebih mencerminkan pola waktu dari manfaat yang dinikmati pengguna.
In the event that lease incentives are received to enter into operating leases, such incentives are recognized as a liability. The aggregate benefit of incentives is recognized as a reduction of rental expense on a straight-line basis, except where another systematic basis is more representative of the time pattern in which economic benefits from the leased asset are consumed.
Pekerjaan Dalam Pelaksanaan
g.
Pekerjaan dalam pelaksanaan merupakan biaya-biaya yang berhubungan langsung dengan pembangunan aset tetap. Pekerjaan dalam pelaksanaan dinyatakan sebesar biaya perolehan, termasuk biaya pinjaman selama masa pembangunan dari pinjaman yang digunakan untuk pembangunan dan beban penyusutan aset tetap yang digunakan dalam pekerjaan pembangunan. Biaya pinjaman termasuk beban bunga, selisih kurs serta amortisasi biaya emisi obligasi, dikurang hasil investasi atas dana pinjaman yang belum terpakai. Kapitalisasi biaya pinjaman dihentikan ketika pembangunan selesai dan aset tetap siap untuk digunakan. Akumulasi biaya perolehan akan dipindahkan ke masingmasing aset tetap yang bersangkutan pada saat selesai dan siap digunakan.
Construction in Progress Construction in progress represents costs directly related to the construction of property, plant and equipment. Construction in progress is stated at cost, which includes borrowing costs during construction on debts incurred to finance the construction and depreciation of property and equipment that were used in the construction. Borrowing costs include interest expense, foreign exchange differences and amortization of debt issuance costs, less any investment income on the unused proceeds from the borrowings. Capitalisation of borrowing cost ceases when the assets are ready for its intended use. Construction in progress is transferred to the respective property, plant and equipment account when completed and ready for use.
- 20 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
h.
i.
j.
Properti Investasi
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
h. Investment Properties
Properti investasi adalah properti (tanah atau bangunan atau bagian dari suatu bangunan atau kedua-duanya) untuk menghasilkan rental atau untuk kenaikan nilai atau keduaduanya. Properti investasi diukur sebesar nilai perolehan setelah dikurangi akumulasi penyusutan dan setiap akumulasi kerugian penurunan nilai.
Investment properties are properties (land or a builing - or part of building – or both) held to earn rentals or for capital appreciation or both. Investment properties are measured at cost less accumulated depreciation and any accumulated impairment losses.
Tanah dinyatakan berdasarkan biaya perolehan dan tidak disusutkan.
Land is stated at cost and is not depreciated.
Aset Tidak Digunakan Dalam Operasi
i.
Assets Not Used In Operations
Aset tidak digunakan dalam operasi meliputi aset tetap yang untuk sementara waktu tidak digunakan dalam operasi dan aset yang akan dihapuskan. Sebelum tanggal 1 Januari 2008, aset tidak digunakan dalam operasi tidak disusutkan sampai digunakan kembali. Aset yang akan dihapuskan dinyatakan sebesar jumlah terendah antara jumlah tercatat dan nilai realisasi bersih.
This account comprised of property, plant and equipment which are temporarily not used in operations and assets which are held for disposal. Prior to January 1, 2008, assets not used in operations are not depreciated until these assets are used and held in service again. Assets for disposal are stated at the lower of carrying amount or net realizable value.
Efektif tanggal 1 Januari 2008, Perusahaan dan anak perusahaan menerapkan PSAK 16 (Revisi 2007), Aset Tetap, yang menggantikan PSAK 16, Aktiva Tetap dan Aktiva Lain-lain dan PSAK 17, Akuntansi Penyusutan. Aset tetap yang sementara waktu tidak digunakan dalam operasi disusutkan dengan metode dan berdasarkan taksiran masa manfaat ekonomis yang sama dengan aset tetap.
Effective January 1, 2008, the Company and its subsidiaries adopted PSAK 16 (Revised 2007), Property, Plant and Equipment, which supersedes PSAK 16, Fixed Assets and Other Assets and PSAK 17, Accounting for Depreciation. Assets not used in operations are depreciated using the same method and based on the economic useful life of the property, plant and equipment.
Investasi
j.
Investments
Investasi pada perusahaan asosiasi
Investments in associates
Perusahaan asosiasi adalah suatu perusahaan dimana induk Perusahaan dan anak perusahaan mempunyai pengaruh yang signifikan, namun tidak mempunyai pengendalian atau pengendalian bersama, melalui partisipasi dalam pengambilan keputusan atas kebijakan finansial dan operasional investee.
An associate is an entity over which the Company and its subsidiaries are in a position to exercise significant influence, but not control or joint control, through participation in the financial and operating policy decisions of the investee.
- 21 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
k.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Penghasilan, aset dan kewajiban dari perusahaan asosiasi digabungkan dalam laporan keuangan konsolidasi dengan mengunakan metode ekuitas. Investasi pada perusahaan asosiasi dicatat di neraca sebesar biaya perolehan dan selanjutnya disesuaikan untuk perubahan dalam bagian kepemilikan Perusahaan dan anak perusahaan atas aset bersih perusahaan asosiasi yang terjadi setelah perolehan, dikurangi dengan penurunan nilai yang ditentukan untuk setiap investasi secara individu. Bagian Perusahaan dan anak perusahaan atas kerugian perusahaan asosiasi yang melebihi nilai tercatat dari investasi tidak diakui kecuali jika Perusahaan dan anak perusahaan mempunyai kewajiban atau melakukan pembayaran kewajiban perusahaan asosiasi yang dijaminnya, dalam hal demikian, tambahan kerugian diakui sebesar kewajiban atau pembayaran tersebut.
The assets and liabilities and results of operations of associates are incorporated in these consolidated financial statements using the equity method of accounting. Investments in associates are carried in the consolidated balance sheet at cost as adjusted by post-acquisition changes in the Company and its subsidiaries’ share of the net assets of the associate, less any impairment in the value of the individual investments. Losses of the associates in excess of the Company and its subsidiaries’ interest in those associates are not recognized except if the Company and its subsidiaries have incurred obligations or made payments on behalf of the associates to satisfy obligations of the associates that the Company and its subsidiaries have guaranteed, in which case, additional losses are recognized to the extent of such obligations or payments.
Investasi lainnya
Other investments
Investasi dalam saham dengan pemilikan kurang dari 20% yang nilai wajarnya tidak tersedia dan dimaksudkan untuk investasi jangka panjang dinyatakan sebesar biaya perolehan (metode biaya). Bila terjadi penurunan nilai yang bersifat permanen, nilai tercatatnya dikurangi untuk mengakui penurunan tersebut dan kerugiannya dibebankan pada laporan laba rugi tahun yang bersangkutan.
Investments in shares of stock with ownership interest of less than 20% that do not have readily determinable fair values and are intended for long-term investments are stated at cost. The carrying amount of the investments is written down to recognize a permanent decline in the value of the individual investments. Any such write-down is charged directly to current operations.
Deposito berjangka
Time deposits
Deposito berjangka yang jatuh temponya kurang dari tiga bulan namun dijaminkan dan deposito berjangka yang jatuh temponya lebih dari tiga bulan disajikan sebagai investasi jangka pendek dan dinyatakan sebesar nilai nominal.
Time deposits with maturities of three months or less which are pledged as loan collateral and time deposits with maturities of more than three months that are realizable within one year from balance sheet date are presented as short-term investments and are stated at their nominal values.
Beban Ditangguhkan
k. Deferred Charges
Biaya perolehan perangkat lunak dan pengurusan hak legal tanah ditangguhkan dan diamortisasi dengan metode garis lurus selama masa manfaatnya.
Costs of software and legal processing of landrights are deferred and amortized using the straight-line method over their beneficial periods.
- 22 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
l.
Biaya Dibayar Dimuka
l.
Biaya dibayar dimuka diamortisasi selama masa manfaatnya dengan menggunakan metode garis lurus. m.
Kas dan Setara Kas
m. Cash and Cash Equivalents Cash and cash equivalents consist of cash on hand and in banks and all unrestricted investments with maturities of three months or less from the date of placement.
Piutang
n. Accounts Receivable
Piutang dinyatakan dalam jumlah bersih setelah dikurangi penyisihan piutang yang diperkirakan tidak dapat ditagih. Penyisihan piutang tersebut dibentuk berdasarkan penelaahan terhadap keadaan masing-masing piutang pada akhir periode. Piutang dihapuskan dalam periode piutang tersebut dipastikan tidak akan tertagih. o.
Accounts receivable are stated at their nominal value less allowance for doubtful accounts. Allowance for doubtful accounts is provided based on a review of the status of the individual receivable accounts at the end of the year. Receivable is written off when the account is determined to be uncollectible.
Persediaan
o. Inventories
Persediaan dinyatakan berdasarkan biaya perolehan atau nilai realisasi bersih, mana yang lebih rendah. Biaya perolehan ditentukan dengan metode rata-rata bergerak. p.
Inventories are stated at cost or net realizable value, whichever is lower. Cost is determined using the moving average method.
Penurunan Nilai Aset
p. Impairment of Assets
Bila nilai tercatat suatu aset melebihi taksiran jumlah yang dapat diperoleh kembali maka nilai tersebut diturunkan ke jumlah yang dapat diperoleh kembali tersebut, yang ditentukan sebagai nilai tertinggi antara harga jual neto dan nilai pakai. Penurunan nilai aset tersebut diakui sebagai kerugian penurunan nilai aset dan dibebankan sebagai kerugian tahun berjalan. q.
Prepaid Expenses Prepaid expenses are amortized over their beneficial periods using the straight-line method.
Kas dan setara kas terdiri dari kas, bank dan semua investasi yang jatuh tempo dalam waktu tiga bulan atau kurang dari tanggal perolehannya dan tidak dijaminkan serta tidak dibatasi penggunaannya. n.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
When the carrying amount of an asset exceeds its estimated recoverable amount, the asset is written down to its estimated recoverable amount, which is determined as the higher of net selling price or value in use. Impairment of asset is recognized as loss on impairment of asset which is charged to current operations.
Penerusan Pinjaman
q. Two-step Loans
Penerusan pinjaman diakui berdasarkan otorisasi penarikan (Withdrawal Authorization) atau dokumen lain sejenis.
Two-step loans are recognized based on the Withdrawal Authorization (WA) or other similar documents.
- 23 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
r.
Pendapatan Ditangguhkan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
r.
Penerimaan atas biaya penyambungan listrik dari pelanggan ditangguhkan dan diamortisasi sebesar 5% per tahun sejak listrik sudah tersambung. s.
Connection fees received from customers are deferred and amortized at the rate of 5% per annum starting from the connection date.
Biaya Emisi Obligasi
s.
Selisih antara hasil emisi bersih dengan nilai nominal merupakan biaya emisi obligasi yang diamortisasi selama jangka waktu obligasi yang bersangkutan dengan metode garis lurus. t.
Issuance Costs of Bonds The difference between the net proceeds and the nominal value is amortized using the straight-line method over the term of the bonds.
Pengakuan Pendapatan dan Beban
t.
Pendapatan penjualan listrik diakui berdasarkan pemakaian energi listrik (kWh), sedangkan beban diakui sesuai manfaatnya pada tahun yang bersangkutan (accrual basis).
u.
Deferred Revenue
Revenue and Expense Recognition Revenue from sale of electricity is recognized based on electricity usage (kWh). Expenses are recognized when incurred (accrual basis).
Pembelian Tenaga Listrik
u. Purchase of Electricity
Perusahaan dan anak perusahaan memiliki sejumlah perjanjian jual beli tenaga listrik (PPA dan ESC) dengan penyedia dan pengembang tenaga listrik swasta (IPP). Dalam perjanjian tersebut, Perusahaan dan anak perusahaan membayar pasokan tenaga listrik yang disediakan oleh IPP sebesar jumlah yang ditentukan berdasarkan formula pembayaran. Pembayaran tersebut mencakup komponen biaya berbeda yaitu komponen kapasitas dan energi untuk PPA, komponen sumberdaya dan pembangkitan untuk ESC, dan pembayaran untuk komponen operasional dan pemeliharaan yang tergantung pada tingkat pasokan energi serta variabel lain yang ditentukan dalam perjanjian.
The Company and its subsidiaries have various Power Purchase Agreements (PPA) and Energy Sales Contracts (ESC) with Independent Power Producers (IPP). Under those contracts, the Company and its subsidiaries pay IPP for the supply of energy at an amount determined in accordance with the payment formula in which payment for different cost components, such as capacity and energy components for the PPA, resource and generation components for the ESC, as well as payment for operations and maintenance components, depends on the level of energy supplied and other variables stipulated in the agreement.
Biaya pembelian tenaga listrik dari IPP diakui pada saat terjadinya berdasarkan ketentuan kontrak dan disajikan sebagai beban pembelian tenaga listrik dalam laporan laba rugi konsolidasi.
The costs of energy purchased from IPP are recognized as incurred based on the terms of the contracts, and presented in the consolidated statements of income as purchased electricity.
- 24 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
v.
Subsidi Pemerintah
v. Government Subsidy
Subsidi listrik Pemerintah yang diberikan melalui Perusahaan diakui sebagai pendapatan atas dasar akrual yang dihitung berdasarkan ketentuan Peraturan Menteri Keuangan Republik Indonesia. Perbedaan antara jumlah subsidi listrik yang telah diakui sebagai pendapatan dan hasil perhitungan final subsidi listrik dicatat pada saat perhitungan final subsidi listrik diperoleh.
w.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Government subsidy of electricity is recognized as revenue on accrual basis which is computed in accordance with the provisions stipulated in the Rule of Ministry of Finance of the Republic of Indonesia. The difference between the amount of electricity subsidy recognized as revenue and the final result of electricity subsidy computation is recorded when the final result of electricity subsidy computation is obtained.
Imbalan Kerja
w. Employee Benefits
Imbalan Pasca-Kerja
Post-employment benefits
Perhitungan imbalan pasca-kerja ditentukan dengan menggunakan metode Projected Unit Credit. Akumulasi keuntungan dan kerugian aktuarial bersih yang belum diakui yang melebihi 10% dari jumlah yang lebih besar diantara nilai kini kewajiban imbalan pasti atau nilai wajar aset program diakui dengan metode garis lurus selama rata-rata sisa masa kerja yang diprakirakan dari para pekerja dalam program tersebut. Biaya jasa lalu dibebankan langsung, apabila imbalan tersebut menjadi hak atau vested, dan sebaliknya diakui sebagai beban dengan menggunakan metode garis lurus berdasarkan periode rata-rata sampai imbalan tersebut menjadi vested.
Post-employment benefits are determined using the Projected Unit Credit Method. The accumulated unrecognized actuarial gains and losses that exceed 10% of the greater of the present value of the defined benefit obligations and the fair value of plan assets, is recognized on straight-line basis over the expected average remaining service years of the participating employees. Past service cost is recognized immediately to the extent that the benefits are already vested, and otherwise is amortized on a straight-line basis over the average period until the benefits become vested.
Jumlah yang diakui sebagai kewajiban imbalan pasca-kerja di neraca merupakan nilai kini kewajiban imbalan pasca-kerja disesuaikan dengan keuntungan dan kerugian aktuarial belum diakui dan biaya jasa lalu belum diakui, dan dikurangi dengan nilai wajar aset program. Aset yang diakui akibat perhitungan ini, terbatas pada jumlah kerugian aktuarial dan biaya jasa lalu belum diakui, ditambah dengan nilai kini dari manfaat ekonomis yang tersedia dalam bentuk pengembalian dana dari program atau pengurangan iuran masa datang.
The employee benefits obligation recognized in the balance sheet represents the present value of the defined benefit obligation as adjusted for unrecognized actuarial gains and losses and unrecognized past service cost, and reduced by the fair value of plan assets. Any asset resulting from this calculation is limited to unrecognized actuarial losses and past service cost, plus the present value of available refunds and reductions in future contributions to the plan.
Imbalan Kerja Jangka Panjang
Long-term Benefits
- 25 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
x.
y.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perhitungan imbalan kerja jangka panjang ditentukan dengan menggunakan Projected Unit Credit. Biaya jasa lalu dan keuntungan (kerugian) aktuarial diakui langsung pada tahun yang bersangkutan.
Long-term benefits are determined using the Projected Unit Credit Method. Past service cost and actuarial gains (losses) are recognized immediately to the current operations.
Jumlah yang diakui sebagai kewajiban imbalan kerja jangka panjang di neraca merupakan nilai kini kewajiban imbalan kerja pasti.
The long-term employee benefit obligation recognized in the consolidated balance sheets represents the present value of the defined benefit obligation.
Kewajiban Diestimasi
x. Provisions
Kewajiban diestimasi diakui bila Perusahaan dan anak perusahaan memiliki kewajiban kini (baik bersifat hukum maupun konstruktif) sebagai akibat peristiwa masa lalu dan besar kemungkinan Perusahaan dan anak perusahaan diharuskan menyelesaikan kewajiban serta jumlah kewajiban tersebut dapat diestimasi secara andal.
Provisions are recognized when the Company and its subsidiaries have a present obligation (legal or constructive) as a result of a past event, it is probable that the Company and its subsidiaries will be required to settle the obligation, and a reliable estimate can be made of the amount of the obligation.
Jumlah diakui sebagai kewajiban diestimasi merupakan taksiran terbaik yang diharuskan menyelesaikan kewajiban pada tanggal neraca, dengan memperhatikan unsur risiko dan ketidakpastian yang melekat pada kewajiban. Kewajiban diestimasi diukur menggunakan estimasi arus kas untuk menyelesaikan kewajiban kini dengan jumlah tercatatnya sebesar nilai kini dari arus kas tersebut.
The amount recognized as a provision is the best estimate of the consideration required to settle the obligation at the balance sheet date, taking into account the risks and uncertainties surrounding the obligation. Where a provision is measured using the cash flows estimated to settle the present obligation, its carrying amount is the present value of those cash flows.
Bila beberapa atau keseluruhan dari manfaat ekonomis mengharuskan penyelesaian kewajiban diestimasi diharapkan dapat dipulihkan dari pihak ketiga, piutang diakui sebagai aset apabila terdapat kepastian tagihan dapat diterima dan jumlah piutang dapat diukur secara andal.
When some or all of the economic benefits required to settle a provision are expected to be recovered from a third party, the receivable is recognized as an asset if it is virtually certain that reimbursement will be received and the amount of the receivable can be measured reliably.
Pajak Penghasilan
y. Income Tax
Beban pajak kini ditentukan berdasarkan laba kena pajak dalam tahun yang bersangkutan yang dihitung berdasarkan tarif pajak yang berlaku.
Current tax expense is determined based on the taxable income for the year computed using the prevailing tax rates.
- 26 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
z.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Aset dan kewajiban pajak tangguhan diakui atas konsekuensi pajak masa mendatang yang timbul dari perbedaan jumlah tercatat aset dan kewajiban menurut laporan keuangan dengan dasar pengenaan pajak aset dan kewajiban. Kewajiban pajak tangguhan diakui untuk semua perbedaan temporer kena pajak dan aset pajak tangguhan diakui untuk perbedaan temporer yang boleh dikurangkan dan rugi fiskal, sepanjang besar kemungkinan dapat dimanfaatkan untuk mengurangi laba kena pajak pada masa datang.
Deferred tax assets and liabilities are recognized for the future tax consequences attributable to differences between the financial statement carrying amounts of assets and liabilities and their respective tax bases. Deferred tax liabilities are recognized for all taxable temporary differences and deferred tax assets are recognized for deductible temporary differences and tax losses to the extent that it is probable that taxable income will be available in future periods against which the deductible temporary differences and tax losses can be utilized.
Pajak tangguhan diukur dengan menggunakan tarif pajak yang berlaku atau secara substansial telah berlaku pada tanggal neraca. Pajak tangguhan dibebankan atau dikreditkan dalam laporan laba rugi konsolidasi, kecuali pajak tangguhan yang dibebankan atau dikreditkan langsung ke ekuitas.
Deferred tax is calculated at the tax rates that have been enacted or substantively enacted at the balance sheet date. Deferred tax is charged or credited in the consolidated statement of income, except when it relates to items charged or credited directly to equity, in which case the deferred tax is also charged or credited directly to equity.
Aset dan kewajiban pajak tangguhan disajikan di neraca konsolidasi, kecuali aset dan kewajiban pajak tangguhan untuk entitas yang berbeda, atas dasar kompensasi sesuai dengan penyajian aset dan kewajiban pajak kini.
Deferred tax assets and liabilities are offset in the consolidated balance sheet, except if these are for different legal entities, in the same manner the current tax assets and liabilities are presented.
Rugi per Saham
z.
Loss per Share
Rugi per saham dasar dihitung dengan membagi rugi bersih residual dengan jumlah rata-rata tertimbang saham beredar pada tahun yang bersangkutan.
Basic loss per share is computed by dividing net loss by the weighted average number of shares outstanding during the year.
Rugi per saham dilusian dihitung dengan membagi rugi bersih residual dengan jumlah rata-rata tertimbang saham biasa yang telah disesuaikan dengan dampak dari semua efek berpotensi saham biasa yang bersifat dilutif.
Diluted loss per share is computed by dividing net loss by the weighted average number of shares outstanding as adjusted for the effects of all dilutive potential ordinary shares.
- 27 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
aa. Informasi Segmen
4.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
aa. Segment Information
Informasi segmen disusun sesuai dengan kebijakan akuntansi yang dianut dalam penyusunan dan penyajian laporan keuangan konsolidasi. Bentuk primer pelaporan segmen Perusahaan dan anak perusahaan adalah segmen geografis sedangkan bentuk sekunder pelaporan segmen adalah segmen usaha.
Segment information is prepared using the accounting policies adopted for preparing and presenting the consolidated financial statements. The Company and its subsidiaries’ primary reporting segment information is based on geographical segment, while their secondary reporting segment information is based on business segment.
Segmen geografis adalah komponen perusahaan yang dapat dibedakan dalam menghasilkan produk atau jasa pada lingkungan (wilayah) ekonomi tertentu dan komponen itu memiliki risiko dan imbalan yang berbeda dengan risiko dan imbalan pada komponen yang beroperasi pada lingkungan (wilayah) ekonomi lain.
A geographical segment is a distinguishable component of an enterprise that is engaged in providing products or services within a particular economic environment and that is subject to risks and returns that are different from those of components operating in other economic environments.
Segmen usaha adalah komponen perusahaan yang dapat dibedakan dalam menghasilkan produk atau jasa (baik produk atau jasa individual maupun kelompok produk jasa terkait) dan komponen itu memiliki risiko dan imbalan yang berbeda dengan risiko dan imbalan segmen lain.
A business segment is a distinguishable component of an enterprise that is engaged in providing an individual product or service or a group of related products or services and that is subject to risks and returns that are different from those of other segments.
ANAK PERUSAHAAN
SUBSIDIARIES
Perusahaan memiliki saham anak perusahaan baik langsung maupun tidak langsung sebagai berikut :
The Company has ownership interests, directly or indirectly, in the following subsidiaries :
- 28 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Anak Perusahaan/ Subsidiaries PT Indonesia Power (IP) dan anak perusahaan/ and its subsidiaries
Domisili/ Domicile
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Jenis Usaha/ Nature of Business
Persentase pemilikan/ Percentage of Ownership 2009 2008
Jakarta
Pembangkitan tenaga listrik/ Power generation
PT Cogindo Dayabersama (CDB) *)
Jakarta
Cogeneration, pemasok energi, jasa pelayanan, dan manajemen/Cogeneration, energy distribution, energy service and management
PT Artha Daya Coalindo (ADC) *)
Jakarta
Perdagangan batu bara/ Coal trading
60.0
PT Indo Pusaka Berau (IPB) ***)
Berau
Pembangkitan tenaga listrik/ Power generation
PT Indo Ridlatama Power (IRP) *)
Kutai
Pembangkitan tenaga listrik/ Power generation
100.0
Jumlah aset sebelum eliminasi/ Total assets before elimination **) 2009 2008
1995
57,302
60,876
1999
475
71
60.0
1999
50
50
50.0
50.0
2005
158
155
55.0
-
****)
2
100.0
100.0
1995
38,766
42,011
99,9
100.0
Tahun Operasi Komersial/ Year of Commercial Operations
99,9
-
PT Pembangkitan Jawa Bali (PJB) dan anak perusahaan/ and its subsidiaries
Surabaya
Pembangkitan tenaga listrik/ Power generation
PT PJB Service (PJBS) *)
Surabaya
Jasa/Service
95.0
95.0
2001
99
49
Jakarta
Jasa listrik dan enjiniring/ Electricity and engineering
92.1
68.1
2004
180
37
PT Pelayanan Listrik Nasional Batam (PLN Batam)
Batam
Penyediaan tenaga listrik/ Electricity supplier
100.0
100.0
2000
1,823
1,746
PT Indonesia Comnets Plus (ICON)
Jakarta
Jasa penyediaan jaringan telekomunikasi/ Telecommunication provider
100.0
100.0
2000
852
572
PT Prima Layanan Nasional Enjiniring (PLNE)
Jakarta
Jasa enjiniring, pengadaan dan konstruksi/Engineering, procurement and construction
99.3
99.3
2003
98
73
Penyediaan tenaga listrik/ Electricity supplier
100.0
100.0
2004
235
233
Belanda/ The Netherlands
Lembaga keuangan/ Finance
100.0
100.0
2006
23,988
18,918
Majapahit Finance B.V. (MF) *)
Belanda/ The Netherlands
Lembaga keuangan/ Finance
100.0
100.0
2006
22,439
19,828
PT PLN Batubara (PLN Batubara)
Jakarta
Perdagangan batubara/ Coal trading
100.0
-
****)
23
PT Rekadaya Elektrika (RDE) *)
PT Pelayanan Listrik Nasional Tarakan (PLN Tarakan) Majapahit Holding B.V. (MH) dan anak perusahaan/ and its subsidiary
Tarakan
*) Pemilikan tidak langsung/Indirect ownership **) Dalam miliaran Rupiah/stated in billions of Rupiah ***) IP mempunyai hak mengatur dan menentukan kebijakan keuangan dan operasi IPB, sehingga laporan keuangan IPB dikonsolidasikan/IP has the power to govern IPB's financial and operating policies, hence its financial statements have been consolidated ****) Dalam tahap pengembangan/Under development stage
- 29 -
-
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pada tahun 2008, RDE meningkatkan modal disetor sebesar Rp 75.369 juta. PJB dan IP melakukan penyetoran atas seluruh peningkatan modal disetor tersebut.
In 2008, RDE increased its paid-up capital amounting to Rp 75,369 million. PJB and IP subscribed all of such increase in paid-up capital. In 2008, the Company established PT PLN Batubara.
Pada tahun 2008, Perusahaan mendirikan PT PLN Batubara.
ASET TETAP
5.
1 Januari/ January 1, 2009 Biaya perolehan Pemilikan langsung Tanah Bangunan umum, waduk dan prasarana Instalasi dan mesin pembangkit Perlengkapan transmisi Perlengkapan distribusi Perlengkapan umum Kendaraan bermotor Material cadang Perlengkapan pengolahan data dan telekomunikasi Sub-jumlah Aset sewaan Tanah Instalasi dan mesin pembangkit Sub-jumlah Jumlah Akumulasi penyusutan Pemilikan langsung Bangunan umum, waduk dan prasarana Instalasi dan mesin pembangkit Perlengkapan transmisi Perlengkapan distribusi Perlengkapan umum Kendaraan bermotor Material cadang Perlengkapan pengolahan data dan telekomunikasi Sub-jumlah Aset sewaan Instalasi dan mesin pembangkit Jumlah Jumlah Tercatat
Penambahan/ Additions
Pengurangan/ Deductions
PROPERTY, PLANT AND EQUIPMENT
Reklasifikasi/ Reclassifications
31 Maret/ March 31, 2009
7,710,976
3,976
1,904
(13,700)
7,699,348
28,411,869
49,077
19,604
38,768
28,480,109
96,967,754 52,704,164 66,502,744 3,644,191 601,977 396,646
464,589 565,671 568,251 65,624 16,178 42,341
260,037 25,006 32,089 5,126 14,983 48
1,685 (284,435) 1,524 (295) 3 (25,088)
97,173,991 52,960,394 67,040,430 3,704,394 603,174 413,851
2,885,180 259,825,501
52,879 1,828,585
590 359,388
488 (281,051)
2,937,957 261,013,648
58,591 15,767,182 15,825,773 275,651,274
1,828,585
-
-
359,388
58,591
(281,051)
6,553,869
233,158
8,401
34,132,417 11,207,181 20,643,156 2,621,140 470,325 136,438
1,216,230 454,286 625,279 101,483 15,432 8,549
134,699 11,644 15,893 4,778 3,661 42
(3,043) 1,625 5,450 252 2 (3,203)
35,210,905 11,651,449 21,257,992 2,718,096 482,099 141,742
1,582,435 77,346,961
57,669 2,712,086
307 179,427
81 1,884
1,639,878 79,881,504
1,289,600 78,636,561
145,992 2,858,079
179,427
1,884
1,435,592 81,317,096
197,014,713
719
15,767,182 15,825,773 276,839,420
6,779,345
195,522,323
- 30 -
At cost Direct acquisitions Land Buildings, reservoir and infrastructure Installation and power plant Transmission equipment Distribution equipment General equipment Motor vehicles Spare parts Telecommunication and data processing equipment Subtotal Leased assets Land Installation and power plant Subtotal Total Accumulated depreciation Direct acquisitions Buildings, reservoir and infrastructure Installation and power plant Transmission equipment Distribution equipment General equipment Motor vehicles Spare parts Telecommunication and data processing equipment Subtotal Leased assets Installation and power plant Total Net Carrying Value
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan 1 Januari/ January 1, 2008 Biaya perolehan atau penilaian kembali Pemilikan langsung Tanah Bangunan umum, waduk dan prasarana Instalasi dan mesin pembangkit Perlengkapan transmisi Perlengkapan distribusi Perlengkapan umum Kendaraan bermotor Material cadang Perlengkapan pengolahan data dan telekomunikasi Sub-jumlah Aktiva sewa guna usaha Tanah Instalasi dan mesin pembangkit Sub-jumlah Jumlah Akumulasi penyusutan Pemilikan langsung Bangunan umum, waduk dan prasarana Instalasi dan mesin pembangkit Perlengkapan transmisi Perlengkapan distribusi Perlengkapan umum Kendaraan bermotor Material cadang Perlengkapan pengolahan data dan telekomunikasi Sub-jumlah Aktiva sewa guna usaha Instalasi dan mesin pembangkit Jumlah Jumlah Tercatat
Penambahan/ Additions
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pengurangan/ Reklasifikasi/ Deductions Reclassifications
7,541,520
15,071
460
28,112,142
87,941
4,737
(27,531)
28,167,814
94,496,547 50,522,104 63,273,061 3,309,621 595,037 480,204
302,970 68,268 557,404 59,982 1,025 14,145
181,514 6,641 5,303 1,433 598 410
(126,872) (19,800) 119,837 (937) (38) 641
94,491,132 50,563,931 63,944,999 3,367,233 595,425 494,579
2,589,790 250,920,025
28,871 1,135,677
178 201,274
(691) (55,311)
2,617,792 251,799,117
58,591 15,767,182 15,825,773 266,745,797
-
81
31 Maret/ March 31, 2008
-
1,135,677
-
201,274
7,556,212
58,591
(55,311)
390
15,767,182 15,825,773 267,624,890
5,641,911
226,696
1,392
29,724,681 9,457,233 18,296,709 2,236,135 426,420 128,581
1,184,553 440,580 606,716 93,703 15,254 5,256
37,012 1,162 4,979 1,376 596 256
(25,923) 1,190 24,164 151 (331) (100)
30,846,300 9,897,841 18,922,610 2,328,613 440,748 133,481
1,365,106 67,276,776
50,660 2,623,420
150 46,923
312 (147)
1,415,929 69,853,126
705,630 67,982,406
145,992 2,769,412
46,923
(147)
851,622 70,704,748
198,763,391
196,920,141
Beban penyusutan dialokasi sebagai berikut :
Accumulated depreciation Direct acquisitions Buildings, reservoir and infrastructure Installation and power plant Transmission equipment Distribution equipment General equipment Motor vehicles Spare parts Telecommunication and data processing equipment Subtotal Leased assets Installation and power plant Total Net Book Value
Depreciation expense was allocated to the following : 2009
Beban usaha Pekerjaan dalam pelaksanaan Jumlah
5,867,604
Cost or revalued amount Direct acquisitions Land Buildings, reservoir and infrastructure Installation and power plant Transmission equipment Distribution equipment General equipment Motor vehicles Spare parts Telecommunication and data processing equipment Subtotal Leased assets Land Installation and power plant Subtotal Total
2008
2,765,935 2,511 2,768,446
- 31 -
2,723,354 2,526 2,725,880
Operating expenses Construction in progress Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Reklasifikasi aset tetap pemilikan langsung terutama berasal dari pemindahan pekerjaan dalam pelaksanaan dan aset tidak digunakan dalam operasi masing-masing sebesar Rp 1.205.174 juta dan Rp 366.998 juta tahun 2009 dan sebesar Rp 627.602 juta dan Rp 51.241 juta tahun 2008 (Catatan 6 dan 9).
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Reclassifications of property, plant and equipment – direct acquisitions arise from transfer of construction in progress and assets not used in operations amounting to Rp 1,205,174 million and Rp 366,998 million, respectively, in 2009 and Rp 627,602 million and Rp 51,241 million, respectively, in 2008 (Notes 6 and 9).
Pengurangan aset tetap pemilikan langsung termasuk pemindahan aset tidak digunakan dalam operasi dengan jumlah tercatat sebesar Rp 269.567 juta tahun 2009 dan Rp 25.088 juta tahun 2008.
Deductions of property, plant and equipment include transfer of assets not used in operations with net carrying value of Rp 269,567 million in 2009 and Rp 25,088 million in 2008.
Perusahaan dan anak perusahaan memiliki beberapa bidang tanah dengan hak legal berupa Hak Pakai dan Hak Guna Bangunan (HGB). Hak pakai tidak mempunyai jangka waktu. Hak guna bangunan berjangka waktu antara 20 tahun sampai dengan 30 tahun yang jatuh tempo antara tahun 2016 sampai dengan 2036. Perusahaan dan anak perusahaan juga mempunyai beberapa bidang tanah yang sedang dalam proses perpanjangan HGB dan pengurusan balik nama menjadi atas nama Perusahaan dan anak perusahaan.
The Company and its subsidiaries own several pieces of land with Rights to Use (Hak Pakai), Building Use Rights (Hak Guna Bangunan). Rights to Use have no expiration date while Building Use Rights will expire between 20 to 30 years until 2016 to 2036. The Company and its subsidiaries also have several pieces of land, which are still being processed for extension and transfer of the certificate in the name of the Company and its subsidiaries.
