Refe erence es
INDU USTRIAL L BUILD DINGS TECH HNICAL L SUPER RVISION N PROJ JECT MANAGE M EMENT
Planbau K Kft. – Tatabán nya
Printed: 20 013.02.21.
Project::
ARTES SYN, Tatab bánya
Nation.:
Date:
Covered C area:
USA
2001
12.000m2 > 20 000 MFt
Costs: C
P Project time: (design + construc ction) 2+7 mon nths
electronicc manufacturin ng c consttruction prefabricated concrete office buillding for financcial department, 2-storey sttorage and co omplete desig gn (studies-perrmission-details) productio on hall co omplete project managemeent and superv vision
Project::
ZENON N Systems s, Tatabá ánya
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + ction) construc
CAN
1998
850 8 m2
> 140 MFt
2+6 mon nths
leading w water treatmen nt company assemble ement fabric with w warehouse e and office bu uilding
Planbau K Kft. – Tatabán nya
prefabricated concrete c consttruction co omplete cesig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Printed: 20 013.02.21.
Project::
Nation.:
Date:
Covered C area:
USA CAN
20012008
22.000m2 > 40 000 MFt
GENER RAL ELEC CTRIC ZENON Europe, Oro oszlány
leading w water treatmen nt company I. Phase.:: greenfield prroduction hall and a office buillding II. Phase:: extension of offices and prroduction hall III. Phase e.: extension with w medical prroduction
Project::
GENERA AL ELECTR RIC ZENON Europe and d OSZRT Oroszlány
P Project time: (design + construc ction) 2+6 mon nths
c consttruction prefabricated concrete co omplete cesig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + ction) construc
CAN/ H/USA
20052006 2007-
900 9 m2
> 200 2 MFt
2+6 mon nths
wastewatter treatment plant p function a also representtative plant II. phase: extension witth a 4.500 m3 pool
Planbau K Kft. – Tatabán nya
Costs: C
monolithical m concrete construuction co omplete cesig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Printed: 20 013.02.21.
Project::
BECOM M Electron nics, I.&II. phase, Körrnye
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
A
2006, 2011
1200 m2 2400 2 m2
4 MFt > 400
1+6 mon nths
electronicc manufacturin ng and east-euro opean headquarter The Indusstrial Building of the Year 20 007 (Kingspan n I. Prize)
Project::
MCI, V Vértesszőlő ős
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
NL
2001
1200m2 1
> 180 MFt
2+6 mon nths
heavy veh hicle trade cen nter and service station hungarian n headquarterr
Planbau K Kft. – Tatabán nya
stteel-construction co omplete Desig gn (studies-peermission-deta ails) off-Site Manage ement
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Printed: 20 013.02.21.
Project::
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
USA
1996-
11.000m2
> 900 9 MFt
2+6 mon nths
PIONE EER HI-BR RED, Szarva as
agriculturral corn-fabriic with cold-W Warehouses, drryers, conveyo ors
Project::
Nation.:
Date:
Covered C area:
USA
1994-
15.000m2 > 18 800 MFt
PEPSI Co. refreshing g drinks bottling plants for Hung gary and Slow wakia on and logisticc centers distributio
Planbau K Kft. – Tatabán nya
c consttruction prefabricated concrete co omplete desig gn (studies-perrmission-details)
Costs: C
P Project time: (design + construc ction) 2 + 4-6 months
c consttruction prefabricated concrete co omplete desig gn (studies-perrmission-details)
Printed: 20 013.02.21.
Project::
BORGW WARNER TurboSystem ms, Oroszlány
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D/USA
2001-
9000 9 m2
> 15 500 MFt
2+8 mon nths
leading automotive com mpany (turbo chargers) c I.Phase: p production hall and office bu uilding II. Phase:: production hall and office building b III. Phase e: emulsion tan nk and wareho ouse
Project::
BORGW WARNER Turbo System ms, Oroszlány
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + ction) construc
D/USA
2007
5000 5 m2
> 750 7 MFt
2+7 mon nths
leading automotive com mpany (turbo-c chargers) e: new financia al office and production p halll IV. Phase
Planbau K Kft. – Tatabán nya
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Printed: 20 013.02.21.
