A Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Magyar Minőséghét Konferencia 2016 Május 13. Lantos Gábor
Knorr-Bremse Group
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Continuous Improvement Program (CIP) identifies and eliminates waste in the Supply Chain Unnecessary motion
Transportation
With consequent use of Cost Analysis and Value Stream Mapping, the waste in the production process can be identified and eliminated.
Knorr-Bremse Group
│2
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Continuous Improvement Program (CIP) – Sequence of steps
Supplier Price
€
Negotiation CM & CA
Cost calculation “Optimal process”
Limited efforts
Steps / Effort
If price reduction can not be achieved by Cost Analysis and Negotiation…. Knorr-Bremse Group
│3
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Continuous Improvement Program (CIP) – Sequence of steps
New negotiation by CM & CA & SDE
CIP workshop VSA “current state map“
Cost calculation “Current process”
Negotiation CM & CA
Cost calculation “Optimal process”
Supplier Price
€
VSD “future state map” defined / implemented
Extended efforts
Steps / Effort
If price reduction can not be achieved by Cost Analysis and Negotiation…. ….CIP workshops are an additional possibility to generate savings potentials. Knorr-Bremse Group
│4
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Continuous Improvement Program (CIP) – supportive
1. 1
1. 3
1. 4
2. 1
2. 2
2. 3
2. 4
3. 1
3. 2
Co C
CA
SD E
CIP
3. 3
- Inputs of suppliers / parts with high impact in the CoC AC
CM
CA
CIP workshop
Negotiation
CM selects suppliers to be negotiated using CA/CIP workshop as additional lever / negotiation leverage
EL FC
KLS AG customer
strategy / indications of possible reduction of price / price increase request / likelihood to receive potential identified
RU
• Long Term Agreement (e.g. LTA / MSA) with near expiration date
daily order
ft s coils
18400 pcs / month 12000 L 6400 R
MRP
u p p l i e Mo + &Mi Wer
• Selection criteria: APV / supplier
PL
SP
production planning & -control
- Stahl faxback
150
IC
SMF
forecast
forecast Krupp
1Tray = 20 pieces AZ/S: 480 min
weekly production plan
S: 2
daily täglich
120m Lager I s t Coilso r 4Tage a g e
I
80m stamping Stanzen 1
Coils 1Tag
I
30m Schweißen welding 1
4600L 2400R
180m welding Schweißen
I
1
1100L 600R
I
20m assembly1 Montage1 1
1600L 850R
I
60m Montage2 assembly2
shipping Versand I
1
1200L 640R
2700L Z/T: 1S C/T: 1s R/T: 60 C/O: 60 Min. min. V: r.: s. 85 80 %% Q: 0,01 % A
Z/T: 39 C/T: 39 S s
Z/T: 46 C/T: 46 S s
Z/T: C/T: 62 62 S s
Z/T: 40 C/T: 40 S s
R/T: C/O: 10 10 Min. min.
R/T: C/O: 10 10 Min. min.
R/T: C/O: 00Min. min.
R/T: C/O: 00 Min. min.
V: s. r.: 10090%%
V: r.: s. 80 80 %%
Q: 0,8 % A
WT/S:480min AZ/S:480Min
WT/S:480min AZ/S:480Min
S: 2
S: 2
V: r.: s. 100100 %%
Q: 0,2 % A
Q: 1,2 % A
WT/S:480min AZ/S:480Min
Q: 0,3 % A
WT/S:480min AZ/S:480Min
S: 2
1440R
V: r.: s. 100100 %%
WT/S:480min AZ/S:480Min
S: 2
S: 2 D/T: 23,6 d
5 days
7,6 days 1s
1,8 days
2,7 days 46 s
39 s
P/T: 188 s 4,5 days
2,0 days 62 s
40 s
€
€
• Suppliers nominated for the yearly negotiation plan
Knorr-Bremse Group
│5
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
CIP Supplier Workshop – Simple steps CIP I Value Stream Mapping
CIP II Value Stream Analysis
Value Stream Design
Value Stream Planning
Savings Implementation
Negotiation
€ The CIP I takes 1 week
The CIP II takes 1-4 weeks
A Value Stream Mapping (VSM) is
A Value Stream Design (VSD) is
performed
performed
Current Scenario, Value Stream Analysis (VSA), is evaluated with clear KPIs
Output
VSM is available Action list is defined
targets and measurable KPIs is agreed
Output
Points of improvement clear identified
Future Status Map (FSM) with clear
FSM is defined Improvement actions are verified
The implementation of quick wins takes 1-3 months
The full implementation of further actions takes 9-12 months
All the agreed measurable KPIs are compared and the improved values are clear
Output
Improvement actions implemented are fully quantified (e.g. time, money)
Based on the improved actions, the negotiation of savings is possible
Typical example of improved scenario, the working place is re-organized and improved, instead of 3 workers, only 1 worker is necessary Knorr-Bremse Group
│6
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Current state map & major highlights Current State
Highlights Improvable areas
Future State
Current State
Future State
Improvement
3 steps
2 steps
33 %
10,2 employees
8,1 employees
20 %
Total lead time in days (including raw material)
77 days
54 days
30 %
Internal lead time in days (excluding raw material)
32 days
6 days
80 %
Number of single process steps Number of employees
Knorr-Bremse Group
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
Egy gyakorlati példa – CIP workshop észrevétel
500000
40
400000
30
300000 20 200000 10
100000 0
0 2008
2009
2010
2011 Volumen
2012
2013
2014
2015
Ár
• 18% árcsökkentés 8 év alatt (átlagosan 2,25% / év) • A vásárolt volumen 730%-al nőtt ugyanezen 8 év alatt • A beszállító arra panaszkodik, hogy a gyártás veszteséges A beszállító nem adaptálta a folyamatát a megnövekedett igényekhez, ezért a termék veszteségessé vált Knorr-Bremse Group
Lean Beszállító fejlesztés tapasztalatai a Knorr Bremse-nél
2015 CIP Workshop eredmények
KPI
Result
Megtartott CIP workshopok
20
Potenciális megtakarítások összesen
1.300.000 €
Tényleges megtakarítások
725.000 €
Költség elkerülés
441.000 €
Átlagos megtakarítási arány termékenként
10%
Knorr-Bremse Group
│9
Köszönöm a figyelmet!
Knorr-Bremse Fékrendszerek Kft. Lantos Gábor Szegedi út 49. Kecskemét 6000
Knorr-Bremse Group
Telefon: +36 76 511-177 Fax: +36 76 511-213 Mobil: +36 20 421-8400 E-mail:
[email protected] Web: www.knorr-bremse.com
Lantos Gábor – 2013.04.17