Pada tanggal 31 Maret 2009, instalasi dan mesin pembangkit serta perlengkapan transmisi diasuransikan kepada beberapa perusahaan asuransi dengan PT Asuransi Tugu Kresna Pratama sebagai penanggung utama terhadap risiko kebakaran dan kemungkinan risiko lainnya dengan jumlah pertanggungan sebesar US$ 12.520 juta dan Rp 677.941 juta, serta aset sewaan diasuransikan kepada PT Asuransi Mitsui Sumitomo Indonesia terhadap risiko kebakaran dan risiko lainnya dengan jumlah pertanggungan sebesar US$ 1.400 juta. Manajemen berpendapat bahwa nilai pertanggungan tersebut cukup untuk menutup kemungkinan kerugian atas aset yang dipertanggungkan. Perusahaan dan anak perusahaan tidak mengasuransikan aset tetap selain instalasi dan mesin pembangkit serta perlengkapan transmisi.
As of March 31, 2009, installation and power plant and transmission equipment were insured to several insurance companies in which PT Asuransi Tugu Kresna Pratama acted as lead underwriter against fire and other possible risks with insurance coverage of US$ 12,520 million and Rp 677,941 million, and leased assets were insured to PT Asuransi Mitsui Sumitomo Indonesia against fire and other possible risks with insurance coverage of US$ 1,400 million. Management believes that the insurance coverage is adequate to cover possible losses on the assets insured. The Company and its subsidiaries do not cover insurance protection for assets other than installation and power plant and transmission equipment.
Pada tanggal 31 Desember 2008, perlengkapan distribusi dengan biaya perolehan sebesar Rp 45.745 juta digunakan sebagai jaminan hutang pada Bank Bukopin (Catatan 30).
As of December 31, 2008, distribution equipment with cost amounting to Rp 45,745 million are used as collateral for loans to Bank Bukopin (Note 30).
Aset sewaan merupakan pembangkit PLTU Tanjung Jati B 2x660 MW.
Leased assets represent the PLTU Tanjung Jati B 2x660 MW power plant.
- 32 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perusahaan dan anak perusahaan melakukan penilaian kembali aset tetap untuk posisi 1 Januari 2002, berdasarkan Surat Keputusan Menteri Keuangan No. 486/KMK.03/2002 tanggal 28 Nopember 2002 dan Surat Keputusan Direktur Jenderal Pajak No. KEP-519/PJ/2002 tanggal 2 Desember 2002. Pada tahun 2002, Perusahaan dan anak perusahaan telah memperoleh persetujuan penilaian kembali aset tetap dan penetapan pajak penghasilan final selisih penilaian kembali aset tetap dari Direktur Jenderal Pajak dalam beberapa surat keputusan.
The Company and its subsidiaries revalued property, plant and equipment as of January 1, 2002. The revaluation was made in accordance with Decision Letter of the Minister of Finance of the Republic of Indonesia No. 486/KMK.03/2002 dated November 28, 2002 and Decision Letter of the Directorate General of Taxes No. KEP519/PJ/2002 dated December 2, 2002. In 2002, the Company and its subsidiaries obtained approval on the revaluation and received decision letters concerning the final income tax on the revaluation increment of such assets from the Directorate General of Taxes.
Penilaian kembali aset tetap Perusahaan dan anak perusahaan tersebut dilakukan oleh PT Sucofindo Appraisal Utama, penilai independen dengan laporannya No. 124-REV/SAU-APP/PST/XII/02 tanggal 28 Pebruari 2003. Penilaian kembali aset tetap menggunakan metode pendekatan biaya dan harga pasar.
The revaluation of the Company and its subsidiaries’ property, plant and equipment was conducted by PT Sucofindo Appraisal Utama, an independent appraiser, in its report No. 124REV/SAU-APP/PST/XII/02 dated February 28, 2003. The revaluation was determined using the cost and market approach method.
Selisih penilaian kembali aset tetap Perusahaan dicatat dalam akun “Selisih Penilaian Kembali Aset Tetap” sebagai bagian dari ekuitas (Catatan 23). Selisih penilaian kembali aset tetap anak perusahaan dicatat oleh Perusahaan berdasarkan persentase pemilikan Perusahaan pada anak perusahaan dan disajikan dalam akun “Selisih Transaksi Perubahan Ekuitas Anak Perusahaan” sebagai bagian dari ekuitas (Catatan 24). Pada awal penerapan PSAK 16 (Revisi 2007) nilai penilaian kembali aset tetap dianggap sebagai biaya perolehan (deemed cost) dan saldo selisih penilaian kembali aset tetap dan selisih transaksi perubahan ekuitas anak perusahaan yang sebelumnya dicatat sebagai bagian dari ekuitas direklas ke saldo laba.
The revaluation increment on the Company’s property, plant and equipment was presented “Revaluation increment on property, plant and equipment” account as part of equity (Note 23). The revaluation increment of the subsidiaries’ property, plant and equipment was recognized by the Company based on percentage of the Company’s ownership in the subsidiaries and presented in ”Difference due to changes of equity in subsidiaries” account as part of equity (Note 24). On initial adoption of PSAK 16 (Revised 2007) the revalued amount of those assets are considered as deemed cost and the balance of the revaluation increment and difference due to changes in equity of subsidiaries, which were previously recorded as part of equity, are reclassified to retained earnings.
Manajemen berpendapat bahwa tidak terdapat kejadian atau perubahan keadaan yang mengindikasikan penurunan nilai aset tetap pada tanggal neraca.
Management believes that there are no events or changes in circumstances which may indicate an impairment in value of property, plant and equipment as of the balance sheet date.
PEKERJAAN DALAM PELAKSANAAN
6.
Akun ini merupakan biaya-biaya yang terjadi sehubungan dengan pembangunan dan perbaikan/renovasi sarana kelistrikan, sebagai berikut :
CONSTRUCTION IN PROGRESS This account represents costs incurred in relation to the construction and renovation/betterment of power supply facilities, as follows :
- 33 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan 2009 Proyek penugasan - Program percepatan Pembangkitan Transmisi Jumlah Konstruksi rutin Pembangkitan Transmisi Distribusi Perlengkapan Jumlah
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued 2008
34,030,278 2,580,606 36,610,884
7,613,554 800,993 8,414,547
13,896,066 11,120,871 818,610 84,445 62,530,876
7,620,360 8,828,611 829,989 83,522 25,777,028
(i) Program percepatan
Mandatory projects - Fast track program Power plants Transmission Total Regular constructions Power plants Transmission Distribution Equipment Total
(i) Fast track program
Program percepatan (fast track program) merupakan proyek yang ditugaskan Pemerintah kepada Perusahaan (Catatan 55). Pekerjaan dalam pelaksanaan program percepatan meliputi pembayaran uang muka kepada kontraktor, beban pinjaman serta pengeluaran lain yang dapat dikapitalisasi.
Fast track program represents projects mandated by the Government to the Company (Note 55). Construction in progress of fast track program comprise advance payments made to the contractors, borrowing costs and other capitalizable expenditures.
(ii) Konstruksi rutin
(ii) Regular constructions
Pembangkitan
Power Plant
Pekerjaan dalam pelaksanaan pembangkitan terutama merupakan PLTU Labuhan Angin 2 x 115 MW, PLTP Sarulla 300 MW, PLTP Lahendong III 1 x 20 MW, Repowering PLTU Muara Karang 720 MW, proyek penugasan khusus penanggulangan krisis listrik Sumatera Bagian Utara (PLTG Bhel Frame GB kapasitas 34,1 MW dan PLTG GE Frame 9EPG 9171E kapasitas 120 MW), PLTA Ampel Gading 2 x 7,5 MW dan PLTGU Muara Tawar 2 x 100 MW. PLTP Sarulla merupakan proyek pembangkitan listrik tenaga panas bumi yang pada tanggal 23 Januari 2004 diambil alih oleh Perusahaan dari Unocal North Sumatera Geothermal Ltd dengan harga perolehan US$ 60 juta (Catatan 55).
Power plants under construction consist mainly of PLTU Labuhan Angin 2 x 115 MW, PLTP Sarulla 300 MW, PLTP Lahendong III 1 x 20 MW, Repowering PLTU Muara Karang 720 MW, task force project to solve the electricity crisis condition in North Sumatera (PLTG Bhel Frame GB kapasitas 34.1 MW and PLTG GE Frame 9EPG 9171E kapasitas 120 MW), PLTA Ampel Gading 2 x 7,5 MW and PLTGU Muara Tawar 2 x 100 MW. PLTP Sarulla is a geothermal power plant which was taken over by the Company on January 23, 2004 from Unocal North Sumatera Geothermal Ltd. for US$ 60 million (Note 55).
Transmisi
Transmission
Pekerjaan dalam pelaksanaan transmisi terutama merupakan proyek jaringan transmisi T/L 500 kv Jawa – Bali, TL 150 kv untuk luar Jawa-Bali, proyek gardu induk 150 kv serta proyek interkoneksi jaringan.
Transmission under construction consists mainly of projects of transmission lines of T/L 500 kv in Java – Bali, T/L 150 kv outside Java – Bali, substations 150 kv and interconnection of transmission projects.
- 34 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Distribusi
Distribution
Pekerjaan dalam pelaksanaan distribusi merupakan proyek jaringan distribusi tegangan menengah dan rendah 20 kv serta proyek gardu distribusi.
Distribution under construction consists of projects of mid and low voltage distribution lines of 20 kv and distribution substation projects.
Pekerjaan dalam pelaksanaan ini diperkirakan selesai antara tahun 2009 dan 2011.
Constructions in progress are expected to be completed between 2009 and 2011.
Pada tahun 2009 dan 2008 pekerjaan dalam pelaksanaan yang telah selesai dan dipindahkan ke aset tetap masing-masing sebesar Rp 757.125 juta dan Rp 627.602 juta (Catatan 5).
Construction in progress which were completed and reclassified to property, plant and equipment amounted to Rp 757,125 million and Rp 627,602 million in 2009 and 2008, respectively (Note 5).
Biaya pinjaman yang dikapitalisasi ke pekerjaan dalam pelaksanaan adalah sebagai berikut :
Borrowing costs which were capitalized to construction in progress are as follows :
2009 Program percepatan Bunga pinjaman Kerugian kurs mata uang asing Jumlah
2008
487,640 7,710 495,350
-
Fast track program Interest expense Loss on foreign exchange Total
Konstruksi rutin Bunga pinjaman Kerugian (keuntungan) kurs mata uang asing Jumlah
73,552
64,476
44,955 118,507
(84,626) (20,150)
Regular constructions Interest expense Loss (gain) on foreign exchange Total
Jumlah
613,857
(20,150)
Total
Manajemen berpendapat bahwa tidak terdapat kejadian atau perubahan keadaan yang mengindikasikan penurunan nilai pekerjaan dalam pelaksanaan pada tanggal neraca.
Management believes that there are no events or changes in circumstances which may indicate an impairment in value of construction in progress as of the balance sheet date.
PROPERTI INVESTASI
7.
INVESTMENT PROPERTIES
Akun ini merupakan tanah milik PJB yang terletak di Paiton, Jawa Timur dan Asahan, Sumatera Utara yang disewakan kepada atau digunakan oleh penyedia listrik swasta PT Paiton dan PT Bajradaya Sentranusa.
This account pertains to pieces of land owned by PT PJB located in Paiton, East Java and Asahan, North Sumatera, which are rented to or used by independent power producers, PT Paiton and PT Bajradaya Sentranusa.
Estimasi nilai wajar properti investasi pada tanggal 31 Maret 2009 sebesar Rp 166.841 juta yang ditentukan berdasarkan nilai jual objek pajak masing-masing bidang tanah.
The estimated fair value of these investment properties as of March 31, 2009 amounted to Rp 166,841 million, which was determined based on the market value of tax object of each parcel of land.
- 35 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
INVESTASI JANGKA PANJANG
8.
Investasi jangka panjang meliputi penyertaan saham dan kerjasama konsorsium, sebagai berikut :
Domisili/ Domicile Pemilikan langsung/Direct ownership Metode ekuitas/Equity method PT Geo Dipa Energi PT Unelec Indonesia
Pemilikan tidak langsung/ Indirect ownership Metode ekuitas/Equity method PT Daya Citra Mulia
Bandung Jakarta
Banjarmasin
PT Mitra Energy Batam
Batam
PT Sumber Segara Primadaya
Cilacap
PT Dalle Energy Batam
Batam
PT Bajradaya Sentranusa
Asahan
PT Indo Medco Power
Jakarta
PT Tenaga Listrik Jayapura
Jayapura
PT Bukit Pembangkit Innovative
Palembang
Kerjasama Konsorsium/ Consortiums CBE consortium
Batam
IP-NTP consortium
Bandung
Indo Kupang Elektrindo Power consortium
Kupang
Metode biaya/Cost method PT Metaepsi Pejebe Power Generation PT Tenaga Prima Teknologi
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Sumsel/South Sumatera Bengkulu
PT Permata Prima Elektrindo
Jambi
PT Tenaga Listrik Bintan
Pulau Bintan
PT TJK Power
Batam
PT Pura Daya Prima
Palembang
PT Elnusa Prima Elektrika
Palembang
PT Multidaya Prima Elektrindo
Sumsel/South Sumatera
LONG-TERM INVESTMENTS Long-term investments consist of investment in shares of stock and consortiums, as follows :
Jenis usaha/ Nature of business
Tahun operasi komersial/ Commercial operations
Persentase penyertaan/ Percentage of ownership 2009 2008 % %
Pembangkit tenaga listrik/ Electricity supplier Penunjang penyedia tenaga listrik/ Electrical supports
2002
33.00
33.00
1988
32.35
32.35
Pertambangan dan perdagangan batu bara/ Coal mining and trading Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit inovatif/ Innovative power plant
2002
25.00
25.00
2004
30.00
30.00
2006
49.00
49.00
2006
20.00
20.00
*)
26.06
26.06
*)
35.00
35.00
*)
20.00
20.00
*)
20.00
20.00
Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier
*)
55.00
55.00
*)
80.00
80.00
*)
51.00
51.00
Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier Pembangkit tenaga listrik/ Electricity supplier
2007
19.00
19.00
*)
15.00
*)
15.00
15.00
*)
10.00
10.00
*)
10.00
10.00
*)
15.00
15.00
*)
7.50
7.50
*)
15.00
15.00
*) Tahap pengembangan/Development stage
- 36 -
-
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Mutasi penyertaan saham dan kerjasama konsorsium adalah sebagai berikut :
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Changes in investments in shares of stock and consortium are as follows :
2009 Bagian atas laba (rugi) Jumlah bersih asosiasi Jumlah tercatat tahun berjalan/ tercatat 1 Januari 2009/ Penambahan Equity in 31 Maret 2009/ Carrying (pengurangan)/ net income (loss) Carrying amount Additions of associates for amount January 1, 2009 (deductions) the current year March 31, 2009 Metode ekuitas PT Geo Dipa Energi PT Unelec Indonesia PT Daya Citra Mulia PT Mitra Energy Batam PT Sumber Segara Primadaya PT Dalle Energy Batam PT Bajradaya Sentranusa PT Indo Medco Power PT Tenaga Listrik Jayapura PT Bukit Pembangkit Inovative PT Tenaga Prima Teknologi Kerjasama konsorsium Konsorsium CBE Konsorsium lainnya Metode biaya PT Metaepsi Pejebe Power Generation PT Permata Prima Elektrindo PT Tenaga Listrik Bintan PT TJK Power Perusahaan lainnya Jumlah
31,807 82,193 1,365 41,531 121,472 18,662 122,632 1,344 60,448 -
-
-
31,807 82,193 1,365 41,531 121,472 18,662 122,632 1,344 60,448 0
-
-
-
0 1,486
Equity method PT Geo Dipa Energi PT Unelec Indonesia PT Daya Citra Mulia PT Mitra Energy Batam PT Sumber Segara Primadaya PT Dalle Energy Batam PT Bajradaya Sentranusa PT Indo Medco Power PT Tenaga Listrik Jayapura PT Bukit Pembangkit Inovative PT Tenaga Prima Teknologi Consortiums CBE consortium Other consortiums
17,670 1,500 4,000 13,000 7,868
Cost method PT Metaepsi Pejebe Power Generation PT Permata Prima Elektrindo PT Tenaga Listrik Bintan PT TJK Power Other companies
1,152
17,670 1,500 4,000 13,000 7,868 526,646
334
-
334
- 37 -
-
526,978 Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2008 Bagian atas laba (rugi) Jumlah bersih asosiasi Jumlah tercatat tahun berjalan/ tercatat 1 Januari 2008/ Penambahan Equity in 31 Maret 2008/ Carrying (pengurangan)/ net income (loss) Carrying amount Additions of associates for amount January 1, 2008 (deductions) the current year March 31, 2008 Metode ekuitas PT Geo Dipa Energi PT Unelec Indonesia PT Daya Citra Mulia PT Mitra Energy Batam PT Sumber Segara Primadaya PT Dalle Energy Batam PT Bajradaya Sentranusa PT Indo Medco Power PT Tenaga Listrik Jayapura PT Bukit Pembangkit Inovative Kerjasama konsorsium Konsorsium CBE Konsorsium lainnya Metode biaya PT Metaepsi Pejebe Power Generation PT Permata Prima Elektrindo PT Tenaga Listrik Bintan PT TJK Power Perusahaan lainnya Jumlah
34,408 44,724 1,661 39,605 302,103 20,528 173,096 63 2,000 40,498
22,198 20,000
(1,929) (139) -
34,408 44,724 1,661 39,605 324,301 18,599 173,096 (76) 2,000 60,498
-
(1,100) -
183 1,153
Equity method PT Geo Dipa Energi PT Unelec Indonesia PT Daya Citra Mulia PT Mitra Energy Batam PT Sumber Segara Primadaya PT Dalle Energy Batam PT Bajradaya Sentranusa PT Indo Medco Power PT Tenaga Listrik Jayapura PT Bukit Pembangkit Inovative Consortiums CBE consortium Other consortiums
17,670 1,500 1,000 13,000 368
Cost method PT Metaepsi Pejebe Power Generation PT Permata Prima Elektrindo PT Tenaga Listrik Bintan PT TJK Power Other companies
1,283 1,153
17,670 1,500 1,000 13,000 368 694,660
42,198
(3,168)
733,690
Total
Penyertaan saham
Investments in shares of stock
Tambahan penyertaan saham dilakukan sehubungan dengan peningkatan modal dasar pada masing-masing perusahaan investee yang bersangkutan, tanpa mengubah persentase kepemilikan saham.
Additional investments were made in relation to the increase of authorized capital of the related investee without a corresponding change in the percentage of ownership.
PT Geo Dipa Energi
PT Geo Dipa Energi
PT Geo Dipa Energi merupakan perusahaan patungan antara Perusahaan dan Pertamina yang ditujukan untuk melanjutkan pembangunan pembangkit tenaga listrik Dieng dan Patuha yang sebelumnya dimiliki Himpurna California Energy Limited dan Patuha Power Limited.
PT Geo Dipa Energi is a joint venture between the Company and Pertamina. It was established to continue the development of Dieng and Patuha power plant projects previously owned by Himpurna California Energy Limited and Patuha Power Limited.
- 38 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PT Unelec Indonesia (Unindo)
PT Unelec Indonesia (Unindo)
Unindo merupakan perusahaan patungan antara Perusahaan dan Areva T & D Holdings. Biaya perolehan penyertaan saham sebesar Rp 15.073 juta, didasarkan pada Peraturan Pemerintah Republik Indonesia No. 2/1998 tanggal 7 Januari 1998. Pada tahun 2007, Perusahaan menambah penyertaan saham sebesar Rp 4.391 juta. PT Mitra Energy Batam
Unindo is a joint venture between the Company and Areva T & D Holdings. The acquisition cost of investment in shares of stock amounting to Rp 15,073 million was based on the Government Regulation No. 2/1998 dated January 7, 1998. In 2007, the Company increased its investment in shares of stock amounting to Rp 4,391 million. PT Mitra Energy Batam
Pada tahun 2004, PLN Batam mengakuisisi 30% saham PT Mitra Energy Batam dari Yayasan Pendidikan dan Kesejahteraan – PLN.
In 2004, PLN Batam acquired 30% shares of PT Mitra Energy Batam from Yayasan Pendidikan dan Kesejahteraan – PLN.
PT Sumber Segara Primadaya (S2P)
PT Sumber Segara Primadaya (S2P)
PJB memiliki 49% saham pada S2P. Pada tahun 2008 dan 2007, PJB telah meningkatkan penyertaan saham masing-masing sebesar Rp 95.841 juta dan Rp 55.401 juta tanpa mengubah persentase kepemilikan saham.
PJB owned 49% shares of S2P. In 2008 and 2007, PJB increased its investment in shares amounting to Rp 95,841 million and Rp 55,401 million, respectively, without changing its percentage of ownership.
PT Dalle Energy Batam
PT Dalle Energy Batam
Pada tahun 2006, PLN Batam mengakuisisi 20% saham PT Dalle Energy Batam dari PT Medco Power Indonesia. Hutang atas akuisisi saham tersebut dicatat sebagai hutang lain-lain (Catatan 36).
In 2006, PLN Batam acquired 20% of PT Dalle Energy Batam from PT Medco Power Indonesia. Liability arising from such acquisition were recorded as other payables (Note 36).
PT Bajradaya Sentranusa (BDSN)
PT Bajradaya Sentranusa (BDSN)
Pada tahun 2006, PJB memiliki investasi dalam bentuk obligasi wajib konversi, nilai nominal Rp 243.707 juta dengan nilai perolehan Rp 160.000 juta, yang telah dikonversi dengan 243.707 saham BDSN dengan nilai nominal Rp 1 juta per saham, tanpa merubah persentase kepemilikan saham. Penyertaan saham PJB pada BDSN sebanyak 262.707 saham dijaminkan sehubungan dengan hutang BDSN kepada China Huadian Hongkong Company Limited.
In 2006, PJB obtained an investment in Mandatory Convertible Bond with par value of Rp 243,707 million at an acquisition cost of Rp 160,000 million. This has been converted into 243,707 BDSN’s shares with par value of Rp 1 million per share. Investment in stock of PJB in BDSN, consisting of 262,707 shares, were pledged as security for the loan of BDSN from China Huadian Hongkong Company Limited.
- 39 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PT Tenaga Listrik Jayapura (TLJ) dan PT Tenaga Listrik Bintan (TLB)
PT Tenaga Listrik Jayapura (TLJ) and PT Tenaga Listrik Bintan (TLB)
TLJ dan TLB didirikan berdasarkan Perjanjian Usaha Patungan tanggal 4 Oktober 2006 antara PLN Tarakan dengan pihak ketiga. Pendirian TLJ dan TLB dimaksudkan untuk membangun, pengoperasian dan perawatan proyek PLTU 2x10 MW, termasuk penjualan tenaga listrik ke Perusahaan. Berdasarkan perjanjian tersebut, PLN Tarakan berkewajiban berpartisipasi membiayai kedua proyek sebesar US$ 9,6 juta. Piutang ini akan dikembalikan setelah proyek beroperasi komersial. Pada tahun 2008, PLN Tarakan telah mendanai masing-masing proyek sebesar US$ 808.368 dan US$ 78.345 yang dicatat sebagai piutang pihak hubungan istimewa (Catatan 10).
TLJ and TLB were established in accordance with Joint Venture Agreements dated October 4, 2006 between PLN Tarakan and third parties. These were established to build, operate and maintain a PLTU 2x10 MW project, including sale of electricity to the Company. Based on the agreement, PLN Tarakan has an obligation to participate in financing both projects amounting to US$ 9.6 million. This financing will be recovered upon commercial operations of the projects. In 2008, PLN Tarakan financed each of the project for US$ 808,368 and US$ 78,345, which were recorded as receivables from related parties (Note 10).
Pada tahun 2008, PLN Tarakan meningkatkan penyertaan saham pada TLB sebesar Rp 3.000 juta dengan memperhitungkan piutang kepada TLB. Berdasarkan Rapat Umum Pemegang Saham Luar Biasa TLJ tanggal 17 Juni 2008, diputuskan untuk membubarkan TLJ. Sehubungan dengan rencana pembubaran tersebut, PLN Tarakan mengakui penurunan nilai investasi sebesar Rp 656 juta. Sampai dengan penerbitan laporan keuangan konsolidasi pembubaran TLJ masih dalam proses.
In 2008, PLN Tarakan increased its investment in shares amounting to Rp 3,000 million by offsetting receivables from TLB. Based on the Extraordinary Stockholders’ Meeting of TLJ dated June 17, 2008, it was agreed that TLJ will be liquidated. In relation to such plan of liquidation, PLN Tarakan recognized impairment of investment amounting to Rp 656 million. As of the date of the issuance of the consolidated financial statements, liquidation of TLJ is still in process.
- 40 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PT Bukit Pembangkit Innovative (BPI)
PT Bukit Pembangkit Innovative (BPI)
Sehubungan dengan penyertaan saham di BPI, PJB berkewajiban untuk mengambil dan membayar saham hingga tahun 2009 sebesar US$ 14.460.000. Pada tahun 2008 dan 2007, PJB telah melakukan penyetoran saham masing-masing sebesar Rp 20.000 juta dan Rp 40.940 juta.
In relation to the investment in BPI, PJB is obliged to take and pay for shares until 2009 amounting to US$ 14,460,000. In 2008 and 2007, PJB made payment of shares amounting Rp 20,000 million and Rp 40,940 million, respectively.
Berdasarkan akta gadai saham No. 20 tanggal 6 Maret 2008 dari Imas Fatimah S.H., notaris di Jakarta, PJB menjaminkan 12.000 sahamnya di BPI sehubungan dengan fasilitas kredit yang diperoleh BPI dari Bank Mandiri.
According to deed of pledge No. 20 dated March 6, 2008 from Imas Fatimah S.H., notary in Jakarta, PJB used its 12,000 shares in BPI as a guarantee of the credit facility obtained by BPI from Bank Mandiri.
PT Metaepsi Pejebe Power Generation (Meppogen)
PT Metaepsi Pejebe Power Generation (Meppogen)
Sehubungan dengan penyertaan saham di Meppogen, PJB berkewajiban menyetorkan modal sebesar 19% dari nilai total modal ditempatkan Meppogen. PJB juga memiliki kewajiban untuk menyediakan fasilitas pelatihan bagi calon operator dan teknisi pemeliharaan PLTG Gunung Megang milik Meppogen. Selain itu, PJB berkewajiban memberikan pengarahan dan petunjuk pengoperasian dan pemeliharaan peralatan PLTG Gunung Megang.
In relation to the investment in Meppogen, PJB is obliged to subscribe 19% of total subscribed capital stock of Meppogen. PJB is also obliged to prepare training facilities for candidates of maintenance operator and maintenance technician of PLTG Gunung Megang, owned by Meppogen. Also, PJB is obliged to provide instructions and guidelines for equipment operations and maintenance of PLTG Gunung Megang.
PT TJK Power (TJK)
PT TJK Power (TJK)
Pada tahun 2006, PLN Batam mendirikan TJK dengan maksud untuk menjalankan usaha ketenagalistrikan melalui rencana pembangunan Pusat Listrik Tenaga Uap (PLTU) kapasitas 2x55 MW. Pada awalnya TJK sepenuhnya dimiliki oleh PLN Batam. Pada tanggal 2 Oktober 2006, PLN Batam menjual 90% saham TJK kepada PT Petra Unggul Sejahtera (PUS). Selanjutnya, peningkatan penyertaan saham PLN Batam pada TJK sebesar Rp 11.900 juta tahun 2007 sepenuhnya disetor oleh PUS untuk kepentingan PLN Batam, sesuai kesepakatan para pemegang saham TJK tanggal 31 Juli 2006.
In 2006, PLN Batam established TJK, for the purpose of conducting electricity business through construction planning of coal-fired electricity power plants (PLTU) with the capacity of 2x55 MW. Initially, TJK was wholly owned by PLN Batam. On October 2, 2006, PLN Batam sold 90% of its shares to PT Petra Unggul Sejahtera (PUS). Furthermore, the increase of investment of PLN Batam in TJK amounting to Rp 11,900 million in 2007 were fully paid by PUS on behalf of PLN Batam in accordance with TJK’s shareholders agreement dated July 31, 2006.
- 41 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Kerjasama Konsorsium
Consortium
IP dan CDB mengadakan kerjasama konsorsium dengan pihak lain untuk melaksanakan pengembangan proyek-proyek tertentu. IP dan CDB mencatat kerjasama konsorsium sebesar dana yang dikeluarkan untuk proyek-proyek tersebut setelah dikurangi penurunan nilai investasi. Kerjasama konsorsium ini akan diubah menjadi perusahaan patungan dalam bentuk perseroan terbatas pada saat pengembangan proyek selesai atau pada saat perusahaan patungan terbentuk. Pada tahun 2008, CDB menghentikan kerjasama konsorsium CBE. Pada tahun 2009, Perusahaan membentuk kerjasama konsorsium Banko tengah.
IP and CDB entered into several consortium agreements with other parties for the development of certain projects. IP and CDB account for the investment in these consortium agreements at cost based on their funding of such projects, less any impairment. These consortium agreements will be changed into limited joint venture companies when the development of the projects is completed or when the joint venture companies are established. In 2008, CDB ended its CBE Consortium. In 2009, The Company established Banko tengah consortium.
ASET TIDAK DIGUNAKAN DALAM OPERASI
2009 Aktiva akan direlokasi, diperbaiki dan dihapusbuku Biaya perolehan Aktiva tetap akan direlokasi dan belum beroperasi Aktiva tetap akan dihapusbuku Aktiva tetap akan diperbaiki Material akan dihapusbuku Pekerjaan dalam pelaksanaan akan dihapusbuku Jumlah Akumulasi penyusutan atau penurunan nilai Aktiva tetap akan direlokasi Aktiva tetap akan dihapusbuku Aktiva tetap akan diperbaiki Material akan dihapusbuku Pekerjaan dalam pelaksanaan akan dihapusbuku Jumlah Jumlah tercatat
9.
ASSETS NOT USED IN OPERATIONS
2008
1,237,615 1,932,526 421,704 112,142
617,642 1,811,976 258,997 126,156
4,733 3,708,720
4,733 2,819,504
167,476 1,916,116 170,783 106,800
93,770 1,664,913 71,711 102,391
2,145 2,363,320
2,145 1,934,931
1,345,400
884,573
Kerugian penurunan nilai aset adalah sebesar Rp 15.964 juta tahun 2009 dan Rp 12.488 juta tahun 2008 dicatat sebagai beban lain-lain (Catatan 48).
Assets for relocation, disposal and repairs At cost Property, plant and equipment to be relocated and not yet used Property, plant and equipment to be disposed of Property, plant and equipment to be repaired Spare parts to be disposed of Construction in progress to be disposed of Total
Accumulated depreciation or decline in value Property, plant and equipment to be relocated Property, plant and equipment to be disposed of Property, plant and equipment to be repaired Spare parts to be disposed of Construction in progress to be disposed of Total Total
Loss on impairment of property, plant and equipment amounting to Rp 15,964 million in 2009 and Rp 12,488 million in 2008 are recorded as other expenses (Note 48).
- 42 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Aset tertentu yang tidak digunakan dalam operasi dijual seharga Rp 5.982 juta tahun 2009 dan Rp 2.482 juta tahun 2008. Nilai buku aset yang dijual tersebut telah nihil sehingga hasil penjualan aset merupakan keuntungan penjualan aset tidak digunakan dalam operasi (Catatan 48).
Certain assets not used in operations were sold with selling price amounting to Rp 5,982 million in 2009 and Rp 2,482 million in 2008. The book value of such assets were nil, hence proceeds from sale of assets represented gain on sale of assets not used on operations (Note 48).
Aset tetap akan direlokasi terutama merupakan pembangkit PLTG unit 2 Talang Duku, peralatan transmisi dan penyaluran tenaga listrik. Aset tetap akan dihapusbuku merupakan pembangkit PLTD Apung di Nanggroe Aceh Darussalam, instalasi pipa gas di PLTG Priok, rumah dinas dan jaringan distribusi.
Property, plant and equipment to be relocated consist mainly of PLTG unit 2 Talang Duku, transmission and distribution equipment. Property, plant and equipment to be disposed of represent PLTD Apung in Nanggroe Aceh Darussalam, pipe gas installations of PLTG Priok, housing and distribution equipment.
Pada tahun 2009 dan 2008, aset tetap tidak digunakan dalam operasi dipindahkan ke aset tetap masing-masing sebesar Rp 163.464 juta dan Rp 99.636 juta.
In 2009 and 2008, assets not used in operations reclassed to property, plant and equipment amounted to Rp 163,464 million and Rp 99,636 million, respectively.
Manajemen berpendapat bahwa penurunan nilai aset tidak digunakan dalam operasi memadai untuk menutup risiko kerugian penurunan nilai yang mungkin timbul dari aset tersebut.
Management believes that impairment for assets not yet used in operations is adequate to cover possible loss on impairment on value of such assets.
PIUTANG PIHAK HUBUNGAN ISTIMEWA
10. RECEIVABLES PARTIES 2009
PT Sumber Segara Primadaya (US$ 93.492.441 tahun 2009 dan US$ 53.196.633 tahun 2008) PT Metaepsi Pejebe Power Generation PT Dalle Energy Batam PT TJK Power PT Tenaga Listrik Jayapura (US$ 808.368 tahun 2009 dan US$ 812.194 tahun 2008) PT Mitra Energy Batam PT Tenaga Listrik Bintan (US$ 78.345 tahun 2009 dan US$ 406.097 tahun 2008) Direksi dan Karyawan Jumlah
FROM
RELATED
2008
1,116,900 49,275 9,943 18,114
489,788 42,386 22,816 18,114
9,357 2,269
7,486 4,496
907 428,761 1,635,526
3,743 792,535 1,381,364
- 43 -
PT Sumber Segara Primadaya (US$ 96,492,441 in 2009 and US$ 53,196,633 in 2008) PT Metaepsi Pejebe Power Generation PT Dalle Energy Batam PT TJK Power PT Tenaga Listrik Jayapura (US$ 808,368 in 2009 and US$ 812,194 in 2008) PT Mitra Energy Batam PT Tenaga Listrik Bintan (US$ 78,345 in 2009 and US$ 406,097 in 2008) Directors and Officers Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PT Sumber Segara Primadaya (S2P)
PT Sumber Segara Primadaya (S2P)
Pada tanggal 28 Januari 2004, PJB memberikan pinjaman jangka panjang sebesar US$ 52 juta kepada S2P untuk membiayai proyek PLTU Cilacap. Jangka waktu pinjaman sembilan tahun, termasuk masa tenggang dua tahun jatuh tempo 28 Januari 2013 dan dikenakan bunga 12,907% per tahun. Bunga akan diterima dalam 15 kali angsuran semesteran mulai 28 Januari 2006 sampai dengan 28 Januari 2013. Piutang ini dijamin dengan saham milik PT Sumberenergi Sakti Prima (SSP) di S2P sesuai perjanjian penjaminan pinjaman tanggal 6 September 2005. Pinjaman pokok akan diangsur dalam 4 kali angsuran mulai 28 Juli 2011 sampai dengan 28 Januari 2013. Pemberian pinjaman ini telah disetujui dalam Rapat Umum Pemegang Saham Luar Biasa PJB tanggal 14 Januari 2004.