Project::
FLEXT TRONICS (NATSTEEL), Bu udapest
Nation.:
Date:
Covered C area:
D
2003
24.000m2 > 25 500 MFt
electronicc manufacturin ng new production halls an nd warehouse es n of halls extension
Project::
BEBUS SCH, Oros szlány
NOKIA A Audio, Székes sfehérvár
IMPRE EGLON, Ta atabánya
Date:
Covered C area:
Costs: C
P Project time: (design + ction) construc
D
1999
1700 m2
> 200 2 MFt
2+6 mon nths
c consttruction prefabricated concrete supervision Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D
1997
3300 3 m2
> 450 4 MFt
2+6 mon nths
stteel constructiion co omplete desig gn (Studies-Peermission-Deta ails)
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + ction) construc
D
2004, 2006, 2007, 2011
1850 m2
> 150 MFt
2+6 mon nths
automotivve, coating tecchnologies II., III., IV., V. phases: extension e of production hall s and warehousses
Planbau K Kft. – Tatabán nya
2+7 mon nths
Nation.:
automotivve productio on hall and office building (now Hartmann)) Project::
P Project time: (design + construc ction)
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-details) project manage ement and suppervision
automotivve productio on hall and office building Project::
Costs: C
c consttruction prefabricated concrete omplete desig gn (studies-perrmission-details) co
Printed: 20 013.02.21.
Project::
J.H. ZIEGLER EE ERC, Báboln na
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D
20052006
2700 2 m2
> 350 3 MFt
2+6 mon nths
automotivve and furniturre industry (no on-wovens) East-Euro opean Region nal Center office, pro oduction and warehouse w
Project::
J.H. ZIEGLER EE ERC, Báboln na
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D
2011-
2700 2 m2
> 450 4 MFt
2+6 mon nths
automotivve and furniturre industry (no on-wovens) extension n of production n hall and warehouses (III. phase e under develo opement)
Planbau K Kft. – Tatabán nya
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Printed: 20 013.02.21.
Project::
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
Wellne et International, Tata a
H
2007
1200 m2
> 150 MFt
2 montths
medical te echnologies Office buiilding productiion with wareh house
Project::
BD, TA ATABÁNYA A
c consttruction prefabricated concrete co omplete desig gn (studies-perrmission-details)
Nation.:
Date:
F
2011
medical te echnology com mpany extension n of production n ares (with cle ean-spaces)
Planbau K Kft. – Tatabán nya
Covered C area:
Costs: C
Pro oject time: (supervision)
> 200 2 MFt
6 montths
omplete supervision co
Printed: 20 013.02.21.
Project::
WGS S Stamping Kft, Szántó ód
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
H, A
2008-
1.400 m2
30 00 MFt
3+6 mon nths
c consttruction prefabricated concrete co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
automotivve, stell pressiing office buillding productio on hall and wa arehouse
Project::
PETER R-LACKE, Pákozd d
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D
2008-
2400
70 00 MFt
-
automotivve, household and electronics (paint syste ems) east-euro opean center offices, prroduction and warehouse
Planbau K Kft. – Tatabán nya
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-tender) co omplete project managemeent
Printed: 20 013.02.21.
Project::
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
H
2011-
1000 m2
18 80 MFt
3 montths
RÉN Spedex Kftt. Tatabá ánya productio on hall with offiices and socia al block
Project::
Logistics hall, Oroszlány
stteel constructiion co omplete desig gn (studies-perrmission-details)
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + ction) construc
H
2011-
10.000 m2
000 MFt > 10
1 montths
new intermodial logisticc center in industrial park off oject) Oroszlányy (running pro
Planbau K Kft. – Tatabán nya
c consttruction prefabricated concrete design (studies s-permission) ement project manage
Printed: 20 013.02.21.
Project::
BORGW WARNER Turbo System ms, Oroszlány
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D/USA
2011-
4000 4 m2
> 800 8 MFt
2 montths
leading automotive com mpany (turbo-c chargers) V. Phase: new headquerter office an nd production hall (under co onstruction)
Planbau K Kft. – Tatabán nya
c consttruction prefabricated concrete co omplete desig gn (studies-perrmission-details) co omplete project managemeent and superv vision
Printed: 20 013.02.21.
Project::
AVE M Magyarorszzág
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D/H
2012-
2000 2 m2
> 1.000 MFt
2 montths
biogas po ower plant (under co onstruction)
Project::
MAHART-LOG, Tata logistic ha all and truck service (running p project)
Planbau K Kft. – Tatabán nya
design (execitu uion plans) co omplete techn nical supervisioon
Nation.:
Date:
Covered C area:
Costs: C
Project time: (design)
H
2012
1500 m2
> 400 4 MFt
2months
c consttruction prefabricated concrete co omplete desig gn (studies-perrmission)
Printed: 20 013.02.21.
