PT PEMBANGKITAN JAWA-BALI UNIT PEMBANGKITANMUARA TAWAR JI. PLTGU MuaraTawar No.1, DesaSegaraJaya, Kec.TarumaJaya, Bekasi Telp. (021) 88990052 (Hunting)Fax. (021) 88990055
PENGUMUMAN
PELELANGAN UMUM
No. 0348.Pm/600/PGD-UPMT/2014 Dengan ini diumumkan bahwa PT PJS Unit Pembangkitan Muara Tawar akan melaksanakan Pelelangan Umum untuk pengadaan barang/jasa :
REHABILITASI BACKWASH FILTER WASH WATER PUMP a.
b.
Jasa: 1. Penggantian filter backwash 2. Penormalan system control automatic 3. Individual test dan commissioning 4. Training operation dan maintenance Material: 1. Backwash filter 2. Motor Listrik 3. Sistem Kontrol (Negara asal produk : Eropa atau Amerika)
1 LOT
1 SET
REHABILITASI BACKWASH FILTER DESALINATION SEA WATER a.
b.
Jasa: 5. Penggantian filter backwash 6. Penormalan system control automatic 7. Individual test dan commissioning 8. Training operation dan maintenance Material: 1. Backwash filter 2. Motor Listrik 3. Sistem Kontrol (Ne~ara asal produk : Eropa atau Amerika)
1.
HPS: RP. 800.000.000,- (delapan ratus juta rupiah)
2.
Persyaratan Peserta
1 LOT
1 SET
1.1. Perseroan Terbatas (PT) dengan bidang keahlian Mekanikal, Elektrikal 1.2. Perusahaan I Rekanan yang pernah mensuply barang I jasa rehabilitasi backwash filter minimal 1 kali dibuktikan dengan dokumen kontrak I PO beserta dokumen SA Penerimaan barang 3.
Persyaratan Pendaftaran 3.1. Menunjukan fotocopy Kompetensi Asosiasi (APTEK I ARDIN I sejenis), TDP, NPWP, PKP, Sukti pelunasan pajak 3 bulan terakhir. 3.2. Fotocopy kontrak I PO pekerjaan sejenis dengan disertai fotocopy SA penyerahan barang.
4.
Pelaksanaan Pelelangan 4.1. Pendaftaran Peserta Pelelangan dan Pengambilan Dokumen Lelang Tanqqal Waktu Tempat
30 Juni s.d 8 Juli 2014 Pukul 10.00 s.d. 15.00 wib PT PJS Unit Pembangkitan Muara Tawar
4.2. Penjelasan Lelang (Aanwijzing) Tanggal Waktu Tempat
10 Juli 2014 Kamis, Pukul 14.00 wib PT PJB Unit Pembangkitan Muara Tawar
Demikian untuk diketahui dan bagi perusahaan yang berminat untuk mengikuti Pelelangan agar segera menyelesaikan persyaratan yang telah ditetapkan. Pengumuman ini bukan merupakan ikatan yang mengakibatkan kewajiban finansial kepada PT PJB. Bekasi, 30 Juni 2014
A~~GADAAN
BARANG/JASA
t2!l~i&I~' Pembangkitan Muara Tawar 1",..~ {
DEl AIL PERMINl AAN NAMA BARANG/JASA
NO A.