On January 28, 2004, PJB granted a long-term loan of US$ 52 million to S2P for financing of PLTU Cilacap project. This loan will mature in nine years, including two years grace period, due on January 28, 2013 and bears interest at 12.907% per annum. The interest will be received in fifteen (15) semi-annual installments starting January 28, 2006 until January 28, 2013. This receivable is guaranteed with shares of stock in S2P owned by PT Sumberenergi Sakti Prima (SSP) in accordance with the loan collateral agreement dated September 6, 2005. The principal will be collected in four (4) installments starting from July 28, 2011 until January 28, 2013. The loan was approved during the Extraordinary General Meeting of the Stockholders dated January 14, 2004. On June 25, 2007, PJB and SSP signed the amendment of loan collateral agreement. According to such amendment, if S2P fails to pay in full its loan to PJB within 30 days from due date (also called as “period in arrears”), PJB and SSP will bind themselves to pay the interest and/or principal of loan of S2P to PJB, based on their respective percentage of ownerships in S2P. If after 30 days from the period in arrears, S2P does not make the payment, PJB and SSP agreed to transfer their respective shares for liquidation and proceeds resulting from such liquidation will be used to settle S2P’s loan to PJB.
Pada tanggal 25 Juni 2007, PJB dan SSP menandatangani amandemen perjanjian penjaminan pinjaman. Berdasarkan amandemen tersebut, apabila S2P tidak mampu melunasi pinjamannya kepada PJB dalam waktu 30 hari setelah jatuh tempo (disebut sebagai “periode tunggakan”) maka PJB dan SSP bersama-sama mengikatkan diri dan menyanggupi untuk membayar bunga dan/atau pokok pinjaman yang terhutang oleh S2P kepada PJB sesuai persentase kepemilikan masing-masing di S2P. Apabila dalam 30 hari setelah berakhirnya periode tunggakan, S2P tidak melakukan pembayaran, maka PJB dan SSP bersedia menyerahkan saham masing-masing untuk dieksekusi dan dana hasil eksekusi saham tersebut digunakan untuk melunasi hutang kepada PJB. Pelaksanaan amandemen perjanjian penjaminan tersebut sedang dalam tahap negosiasi. Manajemen PJB menghendaki agar amandemen perjanjian penjaminan pinjaman tersebut di atas dapat segera dilaksanakan.
Implementation of the amendment of loan collateral agreement is still in the stage of negotiation. Management of PJB demands the immediate implementation of the amendment of loan collateral agreement.
Pada tahun 2006, PJB menempatkan deposito berjangka sebesar US$ 100 juta di Bank Negara Indonesia sebagai jaminan pinjaman letter of credit yang diperoleh S2P dari bank tersebut. Pada tanggal 11 Juli 2008, deposito berjangka sebesar US$ 50 juta dieksekusi oleh Bank Negara Indonesia sehubungan dengan kegagalan S2P untuk menyelesaikan pinjamannya ke bank tersebut. PJB mencatat pencairan deposito sebesar US$ 50 juta tersebut sebagai piutang.
In 2006, PJB placed time deposits amounting to US$ 100 million in Bank Negara Indonesia as a guarantee of letter of credit obtained by S2P from such bank. On July 11, 2008, Bank Negara Indonesia executed its right, by confiscating the time deposits amounting to US$ 50 million, due to the failure of S2P to settle its unpaid letter of credit. PJB recorded such confiscation of time deposits amounting to US$ 50 million as receivables.
- 44 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pada tanggal 31 Maret 2009 dan 2008, piutang bunga dari S2P masing-masing sebesar US$ 14.122.186 (setara Rp 163.464 juta) dan US$ 10.810.011 (setara Rp 99.636 juta) termasuk dalam piutang pihak hubungan istimewa.
As of March 31, 2009 and 2008, interest on receivable from S2P amounting to US$ 14,122,186 (equivalent to Rp 163,464 million) and US$ 10,810,011 (equivalent to Rp 99,636 million), respectively, were recorded as receivables from related parties.
PT Metaepsi Pejebe Power Generation (Meppogen)
PT Metaepsi Pejebe Power Generation (Meppogen)
ada tahun 2007, PJB memberikan pinjaman yang dapat dikonversi kepada Meppogen sebesar US$ 4,5 juta (setara Rp 42.386 juta) untuk membiayai pembangunan proyek pembangkit listrik tenaga gas di Gunung Megang – Sumatera Selatan. Pinjaman ini dikenakan tingkat bunga SIBOR, ditambah 4% - 5% per tahun dan pembayaran bunga dilakukan secara bulanan. PJB memiliki hak melakukan konversi pinjaman menjadi penyertaan saham dalam jangka waktu satu tahun sejak perjanjian. Jumlah saham konversi akan ditentukan dengan membagi jumlah konversi dengan nilai nominal saham konversi seperti tercantum dalam anggaran dasar Meppogen. Pinjaman ini akan jatuh tempo pada tahun ketiga ditambah premi 15% per tahun. Pada tanggal 31 Desember 2008 dan 2007, piutang bunga dari Meppogen masing-masing sebesar US$ 1.347 (setara Rp 15 juta) dan US$ 105.137 (setara Rp 990 juta), termasuk dalam piutang pihak hubungan istimewa.
In 2007, PJB provided a convertible loan to Meppogen amounting to US$ 4.5 million (equivalent to Rp 42,386 million) which was used to fund the construction of Meppogen gas power plant in Gunung Megang – South Sumatra. This loan bears interest at SIBOR plus 4% - 5% per annum and will be paid monthly. PJB shall have the right to convert those loans into shares after the first year of the agreement. The number of converted shares to be issued shall be determined by dividing the conversion amount by the nominal value of the conversion shares as specified in the Articles of Association of Meppogen. This loan will mature on the third year with added premium of 15% per annum. As of December 31, 2008 and 2007, interest receivable from Meppogen amounted to US$ 1,347 (equivalent to Rp 15 million) and US$ 105,137 (equivalent to Rp 990 million), respectively, which were recorded as receivables from related parties.
PT Dalle Energy Batam dan PT Mitra Energy Batam
PT Dalle Energy Batam and PT Mitra Energy Batam
Piutang kepada PT Dalle Energy Batam dan PT Mitra Energy Batam merupakan piutang atas denda kontrak penyediaan tenaga listrik.
Accounts receivable from PT Dalle Energy Batam and PT Mitra Energy Batam represent receivable on penalty of power purchase contract.
PT TJK Power (TJK)
PT TJK Power (TJK)
Piutang kepada TJK merupakan biaya pengembangan proyek PLTU Tanjung Kasam milik TJK, yang terlebih dahulu dibayar oleh PLN Batam.
Accounts receivable from TJK represent advance payment made by PLN Batam for development cost of PLTU Tanjung Kasam owned by TJK.
- 45 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Karyawan
Officers
Piutang karyawan merupakan pinjaman pemilikan rumah tanpa bunga. Pelunasan piutang dilakukan melalui pemotongan gaji.
Accounts receivable from officers represent noninterest bearing housing loans, which are paid monthly through salary deduction.
Manajemen berpendapat bahwa penyisihan piutang ragu-ragu atas piutang kepada pihak hubungan istimewa memadai untuk menutup kerugian yang mungkin timbul dari tidak tertagihnya piutang.
Management believes that the allowance for doubtful accounts for receivables from related parties is adequate to cover possible losses on uncollectible receivables.
REKENING DAN DEPOSITO BERJANGKA DIBATASI PENGGUNAANNYA
11. RESTRICTED CASH IN BANKS AND TIME DEPOSITS
2009 Angsuran sewa guna usaha dan jaminan operasi Rekening bank Sumitomo Mitsui Banking Corporation, Singapura JPY US$ Jaminan pembelian gas Rekening bank Bank International Indonesia - US$ Deposito berjangka Citibank - US$ Standard Chartered Bank - US$
Jaminan pembelian tenaga listrik,
rekening bank Bank Central Asia Bank Mandiri Jaminan pinjaman bank Deposito berjangka - Bank Bukopin Jaminan bank garansi Rekening pada Bank Mandiri Jumlah Tingkat bunga deposito berjangka per tahun Rupiah US$
2008
4,458,862 464,316
4,191,342 362,530
114,392
90,762
63,136 56,113
50,275 44,466
6,901 6,500
-
5,000
-
Lease installments and operation guarantee Cash in bank Sumitomo Mitsui Banking Corporation, Singapore JPY US$ Collateral for gas purchases Cash in bank Bank International Indonesia - US$ Time deposits Citibank - US$ Standard Chartered Bank - US$
Collateral for purchase of electricity Cash in bank Bank Central Asia Bank Mandiri
Collateral for bank loans Time deposit - Bank Bukopin
Bank guarantee 1,708 5,176,928
6,321 4,745,696
Cash in bank in Bank Mandiri Total
Interest rate per annum on time deposits 6,65% - 13,5% 6,5% - 8,5% Rupiah 3,5% - 3,75% 2,75% - 4,62% US$
- 46 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
ASET TIDAK LANCAR LAIN
12.
2009
OTHER NONCURRENT ASSETS
2008
Biaya ditangguhkan - bersih Hak atas tanah Perangkat lunak Jumlah
38,765 390,724 429,489
27,902 231,099 259,001
Deferred charges - net Landrights Software Total
Biaya dibayar dimuka Sewa tanah dan gedung Pensiun Lain-lain Jumlah
5,508 131 765,535 771,175
2,879 62,758 260,407 326,044
Prepaid expenses Building and land rental Pension Others Total
Uang muka Pengembangan proyek
281,737
2,381,684
Advances Projects development
1,482,401
2,966,729
Total
Jumlah
- 47 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Beban amortisasi biaya ditangguhkan tahun 2009 dan 2008 masing-masing sebesar Rp 26.459 juta dan Rp 23.064 juta.
Amortization expenses of deferred charges in 2009 and 2008 amounted to Rp 26,459 million and Rp 23,064 million.
- 48 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
KAS DAN SETARA KAS
13. CASH AND CASH EQUIVALENTS 2009
Kas Bank Bank Bukopin Rupiah US$ Bank Rakyat Indonesia Rupiah US$ JPY EUR Bank Mandiri Rupiah US$ EUR JPY Bank Negara Indonesia Rupiah US$ EUR Frank Swiss Bank Central Asia Rp US$ JPY Bank Internasional Indonesia Rp US$ EUR Bank Danamon Rp US$ Lain-lain (masing-masing dibawah 5% dari jumlah) Rupiah US$ JPY SGD EUR Jumlah kas dan bank Setara kas - deposito berjangka Bank Bukopin Rupiah US$ Bank Rakyat Indonesia Rupiah US$ Bank Negara Indonesia Rupiah US$ Bank Mandiri Rupiah US$ Lain-lain (masing-masing dibawah 5% dari jumlah) Rupiah US$ Jumlah deposito berjangka Jumlah Kas dan Setara Kas Tingkat bunga deposito berjangka per tahun Rupiah US$
2008
41,616
53,814
2,037,373 81,094
2,519,736 253,166
2,086,069 2,073,880 2 3,225
2,335,956 245,758 119,594 1,132
904,131 433,314 3,071 23
1,460,911 477,456 804 3
1,387,923 214,521 1,379 4,793
1,128,110 184,690 2,679 4,344
85,674 378 105
111,612 58,382 -
112,420 6,549 235
33,781 550 209
103,616 2,407
121,449 19,675
395,552 2,403 14 1
237,968 2,208 78 2
9,981,769
9,374,066
100,100 -
132,500 -
13,600 -
2,000 -
-
5,600 -
25,353 868
245,498 90,422
461,804 9,894 611,619
88,792 120,637 685,449
10,593,388
10,059,515
6,65% - 13,5% 3,5% - 3,75%
4,7% - 11,35% 3,25% - 4,75%
- 49 -
Cash on hand Cash in banks Bank Bukopin Rupiah US$ Bank Rakyat Indonesia Rupiah US$ JPY EUR Bank Mandiri Rupiah US$ EUR JPY Bank Negara Indonesia Rupiah US$ EUR CHF Bank Central Asia Rp US$ JPY Bank Internasional Indonesia Rp US$ EUR Bank Danamon Rp US$ Others (each below 5% of total) Rupiah US$ JPY SGD Total cash on hand and in banks Cash equivalents - time deposits Bank Bukopin Rupiah US$ Bank Rakyat Indonesia Rupiah US$ Bank Negara Indonesia Rupiah US$ Bank Mandiri Rupiah US$ Others (each below 5% of total) Rupiah US$ Total time deposits Total Cash and Cash Equivalents Interest rate per annum on time deposits Rupiah US$
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Rincian kas dan setara kas dalam mata uang asing adalah sebagai berikut :
Details of cash and cash equivalents in foreign currencies are as follows :
2009 Mata uang asli/ Ekuivalen Rp/ Original currency *) Rp equivalent US$ JPY EUR Lain-lain **) Jumlah
244,012,181 1,225,356 516,066 414,163
2008 Mata uang asli/ Ekuivalen Rp/ Original currency *) Rp equivalent
2,824,441 145 7,910 4,794 2,837,289
134,738,418 1,299,692,582 8,562,360 471,501
1,241,884 119,925 124,657 4,346 1,490,811
US$ JPY EUR Others **) Total
*)
Dalam jumlah penuh
*)
In full amount
**)
Kas dan setara kas dalam mata uang asing lainnya disajikan dalam jumlah setara US$, menggunakan kurs tanggal neraca.
**)
Cash and cash equivalents denominated in other foreign currencies are presented as US$ equivalents using the exchange rates prevailing at balance sheet date.
INVESTASI JANGKA PENDEK
14. SHORT-TERM INVESTMENTS
2009 Deposito berjangka Bank Negara Indonesia Rupiah US$ Bank Mandiri Rupiah US$ Bank Rakyat Indonesia Rupiah US$ Bank Bukopin Rupiah US$ Lain-lain (masing-masing dibawah 5% dari jumlah) Rupiah US$ Jumlah Investasi lain-lain Rupiah Jumlah investasi jangka pendek Tingkat bunga deposito berjangka per tahun Rupiah US$
2008
83,000 602,250
1,068,995 1,259,744
138,385 105,120
223,567 487,285
151,500 -
154,000 2,754,301
120,000 2,079,887
122,000 2,667,410
44,000 2,190 3,326,331
36,730 1,884 8,775,916
3,675
6,534
3,330,007
8,782,451
6,65% - 13,5% 4% - 9,75% 3,5% - 3,75% 3,75% - 4,92%
Pada tanggal 31 Maret 2009 dan 2008, investasi jangka pendek dalam mata uang asing masingmasing sebesar US$ 240.988.916 (setara Rp 2.789.447 juta) dan US$ 777.978.099 (setara Rp 7.170.624 juta).
Time deposits Bank Negara Indonesia Rupiah US$ Bank Mandiri Rupiah US$ Bank Rakyat Indonesia Rupiah US$ Bank Bukopin Rupiah US$ Others (each below 5% of total) Rupiah US$ Total Other investments Rupiah Total short-term investments Interest rate per annum on time deposits Rupiah US$
As of March 31, 2009 and 2008, short-term investments in foreign currencies amounted to US$ 240,988,916 (equivalent to Rp 2,789,447 million) and US$ 777,978,099 (equivalent to Rp 7,170,624 million).
- 50 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pada tanggal 31 Maret 2009, deposito berjangka yang digunakan untuk jaminan sebagai berikut :
Bank Bank Bukopin
As of March 31, 2009, time deposits used as guarantee deposits, are as follows :
Jumlah/ Amount 1.331.207
Bank Rakyat Indonesia
Bank Negara Indonesia
Fasilitas/Facility Letter of credit pembelian material pemeliharaan PLTU Teluk Naga/Letter of credit to purchase maintenance material of PLTU Teluk Naga
798.179
Letter of credit pembelian material pemeliharaan PLTU Pelabuhan Ratu/Letter of credit to purchase maintenance material of PLTU Pelabuhan Ratu
286.848
Letter of credit pembelian material pemeliharaan PLTU Rembang/Letter of credit to purchase maintenance material of PLTU Rembang
637.785
Letter of credit pembelian material pemeliharaan PLTU Pacitan/Letter of credit to purchase maintenance material of PLTU Pacitan
10.000
Letter of credit pembelian material pemeliharaan/ Letter of credit to purchase maintenance material
3.000
Pinjaman modal kerja ADC/Working capital loan of ADC
Bank Bumiputera Indonesia
7.500
Pinjaman modal kerja ADC/Working capital loan of ADC
Bank Mandiri
5.130
Fasilitas bank garansi/Bank guarantee facility of PLTD MFO 40 MW Batakan
1.030
Pengadaan batubara IP UBP Suralaya/Procurement of coal of IP UBP Suralaya
Jumlah/Total
3.080.679
PIUTANG USAHA
15. TRADE ACCOUNTS RECEIVABLE 2009
2008
a. Berdasarkan langganan
a. By Debtor
Umum Pemerintah Badan Usaha Milik Negara TNI dan Polri Jumlah Penyisihan piutang ragu-ragu
2,115,971 257,487 14,750 330,987 2,719,195 (428,740)
2,156,324 227,969 9,903 432,434 2,826,630 (363,603)
Public Government State-owned companies Indonesian Armed Forces Total Allowance for doubtful accounts
Bersih
2,290,455
2,463,027
Net
b. Berdasarkan umur
b. By Age Category
1 s/d 90 hari 91 s/d 360 hari Lebih dari 360 hari Jumlah Penyisihan piutang ragu-ragu
1,862,550 635,609 221,037 2,719,195 (428,740)
1,552,681 912,547 361,402 2,826,630 (363,603)
Bersih
2,290,455
2,463,027
Mutasi penyisihan piutang ragu-ragu Saldo awal tahun Penambahan Penghapusan Saldo akhir tahun
(370,688) (212,199) 154,147 (428,740)
- 51 -
(291,609) (108,364) 36,370 (363,603)
1 to 90 days 91 to 360 days More than 360 days Total Allowance for doubtful accounts Net Changes in the allowance for doubtful accounts Balance at beginning of year Additions Write-off Balance at end of year
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Manajemen berpendapat bahwa penyisihan piutang ragu-ragu memadai untuk menutup kerugian yang mungkin timbul dari tidak tertagihnya piutang dan tidak terdapat risiko yang terkonsentrasi secara signifikan atas piutang usaha.
Management believes that the allowance for doubtful accounts is adequate to cover possible losses on uncollectible accounts. Management also believes that there are no significant concentration of credit risk in receivables.
PIUTANG SUBSIDI LISTRIK
16. RECEIVABLES SUBSIDY 2009
Tahun anggaran (Catatan 38) 2007 2008 2009 Jumlah
ELECTRICITY
2008
4,609,587 4,609,587
7,918,044 14,901,430 22,819,474
Dalam tahun 2008, Perusahaan telah menerima piutang subsidi tahun anggaran 2006 sebesar Rp 3.510.920 juta dan piutang subsidi tahun anggaran 2007 sebesar Rp 1.905.132 juta.
Budget years (Note 38) 2007 2008 2009 Total
In 2008, the Company received receivables on electricity subsidy for budget year 2006 amounting to Rp 3,510,920 million and for budget year 2007 amounting to Rp 1,905,132 million.
PIUTANG LAIN-LAIN
17. OTHER RECEIVABLES 2009
Kontraktor Piutang bunga Lain-lain Jumlah
ON
2008
187,103 133,791 237,481 558,374
Manajemen berpendapat bahwa penyisihan piutang ragu-ragu atas piutang lain-lain tidak perlu dibentuk, karena seluruh piutang tersebut dapat ditagih.
80,459 112,804 156,338 349,601
Contractors Interest from accounts receivable Others Total
No allowance for doubtful accounts for other receivables was provided, as management believes that all of these receivables are collectible.
- 52 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PERSEDIAAN
18. 2009
INVENTORIES
2008
Bahan bakar dan pelumas Transformator Switchgear dan jaringan Kabel Alat ukur, pembatas dan kontrol Persediaan umum Jumlah Penyisihan penurunan nilai
6,186,463 217,663 427,448 106,464 303,052 1,582,797 8,823,888 (89,971)
4,958,519 118,889 511,557 200,885 313,009 1,370,700 7,473,558 (72,862)
Fuel and lubricants Transformers Switchgear and networking Wire Meter recording device and control equipment General supplies Total Allowance for the decline in value
Jumlah - Bersih
8,733,917
7,400,696
Net
Mutasi penyisihan penurunan nilai persediaan : Saldo awal tahun Penambahan Saldo akhir tahun
(63,325) (26,646) (89,971)
(61,593) (11,269) (72,862)
Changes in allowance for the decline in value are as follows: Balance at beginning of year Additions Balance at end of year
Manajemen berpendapat bahwa penyisihan yang ditetapkan memadai untuk menutup risiko penurunan nilai persediaan.
Management believes that allowance is adequate to cover possible losses on decline in value of inventories.
Perusahaan dan anak perusahaan tidak menutup asuransi atas persediaan terhadap risiko atas kemungkinan kerugian yang timbul atas persediaan.
The Company and its subsidiaries do not provide any insurance to cover the possible losses in inventories.
PAJAK DIBAYAR DIMUKA
19. 2009
PREPAID TAXES
2008
Pajak penghasilan Pasal 21 Pasal 22 Pasal 23
14 67,183 26,322
17,074 12,126
Income taxes Article 21 Article 22 Article 23
Pasal 25 Pajak pertambahan nilai Lainnya
60,673 13,396 1,496
29,658 27,455 856
Article 25 Value added tax Others
169,085
87,169
Total
Jumlah
- 53 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
BIAYA DIBAYAR DIMUKA DAN UANG MUKA
20.
2009
PREPAID EXPENSES AND ADVANCES
2008
Biaya dibayar dimuka Gaji dan tunjangan Pensiun Premi asuransi Sewa Lain-lain Jumlah
292,369 159,422 46,607 21,129 152,306 671,833
258,655 263,539 59,292 16,099 49,636 647,222
Prepaid expenses Salaries and allowances Pension Insurance Rent Others Total
Uang muka Pembelian barang Lain-lain Jumlah
409,088 94,594 503,682
565,474 57,868 623,342
Advances Purchase Others Total
1,175,515
1,270,564
Jumlah
MODAL SAHAM
Total
21. CAPITAL STOCK
Perusahaan mempunyai modal dasar sebesar Rp 63.000.000 juta yang terbagi atas 63.000.000 saham dengan nilai nominal Rp 1 juta per saham.
The Company has authorized capital of Rp 63,000,000 million consisting of 63,000,000 shares, with par value of Rp 1 million per share.
Berdasarkan Rapat Umum Pemegang Saham Luar Biasa tanggal 18 Juli 2001, sebagaimana dinyatakan dalam akta No. 43 tanggal 26 Oktober 2001 dari Haryanto S.H., notaris di Jakarta, pemegang saham menyetujui antara lain :
Based on the extraordinary stockholder’s meeting dated July 18, 2001, as stated in deed No. 43 dated October 26, 2001 of Haryanto, SH, notary in Jakarta, the stockholders approved to :
Melakukan kompensasi hutang Perusahaan kepada Pemerintah sebesar Rp 28.781.355 juta yang berasal dari tunggakan bunga dan denda penerusan pinjaman menjadi tambahan penyertaan modal Pemerintah. Kompensasi hutang menjadi penyertaan modal telah memperoleh persetujuan Menteri Keuangan Republik Indonesia sesuai surat No. S-352/MK.06/2001 tanggal 20 Juni 2001.
Convert the Company’s payable to Government of Rp 28,781,355 million, which arose from overdue interest and penalty on two-step loans, into Government Equity Participation. The conversion was approved by the Minister of Finance of the Republic of Indonesia in its decision letter No. S-352/MK.06/2001 dated June 20, 2001.
Meningkatkan modal ditempatkan dan disetor sebesar Rp 28.781.354 juta, sehingga modal ditempatkan dan disetor Perusahaan menjadi sebesar Rp 46.107.154 juta, terbagi atas 46.107.154 saham dengan nilai nominal Rp 1 juta per saham.
Increase the subscribed and paid-up capital by Rp 28,781,354 million, resulting to the Company’s total subscribed and paid-up capital of Rp 46,107,154 million consisting of 46,107,154 shares with par value of Rp 1 million per share.
Pada tanggal 1 Agustus 2001, tambahan penyertaan modal Pemerintah tersebut telah ditetapkan dalam Peraturan Pemerintah No. 61 tahun 2001.
On August 1, 2001, the Government issued Government Regulation No. 61 year 2001 in relation to the increase in Government Equity Participation in the Company.
- 54 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
The Company’s shares of stock are wholly owned by the Government of the Republic of Indonesia.
Seluruh saham Perusahaan dimiliki oleh Pemerintah Republik Indonesia.
TAMBAHAN MODAL DISETOR
22. ADDITIONAL PAID-IN CAPITAL
Tambahan modal disetor merupakan tambahan penyertaan modal Pemerintah yang diterima Perusahaan yang statusnya belum ditetapkan, dengan rincian sebagai berikut :
Additional paid-in capital represents Government equity participation received by the Company of which it’s status has not been determined yet, with details as follows :
2009 Bantuan proyek Daftar Isian Pelaksanaan Anggaran Bantuan Pemerintah Daerah dan lainnya Jumlah
2008
16,686,061 13,743,941 690,503 31,120,506
16,865,606 11,167,654 398,459 28,431,719
Project aid List of Project Fund Regional Government participation and others Total
Bantuan proyek merupakan bantuan luar negeri untuk bidang kelistrikan yang diteruskan Pemerintah Republik Indonesia kepada Perusahaan.
Project aid represents overseas aid for electricity project, which was directed by the Government of the Republic of Indonesia to the Company.
Daftar Isian Pelaksanaan Anggaran (DIPA) merupakan penerimaan dari Pemerintah Republik Indonesia dalam bentuk proyek kelistrikan melalui Departemen Pertambangan dan Energi.
List of Project Fund (DIPA) represents electricity projects received from the Government of the Republic of Indonesia through the Department of Mining and Energy.
Bantuan Pemerintah Daerah antara lain berupa tanah dan jaringan listrik yang disumbangkan kepada Perusahaan.
Regional Government participation represents land and electricity equipment donated by the Regional Government to the Company.
SELISIH PENILAIAN KEMBALI ASET TETAP
23. REVALUATION INCREMENT ON PROPERTY, PLANT AND EQUIPMENT
Perusahaan melakukan penilaian kembali aset tetap untuk posisi 1 Januari 2002. Rincian selisih penilaian kembali aset tetap adalah sebagai berikut :
The Company revalued its fixed assets as of January 1, 2002. The details of revaluation increment on property, plant and equipment are as follows :
- 55 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2008
Selisih antara jumlah tercatat dengan nilai penilaian kembali aset tetap (Catatan 5) Pajak penghasilan final atas selisih penilaian kembali aset tetap Pengaruh pajak tangguhan Keuntungan pengalihan aset tetap ditangguhkan Jumlah
77,957,726 (3,678,787) 2,810,162 551,457 77,640,558
Difference between the carrying amount and revalued amount of property, plant and equipment (Note 5) Final income tax on revaluation increment on property, plant and equipment Deferred tax effect Deferred gain on transfer of property, plant and equipment Total
Keuntungan pengalihan aset tetap ditangguhkan berasal dari pengalihan aset tetap Perusahaan kepada PLN Batam dan ICON pada saat pendirian anak perusahaan tersebut.
Deferred gain on transfer of property, plant and equipment resulted from the transfer of the Company’s property, plant and equipment to PLN Batam and ICON, subsidiaries, when they were established.
Sehubungan dengan penerapan PSAK 16 (Revisi 2007) pada tahun 2008, saldo selisih penilaian kembali aset tetap direklasifikasi ke saldo laba.
In relation to the adoption of PSAK 16 (Revised 2007) in 2008, balance of revaluation increment on property, plant and equipment was reclassified to retained earnings.
SELISIH TRANSAKSI PERUBAHAN EKUITAS ANAK PERUSAHAAN
24. DIFFERENCE DUE TO CHANGES OF EQUITY IN SUBSIDIARIES
Akun ini merupakan bagian Perusahaan atas perubahan ekuitas anak perusahaan yang berasal dari selisih penilaian kembali aset tetap anak perusahaan sebagai berikut :
This account represents the Company’s interest on the changes in equity of subsidiaries as a result of revaluation increment on property, plant and equipment of subsidiaries as follows :
2008 Selisih antara jumlah tercatat dengan nilai penilaian kembali aset tetap (Catatan 5) Pajak penghasilan final atas selisih penilaian kembali aset tetap Pengaruh pajak tangguhan Hak minoritas Jumlah
65,946,634 (7,124,851) 1,093,989 (77) 59,915,695
Sehubungan dengan penerapan PSAK 16 (Revisi 2007) pada tahun 2008, anak perusahaan mereklasifikasi saldo selisih penilaian kembali aset tetap ke saldo laba.
Difference between the carrying amount and the revalued amount of property, plant and equipment (Note 5) Final income tax on revaluation increment on property, plant and equipment Deferred tax effect Minority interest Total
In relation to the adoption of PSAK 16 (Revised 2007) in 2008, subsidiaries reclassified revaluation increment on property, plant and equipment to retained earnings.
- 56 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PENDAPATAN DITANGGUHKAN
25. DEFERRED REVENUE
Akun ini merupakan penerimaan dari pelanggan sehubungan dengan penyambungan baru dan penambahan daya listrik pelanggan, dengan rincian sebagai berikut :
This account represents connection fees received from customers for electricity connection and upgrading of electricity power, with details as follows :
2009 Saldo awal tahun Penerimaan tahun berjalan Diakui sebagai pendapatan tahun berjalan Jumlah
2008
6,916,376 929,807 (161,252) 7,684,931
6,916,376 379,117 (151,493) 7,143,999
Balance at beginning of year Additions Recognized as revenue during the year Balance at end of year
26. CUSTOMERS’ SECURITY DEPOSITS
UANG JAMINAN LANGGANAN Akun ini merupakan uang jaminan langganan yang ditentukan berdasarkan besar daya dan golongan tarif. Uang jaminan langganan akan dikembalikan apabila pelanggan berhenti menjadi pelanggan, dengan memperhitungkan rekening listrik belum dibayar, dengan rincian sebagai berikut :
This account represents security deposits from customers determined based on power supply and electricity tariff. Customer deposits will be refunded, net of unpaid electricity bills, when customers discontinue subscribing the electricity. The details are as follows :
2009 Saldo awal tahun Penambahan bersih tahun berjalan Saldo akhir tahun
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2008
4,440,923 1,062,654 5,503,577
PENERUSAN PINJAMAN
4,437,740 231,580 4,669,320
Balance at beginning of year Net additions Balance at end of year
27. TWO-STEP LOANS
Akun ini merupakan pinjaman luar negeri Pemerintah Republik Indonesia yang tidak diikat jaminan dan diteruskan kepada Perusahaan untuk membiayai proyek-proyek Perusahaan. Rincian penerusan pinjaman adalah sebagai berikut :
This account represents overseas, collateral-free loans of the Government of the Republic of Indonesia which are re-loaned to the Company to finance its projects. The details of two-step loans are as follows :
- 57 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Mata uang asing International Bank for Reconstruction and Development (IBRD) Rupiah US$ Asian Development Bank (ADB) Rupiah US$ Kreditanstalt Fur Wiederaufbau, Jerman (KFW) Rupiah EUR US$ United Stated Agency for International Development (USAID) - Rupiah Export-Import Bank of The United States (US Bank Exim) Rupiah US$ Japan Bank for International Cooperation (d/h The Export-Import Bank of Japan) Yen US$ Generale Bank S.A., Belgium and Barclay Bank PLC Rupiah EUR Midland Bank Public Limited Company Konsortium Bank Swiss Banque Paribas Rupiah GBP EUR Ryoshin International (Hongkong) Limited Bank Austria Aktiengesellschaft Rupiah EUR Bank of China China Exim Bank - US$ Nebula Leasing - US$ Mitsui Leasing - US$ Islamic Development Bank - US$ Calyon and BNP Paribas - EUR Fortis Bank Belgia - EUR West Merchant Bank Limited - GBP ABN AMRO N.V. - EUR MKB Hungaria - US$ Efic Australia - AUD Kingdom of Belgium / Kerajaan Belgia - EUR Jumlah
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2009 Ekuivalen Rp Bagian jatuh tempo Bagian dalam satu tahun jangka panjang
Jumlah
Tingkat bunga
Periode
356,161,391
676,785 4,122,568
173,994 447,955
502,791 3,674,613
IBRD + (0,755% - 3,50%) IBRD + 0,5%
1989-2013 1994-2023
191,184,576
1,652,481 2,212,961
249,664 98,369
1,402,818 2,114,592
ADB + (1% - 3,75%) ADB + 0,5%
1990-2016 1995-2027
58,307,785 17,677,912
238,161 893,687 204,622
46,439 76,977 24,073
191,723 816,710 180,549
7,6% - 9% and SBI + 1% 1,25%-5,36% dan KFW + 0,5% 4,75% + 0,5%
1980-2020 1997-2020 2004-2018
2%
1979-2009
1,25% - 4,97% LIBOR + 0,5%
2004-2045 2005-2011
SBI + 1%
1995-2020
3,84% 5,26%-6,39%
1998-2022 2002-2018
4% 3,5% - SBI + 1% 3,5%
1996-2012
LIBOR + 1,2% 8,5% 5% - 5,82% 5,32%
1997-2008 2002-2012 2004-2020 2005-2017
4,81% + 0,5% 4% 0,5%
2004-2018 1998-2022 2005-2033
-
63,164,688,753 38,098,506
-
13,522,124 48,942,730
-
-
-
885 -
885 -
-
7,449,501 440,990
249,753 176,396
7,199,749 264,594
187,545 -
8,840 -
178,705 -
223,916 750,148
15,994 69,756
207,922 680,392
-
5,721,917 117,780,194 2,825 369,726 49,200,931 2,523,171 5,635,809 17,820,160 2,274,705
-
-
87,700 1,363,306 33 4,280 754,105 38,673 65,234 141,655 34,865
25,057 70,398 33 1,223 34,407 2,488 6,867 5,415 -
62,643 1,292,908 3,057 719,698 36,185 58,368 136,240 34,865
21,544,102
1,784,983
19,759,119
- 58 -
2004-2018
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Mata uang asing/ Foreign currencies *) International Bank for Reconstruction and Development (IBRD) Rupiah US$ Asian Development Bank (ADB) Rupiah US$ Kreditanstalt Fur Wiederaufbau, Germany (KFW) Rupiah EUR US$ United Stated Agency for International Development (USAID) - Rupiah Export-Import Bank of The United States Rupiah US$ Japan Bank for International Cooperation JPY US$ Generale Bank S.A., Belgium and Barclay Bank PLC - EUR Midland Bank Public Limited Company Banque Paribas GBP EUR Ryoshin International (Hongkong) Limited Bank Austria Aktiengesellschaft - EUR Bank of China China Exim Bank - US$ Nebula Leasing - USD Mitsui Leasing - US$ Islamic Development Bank - US$ Calyon and BNP Paribas - EUR Fortis Bank Belgia - EUR West Merchant Bank Limited - GBP ABN AMRO N.V. - EUR MKB Hungaria - US$ Efic Australia - AUD Kerajaan Belgia/ Kingdom of Belgium - EUR BNP Paribas & Calyon 1206 - EUR Jumlah/Total
Jumlah/ Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2008 Bagian jatuh tempo dalam satu tahun/ Current maturities
Bagian jangka panjang/ Long-term portion
Tingkat bunga/ Interest rate %
Periode/ Period **) Tahun/Years
377,542,448
900,227 3,479,809
142,544 340,981
757,683 3,138,827
IBRD + (1,65% - 3,50%) IBRD + 0,5%
1987-2013 1994-2023
205,577,864
1,953,123 1,894,811
264,583 82,443
1,688,540 1,812,368
ADB + (1,75% - 3,75%) ADB + 0,5%
1989-2016 1995-2027
30,388,033 59,910,092
300,878 442,411 552,191
48,686 34,481 44,951
252,192 407,930 507,240
7,6%-9% dan/and SBI + 1% KFW + 0,5% 4,75% + 0,35%
1980-2014 1997-2020 2004-2018
1,744
859
885
2%
1979-2009
684,303
6,307
6,307
8% atau/or SBI + 1% 7,04% - 7,1%
1988-2008 1996-2008
35,339,670,723 57,456,001
3,260,846 529,572
165,796 151,733
3,095,051 377,839
4,7% - 4,8% LIBOR + 0,5%
1996-2045 2005-2011
99,371
1,447 203,853
1,447 8,840
195,013
7,1% SBI + 1%
1996-2008 1995-2020
15,443,702 36,795,408
284,020 535,694
18,941 48,017
265,080 487,677
3,84% 6,39%
1998-2022 1996-2018
0 6,868,609 0 107,533,207 138 427,186 414,885 6,317,103 2,648,706 103 4,655,874 5,746,705 19,546,875
99,998 0 991,134 1 3,937 3,824 91,969 38,562 2 67,784 52,967 165,174
22,240 0 19,109 1 3,937 853 0 2,113 2 67,782 4,681 5,709
77,759 972,025 (0) 0 2,971 91,969 36,448 2 48,286 159,465
SBI + 1% 4% 3,5% - SBI + 1% 3,5% - 0,5% LIBOR + 1,2% LIBOR + 1,2% 8% 5,32% 4.82% 6,45% 7,10% 4,81% + 0,5% 4%
1995-2007 1996-2012 1995-2007 2004-2018 1995-2007 1997-2008 1996-2012 2004-2019 2005-2017 1996-2007 1995-2008 2004-2018 1998-2022
3,543,183 28,285,056
29,940 239,013
-
29,940 239,013
4%
2005-2033
-
-
-
16,131,240
1,487,036
- 59 -
1
14,644,204
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perusahaan melakukan pembayaran pokok dan bunga penerusan pinjaman sesuai dengan jadual pembayaran dan memenuhi pembatasanpembatasan yang ditentukan dalam perjanjian penerusan pinjaman.