Project::
FCI (DE ELPHI)
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
D/H
2012-
8000 8 m2
> 1.000 MFt
7 montths
automotivve cable plant extension (under co onstruction)
Project::
MTF Tiszalök k, Keszthely y, Mezőtúr service ha alls, (incubato or houses) (running p project)
Planbau K Kft. – Tatabán nya
co omplete techn nical supervisioon
Nation.:
Date:
Covered C area:
Costs: C
Project time: (design)
H
2013
1500 m2
> 400 4 MFt
3months
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-exec cution plans)
Printed: 20 013.02.21.
Project::
PANNO ON LÉZER R, Tata
Nation.:
Date:
Covered C area:
Costs: C
P Project time: (design + construc ction)
H
2012
2000 2 m2
> 400 4 MFt
2months
steel macchining with laser technologie II. phase: new headbuilding and prod duction hall onstruction) (under co
Projekt
BECO OM Electroniics Austria GmbH G electronicc company office hae edquarter and labors
Planbau K Kft. – Tatabán nya
prefabricated concrete c consttruction co omplete desig gn (studies-perrmission-ex.plans)
Nation.
Datum
Fläche
Kosten K
Perio od
A
2013
2000 2 m2
> 400 4 MFt
2 Mona ate
co omplete desig gn (studies-perrmission-cons struczion plans)
Printed: 20 013.02.21.
Refe erence es
RESIIDENTIA AL & PU UBLIC B BUILDIN NGS AND
PROJECT MANAGE M EMENT T
Planbau Kft – Tatabá ánya
1/12
nyyomtatva: 2013.06.04.
Projekt::
LAKE S SIDE Lakó ópark
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
CAN/H
2005-
850 8 m2
> 600 6 MFt
2+8 hón nap
Monolit M vasbeto on és téglafalaazat Feladatunk F voltt: előkészítés,, komplett terv vezés, project manage ement, műszaaki ellenőrzés
Társashá áz, 58 lakásos I. ütem: A A, B épületek, felül kétszinte es lakásokkal
Projekt::
LAKE S SIDE Lakó ópark
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
H
2007-
-
> 600 6 MFt
ap 2 hóna
Társashá áz, II. ütem: C C, D épületek,, felül kétszintes lakásokkal
Planbau Kft – Tatabá ánya
Monolit M vasbeto on és téglafalaazat Je elenleg vázlatttervezés, előkkészítés alatt.
2/12
nyyomtatva: 2013.06.04.
Projekt::
The Ne ew Face of Kaluga
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
A/RUS
2007-
-
-
-
Városfejle esztés Lakóépületek, irodaépü ületek, szállod da és bevásárllóközpont
Projekt::
KALUG GA TOWER
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
H
2007-
-
> 2 Mrd
-
18 szintess iroda és hotel épület alatta kétszintes mélyg garázs
Planbau Kft – Tatabá ánya
Vázlattervek V és s prezentációss anyag UNGE ER In nternationalnak
Monolit M vasbeto on és acélszeerkezet Tervezés T alatt
3/12
nyyomtatva: 2013.06.04.
Projekt::
Árpád Tömb Győr
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
A/RUS
2008-
-
> 600 6 Mio
-
Győr belvvárosában üzlet és társashá áz tervezése mélygará ázzsal
Projekt::
Monolit M vasbeto on vázas szerrkezetű épülett Feladatunk: F Vá ázlat, építési eengedélyezési és kiviteli te ervdokumentáció készítése
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
H
2007-
-
> 600 6 MFt
-
FŐ TÉR RI ÜZLETH HÁZ TATAB BÁNYA Iroda és ü üzletház Tatab bánya belváro osában
Planbau Kft – Tatabá ánya
Monolit M vasbeto on vázszerkezzetű épület mé élygarázzsal Tervezés T alatt
4/12
nyyomtatva: 2013.06.04.
Projekt::
Vértes Agóra, Tatabá ánya
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
H
2009-
3.000 m2
> 1 Mrd
-
Közműve elődés Háza áttalakítása és bővítése b multifunkccionális közpo onttá
Projekt::
Feszty y-udvar és Vackor Óvoda a, Környe
Vázlattervek, V engedélyezési tervezés, kiviteli tervek ké észítése
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
H
2009-
2.000 m2
> 300 3 MFt
-
Feszty-ud dvar és környe ezetének rend dezése valami nt 9 csoportoss óvoda és bölcsőde tervezé ése
Planbau Kft – Tatabá ánya
Nyertes N pályázat, vázlatterveezés, engedélyezési te ervezés
5/12
nyyomtatva: 2013.06.04.
