Copyright © BPH Migas 2013, All Rights Reserved
RENCANA INDUK JARINGAN TRANSMISI DAN DISTRIBUSI GAS BUMI NASIONAL
Information:
Existing transmission pipe (Open Access) Plan of transmission pipe (Open Access) Existing transmission pipe (Upstream Dedicated) Plan of transmission pipe (Upstream Dedicated)
2
Existing Distribution pipe (Downstream Dedicated) Plan of Distribution pipe (Downstream Dedicated) LPG refineries (Production) LPG refineries (not running)
LNG Floating Storage Receiving Terminal LNG Refineries LNG Refineries (Planned)
Copyright © BPH Migas 2013, All Rights Reserved
PIPA GAS BUMI EKSISTING PIPA PENGANGKUTAN (OPEN ACCESS)
PIPA NIAGA DEDICATED HILIR
Panjang total 3773,82 km Diameter antara 8 – 32 inchi
Panjang total 4213,54 km Diameter antara 20 mm – 32 inchi
Pengangkutan Badan Usaha Panjang (km) Prosentase
PGN Pertagas TGI BU Lain
3
1,038.40 1,589.29 1,006.00 140.13
27.52% 42.11% 26.66% 3.71%
Dedicated Hilir Badan Usaha
PGN BU Lain
Panjang (km)
3,877.41 336.13
Prosentase
92% 8%
Copyright © BPH Migas 2013, All Rights Reserved
PIPA GAS BUMI EKSISTING PIPA PENGANGKUTAN (OPEN ACCESS)
PIPA NIAGA DEDICATED HILIR
Panjang total 3773,82 km Diameter antara 8 – 32 inchi
Panjang total 4213,54 km Diameter antara 20 – 32 inchi
Pipa Transmisi Diameter 32 & 36 inchi, Panjang 627,90 Km
Copyright © BPH Migas 2013, All Rights Reserved
PEMBANGUNAN RUAS TRANSMISI GAS BUMI OLEH PEMENANG LELANG HAK KHUSUS KALIJA (Bontang-Semarang), 1115 km,
kapasitas 700 -1000 MMSCFD oleh PT Bakrie & Brothers Tbk, dengan membangun ruas pipa Kepodang – Tambak Lorok sebagai pembangunan Kalija Tahap I on stream Mei 2015 GRESEM (Gresik-Semarang), 258 km,
kapasitas 350-500 MMSCFD oleh PT Pertamina, yang direncanakan on stream pada 2015. CISEM (Cirebon-Semarang), 255 km,
kapasitas 350-500 MMSCFD oleh PT Rekayasa Industri, masih menunggu ketersediaan gas
5
Copyright © BPH Migas 2013, All Rights Reserved
PEMBANGUNAN RUAS TRANSMISI GAS BUMI KALIMANTAN – JAWA (KALIJA)
Kalija
6
Kalija Tahap I (Kepodang – Semarang), saat ini status sedang dalam persiapan konstruksi, penyiapan Dokumen Lelang EPC Kalija Tahap II (Bontang – Semarang), saat ini status dibentuk konsorsium Offtaker Gas Bumi
Copyright © BPH Migas 2013, All Rights Reserved
PEMBANGUNAN RUAS TRANSMISI GAS BUMI GRESIK – SEMARANG (GRESEM)
Gresem Pasokan Gas : a. Sesuai dengan surat Menteri ESDM kepada Kepala SKK Migas Nomor : 1365/12/MEM.M/2013 bahwa pasokan gas untuk PKC sebesar 85 MMSCFD berasal dari Lapangan Gas Bumi Jambaran, Cendan dan Tiung Biru yang dioperasikan oleh PT Pertamina Cepu
b. Sesuai dengan surat Menteri ESDM kepada Kepala SKK Migas Nomor : 0890/15/MEM.M/2013 bahwa untuk kebutuhan pasokan gas FSRU awa Tengah pada tahun 2014 dipasok sebesar 16 kargo yang akan diselesaikan pembangunannya pada tahun 2016 c. Pertamina mengharapkan agar sisa alokasi gas dari PEPCI sekitar 100 MMSCFD dapat dialokasikan untuk Pertamina Gas Niaga untuk mendukung pelaksanaan pembangunan pipa Final Investment Decisions diharapkan sudah diterbitkan pada Desember 2013 Saat ini telah dikoordinasikan dengan Pemerintah Daerah Pemda Jawa Tengah dan Jawa Timur untuk menginventarisasi potensi kebutuhan gas daerah sesuai jalur rencana pembangunan pipa. PT Pertamina mengusulkan kepada BPH Migas bahwa Pembangunan pipa Gresik Semarang agar menggunakan sistem Strategic Partnership dengan Sumber Petrindo Perkasa yang saat ini sudah selesai membangun pipa dari Semarang ke Cepu dan akan dilanjutkan oleh PT Pertamina dari Cepu ke Gresik sepanjang sekitar 130 Km yang diharapkan dapat diselesaikan pada tahun 2014.