The Company made payments on principal and interest on two-step loans in accordance with the schedule of payment and complied with the restrictions specified within the agreements of two-step loans.
Rincian penerusan pinjaman dalam mata uang asing adalah sebagai berikut :
Details of two-step loans in foreign currencies are as follows :
2009 Mata uang asli/ Original currency *) US$ JPY EUR Lain-lain **) Jumlah
2008 Mata uang asli/ Original currency *)
Ekuivalen Rp/ Rp equivalent
726,910,938 63,164,688,753 166,971,239 31,582,776
8,413,994 7,449,501 2,559,177 365,571 18,788,243
815,292,831 35,339,670,723 119,601,342 34,990,681
Ekuivalen Rp/ Rp equivalent 7,514,554 3,260,846 1,546,817 449,196 12,771,413
US$ JPY EUR Others **) Total
*)
Dalam jumlah penuh
*)
In full amount
**)
Penerusan pinjaman dalam mata uang asing lainnya disajikan dalam jumlah setara US$, menggunakan kurs tanggal neraca
**)
Two-step loans denominated in other foreign currencies are presented as US$ equivalents using the exchange rates prevailing at balance sheet date
HUTANG KEPADA PEMERINTAH
28. GOVERNMENT LOANS 2009
Rekening Dana Investasi No. RDI-393/DP3/2001 No. RDI-298/DP3/1996 Jumlah Dikurangi bagian jatuh tempo dalam satu tahun No. RDI-393/DP3/2001 No. RDI-298/DP3/1996 Jumlah Bagian jangka panjang
2008
3,378,615 3,378,615
3,672,407 3,672,407
Investment Fund Account No. RDI-393/DP3/2001 No. RDI-298/DP3/1996 Total
293,793 293,793
293,793 293,793
Less current maturities No. RDI-393/DP3/2001 No. RDI-298/DP3/1996 Total
3,084,823
3,378,615
- 60 -
Long-term portion
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Rekening Dana Investasi No. RDI-393/ DP3/2001
Investment Fund Account No. RDI-393/ DP3/2001
Pada tanggal 20 Juni 2000, Perusahaan dan Pemerintah menyetujui restrukturisasi tunggakan angsuran pokok penerusan pinjaman sebesar Rp 5.288.268 juta sesuai dengan Surat Menteri Keuangan Republik Indonesia No. S-352/MK.06/2001 menjadi pinjaman berjangka waktu 20 tahun termasuk tenggang waktu 2 tahun. Pinjaman ini dikenakan bunga 4% per tahun dan tanpa jaminan. Pinjaman ini dibayar secara angsuran setiap semester sebesar Rp 146.896 juta sampai dengan 30 Juli 2021.
On June 20, 2000, the Company and the Government of the Republic of Indonesia agreed to restructure the overdue principal of two-step loans amounting to Rp 5,288,268 million as stated on the letter of the Ministry of Finance of the Republic of Indonesia No. S-352/MK.06/2001. The new loan is unsecured, has a period of 20 years, including 2 years grace period and bears interest at 4% per annum. The loan will be paid in semi-annual installment of Rp 146,896 million until July 30, 2021.
Rekening Dana Investasi No. RDI-298/DP3/1996
Investment Fund Account No. RDI-298/DP3/1996 The Company obtained from the Government of the Republic of Indonesia an investment loan facility of Rp 230,000 million, with terms of 12 years including 2 years grace period. The loan was used for prepayment of export credit in financing the development of PLTGU Muara Tawar. The loan will be paid in semi-annual installment of Rp 11,500 million until March 13, 2008 and bears interest at 9% per annum for the first 6 years, and for the succeeding years, at an average of the quarterly interest rates of Certificate of Bank Indonesia from the prior 6 months period.
Perusahaan memperoleh fasilitas pinjaman investasi dari Pemerintah Republik Indonesia sebesar Rp 230.000 juta, jangka waktu 12 tahun termasuk 2 tahun masa tenggang. Pinjaman ini digunakan untuk pembiayaan uang muka kredit ekspor dalam rangka pembangunan PLTGU Muara Tawar dan dibayar secara angsuran setiap semester sebesar Rp 11.500 juta sampai dengan 13 Maret 2008. Pinjaman ini dikenakan bunga 9% per tahun untuk periode 6 tahun pertama dan untuk periode selanjutnya dikenakan bunga sesuai tingkat bunga rata-rata 3 bulanan Sertifikat Bank Indonesia selama 6 bulan periode sebelumnya.
HUTANG SEWA PEMBIAYAAN
29. LEASE LIABILITY
Akun ini merupakan hutang kepada PT Central Java Power (CJP) dalam rangka perjanjian sewa pembiayaan atas pengadaan pembangkitan tenaga listrik 2 x 660 MW Tanjung Jati B unit A dan B.
This account represents payable to PT Central Java Power (CJP) in relation to Financial Lease Agreement on the acquisition of Tanjung Jati B Unit A and B power plant 2 x 660 MW.
Pembayaran minimum sewa pembiayaan berdasarkan perjanjian sewa adalah sebagai berikut :
In accordance with the lease agreement, the future minimum lease payments are as follows :
- 61 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Pembayaran jatuh tempo dalam waktu : Tidak lebih dari 1 tahun Antara lebih dari 1 tahun sampai 2 tahun Lebih dari 2 tahun Jumlah pembayaran minimum sewa guna usaha Dikurangi bunga Nilai tunai pembayaran minimum sewa guna usaha masa datang Dikurangi bagian jatuh tempo dalam waktu satu tahun Bagian jangka panjang
2009
2008
2,676,583
2,094,017
2,676,583 22,932,257
2,094,017 19,521,255
28,285,423 (8,917,422)
23,709,289 (7,603,206)
19,368,001
16,106,083
Total minimum lease payments Less interest Present value of future minimum lease payments
(1,308,030) 18,059,971
(953,586) 15,152,497
Less current maturity Long-term lease liabilities - net
Nilai tunai pembayaran minimum sewa pembiayaan masa datang berdasarkan jatuh tempo adalah sebagai berikut : 2009
Pembayaran jatuh tempo dalam waktu : Tidak lebih dari 1 tahun Antara lebih dari 1 tahun sampai 2 tahun Lebih dari 2 tahun Nilai tunai pembayaran minimum sewa guna usaha masa datang
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Minimum lease payments due : Not later than 1 year Later than 1 year and not later than 2 years Later than 2 years
Present value of future minimum lease payments by maturity date are as follows :
2008
1,308,030
953,586
1,403,702 16,656,269
958,564 14,193,933
19,368,001
16,106,083
- 62 -
Minimum lease payments due : Not later than 1 year Later than 1 year and not later than 2 years Later than 2 years Present value of future minimum lease payments
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perusahaan dan CJP mengadakan perjanjian sewa pembiayaan (Financial Lease Agreement - FLA) yang mengatur antara lain bahwa CJP akan menyewakan pembangkit selama 20 tahun sejak operasi komersial atau tanggal batas maksimum keterlambatan setelah 31 Juli 2003, mana yang lebih dahulu dan Perusahaan memiliki hak opsi untuk membeli pembangkit pada akhir masa sewa, atau sebelum masa FLA berakhir sebesar jumlah tertentu sesuai dengan Call Right Agreement. FLA mensyaratkan Perusahaan mengoperasikan pembangkit sesuai dengan Operation and Maintenance Agreement (O&M Agreement). Biaya perolehan aset sewaan diperkirakan sebesar JPY 184.545 juta sesuai dengan FLA. Pembayaran minimum sewa pembiayaan tengah tahunan untuk satu unit adalah sebesar Rp 404.408 juta dan US$ 4,23 juta sebelum disesuaikan dengan faktor antara lain kurs konversi mata uang JPY, tingkat bunga dan tingkat pengembalian investasi sesuai dengan formula yang dinyatakan dalam FLA. Pembayaran minimum sewa pembiayaan tengah tahunan setelah disesuaikan dengan formula dan faktor kondisi pada tanggal FLA adalah sebesar JPY 11.289 juta untuk unit A dan B. Sehubungan dengan keterlambatan operasi komersial pembangkitan unit A dan B yang dimulai masing-masing pada tanggal 1 Oktober dan 1 Nopember 2006, jangka waktu perjanjian sewa telah menjadi 23,5 tahun sampai dengan 31 Maret 2030.
The Company and CJP entered into a Financial Lease Agreement (FLA) which stipulates, among others, that CJP will lease the power plant for 20 years starting on its Commercial Operation Date (COD) or the date of maximum delay, for each unit, after July 31, 2003, whichever is earlier, and the Company has an option to purchase the power plant on or before the end of FLA period at certain purchase price as stipulated in the Call Right Agreement. The FLA required the Company to operate the power plant in accordance with Operation and Maintenance Agreement (O&M Agreement). The acquisition cost of the leased assets is approximately JPY 184,545 million based on FLA. The semi-annual minimum lease payment for one unit amounts to Rp 404,408 million and US$ 4.23 million, before any adjustments on certain factors, among others, conversion of foreign exchange in JPY currency, interest rate and investment rate of returns in accordance with the formula stipulated in the FLA. The semi-annual minimum lease payment, after including adjustments based on the formula and condition factors at the date of FLA amounted to a total of JPY 11,289 million for both Unit A and B. In relation to the delayed COD of power plant Unit A and B, on October 1 and November 1, 2006, respectively, the term of the lease agreement was effected to become 23.5 years until March 31, 2030.
Beban bunga dan keuangan untuk tahun 2009 dan 2008 masing-masing sebesar Rp 660.027 juta dan Rp 496.098 juta. Beban bunga dan keuangan ini termasuk sewa kontinjen untuk faktor penyesuaian tertentu yang antara lain meliputi kurs konversi mata uang JPY, tingkat bunga dan tingkat pengembalian investasi.
Interest expense and financial charges for 2009 and 2008 amounted to Rp 660,027 million and Rp 496,098 million, respectively. These interest expense and financial charges include contingent rent for certain adjustment factors which include, among others, conversion of foreign exchange in JPY currency, interest rate and investment rate of returns.
Sehubungan dengan FLA tersebut, The Sumitomo Mitsui Banking Corporation, Singapura bertindak sebagai Escrow Agent dan Sumitomo Mitsui Banking Corporation, Tokyo bertindak sebagai Security Agent. Untuk memenuhi persyaratan FLA, Perusahaan telah membentuk dana cadangan pada Escrow Agent untuk jaminan pelaksanaan operasi, pemeliharaan dan pengadaan bahan bakar serta untuk angsuran sewa pembiayaan (Catatan 11).
In relation to the FLA, The Sumitomo Mitsui Banking Corporation, Singapore acts as the Escrow Agent and Sumitomo Mitsui Banking Corporation, Tokyo acts as the Security Agent. To fulfill the requirements of FLA, the Company established a reserve account to an Escrow Agent for guarantee of operations, maintenance and fuel procurement and for lease installment (Note 11).
- 63 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perusahaan dibatasi oleh ketentuan FLA, antara lain, menggadaikan escrow accounts, mengalihkan hak Perusahaan berdasarkan Perjanjian Penyelesaian PLN yang akan dikembalikan setelah hutang lunas, dan menyetujui pengalihan hak CJP kepada krediturnya sebagai jaminan pinjaman CJP.
The Company is restricted by certain covenants of the FLA, such as pledge of Escrow Accounts, transfer of the Company’s rights based on PLN Settlement Agreement, which will be returned if the payment of lease liabilities has been made, and recognition of CJP’s transfer of rights to its creditors, as guarantee of CJP’s obligations.
Hutang sewa pembiayaan secara efektif dijamin dengan kembalinya hak atas aset sewaan kepada lessor apabila terjadi gagal bayar.
Lease liabilities are in effect secured by the leased assets, since the rights over these assets will be returned to the lessor when the Company fails to pay.
HUTANG BANK DAN JANGKA MENENGAH
SURAT
HUTANG
2009 Pinjaman terkait program percepatan Bank Negara Indonesia Bank Exim China Bank of China Bank Mandiri Bank Central Asia Bank Bukopin Bank Mega Sub jumlah Pinjaman tidak terkait program percepatan Bank Rakyat Indonesia Bank Bukopin Bank Bumiputera Indonesia Bank Negara Indonesia Surat hutang jangka menengah Sub jumlah Jumlah Dikurangi bagian jatuh tempo dalam satu tahun Bank Negara Indonesia Bank Rakyat Indonesia Bank Bukopin Bank Bumiputera Indonesia Surat hutang jangka menengah Jumlah Bagian jangka panjang
3,120,908 2,660,711 2,147,024 1,101,247 659,975 314,605 528,561 10,533,031
1,500,000 9,235 5,000,000 6,509,235 17,042,266
1,500,000 9,235 1,000,000 2,509,235 14,533,031
30. BANK LOANS AND MEDIUM TERM NOTES
2008 Loans related to fast track program Bank Negara Indonesia Bank Exim China Bank of China Bank Mandiri Bank Central Asia Bank Bukopin Bank Mega Subtotal
-
Loans not related to fast track program Bank Rakyat Indonesia Bank Bukopin Bank Bumiputera Indonesia Bank Negara Indonesia Medium term notes 20,745 Subtotal 8,500 6,245 6,000
20,745 Total
6,245 6,000 12,245 8,500
- 64 -
Less current maturities Bank Negara Indonesia Bank Rakyat Indonesia Bank Bukopin Bank Bumiputera Indonesia Medium term notes Total Long-term portion
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Pada tanggal 31 Maret 2009, hutang bank dalam mata uang asing sebesar US$ 212.364.475.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
As of March 31, 2009, bank loans in foreign currency amount to US$ 212,364,475.
Pinjaman terkait program percepatan
Loans related to fast track program
Perusahaan memperoleh fasilitas kredit dari beberapa bank untuk membiayai 85% dari nilai kontrak Engineering Procurement and Construction (EPC) untuk program percepatan. Pinjaman ini sepenuhnya dijamin oleh Pemerintah Republik Indonesia sesuai dengan Peraturan Presiden Republik Indonesia (PP) No. 91 Tahun 2007 pengganti dari PP No. 86 Tahun 2006, tentang Pemberian Jaminan Pemerintah untuk Percepatan Pembangunan Pembangkit Tenaga Listrik berbahan bakar Batubara. Sehubungan dengan pinjaman ini, Perusahaan dibatasi oleh ketentuan-ketentuan umum sebagaimana ditetapkan dalam perjanjian kredit. Rincian fasilitas pinjaman tersebut adalah sebagai berikut :
The Company obtained credit facilities from several banks to finance 85% of the value of Engineering Procurement and Construction (EPC) contracts for fast track program. These loans are fully guaranteed by the Government of the Republic of Indonesia in accordance with the Presidential Regulation of the Republic of Indonesia (PP) No. 91 Year 2007, which supersedes PP No. 86 in 2006, regarding Grant of Government Guarantee for Construction of Coal-Fired Power Plant. In connection with these loans, the Company is restricted by general rules as decribed in the loan agreements. Details of such loan facilities are as follow:
- 65 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
- 66 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pinjaman tidak terkait program percepatan
Loans not related to fast track program
Bank Rakyat Indonesia
Bank Rakyat Indonesia
Pada tanggal 26 September 2008, Perusahaan memperoleh fasilitas kredit modal kerja sebesar Rp 1.500.000 juta dari Bank Rakyat Indonesia, dengan tingkat bunga per tahun 2,5% + JIBOR yang terhutang setiap bulan dan jatuh tempo 26 Maret 2009. Fasilitas ini telah diperpanjang sampai dengan 26 Maret 2012 dengan jumlah fasilitas kredit sebesar Rp 2.500.000 juta.
On September 26, 2008, the Company obtained working capital loan facilities from Bank Rakyat Indonesia amounting to Rp 1,500,000 million, with annual interest rate of 2.5% plus JIBOR, which is due every month and with maturity date on March 26, 2009. This loan has been extended until March 26, 2012 with total credit facilities amounting to Rp 2,500,000 million.
Pada tahun 2007, PJBS memperoleh fasilitas kredit modal kerja konstruksi sebesar Rp 40.000 juta, dikenakan bunga 11,5% per tahun dan jatuh tempo pada tanggal 7 Mei 2009. Pinjaman ini telah dilunasi pada tanggal 19 Nopember 2008.
In 2007, PJBS obtained construction working capital credit facility amounting to Rp 40,000 million, which bears an interest of 11.5% per annum and due on May 7, 2009. This loan was fully paid on November 19, 2008.
Bank Bukopin
Bank Bukopin
Pada tahun 2006, ICON memperoleh fasilitas kredit investasi sebesar Rp 50.000 juta dengan jangka waktu 4 tahun untuk pembelian peralatan jaringan. Pinjaman ini dikenakan bunga per tahun sebesar 11,75% - 15,50% tahun 2008 dan 11,75% - 13,50% tahun 2007 dan dibayar dalam 43 kali angsuran bulanan sejak 29 Desember 2006 sampai dengan 29 Juni 2010. Pinjaman ini dijamin dengan peralatan jaringan dan distribusi dan deposito berjangka sebesar Rp 5.000 juta pada bank yang sama milik ICON.
In 2006, ICON obtained investment credit facilities totaling Rp 50,000 million, with term of four years, for the purchase of the transmission equipments. This loan bears annual interest of 11.75% - 15.50% in 2008 and 11.75% - 13.50% in 2007, and will be paid in 43 monthly installments from December 29, 2006 until June 29, 2010. This loan is secured by ICON’s transmission and distribution equipment and time deposits of Rp 5,000 million in the same bank.
Bank Bumiputera Indonesia
Bank Bumiputera Indonesia
Pada tahun 2007, ADC memperoleh pinjaman modal kerja sebesar Rp 10.000 juta yang dikenakan bunga sebesar 13% per tahun, jatuh tempo telah diperpanjang sampai dengan 22 Maret 2009 dan fasilitas kredit menjadi Rp 20.000 juta serta dijamin dengan deposito berjangka ADC sebesar Rp 5.000 juta pada bank yang sama.
In 2007, ADC obtained working capital credit facility amounting to Rp 10,000 million, which bears an interest of 13% per annum, with terms extended until March 22, 2009 and with credit facility becoming Rp 20,000 million and secured by ADC’s time deposits in the same bank amounting to Rp 5,000 million.
- 67 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Bank Negara Indonesia
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Bank Negara Indonesia
Pada tahun 2007, PLNE memperoleh fasilitas kredit modal kerja sebesar Rp 1.800 juta yang dikenakan bunga 10,25% per tahun, jatuh tempo tanggal 2 Desember 2008 dan dijamin dengan deposito berjangka PLNE sebesar Rp 2.000 juta pada bank yang sama. Pinjaman ini telah dilunasi pada tanggal 2 Desember 2008.
In 2007, PLNE obtained working capital credit facility amounting to Rp 1,800 million, which bears an interest of 10.25% per annum, will be due on December 2, 2008 and is secured by PLNE time deposits amounting to Rp 2,000 million with the same bank. This loan was fully paid on December 2, 2008.
Surat Hutang Jangka Menengah
Medium Term Notes
Dalam rangka restrukturisasi hutang usaha Perusahaan dan anak perusahaan kepada Pertamina, pada tanggal 27 Juni 2008, Perusahaan dan PT Pertamina (Persero) menandatangani Perjanjian pengalihan hutang usaha Perusahaan dan anak perusahaan atas pembelian bahan bakar minyak per 30 April 2007 menjadi hutang jangka panjang (Perjanjian Restrukturisasi Hutang). Berdasarkan perjanjian tersebut, jumlah hutang usaha sebesar Rp 5.000.000 juta dialihkan menjadi hutang jangka panjang melalui penerbitan Surat Promes. Perusahaan wajib menerbitkan 10 Surat Promes dengan nilai nominal masingmasing Surat Promes sebesar Rp 500.000 juta yang akan jatuh tempo setiap tanggal 15 bulan Juni dan Desember tahun 2009 sampai dengan tahun 2013 dengan tingkat bunga SBI 3 bulanan + 2,5% per tahun. Perjanjian ini telah memperoleh persetujuan dari Rapat Umum Pemegang Saham Perusahaan dan Pertamina, masing-masing tanggal 29 Juli 2008 dan 26 Juni 2008.
In order to restructure the Company and its subsidiaries’ trade accounts payable to Pertamina, the Company and PT Pertamina (Persero) signed an agreement on June 27, 2008, to convert into long-term payable the Company and its subsidiaries’ outstanding trade accounts payable as of April 30, 2007 (Agreement of Restructuring of Payable). Based on such agreement, the trade accounts payable amounting to Rp 5,000,000 million, is reclassified as longterm payable by issuing promissory notes. The Company must issue 10 promissory notes, with nominal value of Rp 500,000 million each, which will mature every 15th of June and December of year 2009 until 2013, with applicable interest rate of SBI 3 months + 2.5% per annum. This agreement has obtained approvals from the General Stockholder’s Meeting of the Company and Pertamina dated July 29, 2008 and June 26, 2008, respectively.
- 68 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Selanjutnya pada tanggal 28 Nopember 2008, Perusahaan dan Pertamina menandatangani Perubahan dan Pernyataan Kembali Perjanjian Restrukturisasi Hutang dimana telah disepakati bahwa penggunaan Surat Promes diganti dengan Surat Hutang Jangka Menengah (MTN). Dalam rangka penerbitan MTN, Perusahaan dan Pertamina setuju untuk menandatangani Perjanjian Penerbitan MTN dengan jumlah pokok MTN sebesar Rp 5.000.000 juta, dalam 10 seri Sertifikat Jumbo MTN dengan nilai nominal masing-masing sebesar Rp 500.000 juta, jatuh tempo setiap tanggal 15 bulan Juni dan Desember tahun 2009 sampai dengan tahun 2013 dengan tingkat bunga SBI 3 bulanan + 2,5% per tahun. Perjanjian ini efektif terhitung sejak tanggal 29 Juli 2008. Perusahaan menerbitkan MTN tersebut pada tanggal 15 Desember 2008.
Furthermore, on November 28, 2008, the Company and Pertamina signed the Changes and Restatement of the Agreement of Restructuring of Payable, wherein, it was agreed that the use promissory notes is replaced with Medium Term Notes (MTN). In issuing MTN, the Company and Pertamina agreed to sign an Agreement on Issuance of MTN with a principal amount of Rp 5,000,000 million, in 10 series of Jumbo MTN certificates with nominal value of Rp 500,000 million each, which will mature every 15th of June and December of year 2009 until 2013, with applicable interest rate of SBI 3 months + 2.5% per annum. This agreement is effective starting on July 29, 2008. The Company issued such MTN on December 15, 2008.
Perusahaan menunjuk PT Mandiri Sekuritas sebagai Arranger dan PT Bank Mandiri (Persero) Tbk sebagai Wali Amanat untuk MTN tersebut.
The Company appointed PT Mandiri Sekuritas as Arranger and PT Bank Mandiri (Persero) Tbk as Trustee of such MTN.
28. HUTANG OBLIGASI
28. BONDS PAYABLE 2009
Obligasi Rupiah Obligasi PLN IX Tahun 2007 Sukuk Ijarah PLN II Tahun 2007 Obligasi PLN VIII Tahun 2006 Obligasi Syariah Ijarah PLN I Tahun 2006 Obligasi PLN VII Tahun 2004 Obligasi PLN X Tahun 2009 Obligasi Syariah Ijarah PLN III Tahun 2009 Obligasi Terjamin - US$ Penerbitan tahun 2007 Penerbitan tahun 2006 Jumlah Biaya emisi belum diamortisasi
2008
2,696,874 299,678 2,190,133
2,700,000 300,000 2,200,100
199,132 1,494,069 1,430,170
200,000 1,500,000 -
754,812
11,575,000 11,575,000 32,214,868
-
9,217,000 9,217,000 25,334,100
(258,391)
(253,251)
Rupiah Bonds PLN IX Bonds Year 2007 Sukuk Ijarah PLN II Year 2007 PLN VIII Bonds Year 2006 Syariah Ijarah PLN I Bonds Year 2006 PLN VII Bonds Year 2004 PLN X Bonds Year 2009 Syariah Ijarah PLN I Bonds Year 2009 Guaranteed Notes - US$ Issued in 2007 Issued in 2006 Total Unamortized debt issuance cost
Jumlah bersih
31,956,477
25,080,849
Total net
Disajikan di neraca Kewajiban lancar Kewajiban tidak lancar Jumlah
31,956,477 31,956,477
25,080,849 25,080,849
Presented in balance sheets Current liabilities Noncurrent liabilites Total
- 69 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Obligasi Rupiah
Rupiah Bonds
Obligasi ini diterbitkan sebesar harga nominal dalam mata uang Rupiah dengan rincian sebagai berikut :
The bonds were issued at nominal value and are denominated in Rupiah, with details as follows:
Tanggal jatuh tempo/ Maturity date
Tingkat bunga/ Interest rate
1.500.000 1.200.000 300.000
10 Juli 2017/July 10, 2017 10 Juli 2022/July 10, 2022 10 Juli 2017/July 10, 2017
10,4% 10,9% -
1.335.100 865.000 200.000
21 Juni 2016/June 21, 2016 21 Juni 2021/June 21, 2021 21 Juni 2021/June 21, 2021
13,60% 13,75% -
1.500.000
11 Nopember 2014/November 11, 2014
12,25%
Pokok/ Principal Obligasi PLN IX Tahun 2007 Seri A Seri B Sukuk Ijarah PLN II Tahun 2007 Obligasi PLN VIII Tahun 2006 Seri A Seri B Obligasi Syariah Ijarah PLN I Tahun 2006 Obligasi PLN VII Tahun 2004 Jumlah
6.900.100
PLN IX Bonds Year 2007 Series A Series B Sukuk Ijarah PLN II Year 2007 PLN VIII Bonds Year 2006 Series A Series B Syariah Ijarah PLN I Bonds Year 2006 PLN VII Bonds Year 2004 Total
Obligasi PLN IX Tahun 2007
PLN IX Bonds Year 2007
Pada tanggal 10 Juli 2007, Perusahaan menerbitkan Obligasi PLN IX Tahun 2007 dengan jumlah nilai nominal Rp 2.700.000 juta, terdiri dari Obligasi Seri A dan Obligasi Seri B, dengan Bank Niaga bertindak sebagai Wali Amanat. Bunga dibayarkan setiap tiga bulan sejak 10 Oktober 2007 sampai dengan tanggal jatuh tempo obligasi.
On July 10, 2007, the Company issued PLN IX Bonds Year 2007 with a total nominal value of Rp 2,700,000 million consisting of Series A and Series B bonds, with Bank Niaga acting as the Trustee. The interest is payable on a quarterly basis, starting from October 10, 2007 until the maturity date of the bonds.
Sukuk Ijarah PLN II Tahun 2007
Sukuk Ijarah PLN II Year 2007
Bersamaan dengan penerbitan Obligasi PLN IX Tahun 2007, Perusahaan juga menerbitkan Sukuk Ijarah PLN II Tahun 2007 dengan nilai nominal Rp 300.000 juta jangka waktu 10 tahun, dengan Bank Niaga bertindak sebagai Wali Amanat. Jumlah imbalan ijarah sebesar Rp 31.200 juta per tahun dan dibayarkan setiap tiga bulan sejak 10 Oktober 2007 sampai dengan tanggal jatuh tempo obligasi.
In the same time with the issuance of PLN IX Bonds Year 2007, the Company also issued Sukuk Ijarah PLN II Year 2007 with a nominal value of Rp 300,000 million with a term of 10 years, with Bank Niaga acting as the Trustee. Total ijarah fee amounts to Rp 31,200 million per annum and is payable on a quarterly basis, starting from October 10, 2007 until the maturity date of the bonds.
Obligasi PLN VIII Tahun 2006 Pada tanggal 21 Juni 2006, Perusahaan menerbitkan Obligasi PLN VIII Tahun 2006 dengan jumlah nilai nominal Rp 2.200.100 juta, dengan Bank Mega bertindak sebagai Wali Amanat. Bunga dibayarkan setiap tiga bulan sejak 21 September 2006 sampai dengan tanggal jatuh tempo obligasi.
PLN VIII Bonds Year 2006 On June 21, 2006, the Company issued PLN VIII Bonds Year 2006 with a total nominal value of Rp 2,200,100 million with Bank Mega acting as the Trustee. The interest is payable on a quarterly basis, starting from September 21, 2006 until the maturity date of the bonds.
- 70 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Sejak tanggal 18 Maret 2008, Wali Amanat berganti menjadi Bank Tabungan Negara sesuai dengan Berita Acara Rapat Umum Pemegang Obligasi PLN VIII Tahun 2006 yang tertuang dalam Akta No. 34 dari Ny. Poerbaningsih Adi Warsito, S.H., notaris di Jakarta.
On March 18, 2008, the acting Trustee was changed with Bank Tabungan Negara in accordance with the Minutes of Meeting of the Bondholders of PLN VIII Bonds Year 2006, as documented in notarial deed No. 34 of Poerbaningsih Adi Warsito, S.H., notary in Jakarta.
Obligasi Syariah Ijarah PLN I Tahun 2006
Syariah Ijarah PLN I Bonds Year 2006
Bersamaan dengan penerbitan Obligasi PLN VIII Tahun 2006, Perusahaan juga menerbitkan Obligasi Syariah Ijarah PLN I Tahun 2006 dengan nilai nominal Rp 200.000 juta, dengan Bank Mega bertindak sebagai Wali Amanat. Cicilan fee ijarah sebesar Rp 6.800 juta per tiga bulan sejak 21 September 2006 sampai dengan tanggal jatuh tempo obligasi.
In the same time with the issuance of PLN VIII Year 2006, the Company also issued Syariah Ijarah PLN I Bonds Year 2006 with a nominal value of Rp 200,000 million, with Bank Mega acting as the Trustee. The ijarah fee amounting to Rp 6,800 million is payable on an installment basis every three months, starting from September 21, 2006 until the maturity date of the bonds.
Sejak tanggal 18 Maret 2008, Wali Amanat berganti menjadi Bank Tabungan Negara sesuai dengan Berita Acara Rapat Umum Pemegang Obligasi Syariah Ijarah Tahun 2006 yang tertuang dalam Akta No. 35 dari Ny. Poerbaningsih Adi Warsito, S.H., notaris di Jakarta.
On March 18, 2008, the acting Trustee was changed with Bank Tabungan Negara in accordance with the Minutes of Meeting of the Bondholders of Syariah Ijarah PLN I Bonds Year 2006, as documented in notarial deed No. 35 of Poerbaningsih Adi Warsito, S.H., notary in Jakarta.