Projekt::
Nation.:
Dátum:
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
Sárberrki Általán nos Iskola,, Tatabá ánya
H
2009-
4.500 m2
> 300 3 MFt
ap 2 hóna
Általánoss Iskola átalakíítása, bővítése e és teljeskörű ű mentesítése akadálym
Projekt::
Óvoda a, Vértesso omló
Vázlattervek, V engedélyezési tervezés és kiviteli k tervek ké észítése
Nation.:
Dátum:
H
2009-
3 csoporttos óvoda tervvezése
Planbau Kft – Tatabá ánya
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
800 m2
> 100 MFt
1 hóna ap
Vázlattervek, V engedélyezési tervezés kész zítése
6/12
nyyomtatva: 2013.06.04.
Projekt::
Fő tér rendezés,, Sárbog gárd
Nation.:
Dátum:
H
2008-
Művelődé ési ház és Polg gármesteri Hiv vatal felújítása a
Projekt::
Turul m mozi, Tata abánya
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) ap 1 hóna
Vázlattervek V ké észítése
Nation.:
Dátum:
H
2008-
Meglévő mozi épület la akóépületté va aló átépítése
Planbau Kft – Tatabá ánya
Terület: T
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) 1 hóna ap
Vázlattervek V ké észítése
7/12
nyyomtatva: 2013.06.04.
Projekt::
Panorá áma Lakóp park, Tatabá ánya
Nation.:
Dátum:
H
2009-
6 lakásbó ól álló társashá ázak
Projekt::
Passzíívház, Bud dapest
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) ap 2 hóna
Vázlattervek, V engedélyezési tervezés kész zítése
Nation.:
Dátum:
H
2009-
Terület: T 230 m2
Berruházás
Projektiidő: ((Tervezés+Kivitelezés)
> 40 4 MFt
1 hóna ap
Vázlattervek, V engedélyezési tervezés és kiviteli k tervek ké észítése
Lakóépület passzívházzként minősítv ve
Planbau Kft – Tatabá ánya
Terület: T
8/12
nyyomtatva: 2013.06.04.
Projekt::
Sportc csarnok, Türkmenisztán
Nation.:
Dátum:
Terület: T
Berruházás
Projektidő: zés) (Tervez
TÜ
2009-
8200 8 m2
> 800 8 MFt
2 hóna ap
Vázlattervek, V engedélyezési tervezés kész zítése fo olyamatban
Sportcsarrnok típustervek kidolgozása 3 méretben
Projekt::
Sportc csarnok, Türkmenisztán
Nation.:
Dátum:
Terület: T
Berruházás
P Projektidő: (T Tervezés)
TÜ
2009-
8200 m2
> 800 8 MFt
2 hóna ap
Vázlattervek, V engedélyezési tervezés kész zítése fo olyamatban
Multifunkccionális csarnok
Planbau Kft – Tatabá ánya
9/12
nyyomtatva: 2013.06.04.
Projekt::
Fő tér rendezés,, Tatabá ánya
Nation.:
Dátum:
H
2008-
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) ap 1 hóna
Ötletpályázat Ö
Projekt::
Samuffalvi Óvoda, Vértesszőlős
Nation.:
Dátum:
H
2010-
Új Óvoda a épület
Planbau Kft – Tatabá ánya
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) 3 hónap +
Engedélyezési E és kiviteli tervvek
10/12
nyyomtatva: 2013.06.04.
Projekt::
HIT Gy yülekezete e, Tatabá ánya
Nation.:
Dátum:
H
2010-
Gyülekezzeti épület
Projekt::
Üzlethá áz Oroszlány
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) 3 hónap +
Engedélyezési E és Kiviteli tervvek
Nation.:
Dátum:
H
2008-
Új üzlet é és lakóépület
Planbau Kft – Tatabá ánya
Terület: T
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) 3 hóna ap
Engedélyezési E és kiviteli tervv
11/12
nyyomtatva: 2013.06.04.
Projekt::
Árpád tömb
Nation.:
Dátum:
H
2012-
Lakóparkk mélygarázzsal, Győr belvá áros
Projekt::
Agosty yán lakópa ark
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) 3 hónap +
Engedélyezési E és Kiviteli tervvek
Nation.:
Dátum:
H/NL
2012-
Családi h házas lakóparkk
Planbau Kft – Tatabá ánya
Terület: T
Terület: T
Berruházás
Projektiidő: ((Tervezés+Kivitelezés) 3 hóna ap
Engedélyezési E és kiviteli tervv
12/12
nyyomtatva: 2013.06.04.