7
Copyright © BPH Migas 2013, All Rights Reserved
PROYEK PEMBANGUNAN PIPA GUNDIH-SEMARANG OLEH PT SPP Keterangan: saat ini perkembangan pembangunan pipanya sudah mencapai 97,08% dan tinggal menunggu commisioning test
Gas Delivery Point Gas Compressor Station
Gas Receiving Station
Proposed 20” +140km Gas Pipeline
GAS LOCATION
8
Copyright © BPH Migas 2013, All Rights Reserved
PEMBANGUNAN RUAS TRANSMISI GAS BUMI CIREBON – SEMARANG (CISEM)
Cisem
Untuk pembangunan pipa ini terkendala pada pasokan gas (dapat memanfaatkan surplus gas dari FSRU Jawa Tengah) dan kepastian kebutuhan Gas Bumi oleh PT. PLN sebagai anchor buyer
9
Copyright © BPH Migas 2013, All Rights Reserved
PROYEK PEMBANGUNAN PIPA TRANSMISI GAS ARUN – BELAWAN Paid , on payment process or no acquisition needed
Re-route
Segmen 2 : 139 KM
Segmen 1 : 124.58 KM
PT. Arun/ DJKN 35 Km
POINT A
Medco 11 Km
Segmen 3 : 71 KM
Aceh Timur : Bupati akan mendata penduduk Aceh Timur dan akan diserahkan pada tim Legal
PTPN I 18 KM Bumi Flora 12.6 Km
Villagers 1.9 Km
Bumi Flora 6 Km
Rantau Panjang Exxon Mobil 38 Km
Reroute dari ROW Medco: 32.5 KM 1. PTPN I: 18 KM 2. Bumi Flora: 12.6 KM 3. Villagers: 1.9 KM
Aceh Tamiang : Selesai pembahasan Komersial
PTPN I 4 Km Villagers 3 Km
SLS A Villagers 6 Km Wahyu Rizki 6 Km Minamas 8 Km Damar Siput 3 Km PTPN I, 11 Km
Timbang Langsa 4 Km
Patria Kamau 5 Km Villagers, 1 Km
Keterangan: Saat ini sedang dalam tahap konstruksi dan pembangunan pipa sudah mencapai sekitar 45 km
Pekerjaan construction EPC mencapai ± 48KM
PTPN I 10 Km PTPN I 4 Km
Tg.Seumeunt
ok Arco 3 Km Mainly villagers 12Km Dapat Construction Plan1 melakukan From To Segmen konstruksi PEP P. Brandan Segmen 3 Belawan Rantau Segmen 2 P. Brandan Rantau Panjang and PEP P. Susu Segmen 1 Rantau Panjang Point B 59 Km
10
U
Land Clearing di segmen 2 mencapai ± 29 KM (Ref. Laporan KCS 04.11.2013)
Bukit Krud POINT B
No approach, approach or survey
Negotiation or legal
Hamparan Perak : • Sedang dilakukan pembayaran dengan villagers • Terdapat 1 PT yang tidak mengizinkan penggunaan lahannya untuk jalur pipa
Ranta u
Pangkalan Batu Pangkalan Brandan
Villagers Sicanang 9 Km Belawan
Pertagas existing ROW 49 Km
Staba t
PTPN II 16 Km
PLN Belawan 1 Km Dapat melakukan konstruksi
Copyright © BPH Migas 2013, All Rights Reserved
RENCANA PEMBANGUNAN INFRASTRUKTUR PIPA GAS MUARA KARANG – MUARA TAWAR – TEGALGEDE
Pondok Tengah
PLTG M. Tawar
PLTG M. Karang
Infrastruktur yang akan dibangun dan infrastruktur eksisting akan digunakan untuk melaksanakan pengangkutan gas dari Muara Karang – Muara Tawar – Pondok Tengah – Tegalgede untuk memenuhi kebutuhan gas PLN dan konsumen industri di sepanjang ruas transmisi eksisting Pertagas.
11
Tegalgede
Copyright © BPH Migas 2013, All Rights Reserved
RENCANA PEMBANGUNAN INFRASTRUKTUR PIPA (LANJUTAN)…. 1. Berdasarkan analisa gas balance di Jawa Barat, terdapat kekurangan pasokan gas (unmeet demand) yang sangat signifikan (> 1000 MMSCFD)
2. Karena upsite potential penemuan cadangan baru di sekitar Jawa Barat sangat terbatas perlu supply gas dari luar daerah termasuk dari sumber LNG 3. Adanya pasokan LNG melalui FSRU NR untuk PLN Muara Karang memiliki kelebihan supply dalam jumlah signifikan (> 200 MMSCFD dan masih dapat ditingkatkan) sulit diserap konsumen karena belum adanya infrastruktur pipa yang menghubungkan ORF Muara Karang ke Jalur pipa transmisi gas Pertagas ruas Tegal gede – Cilegon. 4. Untuk mengatasi kekurangan pasokan gas ke industri-industri di Jawa Barat, sangat mendesak dibangunnya pipa Open Akses dari ORF Muara Karang ke Tegal Gede.