Obligasi PLN VII Tahun 2004
PLN VII Bonds Year 2004
Pada tanggal 11 Nopember 2004, Perusahaan menerbitkan Obligasi PLN VII Tahun 2004 dengan nilai nominal Rp 1.500.000 juta, dengan Bank Niaga bertindak sebagai Wali Amanat. Bunga dibayarkan setiap tiga bulan sejak 11 Pebruari 2005 sampai dengan jatuh tempo obligasi.
On November 11, 2004, the Company issued PLN VII Bonds Year 2004 amounting to Rp 1,500,000 million, with Bank Niaga acting as the Trustee. The interest is payable on a quarterly basis, starting from February 11, 2005 until the maturity date of the bonds.
Sehubungan dengan penerbitan obligasi di atas, masing-masing perjanjian perwaliamanatan menetapkan antara lain bahwa :
In relation to the issuance of the bonds above, each trustee agreement stipulates, among others that :
Satu tahun sejak tanggal emisi, Perusahaan dapat membeli kembali sebagian atau seluruh obligasi ini sebelum tanggal pelunasan pokok obligasi.
After one year from the issuance date, the Company is allowed to buy-back either a portion or the entire bonds before the maturity date.
- 71 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Seluruh obligasi ini tidak dijamin secara khusus, namun dijamin dengan seluruh aset Perusahaan, serta hak pemegang obligasi adalah paripassu tanpa hak khusus dengan hak-hak kreditur lain.
The bonds are not secured by specific collateral but secured by all of the Company’s assets and the bondholders’ rights are paripassu without preference to the other creditors.
Perusahaan tanpa persetujuan tertulis dari Wali Amanat tidak akan melakukan antara lain (a) menjaminkan harta kekayaan Perusahaan; (b) memberikan penjaminan; (c) memberikan pinjaman kepada pihak lain; (d) mengadakan penggabungan, konsolidasi dan akuisisi yang menyebabkan Perusahaan bubar; (e) mengalihkan aset tetap; memberikan izin kepada anak perusahaan untuk memberikan pinjaman kepada pihak lain atau melakukan investasi; (f) menerbitkan obligasi dengan kedudukan lebih tinggi; dan (g) mengubah bidang usaha; mengurangi modal dasar; modal ditempatkan dan disetor. Selain itu Perusahaan juga diwajibkan memenuhi: (a) rasio jumlah kewajiban keuangan terhadap jumlah aset tidak lebih dari 80%; (b) rasio antara laba sebelum beban bunga, pajak dan penyusutan dan amortisasi (termasuk perhitungan aktuaria imbalan kerja) - (EBITDA) dengan beban bunga minimum 2 : 1; dan kecuali untuk Obligasi PLN VII Tahun 2004, (c) rasio aset pembangkit listrik, jaringan transmisi dan distribusi terhadap kewajiban berbunga yang tidak dijamin dengan jaminan khusus (tidak termasuk penerusan pinjaman dan hutang kepada Pemerintah) minimum 150% untuk Obligasi PLN VIII tahun 2006 dan Obligasi Syariah Ijarah PLN I tahun 2006, dan minimum 125% untuk Obligasi PLN IX Tahun 2007 dan Sukuk Ijarah PLN II Tahun 2007.
The Company is restricted by certain covenants, which require written approval from the Trustee to: (a) use the Company’s assets as collateral; (b) act as a guarantor; (c) grant loan to other party; (d) perform merger, consolidation and acquisition that would cause the Company to be dissolved; (e) transfer the Company’s property, plant and equipment, and allow subsidiaries to grant loan to other party or to make an investment; (f) issue higher ranking bonds; and (g) change the business activities and decrease the Company’s authorized, subscribed and paid-up capital. The Company is also required to maintain the following: (a) ratio of total financial liabilities to total assets not exceeding 80%; (b) ratio of income before interest, tax, depreciation and amortization (including actuarial calculation of employment benefit) - (EBITDA) to interest expense at a minimum of 2 : 1; except for PLN VII Bonds Year 2004, (c) ratio of power plant, transmission and distribution facilities asset to interest-bearing liabilities which are not secured by specific collaterals (excluding two-step loans and Government loans) at a minimum of 150% for PLN VIII Bonds Year 2006 and Syariah Ijarah PLN I Bonds Year 2006, and a minimum of 125% for the PLN IX Bonds Year 2007 and Sukuk Ijarah PLN II Year 2007.
- 72 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Untuk Sukuk Ijarah PLN II Tahun 2007 dan Obligasi Syariah Ijarah PLN I Tahun 2006, Perusahaan setuju untuk mengalihkan manfaat perangkat trafo tertentu kepada pemegang obligasi dan pemegang obligasi memberikan kuasa kepada Perusahaan untuk membuat dan melangsungkan perjanjian dengan pihak ketiga sebagai pengguna trafo tersebut untuk kepentingan pemegang obligasi. Perusahaan juga menerima kuasa dari Wali Amanat untuk membuat dan melangsungkan perjanjian dengan pihak ketiga sebagai pengguna trafo tersebut untuk melaksanakan penagihan piutang terkait.
Related to Sukuk Ijarah PLN II Year 2007, and Syariah Ijarah PLN I Bonds Year 2006, the Company has agreed to transfer benefits obtained from certain transformers of the Company to the bondholders, and the bondholders has agreed to provide the Company a power of attorney to enter into agreements with transformer users for the benefits of the bondholders. The Company also received a power of attorney from the Trustee to enter into agreements with the transformer users to collect the related receivables.
Perusahaan membentuk obligasi.
tidak disyaratkan untuk penyisihan dana pelunasan
The Company was not required to provide sinking fund for such bonds.
Kecuali untuk Obligasi PLN VII tahun 2004 dimana dana yang diperoleh digunakan untuk membiayai kembali proyek PLTG Muara Tawar, dana yang diperoleh dari penerbitan Obligasi lainnya digunakan untuk kebutuhan modal kerja antara lain untuk pengadaan bahan bakar.
Except for PLN VII Bonds Year 2004, wherein the proceeds of which were used to refinance the PLTG Muara Tawar Project, the proceeds from the other bonds issued were used for working capital requirement which, among others, include the purchase of fuel.
Perusahaan memenuhi pembatasan-pembatasan yang ditentukan dalam perjanjian Wali Amanat masing-masing obligasi.
The Company complies with the restrictions specified within the agreements with the acting Trustee of the corresponding bond obligations.
Pada tanggal 31 Desember 2008, Obligasi PLN IX Tahun 2007, Sukuk Ijarah PLN II Tahun 2007, Obligasi PLN VIII Tahun 2006 dan Obligasi Syariah Ijarah PLN I Tahun 2006 memperoleh peringkat “idA+” dari PT Pemeringkat Efek Indonesia, dan peringkat “Aa2id/stable” untuk Obligasi PLN VII Tahun 2004 dari PT Moody’s Indonesia.
As of December 31, 2008, the PLN IX Bonds Year 2007, Sukuk Ijarah PLN II Year 2007, PLN VIII Bonds Year 2006 and Syariah Ijarah PLN I Bonds Year 2006 are rated as “idA+” by PT Pemeringkat Efek Indonesia, and PLN VII Bonds Year 2004 are rated as “Aa2id/stable” by PT Moody’s Indonesia.
- 73 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pada tanggal 9 Januari 2009, Perusahaan menerbitkan Obligasi PLN X Tahun 2009 dengan jumlah nilai nominal sebesar Rp 1.440.000 juta yang terdiri dari:
On January 9, 2009, the Company issued PLN X Bonds Year 2009 with a total nominal value of Rp 1,440,000 million which consist of:
Seri A sebesar Rp 1.015.000 juta dengan jangka waktu 5 tahun dan tingkat bunga 14,75% per tahun. Bunga dibayarkan setiap tiga bulan sejak 9 April 2009 sampai dengan tanggal 9 Januari 2014.
Series A of Rp 1,015,000 million, with terms of 5 years and interest rate of 14.75% per annum. The interest is payable on a quarterly basis, starting from April 9, 2009 until January 9, 2014.
Seri B sebesar Rp 425.000 juta, jangka waktu 7 tahun dan tingkat bunga 15% per tahun. Bunga dibayarkan setiap tiga bulan sejak 9 April 2009 sampai dengan tanggal 9 Januari 2016.
Series B of Rp 425,000 million, with terms of 7 years and interest rate of 15% per annum. The interest is payable on a quarterly basis, starting from April 9, 2009 until January 9, 2016.
Bersamaan dengan penerbitan Obligasi PLN X Tahun 2009, Perusahaan juga menerbitkan Sukuk Ijarah PLN III Tahun 2009 dengan nilai nominal sebesar Rp 760.000 juta yang terdiri dari:
In the same time with the issuance of PLN X Bonds Year 2009, the Company also issued Sukuk Ijarah PLN III Year 2009 with a nominal value of Rp 760,000 million which consists of:
Seri A sebesar Rp 293.000 juta, jangka waktu 5 tahun dengan imbalan ijarah sebesar Rp 43.217,5 juta per tahun. Imbalan ijarah dibayarkan setiap tiga bulan sejak 9 April 2009 sampai dengan tanggal 9 Januari 2014.
Series A of Rp 293,000 million, with terms of 5 years with ijarah fee of Rp 43,217.5 million per annum. Ijarah fee is payable on a quarterly basis, starting from April 9, 2009 until the January 9, 2014.
Seri B sebesar Rp 467.000 juta, jangka waktu 7 tahun dengan imbalan ijarah sebesar Rp 70.050 juta per tahun. Imbalan ijarah dibayarkan setiap tiga bulan sejak 9 April 2009 sampai dengan tanggal 9 Januari 2016.
Series B of Rp 467,000 million, with terms of 7 years with ijarah fee of Rp 70,050 million per annum. Ijarah fee is payable on a quarterly basis, starting from April 9, 2009 until the January 9, 2016.
Dalam penerbitan obligasi ini, PT Bank CIMB Niaga Tbk bertindak sebagai Wali Amanat.
In issuing these obligations, PT Bank CIMB Niaga Tbk is acting as the Trustee.
- 74 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Sehubungan dengan penerbitan obligasi ini, tiap perjanjian perwaliamanatan menetapkan antara lain bahwa :
In relation to the issuance of the bonds above, each trustee agreement stipulates, among others that :
Satu tahun sejak tanggal emisi, Perusahaan dapat membeli kembali (buy back) sebagian atau seluruh obligasi ini sebelum tanggal jatuh tempo pokok obligasi.
After one year from the issuance date, the Company is allowed to buy-back either a portion or the entire bonds before the maturity date.
Perusahaan dapat melakukan pembelian awal seluruh Obligasi PLN X Tahun 2009 Seri B dan Sukuk Ijarah PLN III Tahun 2009 Seri B pada ulang tahun ketiga sejak tanggal emisi melalui Opsi Beli.
The Company is allowed to carry-out, through Call Option, an early purchase of the entire PLN X Bonds Year 2009 Series B and Sukuk Ijarah PLN III Year 2009 Series B on the third year since the issuance date.
Seluruh obligasi ini tidak dijamin secara khusus, namun dijamin dengan seluruh aset Perusahaan, serta hak pemegang obligasi adalah paripassu tanpa hak khusus dengan hak-hak kreditur lain.
The bonds are not secured by specific collateral but secured by all of the Company’s assets and the bondholders’ rights are paripassu without preference to the other creditors.
- 75 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perusahaan tanpa persetujuan tertulis dari Wali Amanat tidak melakukan antara lain: (a) menjaminkan harta kekayaan Perusahaan; (b) bertindak sebagai penjamin; (c) memberikan pinjaman kepada pihak lain; (d) mengadakan penggabungan usaha, konsolidasi dan akuisisi yang menyebabkan Perusahaan bubar; (e) mengalihkan aset tetap; memberikan izin kepada anak perusahaan untuk memberikan pinjaman kepada pihak lain atau melakukan investasi; (f) menerbitkan obligasi dengan kedudukan lebih tinggi; dan (g) mengubah bidang usaha dan mengurangi modal dasar, modal ditempatkan dan disetor. Selain itu Perusahaan juga diwajibkan memenuhi: (a) rasio jumlah kewajiban keuangan terhadap jumlah aset tidak lebih dari 80%; (b) rasio antara laba sebelum beban bunga, pajak dan penyusutan dan amortisasi (termasuk perhitungan aktuaria imbalan kerja) - (EBITDA) dengan beban bunga minimum 1,5 : 1; (c) rasio aset pembangkit listrik, jaringan transmisi dan distribusi terhadap kewajiban berbunga yang tidak dijamin dengan jaminan khusus (tidak termasuk penerusan pinjaman, pinjaman langsung, obligasi internasional dan hutang kepada Pemerintah) minimum 125%.
The Company is restricted by certain covenants, which require written approval from the Trustee to: (a) use the Company’s assets as collateral; (b) act as a guarantor; (c) grant loan to other party; (d) perform merger, consolidation and acquisition that would cause the Company to be dissolved; (e) transfer the Company’s property, plant and equipment, and allow subsidiaries to grant loan to other party or to make an investment; (f) issue higher ranking bonds; and (g) change the business activities and decrease the Company’s authorized, subscribed and paid-up capital. The Company is also required to maintain the following: (a) ratio of total financial liabilities to total assets not exceeding 80%; (b) ratio of income before interest, tax, depreciation and amortization (including actuarial calculation of employment benefit) - (EBITDA) to interest expense at a minimum of 1.5 : 1; (c) ratio of power plant, transmission and distribution facilities assets to interest-bearing liabilities which are not secured by specific collaterals (excluding two-step loans, direct loans, global bond and government loans) at a minimum of 125%.
Perusahaan tidak disyaratkan untuk membentuk penyisihan dana pelunasan obligasi.
The Company was not required to provide sinking funds for such bonds.
Dana dari penerbitan obligasi ini digunakan sebagai pengganti dana internal yang telah digunakan membiayai investasi transmisi tahun 2008.
The proceeds of bonds issued are used to replace the internal funds used for capital expenditures incurred in 2008 for transmission projects. Guaranteed Notes – US$
Obligasi Terjamin – US$ Rincian obligasi terjamin yang diterbitkan adalah sebagai berikut :
The details of Guaranteed Notes issued are as follows:
- 76 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Pokok/ Principal *) US$
Harga penerbitan/ Issuing price
Jatuh tempo/ Maturity date
Tingkat bunga/ Interest rate
28 Juni 2017/ June 28, 2017 29 Juni 2037/ June 29, 2037
7,250%
Issued in 2007 Due in 2017
7,875%
Due in 2037
Penerbitan tahun 2007 Jatuh tempo 2017
500.000.000
99,127%
Jatuh tempo 2037
500.000.000
98,586%
Jumlah
1.000.000.000
Total
Penerbitan tahun 2006 Jatuh tempo 2016
550.000.000
98,976%
Jatuh tempo 2011
450.000.000
99,382%
Jumlah Jumlah
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
17 Oktober 2016/ October 17, 2016 17 Oktober 2011/ October 17, 2011
1.000.000.000
7,75%
Issued in 2006 Due in 2016
7,25%
Due in 2011 Total
2.000.000.000
Total
*) dalam jumlah penuh/in full amount
Penerbitan tahun 2007
Issued in 2007
Pada tanggal 28 Juni 2007, Majapahit Holding B.V., Belanda, anak perusahaan, menerbitkan Obligasi Terjamin sejumlah US$ 1 miliar dengan Deutsche Bank Trust Company Americas sebagai Wali Amanat. Bunga dibayarkan setiap enam bulan sejak 28 Desember 2007 sampai dengan jatuh tempo obligasi.
On June 28, 2007, Majapahit Holding B.V., The Netherlands, a wholly-owned special-purpose subsidiary, issued Guaranteed Notes amounting to US$ 1 billion, with Deutsche Bank Trust Company Americas, acting as the Trustee. The interest is payable semi-annually starting from December 28, 2007 until the maturity date of the Guaranteed Notes.
Penerbitan tahun 2006
Issued in 2006
Pada tanggal 16 Oktober 2006, Majapahit Holding B.V., Belanda menerbitkan Obligasi Terjamin sejumlah US$ 1 miliar dengan Deutsche Bank Trust Company Americas sebagai Wali Amanat. Bunga dibayarkan setiap enam bulan sejak 17 April 2007 sampai dengan tanggal jatuh tempo obligasi.
On October 16, 2006, Majapahit Holding B.V., The Netherlands issued Guaranteed Notes amounting to a total of US$ 1 billion with Deutsche Bank Trust Company Americas, acting as the Trustee. The interest is payable semiannually from April 17, 2007 until the maturity date of the Guaranteed Notes.
Obligasi ini tidak dapat dibatalkan dan dijamin tanpa syarat oleh Perusahaan dan anak perusahaan, jika ada.
These Guaranteed Notes are irrevocably and unconditionally guaranteed by the Company and its subsidiaries, if any.
- 77 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Perjanjian perwaliamanatan menetapkan bahwa :
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
The Indenture is governed that :
Tidak lebih dari 30 hari sejak dua kejadian dimana Pemerintah Indonesia kehilangan kepemilikan lebih 50%, baik langsung maupun tidak langsung, hak suara pada Perusahaan atau, jika dan ketika diterbitkan saham Dwiwarna Seri A dan kejadian yang menurunkan peringkat (Change of Control Triggering Event), Majapahit Holding B.V. dapat diminta untuk melakukan penawaran untuk membeli kembali Obligasi Terjamin dengan harga 101% dari nilai nominal ditambah bunga terhutang sampai tanggal pembelian kembali. Majapahit Holding B.V. mempunyai opsi dalam waktu tertentu untuk menebus kembali seluruh Obligasi Terjamin ini dengan harga 100% dari nilai nominal, bersama dengan hutang bunga dalam hal terjadinya perubahan tertentu terhadap perpajakan di Belanda dan Indonesia.
No later than 30 days following the occurrence of both an event in which the Government of Indonesia ceases to own, directly or indirectly, more than 50% of the voting securities of the Company or, if and when issued, the Class A Dwiwarna Share and an event in a rating decline (Change of Control Triggering Event), Majapahit Holding B.V. may be required to make an offer to repurchase all Guranteed Notes outstanding at a purchase price equal to 101% of their principal amount plus accrued and unpaid interest, if any, to the date of repurchase. The Guaranteed Notes are subject to redemption in whole, at 100% of their principal amount, together with any accrued interest, at the option of Majapahit Holding B.V. at a certain time in the event of certain changes affecting taxes of The Netherlands or Indonesia.
Pembatasan tertentu termasuk antara lain: penambahan pinjaman sesuai dengan “Rasio Pengecualian”, setelah memperhitungkan pengaruhnya terhadap pinjaman yang diperkenankan minimum 2 : 1; pemberian jaminan; pembayaran dividen; penggabungan usaha, akuisisi dan penjualan aset.
Certain covenants, including, among others, the incurrence of additional indebtedness along with the “Ratio Exception”, that after giving effect to the permitted indebtedness is at least 2 : 1; the incurrence of liens; the payment of dividends; mergers, acquisitions and disposals.
Perusahaan memenuhi pembatasan-pembatasan yang ditentukan dalam perjanjian Wali Amanat.
The Company complies with the restrictions specified within the agreements with the acting Trustee.
Dana yang diperoleh dari penerbitan Obligasi Terjamin ini digunakan untuk mendanai sebagian kebutuhan investasi program percepatan pembangunan fasilitas tenaga listrik dan untuk tujuan umum korporasi.
The proceeds from Guaranteed Notes issued were used to partially fund the capital expenditure requirements in connection with the Fast Track Program and for general corporate purposes.
Pada tanggal 31 Desember 2008, Obligasi Terjamin ini memperoleh peringkat “Ba3 stable” dari Moody’s Investor Service, Inc., dan “BB-“ dari Standard and Poor’s.
As of December 31, 2008, these Guaranteed Notes are rated as “Ba3 stable” by Moody’s Investors Service, Inc., and “BB-“ by Standard and Poor’s.
- 78 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan 29.
HUTANG LISTRIK SWASTA
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued 29.
ELECTRICITY PURCHASE PAYABLE
Akun ini merupakan hutang listrik swasta yang direstrukturisasi melalui renegosiasi dengan penyedia dan pengembang listrik swasta (Catatan 55b) dengan rincian sebagai berikut:
This account represents electricity purchase payable, which was restructured through renegotiation with Independent Power Producers (Note 55b) with details as follows:
a.
a.
Berdasarkan pemasok
2009 PT Paiton Energy (US$ 664.314.805 tahun 2009 dan US$ 678.663.696 tahun 2008) PT Jawa Power (US$ 57.662.062 tahun 2009 dan US$ 59.083.623 tahun 2008) Jumlah Dikurangi bagian yang jatuh tempo dalam satu tahun Bagian jangka panjang
b.
6,255,243
667,438 8,356,882
544,574 6,799,817
(159,339) 8,197,543
(120,751) 6,679,066
b. 2009
Nilai tunai pembayaran Dikurangi bagian jatuh tempo dalam satu tahun Bagian jangka panjang
2008
7,689,444
Berdasarkan jadual pembayaran
Pembayaran jatuh tempo pada tahun 2008 2009 2010 2011 dan seterusnya Jumlah pembayaran Dikurangi bunga
By creditor
PT Paiton Energy (US$ 664,314,805 in 2009 and US$ 678,663,696 in 2008) PT Jawa Power (US$ 57,662,062 in 2009 and US$ 59,083,623 in 2008) Total Less current maturities Long-term portion
By installment payments
2008
Payment due on years 2008 2009 2010 2011 dan seterusnya Total payments Less interest
643,860 643,860 14,386,962 15,674,682 (7,317,800)
553,837 553,837 12,213,225 13,320,899 (6,521,082)
8,356,882
6,799,817
Present value of payments
(159,339) 8,197,543
(120,751) 6,679,066
Less current maturities Long-term portion
Hutang kepada PT Paiton Energy dikenakan bunga per tahun sebesar 4,81%, dibayar dalam 360 kali angsuran bulanan sejak 1 Januari 2002 sampai dengan 1 Desember 2031.
Payable to PT Paiton Energy bears an annual interest of 4.81%, which is payable in 360 monthly installments from January 1, 2002 until December 1, 2031.
Hutang kepada PT Jawa Power dikenakan bunga per tahun sebesar 18,45%, dibayar dalam 360 kali angsuran bulanan sejak 1 Januari 2002 sampai dengan 1 Desember 2031.
Payable to PT Jawa Power bears an annual interest of 18.45%, which is payable in 360 monthly installments from January 1, 2002 until December 1, 2031.
- 79 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
30. HUTANG PIHAK HUBUNGAN ISTIMEWA
30. PAYABLE TO RELATED PARTIES
2009 Yayasan Pendidikan dan Kesejahteraan - PLN PT Dalley Energy Batam PT Mitra Energy Batam Koperasi karyawan Karyawan Jumlah
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2008
14,385 19,153 11,764 2,212 23,577 71,092
24,914 22,143 12,432 1,221 109,686 170,396
Yayasan Pendidikan dan Kesejahteraan - PLN PT Dalley Energy Batam PT Mitra Energy Batam Employee Cooperative Employees Total
Yayasan Pendidikan dan Kesejahteraan – PLN (YPK)
Yayasan Pendidikan dan Kesejahteraan – PLN (YPK)
ICON dan PLNE memperoleh pinjaman untuk pembangunan jaringan telekomunikasi dan modal kerja dari YPK, yang dikenakan biaya administrasi antara 12% - 16% per tahun. Pinjaman ini dibayar kembali dalam angsuran tetap bulanan dan akan jatuh tempo antara periode September 2008 sampai dengan Agustus 2010.
ICON and PLNE obtained foster fund from YPK which bears administration fee ranging from 12% - 16% per annum. These loans will be paid through fixed monthly installment and will be due between the period of September 2008 until August 2010.
PT Dalle Energy Batam (DEB) dan PT Mitra Energy Batam (MEB)
PT Dalle Energy Batam (DEB) and PT Mitra Energy Batam (MEB)
Hutang kepada DEB dan MEB merupakan hutang atas pembelian switchyard dan trafo.
Payable to DEB and MEB consist of payable on purchase of switchyard and transformers.
Koperasi Karyawan
Employee Cooperative
Hutang kepada koperasi karyawan terutama merupakan hutang atas sewa kendaraan, komputer serta pemeliharaan gedung dan halaman.
Payable to employee cooperative mainly represents vehicle and computer rentals and building and yard maintenance.
Karyawan
Employees
Hutang kepada karyawan terutama merupakan penerimaan dimuka atas cicilan penjualan rumah dinas.
Payable to employees mainly represents receipt of advance installment payment from employees related to house sale.
31. HUTANG BIAYA PROYEK
31. PROJECT COST PAYABLE
Akun ini merupakan hutang kepada kontraktor atas biaya konstruksi dan pengadaan material yang akan direklasifikasi ke akun penerusan pinjaman pada saat penerbitan Withdrawal Authorization (WA) atau dokumen lain yang sejenis.
This account represents payable to contractors arising from construction of property and equipment and purchases of materials. This account will be reclassified into two-step loans account when the Company receives the Withdrawal Authorization (WA) or other similar documents.
- 80 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
32. HUTANG USAHA
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
32. TRADE ACCOUNTS PAYABLE
Akun ini merupakan kewajiban sehubungan dengan pembelian tenaga listrik, bahan bakar, barang dan jasa, sebagai berikut :
This account represents payables arising from purchases of electricity, fuel, goods and services, as follows :
a.
a.
Berdasarkan pemasok 2009 Pihak hubungan istimewa Pembelian tenaga listrik PT Sumber Segara Primadaya Rupiah US$ PT Geo Dipa Energi PT Dalle Energy Batam PT Mitra Energy Batam Pengadaan bahan bakar, barang dan jasa PT Daya Citra Mulia Koperasi Karyawan Jumlah hutang usaha pihak hubungan istimewa Pihak ketiga Pembelian tenaga listrik PT Paiton Energy Rupiah US$ PT Jawa Power Rupiah US$ Unocal Geothermal of Indonesia, Ltd. US$ Amoseas Indonesia Inc. US$ Magma Nusantara Ltd US$ Lainnya (masing-masing dibawah 5% dari sub jumlah) Rupiah US$ Sub jumlah Pembelian bahan bakar, barang dan jasa Pertamina Rupiah US$ PT Tambang Batubara Bukit Asam Lainnya (masing-masing dibawah 5% dari sub jumlah) Rupiah US$ EUR JPY Sub jumlah Jumlah hutang usaha pihak ketiga Jumlah hutang usaha
By creditor
2008 Related parties Purchases of electricity PT Sumber Segara Primadaya
172,256 70,284 15,862 43,554 9,125
16,220 23,064 18,134 27,546 4,233
93,643
24,127
404,723
113,324
PT Geo Dipa Energi PT Dalle Energy Batam PT Mitra Energy Batam Purchases of fuel, goods and services PT Daya Citra Mulia Koperasi Karyawan Total of trade accounts payable to related parties Third parties Purchases of electricity PT Paiton Energy
553,288 758,039
319,685 609,317
360,879 563,553
430,668 546,319
19,078
153,502
15,500
151,570
190,930
81,214
PT Jawa Power Unocal Geothermal of Indonesia, Ltd. Amoseas Indonesia Inc. Magma Nusantara Ltd Others (each below 5% of 520,930 467,840 3,450,037
124,002 156,631 2,572,908
Subtotal Purchases of fuel, goods and services Pertamina
5,761,901 5,546,708
34,585,845 338,844
1,739,286
607,166
9,325,427 849,084 93,507 21,068 23,336,982
3,467,284 78,556 59,439 39,137,134
26,787,018
41,710,042
27,191,741
41,823,366
Jangka waktu kredit yang timbul dari pembelian tenaga listrik, bahan bakar, barang dan jasa, baik dari pemasok dalam maupun luar negeri berkisar 30 hari.
PT Tambang Batubara Bukit Asam Others (each below 5% of
Subtotal Total of trade accounts payable to third parties Total trade accounts payable
Credit terms of payable arising from purchase of electricity, fuel, goods and services, both local and foreign, are approximately 30 days.
- 81 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
b.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Berdasarkan umur
b. 2009
1 - 180 hari 181 - 360 hari Lebih dari 360 hari Jumlah
2008
24,201,471 855,657 2,134,614 27,191,742
39,992,763 1,635,302 195,301 41,823,366
Rincian hutang usaha dalam mata uang asing adalah sebagai berikut :
US$ EUR JPY Jumlah
*)
8,410,732 93,507 21,068 8,525,307
Dalam jumlah penuh
3,155,107 73,108 3,228,215
US$ EUR JPY Total
In full amount
33. OTHER PAYABLES 2009
Bagian jangka pendek
Ekuivalen Rp/ Rp equivalent
288,137,724 4,737,397 -
*)
33. HUTANG LAIN-LAIN
Selisih harga pembelian BBM Penerangan jalan umum Uang muka penjualan tenaga listrik Perolehan aktiva tetap Rupiah US$ - US$ 25.357.495 tahun 2009 dan US$ 15.063.133 tahun 2008 Lain-lain Jumlah Dikurangi bagian jangka panjang Selisih harga pembelian BBM Perolehan aktiva tetap Jumlah
2008 Dalam mata uang asing/ In foreign currencies *)
Ekuivalen Rp/ Rp equivalent
726,629,155 6,100,751 178,639,439
1 - 180 days 181 - 360 days More than 360 days Total
Details of trade accounts payable in foreign currencies are as follows :
2009 Dalam mata uang asing/ In foreign currencies *)
By age category
2008
45,415 633,523 175,643
227,077 390,592 544,350
534,001
296,006
293,513 107,800 1,789,895
138,837 546,518 2,143,380
212,924 212,924
90,830 277,170 368,000
1,576,971
1,775,380
- 82 -
Difference on fuel purchasing price Public street lights Advance sales of electricity Acquisition of property, plant and equipment Rupiah US$ - US$ 25,357,495 in 2009 and US$ 15,063,133 in 2008 Others Total Less long-term portion Difference on fuel purchasing price Acquisition of property, plant and equipment Total Current maturities
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Hutang selisih harga pembelian BBM merupakan 25% harga pasar untuk pembelian bahan bakar minyak (BBM) diatas kuota yang ditetapkan Pertamina dalam tahun 2002 sebesar Rp 726.648 juta. Dalam Keputusan Rapat Umum Pemegang Saham Perusahaan tahun 2005 ditetapkan agar Perusahaan menyelesaikan hutang tersebut. Hutang ini dibayar dalam 16 angsuran tiga bulanan sejak September 2005 sampai dengan Juni 2009 masing-masing sebesar Rp 45.415 juta.
Payable due to difference on fuel purchasing price represents 25% of the market price for purchasing fuel above quota as determined by Pertamina in 2002 amounting to Rp 726,648 million. Based on the decision of the General Meeting of Shareholders in 2005, the Company was required to settle such payable. This payable is paid in 16 quarterly installments of Rp 45,415 million each from September 2005 until June 2009.
34. HUTANG PAJAK
34. TAXES PAYABLE
2009 Pajak kini Pajak penghasilan Pasal 21 Pasal 22 Pasal 23 Pasal 15, 25 dan 26 dan pasal 4 (2) Pajak pertambahan nilai Bea materai Pajak bumi dan bangunan Pajak selisih penilaian kembali aktiva tetap Jumlah
2008
272,066
690,571
33,132 14,090 56,414 17,949 129,985 4,998 4,735
31,852 5,255 36,340 480 72,722 5,085 3,983
34,893 568,261
35,414 881,701
35. BIAYA MASIH HARUS DIBAYAR
Current tax Income taxes Article 21 Article 22 Article 23 Article 15, 25 and 26 article 4 (2) Value added tax Stamp duty Land and building taxes Tax on revaluation increment on property, plant and equipment Total
35. ACCRUED EXPENSES 2009
2008
Bunga dan beban keuangan Hutang usaha atas pembelian BBM Hutang sewa pembiayaan Hutang penerusan pinjaman Hutang kepada pemerintah Hutang obligasi Hutang listrik swasta Hutang bank Jumlah Biaya operasional
1,733,124 1,059,500 253,231 22,524 796,304 49,347 77,404 3,914,032 682,125
856,195 860,383 294,421 24,483 600,412 43,252 2,679,146 211,668
Interest and financing charges Trade payable on fuel purchases Lease liability Two-step loans Government loans Bonds payable Electricity purchase payable Bank Payable Total Operational expenses
Jumlah
4,596,156
2,890,814
Total
Rincian biaya masih harus dibayar dalam mata uang asing adalah sebagai berikut :
Details of accrued expenses in foreign currencies are as follows :
- 83 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan 2009 Mata uang asli/ Original currency *) US$ JPY EUR Lain-lain **) Jumlah
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued 2008 Mata uang asli/ Original currency *)
Ekuivalen Rp/ Rp equivalent
64,693,625 614,582,258 1,722,638 392,571
748,829 71,851 26,403 4,544 851,627
8,844,348 698,611,702 2,368,457 221,147
Ekuivalen Rp/ Rp equivalent 86,132 64,462 38,825 5,413 194,831
US$ JPY EUR Others **) Total
*)
Dalam jumlah penuh
*)
In full amount
**)
Biaya masih harus dibayar dalam mata uang asing lainnya disajikan dalam jumlah setara US$, menggunakan kurs tanggal neraca.
**)
Accrued expenses denominated in other foreign currencies are presented as US$ equivalents using the exchange rates prevailing at balance sheet date.
36. PENJUALAN TENAGA LISTRIK
36. REVENUE FROM ELECTRICITY
Penjualan tenaga listrik menurut pelanggan adalah sebagai berikut :
OF
Sale of electricity by customers are as follows :
2009 Umum Pemerintah Badan Usaha Milik Negara TNI dan Polri Jumlah
SALE
2008
14,374,779 858,208 675,550 4,985,905 20,894,442
18,479,060 763,268 594,055 117,886 19,954,269
Public Government State-owned enterprises Indonesian Armed Forces Total
Pendapatan penjualan tenaga listrik didasarkan pada tarif dasar listrik yang ditetapkan Pemerintah Republik Indonesia.
Revenue from sale of electricity is based on basic electricity tariffs determined by the Government.
Tidak terdapat penjualan kepada pelanggan dengan jumlah transaksi melebihi 10% dari penjualan tenaga listrik.
The Company has no customer from which it obtains its revenue of more than 10% of total sale of electricity.