Supplai barang : 1. Backwash filter 2. Motor Listrik 3. Sistem Kontrol (Negara asal produk : Eropa atau Amerika) B. Data sheet untuk filter wash water adalah sebagai berikut: 1
TAG NO
2
SERVICE
3
QUANTITY
4
RATING:
19PAAOIAT006 SEAWATERTO LINE SPRAYTRAVELLING WATER SCREEN No. - CONTINUOUS
1
%
100
%
2 x 50
GENERAL 5
OPERATING CONDITIONS
- SHOCK
6
LOCATION
INDOOR
7
MANUFACTURER
SPX
8
MODEL
BFSS-D400A3-V with bolted acces cover Viton seals
9
DUTY
CONTINUOUS
10
FLUID HANDLED
SEAWATER
11 SPECIVICGRAVITY
Kg/m3
1025
12 TEMPERATURE
Deg C
32.5 (MAX)
13
PRESSURE
Barg
3,6
14
FLOWRATE
Iiter/min
15 BACKWASHING TIME 16 WATER LOSSDURING BACKWASH 17
Min 3
5
M /h
25
PRESSUREDROP:
18
CLEAN CONDITION
Barg
0,15
19
MAX (BACKWASHING)
Barg
0,35
20
MAX (ALARM)
Barg
0,5 4" NB (DN 100) Automatic Self Cleaning "Compact" Backflushing filter
21 TYPE 22 SCREENSIZE
Mm
1,6
Barg
10
24 TEST PRESSURE
Barg
15
25
DESIGN TEMPERATURE
DegC
45
26
FLANGED
Ansi
ANSI B16.5-150 RF
23
CONSTRUCTION
2060
DESIGN PRESSURE
Kg
-
28 MOTOR RATING
Kw
0,25
29
BASE DIMENSIONS (FLANGE - FLANGE)
cm
57
30
BODY
27 WEIGHT EMPTY/IN OPERATION
Fabricated 55316 /316L with SS316L internal parts (valves, shafts)
MATERIAL
31 COVER
STAINLESSSTEEL316L
32 FILTERELEMENTS
1600 micron SS316l wedge wire element
33 VENT
1" ANSI B16.5-150 RF
34 CONNECTION
2 x 3/8" NPT DPG Connections Automatic / Electrical 1 x IP55 / NEMA4 (0.25 KW) Motor
35
ACTUATOR
1 x IP55 / NEMA4 DP Switch 1 x IP55 / NEMA4 Actuated Drain Valve (SS316 valve) 1 x IP55 / NEMA4 Control Panel- 415V - 3PH - 50HZ Supply
/"
.,.-
-
C. Data sheet untuk backwash filter DSWP adalah sebagai berikut: TAG NO 2
SERVICE
3
QUANTITY
4
RATING:
90GBK03AA003 SEAWATER TO DESALINATION PLANT No. - CONTINUOUS
%
100
%
2x50
GENERAL 5
- SHOCK
6
LOCATION
INDOOR
7
MANUFACTURER
SPX
8
MODEL
BFSS-1000A3-V (WITH BOLTED ACCES COVER VITON SEALS)
9
DUTY
CONTINUOUS
10
FLUID HANDLED
11
SPECIVIC GRAVITY
Kg/m'
1025
12
TEMPERATURE
DegC
32.5 (MAX)
13
PRESSURE
Barg
5,2
OPERATING
14
FLOWRATE
m'/hour
450
CONDITIONS
15
BACKWASHING TIME
Min
5
16
WATER LOSS DURING BACKWASH
M'/h
50
17
PRESSURE DROP:
CONSTRUCTION
SEAWATER
18
CLEAN CONDITION
Barg
0,15
19
MAX (BACKWASHING)
Barg
0,35
20
MAX (ALARM)
Barg
0,5
21
TYPE
22
FILTERING SURFACE
Cm'
22624
23
DESIGN PRESSURE
Barg
10
24
TEST PRESSURE
Barg
15
25
DESIGN TEMPERATURE
Deg C
45
26
FLANGE JOINTS
Ansi
ANSI B16.5-150 RF
27
WEIGHT EMPTY/IN OPERATION
Kg
28
MOTOR RATING
Kw
0,25
29
BASE DIMENSIONS (FLANGE-FLANGE)
cm
87
30
BODY
10" NB (DN250)Automatic
Self Cleaning "Compact"
Backflushing
filter
Fabricated SS316 / 316L WITH SS316L INTERNAL PARTS (VALVES, SHAFTS)
MATERIAL
31
COVER
STAINLESS STEEL 316L
32
FILTER ELEMENTS
500 micron SS316L Wedge wire element
33
DRAIN
2,5" ANSI B16.5-150
34
VENTING
1" ANSI B16.5-150
35
CONNECTION
2
36
AUTO BACKWASH VALVE
DAROT WITH SOLENOID OPERATED DIAPHRAGM
x 3/8"
RF RF
NPT DPG Connections
Automatic
/ Electrical
1 x IP55 / NEMA4 (0.25 KW) Motor 37
ACTUATOR
1 x IP55 / NEMA4 DP Switch 1 x IP55 / NEMA4 Actuated
Drain Valve (SS316 valve)
1 x IP55 / NEMA4 Control Panel - 415V - 3PH - 50HZ Supply
D. Supplai jasa : 1. Penggantian backwash filter 2. Pengaktifan kembali sitem control operasi backwash agar dapat beroperasi secara automatis 3. Individual test dan commissioning 4_ Training operation dan maintenance Dengan detail pekerjaan Rehabilitasi Backwash Filter Wash Water Pump dan Desalination Sea Water Pump sebagai berikut :
fl ~
,.