12
Copyright © BPH Migas 2013, All Rights Reserved
PEMBANGUNAN RUAS TRANSMISI : 1. DURI – DUMAI OLEH PT PGN (PERSERO) TBK 2. P. PEMPING - TANJUNG UNCANG, BATAM OLEH PT PLN BATAM – PT UBE
13
Copyright © BPH Migas 2013, All Rights Reserved
RENCANA LELANG 5 WILAYAH JARINGAN DISTRIBUSI (WJD)
JAMBI
PRABUMULIH LAMPUNG
SEMARANG PASURUAN
14
Copyright © BPH Migas 2013, All Rights Reserved
WWW. BPHMIGAS.GO.ID Copyright © BPH Migas 2013, All Rights Reserved
RENCANA LELANG HAK KHUSUS WILAYAH JARINGAN DISTRIBUSI GAS BUMI
Copyright © BPH Migas 2013, All Rights Reserved
WJD JAMBI PASOKAN/ POTENSI PASOKAN GAS: 1) COPHI - Corridor Block 2) PETROCHINA INT. JABUNG 3) JOB PTM-TALISMAN Jambi Merang 4) TAC Pertamina-EMP Gelam PERMINTAAN/ POTENSI PERMINTAAN GAS: 1) Existing Power Plant a) b) c) d)
PLTG/ GU Batang Hari PLTD/ G Payo Selincah PLTMG/ G S. Gelam (CNG peaking) PLTMG/ G Jambi Peaker
PT Transportasi Gas Indonesia (TGI)
PT Energasindo Heksa Karya (EHK) PT PDPDE
2) Industri: (eksisting LPPPI melalui pipa dedicated hilir PDPDE) 3) Jargas (dibangun tahun 2012 utk 4.000 SR, rencana sumber gas JOB Pertamina Talisman Jambi Merang sebesar 0,5 MMSCFD)
4) SPBG (rencana dibangun tahun 2015) dll Copyright © BPH Migas 2013, All Rights Reserved
WJD PRABUMULIH PASOKAN/ POTENSI PASOKAN GAS: Pertamina EP Region SumBagSel COPHI - Corridor Block (Pengembangan: Letang, Tengah, Rawa Optimization/LTRO, Sumpal Expansion-Phase II)
INFRASTRUKTUR PIPA EKSISTING:
Ruas Transmisi PT. PGN (PERSERO) Tbk (Grissik-Pagardewa) Ruas Pipa Transmisi PT. Pertagas (Betung-Prabumulih) Ruas Pipa Transmisi PT. Pertagas (Limau Timur - Sunyaragi Prabumulih)
Copyright © BPH Migas 2013, All Rights Reserved
WJD LAMPUNG FSRU PGN Rencana pasokan gas berasal dari domestik, (2 MTPA) dengan rencana distribusi gas ke Jawa Barat (pelanggan PGN) dan potensi konsumen di Lampung
Rencana pipa DH distribusi oleh PGN SSWJ II: Grissik-Muara Bekasi
SSWJ I: PagardewaBojanegara Copyright © BPH Migas 2013, All Rights Reserved
WJD SEMARANG PASOKAN/ POTENSI PASOKAN GAS: 1) Petronas Carigali Muriah Limited (PCML) – Kepodang 2) Pertamina EP - Gundih – Randublatung 3) Pertamina EP - North Central Java (NCJ-A) - Mangkang 4) Petronas Carigali – Bukit Tua - Ketapang 5) Kalija Tahap 2 PERMINTAAN/ POTENSI PERMINTAAN GAS: 1) PLTGU Blok 1-2 yang disuplai oleh Sumber Petrindo Perkasa (SPP) dari blok Gundih 2) Industri: Tossa Shakti (eksisting), dll 3) SPBG (rencana dibangun pemerintah tahun 2014) 4) Jargas
Rencana pipa KALIJA I (Kepodang – Tambak Lorok)
Lapangan Kepodang (Blok Muriah) ± 120 MMSCFD
North Central Java Mangkang Kulon, Kendal ± 2,5 MMSCFD
Rencana Cirebon - Semarang Rencana Gresik - Semarang
Rencana Pipa (DH) Gundih – PLTG Tambak Lorok PT Sumber Petrindo Perkasa
Blok Gundih Blora – Grobogan ± 50 MMSCFD Copyright © BPH Migas 2013, All Rights Reserved
WJD PASURUAN