- 84 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
37. GOVERNMENT’S SUBSIDY
37. SUBSIDI LISTRIK PEMERINTAH
ELECTRICITY
Pemerintah Republik Indonesia memberikan subsidi listrik kepada pelanggan melalui Perusahaan. Tatacara penghitungan dan pembayaran subsidi ditetapkan dalam Peraturan Menteri Keuangan Republik Indonesia (PMK) No. 111/PMK.02/2007 tanggal 14 September 2007 yang diperbaharui dengan Peraturan No. 162/PMK.02/2007 tanggal 17 Desember 2007 untuk subsidi listrik Tahun Anggaran 2007. Peraturan ini juga berlaku untuk subsidi tahun anggaran 2008 sampai ditetapkannya peraturan pengganti. Subsidi listrik dihitung dari selisih negatif antara harga jual tenaga listrik rata-rata (Rp/kWh) dari masing-masing golongan tarif dikurangi Biaya Pokok Penyediaan (BPP) tenaga listrik (Rp/kWh) pada tegangan di masing-masing golongan tarif dikalikan volume penjualan (kWh) untuk setiap golongan tarif. BPP tenaga listrik dihitung berdasarkan formula, termasuk tingkat susut jaringan transmisi dan distribusi, yang ditetapkan oleh Menteri Energi dan Sumber Daya Mineral c.q. Direktorat Jenderal Listrik dan Pemanfaatan Energi.
The Government of Republic of Indonesia has provided electricity subsidy to customers through the Company. Procedure for the calculation and payment of electricity subsidy for budget year 2007, is initially set in the Regulation of Minister of Finance of the Republic of Indonesia No. 111/PMK.02/2007 dated September 14, 2007, which has been amended by Regulation No. 162/PMK.02/2007 dated December 17, 2007. The rule is also effective for subsidy budget year 2008 until such rule is changed. The electricity subsidy is computed as the negative difference between the average sales prices (Rp/kwh) of each tariff category less the cost of electricity supplies on the voltage for each tariff category multiplied by the electricity sales volume (kwh) of each tariff category. The cost of electricity supplies is computed based on the formula, including the rate of transmission and distribution losses which is determined by the Directorate General of Electricity and Energy Consumption under the Ministry of Energy and Mineral Resources.
Berdasarkan Surat Pengesahan Daftar Isian Pelaksanaan Anggaran (DIPA) Tahun Anggaran 2008, pagu tertinggi subsidi listrik ditetapkan sebesar Rp 80.395.592 juta. Berdasarkan DIPA Tahun Anggaran 2007, pagu tertinggi subsidi listrik ditetapkan sebesar Rp 39.268.901 juta.
Based on the Approval Letter of Budget Performance List (DIPA) for the budget year 2008, the electricity subsidy plafond was determined to an amount of Rp 80,395,592 million. Based on DIPA for the budget year 2007, the electricity subsidy plafond was determined to an amount of Rp 39,268,901 million.
Perusahaan melakukan penghitungan dan mengakui subsidi listrik tahun 2008 dan 2007 berdasarkan formula penghitungan di atas yang menghasilkan jumlah subsidi listrik sebesar Rp 78.577.390 juta tahun 2008 dan Rp 37.480.668 juta tahun 2007. Besarnya subsidi listrik dalam satu tahun anggaran secara final ditetapkan berdasarkan hasil audit atas ketaatan penggunaan subsidi listrik yang dilakukan oleh auditor yang ditunjuk Menteri Keuangan c.q. Direktorat Jenderal Anggaran. Jumlah subsidi listrik final tersebut dapat berbeda dengan jumlah subsidi listrik yang telah diakui sebagai pendapatan oleh Perusahaan.
The Company computed and recognized the 2008 and 2007 electricity subsidy in accordance with the above formula resulting to the electricity subsidy amounts of Rp 78,577,390 million in 2008 and Rp 37,480,668 million in 2007. The final amount of electricity subsidy in a budget year is based on the result of the compliance audit of the usage of the electricity subsidy performed by an auditor assigned by the Directorate General of Budget under the Ministry of Finance. The final amount of the electricity subsidy could be different from the amount of electricity subsidy which had been recognized as revenue by the Company.
- 85 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Pada tanggal 3 April 2009 dan 2 Mei 2008, Perusahaan telah menyetujui hasil audit perhitungan subsidi listrik tahun 2008 dan 2007 masing-masing sebesar Rp 78.577.390 juta dan Rp 37.480.668 juta.
On April 3, 2009 and May 2, 2008, the Company agreed with the result of audit of 2008 and 2007 electricity subsidy computation amounting to Rp 78,577,390 million and Rp 37,480,668 million, respectively.
Hasil final perhitungan jumlah subsidi listrik tahun 2006 adalah sebesar Rp 33.904.223 juta. Perbedaan antara jumlah yang telah diakui sebagai pendapatan dan hasil final penghitungan subsidi listrik tahun 2006 sebesar Rp 875.917 juta dicatat sebagai pengurang pendapatan subsidi listrik Pemerintah tahun 2007.
The final result of the 2006 electricity subsidy computation amounted to Rp 33,904,223 million. Difference between the amount recognized as revenue and the final result of the electricity subsidy computation for 2006 amounting to Rp 875,917 million was recorded as a deduction from the revenue from Government’s electricity subsidy of 2007.
Pendapatan subsidi listrik dirinci sebagai berikut :
Revenue from electricity subsidy is detailed as follows :
2009 Realisasi penerimaan subsidi tahun anggaran berjalan : Penerimaan tunai Diperhitungkan dengan hutang usaha kepada Pertamina Perbedaan antara jumlah pendapatan subsidi listrik yang diakui dan hasil final perhitungan subsidi listrik Estimasi sisa tagihan subsidi listrik tahun anggaran berjalan (Catatan 14) Jumlah
2008
3,072,672
-
-
-
1,818,202 4,609,587 9,500,461
14,901,430 14,901,430
Realisasi subsidi listrik yang diperhitungkan dengan hutang usaha kepada Pertamina didasarkan pada Surat Perintah Membayar dan Pencairan Dana yang dikeluarkan Direktorat Jenderal Anggaran dan Perimbangan Keuangan dan Perbendaharaan Negara.
The offsetting of electricity subsidy against accounts payable to Pertamina is based on the Payment Instruction Letter and Fund Withdrawal issued by the Directorate General of Budget and Fiscal Balance and the Directorate General of Treasury.
38. PENDAPATAN USAHA LAINNYA
38. OTHER REVENUES 2009
Sewa trafo Perubahan daya tersambung dan administrasi Jasa-jasa dan lainnya Jumlah
Realization of subsidy from current year budget : Cash received Offsetting with accounts payable to Pertamina The difference between the amount of electricity subsidy recognized as revenue and the final result of the electricity subsidy computation Estimated subsidy receivable from current year budget (Note 14) Total
2008
11,542
17,436
14,298 148,244 174,084
12,153 180,433 210,022
- 86 -
Transformer rental Upgrading of electricity power and administration fees Services and others Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan 39.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
BEBAN BAHAN BAKAR DAN PELUMAS
39.
2009
2008
Bahan Bakar Minyak Solar High Speed Diesel Residu Solar Industrial Diesel Lainnya Jumlah
7,268,473 2,561,199 13,837 12,658 9,856,167
15,279,904 3,957,945 36,626 12,366 19,286,841
Bahan Bakar - Non Minyak Gas alam Batubara Panas bumi Minyak pelumas Air Jumlah
2,209,108 3,743,886 488,703 72,795 34,700 6,549,192
1,068,374 1,848,771 563,216 65,194 28,906 3,574,462
16,405,360
22,861,303
Jumlah
Seluruh Bahan Bakar Minyak (BBM), yang merupakan lebih 10% dari jumlah beban bahan bakar dan pelumas, berasal dari pembelian dari Pertamina.
40.
FUEL AND LUBRICANTS EXPENSE
Non fuel Natural gas Coals Geothermal Lubricants Water Total Total
All fuel, which represents more than 10% of the total fuel and lubricants expense, are purchased from Pertamina.
BEBAN PEMBELIAN TENAGA LISTRIK
40.
2009 PT Paiton Energy PT Jawa Power PT Sumber Segara Primadaya PT Unocal Geothermal Indonesia PT Amoseas (Drajat) PT Asrigita Prasarana PT Magma Nusantara PT Energy Sengkang PT Makassar Power PT Dalle Energy Batam PT Cikarang Listrindo PT Meppo Gen PT Indo Matra Power PO Jatiluhur PT Mitra Energy Batam PT Geo Dipa Energy PT Pusaka Jaya Palu Power PT.Krakatau Steel PT.Cahaya Sakti (PLTG) Pertamina Geothermal Pembelian lainnya Sewa diesel Jumlah
Fuel Solar High Speed Diesel Residue Solar Industrial Diesel Others Total
ELECTRICITY PURCHASE EXPENSE
2008
1,887,454 1,487,652 609,950 294,115 280,557 172,114 283,251 246,125 93,235 104,168 171,783 83,104 45,185 29,229 19,496 16,018 20,706 1,337 4,999 64,268 233,833 201,896 6,350,475
- 87 -
1,400,843 1,491,231 264,836 231,936 229,519 135,046 122,312 115,460 152,423 70,267 140,081 64,963 37,375 20,288 16,986 28,323 139,801 258,537 4,920,227
PT Paiton Energy PT Jawa Power PT Sumber Segara Primadaya PT Unocal Geothermal Indonesia PT Amoseas (Drajat) PT Asrigita Prasarana PT Magma Nusantara PT Energy Sengkang PT Makassar Power PT Dalle Energy Batam PT Cikarang Listrindo PT Meppo Gen PT Indo Matra Power PO Jatiluhur PT Mitra Energy Batam PT Geo Dipa Energy PT Pusaka Jaya Palu Power PT.Krakatau Steel PT.Cahaya Sakti (PLTG) Pertamina Geothermal Other electricity purchase Diesel rental Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Detailed purchases to suppliers which represent more than 10% of the total purchases of electricity are as follows :
Rincian pembelian kepada pemasok yang melebihi 10% dari jumlah pembelian tenaga listrik adalah sebagai berikut : 2009 Rp **) PT Paiton Energy PT Jawa Power Jumlah
2008 % *)
1,887,454 1,487,652 3,375,106
Rp **)
29.72 23.43 53.15
*) Persentase terhadap jumlah beban pembelian tenaga listrik **) Dalam jutaan
41.
1,400,843 1,491,231 2,892,074
41.
Akun ini merupakan beban yang timbul dari pemakaian material dan jasa borongan, sebagai berikut :
MAINTENANCE EXPENSES
2008
650,514 725,739 1,376,253
766,521 609,038 1,375,559
BEBAN KEPEGAWAIAN
42.
2009 Imbalan kerja Tunjangan Gaji Jasa produksi dan insentif prestasi kerja Lain-lain Jumlah
PT Paiton Energy PT Jawa Power Total
This account represents spare parts used and contractor fees for maintenance purposes, as follows :
2009
42.
28.47 30.31 58.78
*) Percentage to total electricity purchase expenses **) In million
BEBAN PEMELIHARAAN
Pemakaian material Jasa borongan Jumlah
% *)
Spare parts used Contractor fees Total
PERSONNEL EXPENSES
2008
475,194 281,675 608,850 8,245 250,374 1,624,338
514,990 159,811 637,685 7,622 230,040 1,550,148
- 88 -
Employee benefits Allowances Salaries Bonus, performance and incentives Others Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
43. BEBAN USAHA LAIN-LAIN
43. OTHER OPERATING EXPENSES 2009
Honorarium Penagihan rekening dan penertiban pemakaian tenaga listrik Perjalanan dinas Baca meter Teknologi informasi Konsumsi Pos, telepon dan telegram Piutang ragu-ragu Pemakaian gas, listrik dan air Alat tulis kantor Asuransi Retribusi dan keamanan Iklan dan barang cetakan Pengelolaan pelanggan Sewa Cetak rekening Pemasaran Blanko rekening Lain-lain Jumlah
2008
84,698
116,045
73,610 108,835 91,973 14,445 47,151 14,839 26,904 49,165 32,101 97,700 18,330 26,024 22,663 23,335 13,930 5,123 3,069 124,162 878,060
96,091 117,981 77,686 6,851 49,404 45,286 29,547 40,728 31,000 36,773 28,815 27,621 28,083 23,938 11,951 4,574 2,437 94,059 868,868
44. BEBAN BUNGA DAN KEUANGAN
44. INTEREST EXPENSE AND FINANCING CHARGES 2009
Hutang sewa pembiayaan Hutang pembelian bahan bakar Penerusan pinjaman Hutang obligasi Hutang listrik swasta Hutang kepada pemerintah Hutang bank Lain-lain Jumlah
Honorarium Billing collection and orderliness of of electricity used Travel Meter reading Technological information Consumables Postage, telephone and telegraph Provision for doubtful accounts Gas, electricity and water Stationeries Insurance Dues and security Printing materials and promotion Customer maintenance Rent Bill printing Marketing Bill form Others Total
2008
660,027 136,364 189,117 273,322 124,674 34,276 50,040 459 1,468,279
496,098 192,952 205,966 102,861 37,391 1,417 880 1,037,565
- 89 -
Lease liability Accounts payable on purchases of fuel Two-step loans Bonds payable Electricity purchase payable Government loans Bank loans Others Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
45. PENGHASILAN BERSIH
(BEBAN)
LAIN-LAIN
-
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
45. OTHER INCOME (EXPENSES) - NET
2009
2008
Penghasilan denda administrasi Penghasilan jasa dan klaim Keuntungan penjualan aset tetap Premi penerangan jalan umum
112,871 14,966 5,982 8,091
103,470 14,373 2,482 12,537
Beban penurunan nilai aset tetap Bagian laba (rugi) perusahaan asosiasi (Catatan 6) Beban penelitian Lain-lain Jumlah
(15,964)
(12,488)
(12) 261,666 387,599
(139) (307) 40,033 159,961
46. PAJAK PENGHASILAN
Administrative penalty income Claim and service income Gain on sale of property, plant and equipment Fees for street lights Loss on impairment of property, plant and equipment Equity in net income (loss) of associates (Note 6) Research Others Total
46. INCOME TAX
Beban (manfaat) pajak Perusahaan dan anak perusahaan terdiri dari :
Tax expense (income) of the Company and its subsidiaries consist of the following :
2009 Pajak kini Pajak tangguhan Jumlah beban pajak
2008
31,675 214,309 245,984
290,855 335,413 626,269
Current tax Deferred tax Total tax expense
Pajak Tangguhan
Deferred Tax
Rincian dari aset dan kewajiban pajak tangguhan Perusahaan dan anak perusahaan adalah sebagai berikut :
The details of the Company and its subsidiaries deferred tax assets and liabilities are as follows :
- 90 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
1 Januari/ January 1, 2009 Aset Pajak Tangguhan Anak Perusahaan - Bersih Kewajiban Pajak Tangguhan Perusahaan Aset pajak tangguhan Kewajiban imbalan kerja Pendapatan ditangguhkan Jumlah Kewajiban pajak tangguhan Pensiun dibayar dimuka Aset tetap Sewa pembiayaan Lainnya Jumlah Bersih Anak Perusahaan - Bersih Kewajiban Pajak Tangguhan Bersih
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Dikreditkan (dibebankan) ke laporan laba rugi/ Credited (charged) to income for the year
8,767
3,267,085 1,853,952 5,121,037
1,110
19,681 24,372 44,053
31 Maret/ March 31, 2009 9,877
3,286,766 1,878,324 5,165,090
(31,530) (9,213,508) (286,650) (485) (9,532,173)
0 (206,134) (24,033) 445 (229,721)
(31,530) (9,419,642) (310,683) (40) (9,761,894)
(4,411,136)
(185,668)
(4,596,804)
(3,862,747)
(28,953)
(3,891,700)
(8,273,883)
(214,621)
(8,488,504)
Deferred Tax Assets Subsidiaries - Net Deferred Tax Liabilities The Company Deferred tax assets Employee benefit obligation Deferred income Total Deferred tax liabilities Prepaid pension Property, plant and equipment Leases Others Total Net Subsidiaries - Net
Deferred Tax Liabilities - Net
Berdasarkan Undang Undang Pajak Penghasilan No. 36 tahun 2008 pengganti Undang Undang pajak No. 7/1983, tarif pajak badan adalah sebesar 28% yang berlaku efektif 1 Januari 2009 dan sebesar 25% yang berlaku efektif 1 Januari 2010. Aset dan kewajiban pajak tangguhan disesuaikan dengan tarif pajak yang berlaku pada periode ketika aset direalisasikan dan kewajiban diselesaikan berdasarkan tarif pajak yang akan ditetapkan.
Based on law No 36/2008 the amendment of tax law No. 7/1983 on income taxes, the new corporate tax rate is set at flat rate of 28% effective January 1, 2009 and 25% effective from January 1, 2010. Accordingly, deferred tax assets and liabilities has been adjusted to the tax rates that are expected to apply at the period when the asset is realized or liability is settled, based on the tax rates that will be enacted.
Perusahaan dan anak perusahaan belum mempunyai dasar memadai untuk menentukan manfaat pajak masa datang aset pajak tangguhan tersebut. Aset pajak tangguhan ini akan diakui dalam laporan keuangan konsolidasi pada saat laba kena pajak tersedia dimasa akan datang.
The Company and its subsidiaries does not have a sufficient basis to determine the future tax benefit on the deferred tax asset. The deferred tax asset will be recognized in the consolidated financial statements when the taxable income becomes available in future periods.
- 91 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Surat Ketetapan Pajak
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Tax Assessment Letter
Perusahaan
The Company
Pada tahun 2008, Perusahaan menerima Surat Ketetapan Pajak Lebih Bayar (SKPLB) atas pajak penghasilan (PPh) badan tahun pajak 2006 sebesar Rp 2.103 juta serta penetapan rugi fiskal sebesar Rp 3.919.814 juta.
In 2008, the Company received Tax Assessment Letters for Overpayment (SKPLB) of corporate income tax for fiscal year 2006 amounting to Rp 2,103 million and assessment for tax loss of Rp 3,919,814 million.
Pada tahun 2007, Perusahaan menerima Surat Ketetapan Pajak Kurang Bayar (SKPKB) atas PPh pasal 4 ayat (2), pasal 21, pasal 23 dan Pajak Pertambahan Nilai (PPN) untuk tahun pajak 2005 sejumlah Rp 6.764 juta, dan telah dilunasi pada tahun 2007. Perusahaan juga menerima SKPLB PPh badan tahun pajak 2005 sebesar Rp 1.751 juta serta penetapan rugi fiskal sebesar Rp 5.291.969 juta.
In 2007, the Company received Tax Assessment Letters for Underpayment (SKPKB) of income tax article 4 section (2), article 21, article 23 and value added tax (VAT) for fiscal year 2005 totaling to Rp 6,764 million, and were paid in 2007. The Company also received SKPLB of corporate income tax for fiscal year 2005, amounting to Rp 1,751 million and assessment for tax loss of Rp 5,291,969 million. Subsidiary – IP
Anak perusahaan - IP Pada tahun 2008, IP menerima Surat Tagihan Pajak (STP) denda keterlambatan pembayaran PPh pasal 25 tahun 2008, PPh badan tahun 2007 dan PPN tahun 2007 dengan jumlah keseluruhan sebesar Rp 31.979 juta.
In 2008, IP received Tax Collection Notice (STP) for late payment of income tax article 25 year 2008, corporate income tax year 2007 and VAT year 2007 with total amount of Rp 31,979 million.
Pada tahun 2007, IP menerima STP atas keterlambatan pembayaran PPh Badan tahun 2006, 2005 dan 2004 sebesar Rp 210.809 juta.
In 2007, IP received STP for late payment of corporate income tax in 2006, 2005 and 2004 totaling to Rp 210,809 million.
Pada tahun 2007, IP juga menerima SKPKB dan STP atas PPh pasal 4 ayat (2) final, pasal 21, pasal 23, pasal 26 dan PPN tahun 2006, 2004, 2003, 2002 dan 2001 dengan jumlah keseluruhan sebesar Rp 76.194 juta.
In 2007, IP also received SKPKB and STP for income tax article 4 section (2) final, article 21, article 23, article 26 and VAT for year 2006, 2004, 2003, 2002 and 2001 with total amount of Rp 76,194 million.
Pada tanggal 31 Desember 2008 dan 2007, jumlah STP yang belum dibayar masing-masing sebesar Rp 44.017 juta dan Rp 130.902 juta.
As of December 31, 2008 and 2007, total STP which has not been paid amounted to Rp 44,017 million and Rp 130,902 million, respectively.
- 92 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Pada tahun 2006, IP menerima SKPKB dan STP meliputi PPh pasal 4 ayat (2) final, pasal 21, pasal 23 dan PPN tahun 2004 dengan jumlah keseluruhan sebesar Rp 20.458 juta. IP mengajukan keberatan atas SKPKB dan STP sebesar Rp 19.611 juta, sedangkan SKPKB dan STP sebesar Rp 847 juta, telah disetujui dan dicatat IP sebagai beban lain-lain tahun 2006. Pada tahun 2007, Direktorat Jenderal Pajak (DJP) menolak keberatan yang diajukan IP sebesar Rp 14.796 juta dan dicatat sebagai beban lain-lain tahun 2007. Pembayaran yang telah dilakukan IP atas SKPKB dan STP sebesar Rp 1.947 juta tanggal 31 Desember 2007 dicatat sebagai pajak dibayar dimuka. Pada tahun 2008, DJP menolak keberatan yang diajukan IP dan pajak dibayar dimuka sebesar Rp 1.947 juta dicatat sebagai beban lain-lain tahun 2008.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
In 2006, IP received SKPKB and STP for Income tax article 4 section (2) final, article 21, article 23 and VAT for year 2004 with total amount of Rp 20,458 million. IP filed an objection letter on the SKPKB and STP amounting to Rp 19,611 million, while SKPKB and STP amounting to Rp 847 million were recognized and recorded by IP as other expenses in 2006. In 2007, Director General of Tax (DJP) denied the objection filed by IP amounting to Rp 14,796 million and was recorded as other expense in 2007. Payment made by IP for SKPKB and STP amounting to Rp 1,947 million in December 31, 2007 were recorded as prepaid taxes. In 2008, DJP declined the objection filed by IP and prepaid taxes amounting to Rp 1,947 million were recorded as other expenses in 2008. In 2006, IP received SKPKB for 2004 corporate income tax of Rp 1,119,635 million. IP filed an objection on such assessment. In 2007, DJP decided that the 2004 corporate income tax and penalty amount to Rp 395,531 million.
Pada tahun 2006, IP menerima SKPKB atas PPh badan tahun 2004 sebesar Rp 1.119.635 juta. IP mengajukan keberatan atas ketetapan tersebut. Pada tahun 2007, DJP memutuskan PPh badan tahun 2004 beserta denda sebesar Rp 395.531 juta. Pada tahun 2005, IP menerima SKPKB dan STP, yang meliputi PPN, PPh pasal 4 ayat (2) final, pasal 21, pasal 23 dan 26 tahun 2002 dan 2001, dengan jumlah keseluruhan sebesar Rp 313.953 juta. Atas SKPKB dan STP tersebut, IP mengajukan keberatan. Dalam tahun 2006, DJP menolak keberatan yang diajukan IP sebesar Rp 311.367 juta. IP mengajukan banding atas penolakan dari DJP tersebut sebesar Rp 124.636 juta, sedangkan pajak lainnya sebesar Rp 186.731 juta, telah disetujui dan dicatat IP sebagai beban lain-lain tahun 2006. Pada tahun 2007, pengadilan pajak menolak banding yang diajukan sebesar Rp 111.943 juta dan mengabulkan banding sebesar Rp 10.604 juta. Pembayaran yang telah dilakukan IP atas SKPKB dan STP sebesar Rp 12.403 juta tanggal 31 Desember 2007, dicatat sebagai pajak dibayar dimuka. Pada tahun 2008, pajak dibayar dimuka sebesar Rp 11.216 juta dipindahbukukan terhadap hutang pajak badan tahun 2005 dan dicatat sebagai beban lain-lain tahun 2008 sebesar Rp 570 juta.
In 2005, IP received SKPKB and STP for VAT, income tax article 4 section (2) final, article 21, article 23 and 26 for year 2002 and 2001, totalling to Rp 313,953 million. IP filed an objection letter on these SKPKB and STP. In 2006, DJP denied the objection filed by IP amounting to Rp 311,367 million. IP filed an appeal for the objection denied by DJP for the amount of Rp 124,636 million, while other taxes amounting to Rp 186,731 million, were recognized and recorded as other expenses in 2006. In 2007, the tax court denied the appeal filed by IP amounting to Rp 111,943 million and approved appeal amounting to Rp 10,604 million. Payments made by IP for SKPKB and STP amounting to Rp 12,403 million in December 31, 2007, were recorded as prepaid taxes. In 2008, prepaid taxes amounting to Rp 11,216 million were offset with 2005 corporate income tax payable and prepaid taxes recorded as other expenses in 2008 amounted to Rp 570 million.
- 93 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Anak perusahaan – PJB
Subsidiary – PJB
Pada tahun 2007, PJB menerima SKPKB meliputi PPh pasal 15, pasal 21 dan pasal 23 sejumlah Rp 112.477 juta. PJB mengajukan keberatan atas SKPKB tersebut. Pembayaran yang telah dilakukan atas SKPKB sebesar Rp 39.208 juta dicatat sebagai pajak dibayar dimuka. Pada tahun 2008, DJP menolak keberatan yang diajukan PJB dan PJB mengajukan banding atas penolakan dari DJP tersebut.
In 2007, PJB received SKPKB for income tax article 15, article 21 and article 23 amounting to Rp 112,477 million. PJB filed an objection letter on these SKPKB. Payment made for such SKPKB amounting to Rp 39,208 million were recorded as prepaid taxes. In 2008, DJP denied the objection filed by PJB and PJB has filed an appeal for such refusal.
Anak perusahaan – PLN Batam
Subsidiary – PLN Batam
Pada tahun 2008, PLN Batam menerima SKPKB PPh pasal 4 ayat (2) final, pasal 21 dan pasal 23 dan PPN tahun 2000 sampai dengan 2005 dengan jumlah keseluruhan sebesar Rp 35.886 juta. Pada tanggal 31 Desember 2008 jumlah SKPKB yang belum dibayar sebesar Rp 34.960 juta.
In 2008, PLN Batam received SKPKB for income tax article 4 section (2) final, article 21, article 23 and VAT for years 2000 until 2005 totalling to Rp 35,886 million. As of December 31, 2008, the SKPKB which has not been paid amounted to Rp 34,960 million.
47. RUGI PER SAHAM DASAR
47. BASIC LOSS PER SHARE
Rugi
Loss
Rugi bersih untuk tujuan perhitungan rugi per saham dasar adalah sebesar Rp 1.662.342 juta tahun 2009 dan Rp 1.338.823 juta tahun 2008.
Net loss for the computation of basic loss per share amounted to Rp 1,662,342 million in 2009 and Rp 1,338,823 million in 2008.
Jumlah saham
Number of shares
Rata-rata tertimbang saham untuk tujuan perhitungan rugi per saham dasar adalah 46.107.154 saham.
The weighted average number of shares for the computation of basic loss per share was 46,107,154 shares.
Perusahaan tidak mempunyai efek berpotensi dilusi saham, sehingga Perusahaan tidak menghitung rugi per saham dilusian.
The Company did not calculate dilutive loss per share because it has no potential dilutive ordinary shares.
48. IMBALAN KERJA
48. EMPLOYEE BENEFITS Post-employment Benefits
Imbalan Pasca-Kerja
- 94 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Program Pensiun Imbalan Pasti
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Defined Benefit Pension Plan
Perusahaan dan anak perusahaan menyelenggarakan program pensiun imbalan pasti untuk semua karyawan tetap. Program pensiun ini memberikan imbalan pensiun yang ditentukan berdasarkan penghasilan dasar pensiun dan masa kerja karyawan. Program pensiun ini dikelola oleh Dana Pensiun PLN (Persero) (DP-PLN) yang akta pendiriannya telah disahkan oleh Menteri Keuangan Republik Indonesia dengan Surat Keputusannya No. KEP-284/KM.17/1997 tanggal 15 Mei 1997.
The Company and its subsidiaries established a defined benefit pension plan covering all of their permanent employees. This plan provides pension benefits based on salaries and years of service of the employees. The pension plan is managed by Dana Pensiun PLN (Persero) (DP-PLN), which deed of establishment was approved by the Ministry of Finance of the Republic of Indonesia in its decision letter No. KEP-284/KM.17/1997 dated May 15, 1997.
DP-PLN telah mendapat persetujuan dari Menteri Keuangan Republik Indonesia dalam surat keputusan No. KEP-078/KM.12/2006 tanggal 29 Agustus 2006 atas peningkatan imbalan pasti pensiun yang disediakan Perusahaan dan anak perusahaan dalam program dana pensiun.
DP-PLN obtained an approval from the Minister of Finance of the Republic of Indonesia No. KEP-078/KM.12/2006 dated on August 29, 2006 in relation to the increase in pension benefits provided by the Company and its subsidiaries’ pension plan.
Pendanaan DP-PLN terutama berasal dari iuran karyawan sebesar 6% dan pemberi kerja sebesar 8,00% - 9,45%.
DP-PLN is mainly funded by contributions from both the employees, which is 6% and the employer, which is 8.00% - 9.45%.
Imbalan Pasca-Kerja Lain
Other Post-employment Benefits
Perusahaan dan anak perusahaan juga memberikan imbalan pasca-kerja lain tanpa pendanaan berupa uang pesangon, penghargaan masa kerja dan ganti kerugian, tunjangan tambahan penghasilan dan penghargaan purna jabatan kepada karyawan yang memenuhi persyaratan sesuai dengan kebijakan Perusahaan dan anak perusahaan. Imbalan program ini ditentukan berdasarkan penghasilan dan masa kerja karyawan.
The Company and its subsidiaries also provide other unfunded defined post-employment benefit plans such as severance pay, service pay, compensation pay, additional allowance and functional retirement pay for their qualifying employees based on the Company and its subsidiaries’ policies. These other postemployment benefits are computed based on the salaries and service years of the employees.
Imbalan Pemeliharaan Kesehatan
Health Care Benefits
Selain program pensiun DP PLN dan imbalan pasca kerja lain, Perusahaan dan anak perusahaan menyediakan imbalan program kesehatan tanpa pendanaan bagi pensiunan dan keluarganya yang memenuhi persyaratan.
In addition to the pension plan managed by DPPLN and the other post-employment benefits, the Company and its subsidiaries also provide unfunded defined health care plans for their pensioners and their eligible dependents.
- 95 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Imbalan Kerja Jangka Panjang
Long-term Benefits
Perusahaan dan anak perusahaan juga memberikan imbalan kerja jangka panjang tanpa pendanaan berupa uang cuti besar, tunjangan kecelakaan dinas, bantuan kematian dan pemakaman dan penghargaan winduan bagi karyawan yang memenuhi persyaratan.
The Company and its subsidiaries also provide unfunded defined long-term benefit plans such as long service leave, work accident, death and funeral allowances, and eight years service award for their qualifying employees.
Perhitungan estimasi imbalan pasca-kerja dan imbalan kerja jangka panjang ini dihitung berdasarkan perhitungan PT Binaputera Jaga Hikmah, aktuaris independen pada tahun 2008.
The estimated cost of providing postemployment and long-term benefits were calculated based on an independent actuary, PT Binaputera Jaga Hikmah in 2008.
49. SIFAT DAN ISTIMEWA
TRANSAKSI
HUBUNGAN
49. TRANSACTIONS PARTIES
WITH
RELATED
Perusahaan dan anak perusahaan tidak diperlukan mengungkapkan transaksi dengan Badan Usaha Milik Negara/Daerah sebagai pihak hubungan istimewa sesuai dengan Pernyataan Standar Akuntansi Keuangan (PSAK) No. 7 mengenai “Pengungkapan Pihak-pihak yang mempunyai hubungan istimewa”.
The Company and its subsidiaries do not need to disclose the transactions with Stateowned/Regional-owned enterprises as transactions with related parties in accordance with Statement of Financial Accounting Standards (SFAS) No. 7 “Related Party Disclosure”.
Dalam kegiatan usahanya, Perusahaan dan anak perusahaan melakukan transaksi tertentu dengan pihak-pihak hubungan istimewa. Seluruh transaksi signifikan dengan pihak hubungan istimewa, baik yang dilakukan dengan persyaratan dan kondisi yang sama dengan atau tidak sama dengan pihak ketiga, telah diungkapkan dalam catatan atas laporan keuangan konsolidasi.
In the normal course of business, the Company and its subsidiaries entered into transactions with related parties. All significant transactions with related parties, whether or not done at normal prices and conditions as those done with third parties, are disclosed in the notes to consolidated financial statements.
Sifat Hubungan Istimewa
Nature of Related Parties
a.
Perusahaan dan anak perusahaan merupakan pemegang saham dengan pemilikan langsung dan tidak langsung pada perusahaan asosiasi sebagaimana dijelaskan dalam Catatan 8.
a.
The Company and its subsidiaries have investment in associate companies as identified in Note 8.
b.
Pengurus koperasi karyawan juga merupakan karyawan Perusahaan dan anak perusahaan.
b.
Management of Employee Cooperative is composed of the Company and its subsidiaries’ employees.
c.
Pendiri dan pengawas Yayasan Pendidikan dan Kesejahteraan PT PLN (Persero) merupakan pengurus dan karyawan Perusahaan dan anak perusahaan.
c.
The founders and controllers of Yayasan Pendidikan dan Kesejahteraan PT PLN (Persero) are composed of management and employees of the Company and its subsidiaries.
- 96 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
d.
Karyawan merupakan orang-orang yang mempunyai wewenang dan tanggungjawab untuk merencanakan, memimpin dan mengendalikan kegiatan Perusahaan.
d.
Transaksi Hubungan Istimewa Catatan/ Notes
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Transactions with Related Parties 2009
2008 % *)
Piutang pihak hubungan istimewa Direksi dan karyawan PT Sumber Segara Primadaya PT Metaepsi Pejebe Power Generation PT Dalle Energy Batam PT TJK Power PT Tenaga Listrik Jayapura PT Mitra Energy Batam PT Tenaga Listrik Bintan Jumlah
8
Hutang usaha PT Sumber Segara Primadaya Koperasi Karyawan PT Dalle Energy Batam PT Geo Dipa Energi PT Mitra Energy Batam Jumlah
33
Hutang pihak hubungan istimewa Karyawan Yayasan Pendidikan dan Kesejahteraan - PLN PT Dalley Energy Batam PT Mitra Energi Batam
31
Koperasi karyawan PT Tenaga Listrik Jayapura PT Tenaga Listrik Bintan Jumlah Jumlah Pembelian listrik swasta PT Sumber Segara Primadaya PT Dalle Energy Batam PT Mitra Energy Batam PT Geo Dipa Energi Jumlah
Officers are people who have authority and responsibility for planning, directing and controlling the activities of the Company.