bAN. C{-.I
f.....
'"
., UNIT
-:.
'\' "nE1-!BANGK)TAN ~ \ \~* '\.
MUARA TAWAR
I'
.••
»:r, WA.
_ 'D ,...\.
\
(1)
Pembongkaran Filter Existing. a. Mempersiapkan peralatan teknis yang dibutuhkan, semua peralatan teknis dalam proses ini disediakan oleh pihak ke-3 pemenang tender. b. Mempresentasikan rencana dan jadwal pekerjaan pelepasan filter existing, mobilisasi filter existing dan instalasi filter baru, peralatan yang akan digunakan beserta resiko yang mungkin terjadi di hadapan direksi pekerjaan. c.
(2)
Melakukan mekanisme penggantian filter dengan memperhatikan faktor Keselamatan dan Kesehatan Kerja.
Mobilisasi Filter Existing ke Gudang UP Muara Tawar. a.
(3) (4)
(5)
Melakukan pengangkatan filter existing untuk dibawa ke gudang UP Muara Tawar dengan peralatan teknis. Pemasangan Backwash Filter Baru. a. Melakukan pemasangan backwash filter baru beserta kelengkapannya. Set up Sistem Mechanical, Electrical, dan Control System ke System Operasi Wash Water. a. Melakukan setting mechanical, electrical, dan intrumentation control ke dalam sistem pengoperasian wash water pump. Koneksi akan dibantu oleh pihak PJB UP Muara Tawar. Individual Test. a.
Melakukan pengujian backwash filter.
b.
(6)
(7)
(8)
Pelaksana pekerjaan akan melakukan perbaikan jika ada kerusakan ataupun kegagalan pada saat dilakukan individual test. Test Commissioning. a. Melakukan commissioning backwash filter. b.
Pelaksana pekerjaan akan melakukan perbaikan jika terdapat suatu item commissioning backwash filter mengalami kegagalan, perbaikan dilakukan sampai item pengujian tersebut dinyatakan berhasll.
c.
Jika masih ada kerang/sampah yang masih tersangkut di pipa drain, maka pihak ke-3 harus bersedia mengganti dimensi pipa drain sarnpai tidak ada kerang/sampah yang tersangkut lagi. (untuk backwash filter DSWP)
d. Dokumentasi setiap proses commissioning. Pelaporan a. Membuat report dan dokumentasi terkait proses plug and play dari awal sampai akhir proses yang disetujui oleh direksi pekerjaan. Training Memberikan training kepada personel PT PJB UP Muara Tawar dengan rincian sebagai berikut: a. b. c. d.
Training baru. Training baru. Training baru. Training
untuk Engineer (2 orang) terkait dengan mekanisme dan system backwash filter untuk bidang operasi (5 orang) terkait dengan sistem pengoperasian backwash filter untuk bidang pemeliharaan (3 orang) terkait sistem pemeliharaan backwash filter dilakukan selama 2 hari (1 hari teori dan 1 hari praktek di lapangan).