% *)
428,762 1,116,900
0.14% 0.37%
792,535 489,788
0.28% 0.17%
49,275 9,943 18,114 9,357 2,269 907 1,635,527
0.02% 0.00% 0.01% 0.00% 0.00% 0.00% 0.58%
42,386 22,816 18,114 7,486 4,496 3,743 1,381,364
0.01% 0.01% 0.01% 0.00% 0.00% 0.00% 0.48%
Receivables from related parties Directors and employees PT Sumber Segara Primadaya PT Metaepsi Pejebe Power Generation PT Dalle Energy Batam PT TJK Power PT Tenaga Listrik Jayapura PT Mitra Energy Batam PT Tenaga Listrik Bintan Subtotal
242,539 93,643 43,554 15,862 9,125 404,723
0.14% 0.05% 0.03% 0.01% 0.01% 0.27%
39,284 24,127 27,546 18,134 4,233 113,324
0.03% 0.02% 0.02% 0.01% 0.00% 0.07%
Trade accounts payable PT Sumber Segara Primadaya Koperasi Karyawan PT Dalle Energy Batam PT Geo Dipa Energi PT Mitra Energy Batam Subtotal
23,577
0.01%
109,686
0.07%
14,385 19,153 11,764
0.01% 0.01% 0.01%
24,914 22,143 12,432
0.02% 0.01% 0.01%
Payable to related parties Employees Yayasan Pendidikan dan Kesejahteraan - PLN PT Dalley Energy Batam PT Mitra Energi Batam
2,212 71,092 475,815
0.00% 2,000 0.05% 0.31%
1,221 2,000 1,000 173,396 286,720
0.00% 0.11% 0.19%
Employee Cooperative PT Tenaga Listrik Jayapura PT Tenaga Listrik Bintan Subtotal Total
609,950 104,168 19,496 16,018 749,633
9.60% 1.64% 0.31% 0.25% 7.92%
264,836 70,267 16,986 28,323 380,412
5.38% 1.43% 0.35% 0.58% 7.73%
Electricity purchases PT Sumber Segara Primadaya PT Dalle Energy Batam PT Mitra Energy Batam PT Geo Dipa Energi Total
41
*) Persentase terhadap jumlah aktiva/ kewajiban/beban yang bersangkutan
50. ASET DAN KEWAJIBAN DALAM MATA UANG ASING
*) Percentage to related total assets/liabilities/expenses
MONETER
50. MONETARY ASSETS AND LIABILITIES DENOMINATED IN FOREIGN CURRENCIES
Pada tanggal 31 Maret 2009 dan 2008, Perusahaan dan anak perusahaan mempunyai aset dan kewajiban moneter dalam mata uang asing sebagai berikut :
At March 31, 2009 and 2008, the Company and its subsidiaries had monetary assets and liabilities in foreign currencies as follows :
- 97 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
2009 JPY *)
USD *)
EUR *)
Lain-lain/ Others **)
-
-
Aktiva moneter Piutang pihak hubungan istimewa Rekening dan deposito berjangka dibatasi penggunaannya Kas dan setara kas Investasi jangka pendek
3,936,956,058 1,225,356 -
405,399,842 244,012,181 240,988,916
516,066 -
414,163 -
Monetary assets Related party receivables Restricted cash in banks and time deposits Cash and cash equivalents Short-term investments
Jumlah aktiva moneter
3,938,181,414
987,780,092
516,066
414,163
Total monetary assets
Kewajiban moneter Penerusan pinjaman Hutang sewa guna usaha Hutang obligasi Hutang listrik swasta Hutang lain-lain Hutang biaya proyek Hutang usaha Biaya masih harus dibayar Jumlah kewajiban moneter
63,164,688,753 160,066,128,081 2,824,810,771 178,639,439 614,582,258 226,848,849,302
726,910,938 2,000,000,000 721,976,867 25,357,495 30,958,188 726,629,155 64,693,625 4,296,526,268
166,971,239 34,739,500 6,100,751 1,722,638 209,534,127
31,582,776 5,940,210 392,571 37,915,556
Monetary liabilities Two-step loans Lease liability Bonds payable Electricity purchase payable Other payables Project cost payable Trade accounts payable Accrued expenses Total monetary liabilities
Kewajiban moneter bersih
(222,910,667,887)
(3,308,746,175)
(209,018,061)
(37,501,393)
Net monetary liabilities
Ekuivalen Rupiah (dalam jutaan)
(26,303,459)
(38,298,737)
(3,203,620)
(434,079)
Jumlah dalam Rupiah bersih (dalam jutaan)
(68,239,894)
-
97,379,154
Rupiah equivalent (in millions)
Total in Rupiah - net (in millions)
- 98 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued 2008
JPY *)
USD *)
EUR *)
Lain-lain/ Others **)
-
-
Aktiva moneter Piutang pihak hubungan istimewa Rekening dan deposito berjangka dibatasi penggunaannya Kas dan setara kas Investasi jangka pendek
45,423,991,320 2,870,162,690 -
59,458,937 120,072,698 895,089,610
375,618 8,286,275
470,358 -
Monetary assets Related party receivables Restricted cash in banks and time deposits Cash and cash equivalents Short-term investments
Jumlah aktiva moneter
48,294,154,010
1,128,979,169
8,661,893
470,358
Total monetary assets
Kewajiban moneter Penerusan pinjaman Hutang sewa guna usaha Hutang obligasi Hutang listrik swasta Hutang lain-lain Hutang biaya proyek Hutang usaha Biaya masih harus dibayar
35,339,670,723 174,550,910,166 2,554,918,950 698,611,702
804,518,131 2,000,000,000 737,747,319 2,641,312 25,700,997 231,399,080 9,344,855
113,068,170 9,833,082 4,082,703 2,666,785
34,990,681 1,144,922 380,384
Monetary liabilities Two-step loans Lease liability Bonds payable Electricity purchase payable Other payables Project cost payable Trade accounts payable Accrued expenses
Jumlah kewajiban moneter
213,144,111,541
3,811,351,694
129,650,740
36,515,987
Total monetary liabilities
Kewajiban moneter bersih
(164,849,957,531)
(2,682,372,525)
(120,988,847)
(36,045,629)
Ekuivalen Rupiah (dalam jutaan)
(15,210,961)
(24,723,428)
(1,761,443)
(332,233)
Jumlah dalam Rupiah bersih (dalam jutaan)
(42,028,065)
-
54,357,924
Net monetary liabilities Rupiah equivalent (in millions) Total in Rupiah - net (in millions)
*)
Dalam jumlah penuh
*)
In full amount
**)
Aset dan kewajiban dalam mata uang asing lainnya disajikan dalam jumlah setara US$, menggunakan kurs tanggal neraca
**)
Assets and liabilities denominated in other foreign currencies are presented as US$ equivalent using the exchange rate prevailing at balance sheet date
Pada tanggal neraca, kurs konversi yang digunakan adalah sebagai berikut :
Mata uang JPY US$ EUR
On the balance sheet date, the conversion rates used are as follows :
2009 Kurs tengah/ Middle rate Rp *)
2008 Kurs tengah/ Middle rate Rp *)
118 11,575 15,327
92 9,217 14,559
*) Dalam jumlah penuh
Currency JPY US$ EUR *) In full amount
- 99 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Sehubungan dengan fluktuasi kurs mata uang Rupiah terhadap mata uang asing, Perusahaan dan anak perusahaan mencatat kerugian kurs mata uang asing sebesar Rp 1.310.577 juta tahun 2009 dan Rp 920.803 juta tahun 2008.
In relation to the fluctuation of Rupiah against foreign currencies, the Company and its subsidiaries recorded net loss on foreign exchange of Rp 1,310,577 million in 2009 and Rp 920,803 million in 2008.
51. INFORMASI SEGMEN
51. SEGMENT INFORMATION
Segmen Geografis
Geographical Segments
Untuk tujuan pelaporan manajemen, saat ini Perusahaan dan anak perusahaan dibagi dalam operasi geografis Jawa dan Luar Jawa. Operasi geografis tersebut menjadi dasar pelaporan informasi segmen primer Perusahaan dan anak perusahaan, sebagai berikut :
For management reporting purposes, the Company and its subsidiaries are currently divided into Java and outside Java geographical operations. These geographical operations are the basis on which the Company and its subsidiaries report their primary segment information, as follow : 2009
Jawa/ Java Pendapatan usaha Pendapatan eksternal Pendapatan antar segmen Jumlah Hasil segmen Beban usaha tidak dapat dialokasikan Laba usaha Beban lain-lain tidak dapat dialokasikan Beban pajak Rugi bersih
Luar jawa/ Outside Java
25,051,536 25,051,536
5,226,439 5,226,439
105,240,869
(7,704,517)
Eliminasi/ Elimination
(77,602,701)
Jumlah/ Total
30,277,975 30,277,975 19,933,650 (19,056,096) 877,554 (2,293,912) (245,984) (1,662,342)
Aktiva segmen Aset Aset tidak dapat dialokasikan Jumlah aktiva konsolidasi
216,461,874 117,933,241
98,042,922
Kewajiban segmen Kewajiban dialokasikan Kewajiban tidak dapat dialokasikan Jumlah kewajiban konsolidasi
112,396,250 (22,073,342)
135,919,248
Revenue External revenue Inter-segment revenue Total Segment results Unallocated operating expenses Income from operations Unallocated other charges Tax expense Net loss Segment Assets
(133,061,534)
- 100 -
(52,344,923)
181,443,262 117,933,241 299,376,503
Unallocated assets Total consolidated assets
195,970,575 (22,073,342) 173,897,233
Segment Liabilities Allocated liabilities Unallocated liabilities Total consolidated liabilities
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued 2008
Jawa/ Java Pendapatan usaha Pendapatan eksternal Pendapatan antar segmen Jumlah Hasil segmen Beban usaha tidak dapat dialokasikan Laba usaha Beban lain-lain tidak dapat dialokasikan Beban pajak Rugi bersih
Luar jawa/ Outside Java
30,596,167 30,596,167
4,621,048 4,621,048
111,494,731
(9,579,615)
Kewajiban segmen Kewajiban dialokasikan Kewajiban tidak dapat dialokasikan Jumlah kewajiban konsolidasi
104,766,317 (10,178,097)
Segmen Usaha
85,685,797
(142,968,690)
118,680,352
(61,861,190)
26,703,253
137,981,099 148,844,002 286,825,101
161,585,479 (10,178,097) 151,407,382
Business Segments The Company and its subsidiaries’ operations are mainly to provide electricity power supply. The Company and its subsidiaries’ operations which are not engaged in electricity represent 0.42% and 0.44% of total revenues in 2008 and 2007, respectively. Revenues based on business segments are as follows :
Operasi Perusahaan dan anak perusahaan terutama bergerak dalam bidang penyediaan tenaga listrik. Operasi Perusahaan dan anak perusahaan yang bukan bergerak dalam bidang tenaga listrik mencakup 0,42% dan 0,44% dari pendapatan usaha masing-masing tahun 2008 dan 2007. Pendapatan usaha berdasarkan segmen usaha adalah sebagai berikut : 2009
Lain-lain Jumlah
(75,211,863)
35,217,215 35,217,215
(2,293,912) (245,984) 5,107,261
195,263,992 148,844,002
Perubahan daya tersambung dan administrasi serta sewa trafo Jumlah
-
Jumlah/ Total
(19,056,096) 7,647,157
Aktiva segmen Aset Aset tidak dapat dialokasikan Jumlah aktiva konsolidasi
Usaha penyediaan tenaga listrik Penjualan listrik berdasarkan golongan tarif Industri Rumah tangga Usaha Umum Jumlah Subsidi listrik Pemerintah Pendapatan penyambungan pelanggan
Eliminasi/ Elimination
2008
6,713,244 7,591,596 5,174,813 1,414,789 20,894,442 9,500,461
7,452,784 6,998,209 4,242,159 1,261,117 19,954,269 14,901,430
161,252
151,493
25,841 30,581,995
17,436 35,024,628
148,244 30,730,239
192,586 35,217,214
- 101 -
Electricity power supply Revenue from sale of electricity by tariff category Industry Residentials Business Public Subtotal Government subsidy Customer connection fees Upgrading of electricity power and administration fees, and transformer rental Subtotal Others Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
52. IKATAN DAN KONTINJENSI
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
52. COMMITMENTS AND CONTINGENCIES
Pada tanggal 31 Maret 2009, Perusahaan dan anak perusahaan memiliki perikatan penting dan kontinjensi sebagai berikut :
As of March 31, 2009, the Company and its subsidiaries have significant commitments and contingencies, as follows :
a.
a.
Perjanjian pengadaan bahan bakar
i. Gas
Fuel supply agreements i. Gas
Sektor/ Sector Cilegon Cilegon Muara Karang - Priok Muara Tawar Muara Tawar Muara Tawar Gresik - Grati Gresik Gresik Gresik Aceh Belawan Pekanbaru Keramasan Keramasan Borang Inderalaya Payo Selincah Tanjung Batu Tarakan Bontang Batam Tg. Priok Grati Muara Tawar
Pemasok/ Supplier a) PT Perusahaan Gas Negara (Persero) Tbk b) PT Perusahaan Gas Negara (Persero) Tbk c) Medco E&P Lematang Kangean Energy Indonesia PT Pertamina (Persero), Kodeco (TAC) Hess Ltd PT Walinusa Energi PT Medco E&P Malaka PT Pertamina (Persero) Kalila Bentu Ltd PT Medco E&P Indonesia PT Pertamina (Persero) PT Medco E&P Indonesia PT Medco E&P Indonesia PT Energigasindo HK PT Pertamina (Persero), Semco (TAC) PT Medco E&P Indonesia Total E&P Indonesie, INPEX Co PT Perusahaan Gas Negara (Persero) Tbk PT Perusahaan Gas Negara (Persero) Tbk d) PT Pertamina EP
Periode/ Period
Satuan/ Unit
Kuantitas/ Quantity e)
2006-2018 2009-2019 2004-2016 2008-2013 2009-2020 2009-2018 2010-2027 2002-2013
bbtu bbtu bbtu bbtu bbtu bbtu bbtu bbtu
356.300 109.500 679.000 255.500 360.620 129.136 368.700 482.560
2006-2026 2010-2018 2010-2027 2002-2011 2005-2020 2009-2013 2005-2010 2004-2013 2002-2012 2009-2018 2005-2015
bbtu bbtu bbtu bbtu bbtu bbtu bbtu bbtu bbtu bbtu bbtu
440.000 44.160 85.000 151.900 146.036 32.680 27.375 61.999 56.182 65.700 79.026
2002-2012 2009-2013 2004-2019 2009-2012 2009-2016 2008-2010
bbtu bbtu bbtu bbtu bbtu bbtu
9.651 681 72.270 32.850 116.070 21.900
a)
CNOOC SES Ltd, Inpex Sumatra Ltd, KNOC Sumatra Ltd, MC Oil & Gas Sumatra BV, Paladin Resources (Sunda) Ltd, Paladin UK (Southeast Sumatra) Ltd, Paladin Resources (Bahamas) Ltd.
b)
BP West Java Ltd, Itochu Oil Exploration Co. Ltd, MC Oil & Gas Java BY, Inpex Jawa Ltd, CNOOC ONWC Ltd dan/and Paladin Resources (Sunda) Ltd.
c)
Pertamina, Hess Ltd. (dahulu/formerly Amerada Hess Ltd.), Pasific Oil & Gas Ltd.
d)
Santos (Sampang) Pty Ltd., Singapore Petroleum Sampang Ltd (dahulu/formerly Coastal Indonesia Sampang Ltd.) dan/and Cue Sampang Pty Ltd.
e)
Dalam jumlah penuh/In full amount
- 102 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Harga pembelian gas pada titik penyerahan berkisar antara US$ 1,15 sampai dengan US$ 5,98 per MMBtu.
Gas purchase price at point of delivery ranges from US$ 1.15 to US$ 5.98 per MMBTu.
Pada tanggal 26 Juli 2007, PJB mengadakan perjanjian dengan PT Petrokimia (PKG) dan EMP Kangean Limited terkait Gas Diversion Agreement. Perjanjian ini menetapkan bahwa PKG akan menerima pinjaman gas dari pihak PJB dengan mengalihkan sejumlah pasokan gas yang diperoleh EMP Kangean ke PKG. Atas pinjaman gas tersebut PKG akan membayar penggantian biaya kompensasi swap gas pada PJB. Pada tanggal 25 September 2007, PJB mengadakan kesepakatan dengan PKG terkait metode perhitungan penggantian biaya kompensasi swap gas.
In July 26, 2007, PJB entered into an agreement with PT Petrokimia (PKG) and EMP Kangean Limited, relating to Gas Diversion Agreement. This agreement determined that PKG will receive gas loan from PJB by diverting an amount of supply of gas, which is provided by EMP Kangean to PKG. In accordance with such gas loan, PKG will pay to PJB the replacement costs for the compensation expenses of gas swap. In September 25, 2007, PJB established an agreement with PKG, in relation to the method of computation of replacement costs for the compensation expenses of gas swap.
Pada tanggal 25 September 2008, Perusahaan dengan PGN mengadakan perjanjian jual beli dan pengeluaran gas untuk PLTU Cilegon untuk jangka waktu sepuluh tahun yang dimulai sejak Maret 2009 sampai dengan Pebruari 2019. Penyaluran gas untuk periode bulan pertama adalah sebesar 36,36 BBTU per hari, sedangkan untuk periode selanjutnya sampai dengan lima tahun sebesar 27,27 BBTU per hari. Untuk periode selanjutnya sampai berakhirnya perjanjian, pemakaian maksimum dan minimum gas akan disesuaikan dengan kesediaan gas PGN.
In September 25, 2008, the Company with PGN entered into buy and sell, and extraction of gas agreement, for PLTU Cilegon for a term of 10 years starting from March 2009 until February 2019. Gas channeling for the first month is 36.36 BBTU per day, while for the succeeding periods until the fifth year is 27.27 BBTU per day. For the remaining succeeding periods until the end of the agreement, the maximum and minimum use of gas will be in accordance with the availability of gas of PGN.
- 103 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
IP memperoleh fasilitas stand-by letter of credit (SBLC) maksimum sebesar US$ 39,9 juta dari Bank Negara Indonesia, berjangka waktu 13 tahun sampai dengan 31 Desember 2016.
IP has stand-by letters of credit (SBLC) facility with maximum amount of US$ 39.9 million, with a term of 13 years, due on December 31, 2016, from Bank Negara Indonesia.
IP menandatangani perjanjian fasilitas kredit tanggal 24 Mei 2007 sebesar US$ 55 juta dengan Citibank, N.A., Jakarta, PT Bank Internasional Indonesia dan Standard Chartered Bank, Jakarta. Pada tanggal 4 Juni 2007, IP telah menyerahkan jaminan rekening bank sebesar US$ 20 juta (setara dengan Rp 189.302 juta). Fasilitas kredit ini terikat dengan batasan tertentu termasuk, antara lain, penerbitan hutang, mengadakan penggabungan usaha dan akuisisi. Pembayaran pembelian gas dijamin dengan SBLC ini.
IP signed a Credit Facility Agreement amounting to US$ 55 million on May 24, 2007 with Citibank N.A, Jakarta, PT Bank Internasional Indonesia and Standard Chartered Bank, Jakarta. On June 4, 2007, IP made a placement of US$ 20 million (equivalent to Rp 189,302 million) as cash collateral account. This credit facility is governed by certain covenants, including, among others, incurrence of indebtedness, mergers and acquisition. Payments of gas purchase are secured by these SBLC.
Pada tanggal 31 Desember 2008, PLN Batam telah menempatkan deposito berjangka sebesar Rp 5.000 juta untuk memenuhi kewajiban rekening penjaminan (pledge deposit) kepada PGN.
In December 31, 2008, PLN Batam have placed a time deposit amounting to Rp 5,000 million to fulfill the loan obligation (pledge deposit) to PGN.
- 104 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
ii.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Batubara
ii. Coal Jumlah metrik ton per tahun / Quantity per year in metric ton a)
Pemasok/Suppliers Rutin /Regular PT Tambang Batubara Bukit Asam PT Berau Coal PT Adaro Indonesia PT Kaltim Prima Coal PT Kideco Jaya Aung PT Kasih Industri Indonesia PT Oktasan Baruna Persada PT Central Korporindo Internasional PT Natuna Energi Indonesia PT Bara Adhipratama PT Wijaya Karya Intrade PT Indominco Mandiri PT Arutmin Indonesia PT Jorong Barutama Graston Kerjasama konsorsium/Consortium PT Arutmin Indonesia & PT Darma Henwa PT Kasih Industri Indonesia & PT Senamas Energindo Mulai PT Surya Sakti Darma Kencana Lainnya/Others Program Percepatan/Fast Track Program PT Titan Mining Energy PT Baratmutiara Prima Kerjasama konsorsium/Consortium PT Arutmin Indonesia & PT Darma Henwa PT Kasih Industri Indonesia & PT Senamas Energindo Mulia
Periode/ Period
7.792.000 4.000.000 2.160.000 2.000.000 1.500.000 1.080.000 1.035.000 1.000.000 1.000.000 525.000 520.000 500.000 396.000 300.000
2003-2013 2008-2009/2018 2006-2011 2007-2016 2008-2018 2006-2009 2006-2009 2006-2009 2006-2009 2008-2028 2008-2016 2008-2013 2007-2027 2004-2009
1.501.000 783.000 522.000 1.046.000
2007-2027 2007-2027 2008-2028 2008-2009
3.205.000 2.328.000
2007-2027 2007-2027
5.903.000 5.451.000
2007-2027 2007-2027
a) Dalam jumlah penuh/In full amount
Harga stockpile pembelian batubara berkisar antara Rp 425.000 dan Rp 1.105.000 per ton yang disesuaikan terhadap nilai kalori, kadar abu, sulfur, air, SFT dan HGI.
The stockpile price of coal purchases ranges from Rp 425,000 to Rp 1,105,000 per ton, which is adjusted against calorific value, ash content, sulphur, water, SFT and HGI.
- 105 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
iii. Bahan Bakar Minyak
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
iii. Fuel
Perusahaan dan Pertamina mengadakan Perjanjian Payung Jual Beli Bahan Bakar Minyak No. 071.PJ/060/DIR/2001 tanggal 8 Oktober 2001 yang berlaku sampai dengan 8 Oktober 2004. Perjanjian ini telah mengalami beberapa kali perpanjangan dan pembaharuan, terakhir tanggal 16 Mei 2007 dimana Perusahaan dan Pertamina menyepakati antara lain: (i) penggunaan harga bahan bakar bulanan yang ditetapkan oleh Pertamina untuk periode 1 Januari sampai dengan 30 April 2007 dan harga bahan bakar 109,5% dari Mid Oil Platts Singapore (MOPS) ditambah Pajak Pertambahan Nilai untuk periode 1 Mei sampai dengan 31 Desember 2007; (ii) harga bahan bakar setelah tanggal 31 Desember 2007 akan ditetapkan oleh kedua belah pihak setiap tahun; (iii) jangka waktu pembayaran berikut pengenaan denda keterlambatan pembayaran sebesar tingkat bunga Sertifikat Bank Indonesia bulanan ditambah 1,3%; (iv) efektif mulai 1 Mei 2007, saldo hutang yang belum dibayar atas pembelian bahan bakar sampai dengan 30 April 2007 dikenakan bunga sebesar tingkat bunga Sertifikat Bank Indonesia per tahun ditambah 1,3%, sampai diselesaikan dengan menerbitkan obligasi PLN selambat-lambatnya tanggal 31 Agustus 2007; (v) hutang kepada Pertamina, termasuk obligasi yang akan diterbitkan maksimum sebesar Rp 18 triliun; (vi) perjanjian ini berlaku untuk 5 tahun sejak 1 Januari 2007 sampai dengan 31 Desember 2011; (vii) PT Sucofindo (Persero) ditunjuk sebagai independent surveyor.
The Company and Pertamina entered into a Fuel Buy and Sell Agreement No. 071.PJ/060/DIR/2001 dated October 8, 2001 which was valid until October 8, 2004. This agreement has been amended several times, with the last amendment on May 16, 2007, whereby, the Company and Pertamina agreed among others: (i) the monthly fuel price to be used for the period of January 1 until April 30, 2007 is determined by Pertamina and, the fuel price from 109.5% from Mid Oil Platts Singapore (MOPS) plus Value Added Tax for the period of May 1 until December 31, 2007; (ii) the fuel price subsequent to December 31, 2007 will be determined by both parties every year; (iii) the terms of payment and penalty charges on late payment with a rate of monthly Certificate of Bank Indonesia plus 1.3%; (iv) effective on May 1, 2007, the unpaid balance of payable for the purchases of fuel until April 30, 2007 will bear an interest with a rate per annum of Certificate of Bank Indonesia plus 1.3%, until settled by issuance of PLN Bonds, which is no later than August 31, 2007; (v) the maximum payable to Pertamina, includes bonds which will be issued amounting to Rp 18 trillion; (vi) this agreement is valid for 5 years from January 1, 2007 until December 31, 2011; (vii) PT Sucofindo (Persero) is assigned as an independent surveyor.
Harga BBM tahun 2008 untuk minyak solar untuk volume sampai dengan 5.300.000 kilo liter (KL) adalah sebesar 105% dari MOPS dan volume diatas 5.300.000 KL sebesar 109,5% dari MOPS, minyak bakar untuk volume sampai dengan 3.346.000 KL sebesar 105% dari MOPS dan volume diatas 3.346.000 KL sebesar 109,5% dari MOPS.
The cost of oil fuel in 2008 for diesel oil for a volume quantity until 5,300,000 kilo litres (KL) amounts to 105% from MOPS and for volume quantity exceeding 5,300,000 KL amounts to 109.5% from MOPS; fuel oil for volume quantity of 3,346,000 KL amounts to 105% from MOPS and for volume quantity exceeding 3,346,000 KL amounts to 109.5% from MOPS.
- 106 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Pada tanggal 31 Desember 2008 dan 2007, estimasi kewajiban bunga dan denda atas hutang pembelian bahan bakar kepada Pertamina masing-masing sebesar Rp 1.569.560 juta dan Rp 856.195 juta yang dicatat sebagai biaya masih harus dibayar (Catatan 38).
As of December 31, 2008 and 2007, estimated liabilities on interest and penalties for payable on purchases of fuel to Pertamina amounted to Rp 1,569,560 million and Rp 856,195 million, respectively, which are recorded as accrued expenses (Note 38).
iv. Uap Panas Bumi
iv. Geothermal Heat
Perusahaan memiliki perjanjian dengan Pertamina untuk pengadaan uap panas bumi untuk Kamojang selama 30 tahun yang berakhir tahun 2012, dan untuk Gunung Salak dan Darajat selama 30 tahun yang berakhir tahun 2030.
b.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
The Company has a geothermal heat procurement agreement with Pertamina for Kamojang for 30 years until 2012, and for Gunung Salak and Darajat for 30 years until 2030.
Perjanjian jual beli tenaga listrik
b. Power purchase agreement
Sebelum tahun 1997, Perusahaan mengadakan perjanjian jual beli tenaga listrik (PPA dan ESC) dengan penyedia dan pengembang tenaga listrik swasta (IPP) skala besar. Pada tahun 1999, Perusahaan telah melaksanakan renegosiasi terhadap PPA dan ESC melalui Kelompok Kerja Renegosiasi Kontrak Khusus PLN dibawah arahan Pemerintah. Renegosiasi tersebut meliputi antara lain keseimbangan kondisi kontrak, kewajaran harga dan disparitas harga jual listrik swasta dan harga jual Perusahaan.
Prior to 1997, the Company entered into Power Purchase Agreement (PPA) and Energy Sales Contract (ESC) with big scale Independent Power Producers (IPP). In 1999, the Company entered into renegotiation of PPA and ESC through Working Group on PLN Special Contract Renegotiation under the direction of the Government. Such renegotiation includes, among others, equalization in contract condition, reasonableness of price and disparity of selling price between IPP and the Company.
Dalam perjanjian dengan IPP tertentu, disepakati bahwa setiap saat selama perjanjian berlaku, Perusahaan dapat melaksanakan opsi untuk membeli hak penjual, milik, dan kepentingan atas proyek yang bersangkutan.
Based on the agreements with certain IPPs, the Company may exercise its option to purchase all of the IPP’s rights, title and interest in the projects at any time during the contract period.
Pada tanggal 31 Maret 2009, perjanjian penting antara Perusahaan dan anak perusahaan dengan IPP adalah sebagai berikut :
As of March 31, 2009, the significant agreements between the Company and its subsidiaries with IPPs are as follows :
- 107 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
i. Sudah Beroperasi
No.
Perusahaan/Company
i.
Proyek/Project
1. 2.
PT Cikarang Listrindo PT Energi Sengkang
Cikarang, Jabar/West Java Sengkang, Sulsel/South Sulawesi
3.
Unocal Geothermal Indonesia Ltd. PT Makassar Power PT Paiton Energy PT Jawa Power Pertamina, Cevron Drajat Ltd. Texaco Drajat Ltd. dan/and PT Drajat Geothermal Ind. Pertamina and Magma Nusantara Limited PT Geo Dipa Energy
Salak, Jabar/West Java
10.
PT Asrigita Prasarana
11. 12. 13. 14.
PT Sumber Segara Primadaya PT Dalle Energy Batam PT Mitra Energi Batam PT Indo Matra Power
15. 16.
PT Jembo Energindo PT Metaepsi Pejebe Power Generation PT Pusaka Jaya Palu Power
Palembang Timur, Sumsel/ South Sumatera Cilacap, Jateng/Central Java Panaran, pulau Batam/Batam Island Panaran, pulau Batam/Batam Island Kawasan Industri Kabil, Pulau Batam/Industrial Zone, Batam Island Panaran, pulau Batam/Batam Island Gunung Megang, Sumsel/ South Sumatera Palu, Sulawesi Tengah/ Central Sulawesi Kamojang, Jabar/West Java
4. 5. 6. 7.
8. 9.
17. 18. 19.
PT Pertamina Geothermal Energi PT Cipta Daya Nusantara
Pare-pare, Sulsel/South Sulawesi Paiton I, Jatim/East Java Paiton II, Jatim/East Java Drajat, Jabar/West Java Wayang Windu, Jabar/West Java Dieng, Jateng/Central Java
Mobuya, Sulawesi Utara/ North Sulawesi
Jumlah/Total
- 108 -
In Operations
Bahan bakar/ Fuel
Kapasitas/ Capacity (MW)
AF b) (%)
Periode/ Period
150 195
72 85
1996-2016 1997-19982028/2031
330 60 1.230 1.220
90 80 85 83
2002-2040 1999-2016 1994-2040 1995-2030
180
95
110
90
20002030/2040 1998-19992008/2029
60
85
2004-2046
Gas Batubara/Coal Gas Gas
150 600 55 55
85 80 80 84
2002-2022 2004-2036 2005-2016 2005-2016
Gas Gas
17 24
90 65
2005-2017 2008-2011
Gas
80
80
2005-2025
Batubara/Coal Panas bumi/ Geothermal
27 60
80 90
2007-2032 2008-2038
Gas Gas Panas bumi/ Geothermal MFO Batubara/Coal Batubara/Coal Panas bumi/ Geothermal Panas bumi/ Geothermal Panas bumi/ Geothermal
Hidro/Hydro
3 4.606
2007-2027
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
ii. Belum Beroperasi (Dalam Tahap Pengembangan)
No.
Perusahaan/ Company
ii.
Proyek/Projects
Not Yet in Operations (Development Stage)
Bahan bakar/ Fuel
AF b) (%)
Periode/ Period a)
800 600 380
85 80% 85%
2012-2042 2011-2041 2011-2041
330
80%
2011-2041
2 3
PT Cirebon Electric Power PT General Energy Bali
4
Sarulla Operations Ltd
Sarulla, Sumatera Utara /North Sumatera
5
PT Ranyza Energi
Kuala Tanjung, Sumatera Utara/ North Sumatera
Batubara / Coal
225
84%
2010-2040
6
PT Priamanaya Power Energi
Baturaja, Sumatera Selatan / South Sumatera
Batubara / Coal
225
80%
2011-2041
7
PT Bukit Pembangkit Innovative
Batubara / Coal
200
80%
2010-2040
8
PT Bosowa Energy
Batubara / Coal
200
80%
2011-2041
9
PT Poso Energy
Banjarsari, Sumatera Selatan / South Sumatera Jeneponto, Sulawesi Selatan / South Sulawesi Poso, Sulawesi Tengah / Central Sulawesi Asahan 1, Sumatera Utara / North Sumatera
Batubara/ Coal Batubara / Coal Batubara / Coal Panas Bumi / Geothermal
Kapasitas/ Capacity (MW)
Paiton Ekspansi, Jatim/ Paiton Expantion, East Java Cirebon, Jawa Barat /West Java Celukan Bawang, Bali
1
PT Paiton Energy
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Tenaga Air /Hydro
195 720 GWh /thn
2010-2040
Tenaga Air / Hydro
180
75%
2010-2040
180
85%
2004-2046
110 110 50
90% 85% 80%
2008-2029 2009-2038 2010-2035
Batubara / Coal
50
80%
2010-2040
Batubara / Coal
50
72%
2008-2038
15 Lainnya/Others c)
267
65-95
2008-2035
Jumlah/Total
4.152
10 PT Bajradaya Sentranusa 11 PT Geo Dipa Energi
Patuha, Jawa Barat / West Java
12 PT Magma Nusantara Ltd 13 PT TJK Power 14 PT Equator Manunggal Power
Wayang windu 2, Jabar/West Java Pulau Batam/Batam Island Pontianak, Kalbar/West Kalimantan Samboja, Kalimantan Timur / East Kalimantan Embalut, Kalimantan Timur/ East Kalimantan
15 PT Indo Ridlatama Power 16 PT Cahaya Fajar
- 109 -
Panas Bumi / Geothermal Panas Bumi Batubara / Coal Batubara / Coal
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
a)
Perjanjian berlaku sejak ditandatangani, dan jual beli tenaga listrik berlaku antara 19 sampai dengan 30 tahun sejak tanggal produksi komersial.
a)
The agreements are effective from the date of signing and will last for about 19 to 30 years starting on the commercial operation date.
b)
AF = Faktor Pemasokan Tenaga yang harus diserap Perusahaan.
b)
AF = Power supply factor which should be absorbed by the Company.
c)
Meliputi kontrak dengan 27 IPP, berlokasi diberbagai daerah di Indonesia, menggunakan bahan bakar batu bara, panas bumi dan mini hydro dengan kapasitas masing-masing pembangkit kurang dari 50 MW.
c)
Represents contracts with 27 IPPs which are located in several areas of Indonesia, and are generated by coal, geothermal and mini hydro each with power plant’s capacity less than 50 MW.
Harga tenaga listrik per kWh untuk pembangkitan bahan bakar gas, MFO dan batubara ditetapkan berdasarkan formula tertentu yang ditetapkan dalam perjanjian yang antara lain mengatur pemulihan biaya modal, pembayaran biaya tetap operasi dan pemeliharaan, biaya bahan bakar dan pembayaran biaya variabel operasi dan pemeliharaan. Untuk pembangkitan yang menggunakan panas bumi, harga tenaga listrik ditetapkan berdasarkan formula tertentu sebagaimana dinyatakan dalam perjanjian antara lain Energy Charge dan Capacity Charge. Sehubungan dengan pembelian tenaga listrik, PLN Batam telah menyerahkan jaminan rekening dan deposito berjangka sebesar Rp 7.900 juta (Catatan 11).
The electricity power price per kWh for gas, MFO and coal power plants are determined by certain formula as stated in the agreement which regulate, among others, capital cost recovery, fixed operation and maintenance cost payment, fuel expense and variable operation and maintenance cost payment. For geothermal heat power plant, the electricity power price are determined by certain formula as stated in the agreement, among others, Energy Charge and Capacity Charge.
In relation with the purchase of electiricy, PLN Batam has placed collateral account and time deposit amounting to Rp 7,900 million (Note 11).
- 110 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
c. Perolehan barang modal
c. Capital expenditures
Pada tanggal 31 Maret 2009, jumlah ikatan perolehan barang modal berdasarkan kontrak, terutama sehubungan dengan pengadaan pembangkitan, jaringan transmisi dan distribusi adalah sebagai berikut :
Mata uang/ Currencies Program percepatan Kontrak pembangkitan
Kontrak transmisi
As of March 31, 2009, total commitments on capital expenditures based from contracts, specially relating with procurement of power plants, transmissions and distributions are as follows :
Jumlah dalam mata uang asing/ Amount in foreign currencies *)
US$ Rupiah
Setara Rupiah/ Rupiah equivalent *)
6.265
68.603.818 12.820.310 81.424.128
Rupiah
Proyek task force
US$ Rupiah
Kontrak konstruksi rutin
US$ EUR JPY Lain-lain/Others **) Rupiah
Fast track program Power plant contracts
1.702.540 15
161.220 113.621 274.841
336 196 68.620 76
3.678.043 3.019.812 8.318.745 836.127 9.328.638 25.181.365
Transmission contracts Task force projects
Regular construction contracts
*)
Dalam jutaan
*)
In million
**)
Perolehan barang modal dalam mata uang asing lainnya disajikan dalam jumlah setara US$, menggunakan kurs tanggal neraca.
**)
Capital expenditures denominated in other foreign currencies are presented as US$ equivalent using the exchange rate prevailing at balance sheet date
Program Percepatan
Fast Track Program
Berdasarkan Peraturan Presiden Republik Indonesia No. 71 Tahun 2006 tanggal 5 Juli 2006, Pemerintah menugaskan Perusahaan untuk membangun pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara di 40 lokasi di Indonesia, meliputi 10 pembangkit dengan kapasitas 6.900 MW di Jawa - Bali dan 30 pembangkit dengan kapasitas 1.852 MW di luar Jawa – Bali. Proyek ini diharapkan beroperasi pada tahun 2009 dan 2012.
Based on Presidential Decree No. 71 Year 2006 dated July 5, 2006, the Government mandates the Company to build coal-fired power plants (PLTU) at 40 locations in Indonesia, which include 10 power plants with aggregate capacity of 6,900 MW in Java - Bali and 30 power plants with aggregate capacity of 1,852 MW outside Java – Bali. These projects are expected to be in operation by 2009 and 2012.
- 111 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Kontrak Pembangkitan
Power Plant Contracts
Pada tanggal 31 Desember 2008, Perusahaan telah menandatangani 31 kontrak Engineering Procurement and Construction (EPC) meliputi 9 pembangkit tenaga listrik dengan kapasitas 5.300 MW di Jawa - Bali dan 22 pembangkit tenaga listrik dengan kapasitas 750 MW di luar Jawa – Bali. Berdasarkan kontrak EPC tersebut, Perusahaan diharuskan membayar uang muka sekitar 15% dari nilai kontrak dan 85% akan didanai melalui fasiltas kredit ekspor.
As of December 31, 2008, the Company signed 31 Engineering Procurement and Construction (EPC) contracts which consist of 9 electricity power plants with aggregate capacity of 5,300 MW in Java - Bali and 22 electricity power plants with aggregate capacity of 750 MW outside Java - Bali. Under the terms of such contracts, the Company is required to pay the contractor a down payment, which is approximately 15% of the contract price and the remaining 85% will be funded through export credit facility. As of December 31, 2008, the Company made a total down payment of US$ 662 million and Rp 3,155,990 million for 20 EPC contracts or approximately 15% of the total contract price, which are recorded as construction in progress (Note 6). Such down payments are funded by the proceeds of the issued Guaranteed Notes and withdrawal of credit facilities for fast track program.
Pada tanggal 31 Desember 2008, Perusahaan membayar uang muka sebesar US$ 662 juta dan Rp 3.155.990 juta untuk 20 kontrak EPC, atau sekitar 15% dari jumlah nilai kontrak, yang dicatat sebagai pekerjaan dalam pelaksanaan (Catatan 6). Uang muka tersebut didanai dari hasil penerbitan Obligasi Terjamin dan penarikan fasilitas kredit program percepatan.
Kontrak Transmisi
Transmission Contracts
Pada tanggal 31 Desember 2008, Perusahaan telah menandatangani 29 kontrak untuk peningkatan dan pembangunan transmisi baru dan gardu induk di Jawa dan luar Jawa. Proyek ini didanai dari pinjaman luar negeri melalui Pemerintah.
As of December 31, 2008, the Company signed 29 contracts for upgrading and constructing new transmission and substations in Java and outside Java. These projects are funded with overseas loans through the Government.
Proyek Penugasan Khusus
Task Force Project
Pada tahun 2007, Perusahaan membentuk Tim Penugasan Khusus untuk menanggulangi deficit tenaga listrik yang mengakibatkan pemadaman listrik secara bergilir di Sumatra Bagian Utara. Sehubungan dengan kondisi tersebut, Perusahaan telah menandatangani kontrak pengadaan beberapa unit pembangkit dan perlengkapannya meliputi PLTG Bhel Frame GB dan PLTG GE Frame GE-PG.
In 2007, the Company established a Task Force Team to resolve electricity deficit in North Sumatra. In relation to this matter, the Company has signed procurement contracts of several power generator unit and their related equipment which consist of PLTG Bhel Frame GB and PLTG GE Frame GEPG.
Kontrak konstruksi rutin
Regular Construction Contracts
- 112 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Ikatan pengadaan barang modal untuk konstruksi rutin merupakan kontrak yang telah ditandatangani untuk tambahan pembangkit listrik dan pengembangan jaringan transmisi dan distribusi. Proyek ini dibiayai melalui dana sendiri dan pihak luar melalui pinjaman luar negeri, bantuan dan proyek investasi sebagai bagian dari anggaran belanja negara.
Capital expenditure commitments for regular construction represent project contracts signed for additional electricity generating plants and development of transmission and distribution network. These projects are financed by own funds and other external funding through offshore loans, grants and investment projects which form part of the Government budget.
Pada tanggal 31 Desember 2008, IP mengadakan ikatan/kontrak dengan berbagai pihak untuk pengadaan material dan aset tetap serta jasa borongan dengan berbagai mata uang dengan jumlah setara Rupiah sebesar Rp 1.320.822 juta.
As of December 31, 2008, IP entered into commitments or contracts with various parties for the supply of materials, property, plant and equipment, and contracted services in various currencies, with Rupiah equivalent totaling to Rp 1,320,822 million.
Pada tanggal 31 Desember 2008, PJB mengadakan ikatan/kontrak dengan berbagai pihak untuk pengadaan material dan asset tetap serta jasa borongan dengan berbagai mata uang dengan jumlah setara Rupiah sebesar Rp 107.884 juta.
As of December 31, 2008, PJB entered into commitments or contracts with various parties for the supply of materials, property, plant and equipment, and contracted services in various currencies, with Rupiah equivalent totaling to Rp 107,884 million.
d. Fasilitas pinjaman belum digunakan
d. Unused two-step loan facilities
Penerusan pinjaman
Mata uang US$ EUR JPY Jumlah
Two-step loans Dalam mata uang asing/ In foreign currencies *) 321 54 250.353
*) Dalam jutaan
Ekuivalen Rp/ Rp equivalent *) 3.513.067 831.239 30.283.449 34.627.755
Curency US$ EUR JPY Total *) In millions
Fasilitas pinjaman belum digunakan setara Rp 6.900.000 juta dikenakan provisi sebesar 0,20% - 0,75% per tahun, sedangkan fasilitas sebesar Rp 27.700.000 juta tidak dikenakan provisi. Fasilitas ini berakhir antara tahun 2009 sampai dengan 2013.
The unused facilities with equivalent of Rp 6,900,000 million bears provision charge of 0.20% - 0.75% per annum, while the remaining facilities of Rp 27,700,000 million do not have any provision charge. These facilities will be due between 2009 to 2013.
- 113 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Perjanjian pinjaman program percepatan
Loan agreements for fast track program
Tujuan fasilitas pinjaman ini adalah untuk membiayai 85% dari nilai kontrak EPC untuk program percepatan. Jangka waktu pinjaman termasuk periode penyediaan kredit selama 36 bulan, dan sepenuhnya dijamin oleh Pemerintah Republik Indonesia sesuai dengan Peraturan Presiden Republik Indonesia (PP) No. 91 Tahun 2007 pengganti dari PP No. 86 Tahun 2006, tentang Pemberian Jaminan Pemerintah untuk Percepatan Pembangunan Pembangkit Tenaga Listrik berbahan bakar Batubara. Sehubungan dengan pinjaman ini, Perusahaan diwajibkan memenuhi batasan – batasan umum. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi, rincian fasilitas pinjaman untuk membiayai program percepatan adalah sebagai berikut :
The purpose of these loan facilities is to finance 85% of the contract price of EPC for fast track program. The term of the loan includes preparation of credit for 36 months and is fully guaranteed by the Government of the Republic Indonesia in accordance with the Presidential Regulation of the Republic of Indonesia (PP) No. 91 Year 2007, superseding No. 86 Year 2006, regarding Grant of Government Guarantee for Construction of Coal-Fired Power Plant. In connection with these loans, the Company is obliged to comply with general restrictions. As of the date of the issuance of the consolidated financial statements, details of loan facilities to finance the fast track program are as follow:
- 114 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
- 115 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Fasilitas pinjaman yang telah digunakan oleh Perusahaan sampai dengan tanggal penerbitan laporan keuangan konsolidasi adalah setara Rp 1.900.000 juta.
As of the date of the issuance of the consolidated financial statements, the Company utilized loan facilities amounting to equivalent of Rp 1,900,000 million.
e. Program operasi dan pemeliharaan
e. Operation and maintenance programs
Untuk meningkatkan dan memulihkan daya guna unit pembangkit sampai pada level tertentu, Perusahaan menandatangani Operation and Maintenance Agreement dengan beberapa kontraktor. Nilai kontrak terdiri dari porsi tetap dan tidak tetap. Kontraktor diharuskan memenuhi target tertentu dan akan dikenakan denda jika target tersebut tidak tercapai. Komitmen dengan kontraktor untuk porsi tetap adalah sebagai berikut : Pembangkitan/ Power plant
PLTU Tanjung Jati B PLTU Muara Tawar Jumlah/Total
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
In order to improve and restore the performance of generator units until a certain level, the Company has entered into Operation and Maintenance Agreement with contractors. The contract payment comprise of fixed and variable portions. The contractor has to meet certain targets and will be charged with penalty if these targets are not met. The commitments with the contractors for fixed portion are as follows : Kontraktor/ Contractors
Konsorsium/ consortium of Fortum Service OY & PT Medco Energy Siemens AG
- 116 -
Nilai kontrak/ Contract amount Setara Rupiah/ Rupiah equivalent
2.800.000 954.506 3.754.506
Periode/ Period
2005-2030 2004-2014
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
f. Perjanjian Sewa Pembiayaan Ekspansi
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
f. Expansion Finance Lease Agreement
Pada tanggal 4 Nopember 2008, Perusahaan dan PT Central Java Power (CJP) mengadakan perjanjian sewa pembiayaan untuk ekspansi Tanjung Jati B 1 & 2 - “FLA V”, yang antara lain mengatur bahwa CJP akan menyewakan aset sewa ekspansi (Unit “C” dan “D”) kepada Perusahaan. Pada tanggal perjanjian sewa pembiayaan ekspansi perkiraan perolehan aset sewaan untuk biaya ekspansi tersebut sebesar JPY 200.000 juta. Periode sewa akan dimulai sejak tanggal sewa ekspansi untuk setiap unit ekspansi dan akan berakhir 20 tahun setelah operasi komersial Unit D. Pembayaran minimum sewa pembiayaan selama ekspansi tahap satu, yang periodenya dimulai sejak tanggal sewa Unit C dan berakhir pada tanggal yang telah ditentukan dalam perjanjian adalah sebesar JPY 6.486 juta untuk setiap unit ekspansi per 6 bulanan. Pembayaran sewa harus dilakukan setiap setengah tahun sejak enam bulan dari tanggal sewa Unit D dan jumlah hutang sewa yang dibayar oleh Perusahaan pada tanggal jatuh tempo ditentukan berdasarkan perjanjian sewa pembiayaan ekspansi. Perusahaan memiliki hak opsi untuk membeli aset sewaan tersebut senilai JPY 1.000.
On November 4, 2008, the Company and PT Central Java Power (CJP) entered into Finance Lease Agreement for Expansion of Tanjung Jati B 1 & 2 - “FLA V”, which stipulates among others that CJP will lease the expansion leased assets (Units “C” and “D”) to the Company. The expected acquisition costs of the expansion leased assets, as of the date of the Expansion Finance Lease Agreement, is approximately JPY 200,000 million. The lease period will commence on the expansion lease-in date for each expansion unit and will expire on the date that is 20 years after the Unit D COD. The minimum amount of lease payment during the expansion phase one, which is the period commencing on the Unit C lease-in date and ending at a date determined in the agreement, shall be JPY 6,486 million for each expansion unit per every 6 months. The lease payment shall be paid semi-annually from six months after the Unit D lease-in date and the amount of the lease payment payable by the Company on the due date shall be determined in accordance with the Expansion Finance Lease Agreement. The Company has an option to purchase the expansion leased assets for JPY 1,000.
Sehubungan dengan perjanjian sewa pembiayaan ekspansi tersebut, Perusahaan, CJP dan Sumitomo Mitsui Banking Corporation mengadakan perjanjian escrow ekspansi pada tanggal 4 Nopember 2008 dengan tujuan untuk membentuk rekening escrow ekspansi sesuai dengan perjanjian sewa pembiayaan ekspansi. Sumitomo Mitsui Banking Corporation ditunjuk sebagai Exspansion Escrow Agent.
In relation to the Expansion Finance Lease Agreement, the Company together with CJP and Sumitomo Mitsui Banking Corporation, entered into an Expansion Escrow Agreement on November 4, 2008, for the purpose of establishing expansion escrow accounts pursuant to the Expansion Finance Lease Agreement. Sumitomo Mitsui Banking Corporation was appointed as the Expansion Escrow Agent.
Sampai dengan penerbitan laporan keuangan konsolidasi, periode sewa tersebut belum dimulai.
As of the date of the issuance of the consolidated financial statements, the lease period has not commenced yet.
- 117 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
g. Litigasi (i)
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
g. Litigations
Pada tanggal 29 Juli 1999, penduduk Desa Sirnagalih , Kecamatan Manis, Kabupaten Purwakarta mengajukan gugatan kepada Perum Perhutani Unit III Jawa Barat (“Perhutani”), sebuah Badan Usaha Milik Negara dibidang Kehutanan, dimana Perusahaan dan PJB juga sebagai pihak tergugat. Penggugat menyatakan bahwa Perhutani secara tidak syah menggunakan dan menjual tanah seluas 88.900 Ha kepada PJB untuk pembangunan Pembangkit Listrik Tenaga Air (PLTA Cirata). Tuntutan sebesar Rp 162,5 miliar dan pengembalian tanah. Pada bulan April 2000, Pengadilan Tinggi Bandung memutuskan untuk menerima permohonan banding Perhutani dan membatalkan putusan Pengadilan Negeri Purwakarta sebelumnya yang memenangkan tuntutan penggugat. Penggugat mengajukan kasasi ke Mahkamah Agung, yang membatalkan putusan Pengadilan Tinggi Bandung dan memerintahkan Pengadilan Tinggi untuk memeriksa dan memutus pokok perkara. Pada tanggal 3 Desember 2004, Pengadilan Tinggi menolak semua gugatan penuntut. Pada tanggal 28 Desember 2005, penggugat mengajukan memori kasasi ke Mahkamah Agung, dan selanjutnya Perusahaan dan PJB juga melakukan kontra memori kasasi ke Mahkamah Agung. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi, perkara ini masih dalam proses peninjauan kembali.
(i)
(ii) Perusahaan menghadapi gugatan ganti rugi sebesar Rp 110,4 miliar dari anggota Kelompok Konsumen Listrik PLN atas padamnya listrik di Nanggroe Aceh Darussalam. Pada tanggal 19 Januari 2004, Pengadilan Tinggi Nanggroe Aceh Darussalam menolak gugatan tersebut. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi, perkara ini dalam proses kasasi di Mahkamah Agung.
On July 29,1999, the people of the village of Sirnagalih, Manis Subdistrict, Purwakarta Regency Area filed a suit against Perum Perhutani Unit III West Java (“Perhutani”), a state-owned forestry enterprise, in which the Company and PJB were also named as defendants. The plaintiffs claim that Perhutani illegally seized and sold 88,900 hectares of land to PJB, which was used for the development of a water power plant (PLTA Cirata). The claim is for Rp162.5 billion and the return of the land. In April 2000, the Bandung High Court granted Perhutani’s appeal and annulled an earlier decision by the Purwakarta District Court in favor of the plaintiffs. The plaintiffs submitted a cassation application to the Supreme Court, which annulled the High Court’s decision and ordered the High Court to re-examine the case. On December 3, 2004, the High Court rejected all claims by the plaintiff. The plaintiffs filed a second cassation application to the Supreme Court on December 28, 2005, and the Company and PJB also made a counter-file to the Supreme Court. As of the date of the issuance of the consolidated financial statements, this case is under the judicial review process.
(ii) The Company faced claims from Kelompok Konsumen Listrik PLN amounting to Rp 110.4 billion for electricity shut-down in Nanggroe Aceh Darussalam. On January 19, 2004, the High Court of Nanggroe Aceh Darussalam have denied the claims. As of the date of the issuance of the consolidated financial statements, the case is still under appeal to the Supreme Court.
- 118 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
(iii) Pada tanggal 17 Mei 2004, PJB melakukan pemutusan kontrak “NonOEM Re-engineered Hot Gas Part of Muara Tawar Project” dengan Columbia Turbo and Engineering Service Pte. Ltd., Singapura (Columbia). Pada tanggal 15 Desember 2004, kedua belah pihak setuju untuk tidak menggunakan hukum International Arbitration di Singapura dalam penyelesaian kasus ini. Selanjutnya, pada tanggal 15 Juli 2005, PJB dan Columbia sepakat melanjutkan kontrak dengan ketentuan PJB dapat menyelesaikan kondisi yang menghambat pelaksanaan kontrak sampai dengan Desember 2005. Kedua belah pihak juga sepakat masalah tersebut sementara dianggap status quo dan akan dinegosiasikan melalui penyelesaian damai. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi, negosiasi kontrak masih dalam proses.
(iii) On May 17, 2004, PJB terminated the contract of ”Non-OEM Re-engineered Hot Gas Part of Muara Tawar Project” with Columbia Turbo and Engineering Service Pte. Ltd., Singapore (Columbia). On December 15, 2004, both parties agreed not to use the International Arbitration in Singapore to settle the case. Furthermore, on July 15, 2005, PJB and Columbia agreed to continue the contract under the condition that PJB will agree to resolve the obstacle of the contract implementation until December 2005. Both sides also agreed that the case is temporarily in status quo and will be negotiated through amicable contract settlement. As of the date of the issuance of the consolidated financial statements, the contract negotiation is still in process.
(iv) Pada tanggal 21 Oktober 2004, PT Kereta Api Indonesia (Persero) mengajukan gugatan terhadap Perusahaan di Pengadilan Negeri Jakarta Utara yang menyatakan bahwa Perusahaan tidak memiliki dasar hukum atas tanah kosong tertentu di Jalan Martadinata, Jakarta Utara yang berbatasan dengan tanah milik penggugat. Gugatan ganti rugi sebesar Rp 120,5 miliar. Pada tanggal 21 Pebruari 2006, Pengadilan Tinggi mengalahkan Perusahaan dan pada bulan Juli 2006, Perusahaan mengajukan banding ke Mahkamah Agung. Pada tanggal 24 Maret 2009 Perusahaan telah menerima surat pemberitahuan dari Mahkamah Agung RI yang menolak gugatan penggugat dan membatalkan putusan dari Pengadilan Tinggi tanggal 21 Pebruari 2006.
(iv) On October 21, 2004, PT Kereta Api Indonesia (Persero), filed a suit in the District court at North Jakarta against the Company stating that the Company does not have a legal claim over certain unoccupied land on Jalan Martadinata, North Jakarta, which is adjacent to certain land owned by the plaintiff. The claim amount involved is approximately Rp120.5 billion. On February 21, 2006, the High Court ruled against the Company and the Company submitted a cassation application to the Supreme Court in July 2006. On March 24, 2009, the Company received the letter of notification from the Supreme Court of RI, which denied the plantiff’s claim and cancelled the verdict dated February 21, 2006 from the High Court.
- 119 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
(v)
Pada tanggal 31 Januari 2000, Kilpatrick Green Pty, Ltd mengajukan gugatan terhadap PT Dharga Sentama Perkasa (Dharga) dan Perusahaan. Penggugat merupakan sub-kontraktor Dharga, kontraktor untuk perbaikan saluran kabel laut 150 kv Jawa - Madura. Penggugat menyatakan bahwa Dharga wanprestasi kontrak karena tidak melunasi sisa tagihan kepada penggugat. Gugatan ganti rugi sebesar US$ 4,2 juta dan Rp 1,5 miliar yang merupakan sisa tagihan dan kerugian lainnya. Pada tanggal 30 Juli 2004, Pengadilan Tinggi menolak gugatan tersebut, dan Mahkamah Agung menolak permohonan kasasi pihak penggugat tanggal 22 Juni 2006. Meskipun keputusan Mahkamah Agung telah bersifat final dan mengikat, sesuai dengan Perundang-undangan Indonesia, penggugat diperbolehkan mengajukan bukti baru untuk peninjauan ulang. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi, pengajuan tersebut tidak dilakukan.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
(v)
(vi) Pada tanggal 10 Juni 2005, Perusahaan menghadapi gugatan ganti rugi sebesar US$ 2,3 juta dan Rp 10 miliar dari PT Kurodona Gaugetama, salah satu penyewa gedung milik pelanggan listrik, atas kerugian yang timbul akibat pemutusan aliran listrik pelanggan karena keterlambatan pembayaran tagihan biaya pemakaian listrik. Meskipun Perusahaan menang di Pengadilan Negeri dan Pengadilan Tinggi Banten, penggugat telah mengajukan kasasi ke Mahkamah Agung pada tanggal 30 Januari 2007. Pada tanggal 10 Juni 2008, Mahkamah Agung RI menolak gugatan tersebut.
On January 31, 2000, Kilpatrick Green Pty Ltd, filed a suit against PT Dharga Sentama Perkasa (Dharga) and the Company. The plaintiff is a subcontractor of Dharga, who is the Company’s contractor for the repair of the Java - Madura 150kv submarine cable. The plaintiff claimed that Dharga defaulted on their contract by not making the remaining payment to them. The amount of the suit is Rp1.5 billion and U.S.$4.2 million, which represents the remaining payment under the contract and damages. The High Court denied the plaintiff’s claim on July 30, 2004, and the Supreme Court denied the plaintiff’s cassation application on June 22, 2006. Although the decision of the Supreme Court is final and binding, under Indonesian law the plaintiff is permitted to submit new evidence for civil review. As of the date of the issuance of the consolidated financial statements, no such submission had been made.
(vi) On June 10, 2005, a claim was made against the Company by PT Kurodona Gaugetama, the customer’s tenant, for damages incurred caused by termination of the supply of electricity to the customer’s property for non-payment of subscription charges. The amount claimed is US$ 2.3 million and Rp 10 billion. Although the Company prevailed in the District Court and the High Court of Banten, the plaintiff has submitted a cassation application to the Supreme Court on January 30, 2007. On June 10, 2008, the Supreme Court of RI denied such plaintiff’s claim.
- 120 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
(vii) Pada tanggal 26 September 2003, PT Bintara Saudara mengajukan gugatan terhadap Perusahaan di Pengadilan Negeri Medan atas pembatalan surat perjanjian pengadaan energi listrik. Gugatan ganti rugi sebesar Rp 61,1 miliar. Meskipun Perusahaan menang di Pengadilan Negeri, penggugat mengajukan banding ke Pengadilan Tinggi. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi perkara ini dalam proses banding di Pengadilan Tinggi.
(vii) On September 26, 2003, PT Bintara Saudara filed a lawsuit against the Company in the District Court in Medan, North Sumatera, for damages caused by the cancellation of the electricity power procurement agreement. The amount claimed is Rp 61.1 billion. Although the Company prevailed in the District Court, on August 19, 2004 the plaintiff appealed to the High Court. As of the date of the issuance of the consolidated financial statements, the case is under appeal to the High Court.
(viii) Pada tanggal 15 Nopember 2006, Perusahaan menghadapi gugatan ganti rugi dari Fakultas Hukum Universitas Muhammadiyah Sumatera Utara dan Persaudaraan Advokat Konsumen sebesar Rp 250 miliar sebagai bagian dari class action sehubungan dengan kerusakan yang disebabkan pemadaman listrik di Medan, Sumatera Utara. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi perkara ini dalam proses persidangan di Pengadilan Negeri Medan.
(viii) On November 15, 2006, the Company faced claims from the Facultas Hukum Universitas Muhammadiyah Sumatera Utara and Persaudaraan Advokat Konsumer amounting to Rp 250 billion as part of class action relating to damages caused by electricity shut down in Medan, North Sumatera. As of the date of the issuance of the consolidated financial statements, the case is still in process in the District Court of Medan.
- 121 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
(ix) Pada tanggal 19 Pebruari 1999, terjadi kerusakan kabel laut di Selat Madura akibat tersangkut jangkar Kapal Motor (MV) Kota Indah. Perusahaan menuntut ganti rugi sebesar US$ 5.699.995 dan Rp 15.801 juta kepada Advance Container Lines (Pte) Ltd., Pacific International Lines (Pte) Ltd., Shaukat Ali Akhtar, Nahkoda MV. Kota Indah, The Britania Steam Ship Insurance Association Ltd (P & I Club). Perusahaan menang dalam perkara ini sesuai dengan Keputusan Mahkamah Agung No. 1801 K/Pdt/2002 tanggal 15 Juli 2004 dan menghukum para tergugat secara tanggung renteng untuk memberikan ganti rugi kepada Perusahaan. Tergugat mengajukan peninjauan kembali dan Perusahaan telah memasukkan kontra memori peninjauan kembali. Pada saat penerbitan laporan keuangan konsolidasi proses eksekusi Mahkamah Agung RI telah dilaksanakan dengan sukarela.
(ix) On February 19, 1999, there has been a damage on the sea wire at Madura Strait caused by Motor Vessel (MV) Kota Indah. The Company has filed a claim of US$ 5,699,995 and Rp 15,801 million against Advance Container Lines (Pte) Ltd., Pacific International Lines (Pte) Ltd., Shaukat Ali Akhtar, the Captain of MV. Kota Indah and The Britania Steam Ship Insurance Association Ltd (P & I Club). The Company won the case based on Decision of Supreme Court No. 1801 K/Pdt/2002 dated July 15, 2004 and the defendants on a parri-passu basis are forced to pay the compensation to the Company. The defendants have filed for a judicial review and accordingly the Company has submitted a counter appeal for such review. As of the date of the issuance of consolidated financial statements the process of executing the decision of the Supreme Court of the Republic of Indonesia was voluntarily carried-out.
(x)
(x)
Pada tanggal 24 April 2008, Perusahaan menghadapi gugatan ganti rugi dari Jamsuri dan Maswi sebesar Rp 50 miliar untuk kerugian material dan Rp 25 miliar untuk kerugian immaterial sehubungan dengan kepemilikan tanah sengketa yang dimiliki Perusahaan. Meskipun Perusahaan dinyatakan menang di Pengadilan Negeri, penggugat mengajukan banding ke Pengadilan Tinggi. Pada tanggal 28 Desember 2008, Pengadilan Tinggi menolak gugatan dari penggugat. Penggugat mengajukan banding ke Mahkamah Agung RI tanggal 3 Maret 2009. Perusahaan telah mengajukan Kontra Banding pada tanggal 20 Maret 2009. Sampai dengan tanggal penerbitan laporan keuangan konsolidasi perkara ini dalam proses banding di Mahkamah Agung.
- 122 -
On April 24, 2008, the Company faced claims from Jamsuri and Maswi amounting to Rp 50 billion for the material loss and Rp 25 billion for the immaterial loss in relation to the ownership of land by the Company which is under dispute. Although the Company prevailed in the District Court, the plaintiff has appealed to the High Court. The High Court denied the plaintiff’s claim on December 28, 2008. The plaintiff submitted cassation application to the Supreme Court on March 3, 2009. The Company has submitted a counter appeal for such cassation on March 20, 2009. As of the date of the issuance of the consolidated financial statements, the case is under appeal to the Supreme Court of the Republic of Indonesia.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
(xi) Perusahaan juga menghadapi gugatan ganti rugi dalam jumlah yang tidak material di beberapa lokasi bangunan jaringan transmisi/distribusi, perselisihan dengan karyawan, perkara dengan pelanggan dan pemasok. Manajemen berpendapat klaim-klaim tersebut tidak material dan tidak mempengaruhi kegiatan usaha Perusahaan.
53. PENGARUH KRISIS KEUANGAN GLOBAL
(xi) The Company also faced claims for compensation of losses, which are immaterial in amount, at several areas of the Company’s transmission/distribution facilities, disputes with the Company’s employees, and cases with customers and suppliers. Management believes that such claims are not material and will not significantly affect the Company’s operations. 53. IMPACT OF GLOBAL FINANCIAL CRISIS
Pada bulan September 2008, terjadi krisis keuangan di Amerika Serikat yang membawa dampak terjadinya krisis keuangan secara global, termasuk di negara Indonesia. Pengaruh dari krisis ini mengakibatkan terjadinya depresiasi nilai tukar mata uang Rupiah terhadap US Dollar. Akibat utamanya adalah langkanya likuiditas dan tingginya tingkat suku bunga serta kurs mata uang asing. Kondisi ini mencakup pula penurunan harga saham dan pengetatan penyediaan kredit. Hingga saat laporan keuangan ini diterbitkan, kondisi ekonomi masih belum stabil yang ditandai dengan masih berfluktuasinya kurs mata uang asing dan harga saham di pasar modal. Tingginya nilai tukar Rupiah ke US Dollar telah mengakibatkan Perusahaan menanggung beban selisih kurs yang cukup signifikan atas pinjaman dengan mata uang asing.
In September 2008, financial crisis hit United States of America, which caused financial crisis globally, including Indonesia. This crisis resulted to depreciation of foreign exchange of Rupiah to US Dollar. Its primary consequences are minimum liquidity and increase in add-on rate and foreign exchange rate. These conditions also caused a decrease in value of shares and tightening of credit supply. Until the issuance of the consolidated financial statements, economic conditions are not yet stable, as evidenced with fluctuative foreign exchange rates and value of shares in the capital market. Due to the increased foreign exchange rate of Rupiah to US Dollar, the Company incurred significant foreign exchange losses in relation to its foreign currency denominated loans.
Manajemen tetap berhati-hati dalam mengelola dan menjalankan operasi Perusahaan dan anak perusahaan dengan mengambil langkah-langkah berikut : Menyusun ulang prioritas rencana investasi Perusahaan
dan
Management remains prudent in managing and carrying out the Company and its subsidiaries’ operations by taking the following steps:
evaluasi
Re-arranging priorities and evaluating investment plans of the Company
Mempercepat proses pencairan pinjaman untuk proyek Fast Track 10.000 MW
Accelerating process of drawdown of loans for 10,000 MW Fast Track Program
- 123 -
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA DAN ANAK PERUSAHAAN CATATAN ATAS LAPORAN KEUANGAN KONSOLIDASI UNTUK PERIODE TIGA BULAN YANG BERAKHIR 31 MARET 2009 DAN 2008 (Angka dalam tabel dinyatakan dalam jutaan Rupiah) - Lanjutan
Pemulihan perekonomian ke kondisi yang sehat dan stabil sangat tergantung pada kebijakan fiskal dan moneter yang terus menerus diupayakan oleh pemerintah untuk menyehatkan ekonomi – suatu tindakan yang berada diluar kendali Perusahaan. Oleh karena itu tidaklah mungkin bagi Perusahaan untuk menentukan dampak krisis keuangan global di masa depan terhadap likuiditas dan dalam rangka memenuhi pembatasan-pembatasan tertentu yang terdapat dalam perjanjian perwaliamanatan, termasuk dampak mengalirnya dana investor dan kreditur. Manajemen berpendapat bahwa Perusahaan dapat melaksanakan rencana – rencana tersebut di atas dalam mengatasi krisis keuangan global yang dapat mempengaruhi kelangsungan usahanya di masa yang akan datang.
PERUSAHAAN PERSEROAN (PERSERO) PT PERUSAHAAN LISTRIK NEGARA AND ITS SUBSIDIARIES NOTES TO CONSOLIDATED FINANCIAL STATEMENTS FOR THE THREE MONTH PERIODS ENDED MARCH 31, 2009 AND 2008 (Figures in tables stated in millions of Rupiah) - Continued
Economic reform to strong and stable condition is highly dependent on fiscal and monetary policies, which the government is continuously exerting effort with to strengthen the economy, which is certainly outside the control of the Company. Because of this, it is not possible for the Company to determine the impact of the global financial crisis in the future concerning about the liquidity and the compliance with the requirements of trustee agreement, including impact of flow of funds of investors and creditors. Management believes that the Company will be able to implement the plans stated above to cope with global financial crisis, which may have an impact to the Company’s ability to continue as a going concern.
********
- 124 -